ML16341B911
| ML16341B911 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/23/1983 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Ahearne J, Gilinsky V, Palladino N NRC COMMISSION (OCM) |
| Shared Package | |
| ML16341B912 | List: |
| References | |
| TASK-AS, TASK-BN83-022, TASK-BN83-22 BN-83-022, BN-83-22, NUDOCS 8303040645 | |
| Download: ML16341B911 (8) | |
Text
Docket No.:
50-275 FEB 23 1983 MEMORANDUM FOR:
Chairman Palladino Commissioner Gilinsky Commissioner Ahearne
'ommissioner Roberts Commissioner Asselstine FROM:
SUBJECT:
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM FOR DIABLO CANYON, UNIT 1 (Board Notification No. 83-22)
OFFICE lI SURNAMElI In accordance with the present NRC procedures for Board Notifications, the following items are enclosed for information of the Commission:
1.
Letter from W. Cooper (TES) to G. A. Maneatis (PG&E) et al dated January 18, 1983 - "
Subject:
DCNPP-IDVP Additional Sample and Additional Verification - Phase II" 2.
Letter from W. Cooper (TES) to G. A. Maneatis (PG&E) et al dated January 18, 1983 - "
Subject:
IDVP Civil/Structural Efforts" 3.
R. F. Reedy,Inc.,
"Semi-monthly Report - Progress Report 23," no date 4.
Stone
& Webster Engineering Corporation, "ITR 34 - Verification of Diablo Canyon Report Efforts by Stone
& Webster Engineering Corporation," letter dated February 7.-1983 5.
Stone
& Mebster Engineering Corporation, SWEC February Semi-monthly
,i Report (Construction QA), letter DCS-275Q dated February 11, 1983 6.
Stone
& Webster Engineering Corporation, SWEC Semi-monthly Report, letter DCS-278 dated February 11, 1983 7.
Teledyne Engineering Services.
"IDVP Semi-monthly Report," letter dated February 11, '1983 8.
R. L. Cloud Associates, Open Item Reports, letter dated February 11, 1983 8303040645 830223 PDR ADGCK 05000275 PDR
Contact:
Hans scnierI-III', OfiRR
~ ~ ~ 0<< ~ ~ ~ ~ ~ ~ ~ << ~ <<<< ~ << ~ ~ ~ << ~ 0 DATE Q NRG FORM 318 (10-80) NRCM 0240
~ ~ << ~ ~ ~ ~ ~ ~
~<<<< ~ << ~ << ~
OFFlCIAL RECORD COPY
~ ~ ~ ~ ~ << ~ << ~ ~ <<<<<<<< ~ ~ ~ ~ << ~ ~ ~ << ~
USGPO: 1981~8.960
I f
The Commission 9.
NRC Memorandum, M. Hartzman to R. Bosnak dated February 14, 1983-
Subject:
Trip Report - Meeting with RLCA on January 26, 1983 in Berkeley, California."
10.
Transcript of NRC Meeting with BNL, PG&E and IDVP on February 15, 1983, "
Subject:
Status of BNL Studies,"
- Bethesda, Maryland 11.
NRC Memorandum, H. Polk and H. Schierling to G. Lear and G. Knighton dated February 18, 1983 - Subje'ct:
Trip 'Report - Meeting of Diablo Canyon Project with IDVP on Containment Annulus Steel Structure and Auxiliary Building Floor and Hall Loads, February,~g,
- 1983, San Francisco,
The enclosures provide information on the status of activities performed under the Independent Design Verification Program (IDVP) for Diablo Canyon Uni.t 1 by the participating organizations and by the NRC staff.
The information is relevant to the 's'afety issue on the design adequacy of Diab1oj Canyon Unit 1.
This is the subject of Commission Order CLI-81-30 which is the basis for the IDVP.
The material does not pertain to those. matters that were raised by ALAB-644.
Enclosures:
As stated rigina ly3gaed bi:
ub~ MQe
~ Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation cc:
J.
F. Wolf, ASLB G. 0. Bright, ASLB J. Kline, ASLB T. S. Moore, ASLAB W.
R. Johnson, ASLAB J.
H. Buck, ASLAB SECY OGC OPE Distribution:
See attached sheet OFFICEI SURNAME/
DATEP DL:LB¹3
~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~
Schi.'erl'i'n 2/ tW /83
~ ~ ~ ~ ~ o$o ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
D J'/
¹3
~ ~ 0 ~ ~ ~ ~ ~I~ 0 ~
~
/83 DL'
~ ~ ~
~ ~ ~
~
~ ~ ~ ~ ~ ~ ~ ~ ~
GK n
~ I ~ ~ ~ ~ 0 ~ 0
~ ~ ~ 0 ~ 0 ~ ~ ~ ~ ~ ~ ~ ~
2/ A /83
~ ~ ~ ~ ~
~ ~ 0TI ~ 0 ~ ~ ~ ~i~ ~ ~ ~
D:L
~
~ ~
0 ~ 0 ~
~ ~ ~
TN 2/
/83 L'enhut
- ./..>5/93...
NRG FOAM 318 (10-80) NRCM 0240 OFFlCIAL RECORD COPY USQPO: 1981-33&990
I
~ I SERVICE LIST FOR BOARD NOTIFICATION Diablo Canyon, Units I 8
2 Docket Nos. 50-275/50-323 OL Ms. Elizabeth Apfelberg Mr. Richard E. Blankenburg Mr. Herbert H.
Brown Dr. William E.
Cooper Philip A. Crane, Jr.,
Esq.
Mr. Frederick Eissler David S. Fleischaker, Esq.
Mrs.
Raye Fleming Arthur C. Gehr, Esq.
Mr. Mark Gottlieb Mr. Thomas H. Harris Mr. Richard B. Hubbard Janice E. Kerr, Esq.
Mr. John Marrs Bruce Norton, Esq.
Joel R. Reynolds, Esq.
Mr. James
- 0. Schuyler Mr. Gordon Silver Michael J.
Strumwasser, Esq.
Paul C. Valentine, Esq.
Harry M. Willis Advisory Committee on Reactor Safeguards Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board Panel Docketing and Service Section
DISTRIBUTION BOARD NOTIFICATION DIABLO CANYON 8%22
- Cy of BN w/enclosure ocument Control (50-275)*
NRC PDR Local PDR PRC System NSIC LB83 Reading File G. Knighton
'. Schierling J.
Lee T. Novak M. Stine D. Eisenhut/R.
Purple M. Williams H. Denton/E.
Case PPAS J.
Youngblood A. Schwencer ED Adensam C.
Thomas R. Vollmer H. Thompson R. Mattson S.
Hanauer L. Chandler, ELD*
E. Jordan, IE J. Taylor, IE Regional Administrator Resident Inspector W. Dircks, EDO (3)
E. Christenbury, ELD J. Scinto, ELD A. Bennette (1)*'.
Black cc:
Board Service List Document Management Branch Document Control Desk Room 016, Phillips Building
'I 0 b'