ML16341D000
| ML16341D000 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 10/24/1979 |
| From: | Ballard R Office of Nuclear Reactor Regulation |
| To: | Kenneth Jones CALIFORNIA, STATE OF |
| References | |
| NUDOCS 7911050060 | |
| Download: ML16341D000 (22) | |
Text
Docket Nos. 50-275 and 323 Mr"..Ken'neth R." Jones Executive Officer California Hater -guality Control Board Central'Coast Region 1102 Laural Lane San Luis Obispo, CA 93401, DISTRIBUTION Dockets Environ)
TERA NRC PDR Local PDR NRR Reading EP-1 Reading GLear RBallard SKirslis MSlater
Dear ter. Jones:
As you are aware, the-Atomic Safety and Licensing Board (ASLB} issued a Partial Initial Decision relating to the Diablo Canyon Nuclear Plant, Units 1 and 2.
on June 13, 1978.
This-decision contained several environmental monitoring conditions which were not mentioned in the National Pollutant Discharge Elimination System (NPDES) permit (No. 76-11) issued by your board on, April 9,'1976.
These conditjions are listed in-the enclosure.
Subsequent.to the ASLB's partial decision. it was decided that NRC's responsi-,
bilities under,NEPA would be met, 'and duplication would be'avoided, if the cognizant'state agencies assumed regulatory responsibilitjgjfor preooperational and operational monitoring of water quality and aquatic'biota.
In connection with the environmental conditions in the enclosure, our staff made several
-phone calls to the staffs of your board, of the California Department of Fish and Game, and of Pacific Gas, and Electric Company.
From these'phone calls we learned that each of the programs or studies listed, in the enclosure is being carried out either by the California Department of Fish and Game or by consultants to, Pacific Gas and Electric Company.,
So. Chat we may be able to'ocument that our. responsibilities under,NEPA have been met,'we would appreciate receiving a brief writtan discription of'ach of these programs.-
To* avoid
" impacti~g the licensing process for Diablo Canyon, it would be helpful for us Co receive this information at an early date.
He shall request Pacific Gas and Electric Company to include in its annual report to the NRC a report on the results of these studies.
If you require any further information from us regarding the items in the enclosure, please contact Dr. S. S. Kirslis at (301) 492-8426.
Sincerely,
~@9
'g 911 050 ~
Qd gp.(<~ ~
orr(cs~
OtlsNAM4&
OAV4~
p-1 fs:mh
~ ~ ~ 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
. DSE-ESB GLear Q 10/Pt/79 EP,-,l, Enyft LBa 1 I ardDivis "1'0'/
/'7'9" 'aTI'd nmental Pro) cts Branch 1
on of Site S fety Environmenta -Analysis---
~ ~
~ I ~ ~ ~ \\ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Ãac rem sea y-g NRaa OWO ua oovsssacstn rswtiso orricsl sore - aeI -vs@
l
Hr. Kenneth R. Jones oo 2 0
cc:
Mr. Gary Tidrick Pacific Gas and Electric Company Room 2676 77 Beale Street San Francisco, CA 94106 Mr. Daniel M. Gotshall California Department'of Fish and Game P. 0. Box 98 Avila Beach, CA 93424, orrlca~
OIINNAMaW t OATa~
~ P ~
~ ~ ~ ~ ~ ~ ~
~ ~
~
~ 0
~
I ~
~ I ~
~ ~
~
~ ~
~ I
~ ~ ~ ~ ~ ~ ~ ~
~
~ ~
~
I ~ ~ ~ ~
~
~ ~
~ ~
~
~
i i ~
~ ~
~ ~ ~
KZtC POR5f, 318 (9 76)
NEOISM OMQ 0 UeD OOVONNMONT DNINTINOOrrlcal I ~ TD DDD
'lD~
L I
> ~
gH
~
Encl osure Environmental Monitoring Requirements in the Partial Initial Decision for Diablo Canyon not Covered in the NPDES Permit.
l.
