ML16343A975
| ML16343A975 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/24/2016 |
| From: | Indiana Michigan Power Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16336A263 | List:
|
| References | |
| AEP-NRC-2016-42 | |
| Download: ML16343A975 (1) | |
Text
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
16.1 Table:14.1.2B-1 Page:
1 of 1 Unit 2 TIME SEQUENCE OF EVENTS (FULL VANTAGE 5 CORE)
Accident Event Time (sec)
Uncontrolled RCCA Bank Withdrawal At Full Power Case A: (high insertion rate max feedback)
Initiation of uncontrolled RCCA bank withdrawal at a high reactivity insertion rate (80 pcm/sec) 0 Power range high neutron flux high trip signal initiated 5.8 Rods begin to fall into core 6.3 Minimum DNBR occurs 6.4 Case B: (small insertion rate, max feedback)
Initiation of uncontrolled RCCA bank withdrawal at a small reactivity insertion rate (4 pcm/sec) 0 Overtemperature T reactor trip signal initiated 314.5 Minimum DNBR occurs 316.2 Rods begin to fall into core 316.5