A study to determine the concentrations of small fish and of the eggs and larvae of marine organisms in the intake cove.
From these data, the impact of impingement and entrainment on these biota may be estimated.
2.
A study of fish impingement on the travelling screen. of the intake structure.
3.
A study to monitor the size of kelp canopies-and abalone populations in the Diablo Cove area for three years from the start of commercial operation of the first unit of the Diablo Canyon plant.
4.
A study of ocean currents in the intake and discharge areas starting at least one year before operation and continuing for one year after full-power operation of both units.
5.
A study of thermal plumes near the discharge for one year after full-power operation of, both units to determine compliance with state requirements.
Also a study of far-field effects to determine the extent of re-circulation.
The latter study would use both dye and thermal measurements.
0 0'
I I'
/
~
g H
P
Doc etN 60-272 60-311 UNITED STATES NUCLEAR REGULATORY COMMISSION
'ASHINGTON, O.C. 20555 June 15, 1979 E ATTAC ED LIST subject:
PtjBLIC SERHCE ELECTRIC AND GAS COj'(PANY Salem, Units 1 and 2 The following documents concerning our review of the subject facility are transmitted I'r your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No., dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating'License.
Cl Application and Safety Analysis Report, Vol.
Amendment No.
to ApplicationiSAR, dated Construction Permit No. CPPR-
, dated Facility Operating License No. DPR-
, NPF-
, dated AmendmentNo.
to CPPR-or DRR-, dated ent e
t o
flit Set a e Treatment Office of Nuclear Reactor Regulation
Enclosures:
As stated CC; OFFICE ~
SURNAMEi OATE NRC 21 (6 76)
1 1
1
~
~ ~ 1 1
1 11 p
- 1 1
1
~ 1
~
1 1'%C-
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> O.C. 20555 June 15, 1979 Docket N.90-272 50-311 SE ATTACHED ST
Subject:
PUBLIC SERVICE ELECTRIC AND GAS COHPANY
- Salem, 1 and 2 The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safely Evaluation, or Supplement No., dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of'ssuance of Facility Operating License.
Application and Safety Analysis Report, Vol.
Amendment No.
to Application/SAR, dated Construction Permit No. CPPR-Facility Operating License No. DPR-dated
, NPF-
, dated AmendmentNo.
to CPPR-or DRR-, dated Other:
Office of Nuclear Reactor Regulation
Enclosures:
As stated CC:
OFFICE %
SURNAMEi OArE NRC 21 I6<<76)
0 ll lr t,l.t
<<,u r
[
-c ll W
'w<< 'a
Docket
- o. 50-272 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555 fauna 16, 1979 SEE NTACHED UST
Subject:
PUBLIC SERVICE ELECTRIC AN9 GAS CONPAtF Sa1em, Unit 1 The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No.. dated 0
Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
CI Application and Safety Analysis Report. Vol.
Amendment No.
to Application/SAR, dated Construction Permit No. CPPR-Facility Operating License No. DPR-
, dated
, NPF-
, dated AmendmentNo.
to CppR-or DRR-, dated Other:
Im fn ement V~ni& fn o
am e
t 24 79 Office of Nuclear Reactor Regulation
Enclosures:
As stated 4
CC:
OFFICE i SUIINAME Io OA1E NRC 21 I6 76)
0
~ gll I fl I
rm g ~
1 g
f' f8
~
~e llr~
4 l t ~
) '>', f ~g'>X~
4
'I I
rL A;tw g
> ',t
'> Iltl~,'%c Cy
~Pic y
1pz ilgA~r
UNITED STATES NUCLEAR REGULATORY COMMISSION INASHINGTONID.C. 20555 June l5, 'f979 Docket No.
50-272 50-3ll SEE ATTACHED LIST
Subject:
PUBLIC 'SERVICE ELECTRIC ND GAS COMPANY SaleIII, Un)ts l and Z
The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No., dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report', VOL Amendment No.
to Application/SAR, dated Construction Permit No. CPPR-Facility Operating License No. DPR-'ated
, NPF-
, dated Amendment No.
to CPPR-or DRR-, dated X
other 0 eratfn Re ort for Harch l979 Industrtal least(e Treatment Plant at Facilft Office of Nuclear Reactor Regulation
Enclosures:
As stated CC:
OFFICE. p SURNAME ~
OArs NRC 21 I6 76)
h
\\
~
I 1
l.
r C'-
1 II
%rz
UNITED STATES NUCLEAR REGULATORYCOMMISSION WASHINGTON> O.C. 20555 June 15, 1979 Docket N 60>>272 SEE ATTACHED LIST subject:
PUBLIC SERYICE ELECTRIC AND GAS COHPAQY
- Sa1em, Units 1 and 2
The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No., dated Notice of Hearing on Application for Construction Permit
, Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, VOL Amendment No.
to Application/SAR, dated Construction Permit No. CPPR-D Facility Operating License No. DPR-
. dated
, NPF-
, dated Amendment No.
to CPPR-or DRR-, dated Q
Other:
Industria1 Haste Treatment P1ant 0 eratin Re ort 9 9 Office of Nuclear Reactor Regulation
Enclosures:
As stated CC:
OFFICE y SURNAME y OATE NRC 21 16 761
<r I
I"
'I tr IIII I
~ r
(
a I
'I I ~
VI It It I
II I ~
I
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555 June 15, 1979 Docket No GQ-272 SEE ATTACHED LIST
Subject:
PUBLIC SERYICE ELECTRIC AND GAS COl'1PANY Salem Unit 1 The following documents concerning our review of the subject facility are transmitted for your information:
.- 0 Notice of Receipt of Application.
Draft/Final, Environmental Statement, dated P
Safety Evaluation, or Supplement No., dated Notice of Hearing on Application for Construction Permit.
Q Notice of Consideration of Issuance of Facility Operating License.
Q Application and Safety Analysis Report, UOL Amendment No.
to Application/SAR, dated Construction Permit No. CPPR-C]
Facility Operating License No. DPR-dated
, NPF-
, dated Amendment No.
to CppR-or DRR-, dated QX Other t'tonthl 0 eratin Re ort for A ril 1979 re
~e r
Office of Nuclear Reactor Regulation
Enclosures:
As stated CC:
OFFICE p SURNAME Ia OArE NRC 21 I6 76)
'I P
P f
~
h
UNITED STATES NUCLEAR REGULATORYCOMMISSION WASHINGTON> O.C. 20555 June 15, 'l979 Docket
- o. 50-2 11 SEE ATTACHED LIST
Subject:
PUBLIC SERVICE ELECTRlC AND GSS COMPANY
- Salem, Units 1 and 2
The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No., dated Notice of Hearing on Application for Construction Permit Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Vol.
Amendment No.
to Application/SAR. dated Construction Permit No. CPPR-dated Facility Operating License No. DPR-
, NPF-
, dated Amendment No.
to CPPR-or DRR-, dated X
Other:
Office of Nuclear Reactor Regulation
Enclosures:
As stated CC:
OFFICE R SURNAME R DATE NRC-21 I6 76I
U k
j
,~'
I I
lg
~ A)B
+
~
f
~ ~
1 Ml
'J 1
1tf H
lb r
1 S
\\ I t
~
l II
UNITED STATES NUCLEAR REGULATORYCOMMISSION WASHINGTON, D.C. 20555 tune 15, 1979 Docket No.60-311 SEE ATTACHED LIST subject'UBLIC SERYICE ELECTRIC AND GAS COHPANY
- Sa1em, Units 1 and 2
The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No., dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Vol.
Amendment No.
to Application/SAR, dated Construction Permit No. CPPR-Facility Operating License No. DPR-Amendment No.
to CPPR-K]
Other:
dated
, NPF-
, dated or DRR-, dated e
i1 19 9 Office of Nuclear Reactor Regulation
Enclosures:
As stated CC:
OFFICE i SURNAME y OATE NRC 2I (6 76I
4 f
~
g ~
I