ML16341B894
| ML16341B894 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 12/28/1982 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Crane P PACIFIC GAS & ELECTRIC CO. |
| References | |
| NUDOCS 8301130182 | |
| Download: ML16341B894 (8) | |
Text
4
~zoo j
I
~"
OF.O 3 S 198K wee.Zi I
istribution:
Document Control..50-275/323'RC PDR L PDR NSIC PRC System Docket Nos.:
50-275 and 50-323 Philip A. Crane, Jr.,
Esq.
Pacific Gas and Electric Company Post Office Box 7442 San Francisco, California 94120
Dear Hr. Crane:
LB3 Reading File DEisenhut/RPurple TMNovak GKnighton HSchierling JLee
- JTaylor, IE
On December 9,
1982 the Commission discussed (1) the staff recommendations regarding Phase II of the Diablo Canyon design verification program as contained in the staff report SECY 82-414 and (2) your proposal for a
three step licensing process as described in your letter to me of December 3, 1982.
The Commission approved (1) the Phase II Program Plan of June 18, 1982, including the proposed IDVP contractors, as modified by the staff in Enclosure 11 to SECY 82-414 and (2) the redirection and completion requirements of Phase I and Phase II contained in Figure 3 of SECY 82-414 as modified by your Figure 1 of your December 3, 1982 letter.
As discussed by the staff at the Comnission meeting we do not anticipate any difficulties in utilizing the two step licensing approach in our evaluation of matters necessary for reinstatement of. the suspended license for Diablo Canyon Unit 1 (i1.e., (1) fuel loading and cold system testing and (2) criticality and low power testing) prior to the third step of issuance of a full power license.
He intend to discuss these matters with you at a meeting in San Francisco during the week of January 10, 1983.
Sincerely, QrlSfna1
~u Darren G.
Darrell G. Eisenhut, Director Division of Licensing cc:
See next page 830if30182 821228 PDR ADOCK 05000275 P
- See previous concurrence/initials DL:LBII3 OFFICE/
SURNAME/ Schierling:p
~ ~
12/22/82 DATE0 NRC FORM 318 (10-80) NRCM 0240 DL:LBP3
- GKnighton 12/2%82 OELD
- LChandler 12/27LSX DL:AD:L
~TNovak
.12J22JBz.......
DL:D D
huts
~ ~ ~ ~ ~ ~ ~ ~
~ ~ 0 ~ ~ 0 ~ ~
.is~.isa....
OFFICIAL RECORD COPY
~ ~ ~ ~
~ ~ ~
~ ~ ~ ~ ~
~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
~ 0 ~ ~ I~ ~
)'SGPO:
198)~MO
A=K '
DISTRIBUTION:
Document Control 50-275/323 NRC PDR L PDR NSIC PRC System Docket Nos.:
50-275 and 50-323 He intend to discuss hese matters with you at a meeting in San Francisco during the week of anuary 10. 1983.
Sincerely, LB83 Reading DEisenhut/RPurple TMNovak Philip A. Crane, Jr.,
Esq.
GKnighton Pacific Gas and Electric Company HSchierling Post Office Box 7442 JLee San Francisco, California 94120
- JTaylor, IE
- EJordon,
Dear M. Crane:
LChandle OELD ACRS
)
On December 9, 1982 the Commission discussed
(
the staff recommendations regarding Phase II of the Diablo Canyon desi verification program as contained in the staff report SECY 82-414 a
(2) your proposal for a three step licensing process as described n your letter to me of December 3, 1982.
The Commission approved (1) the P ase II )rogram.Plan of June 18, 1982,
-including the proposed IDVP contractor
, as modified by the staff in Enclosure ll to SECY 82-414 and (2).,the redirec on and completion requirements of Phase I and Phase II contained in Figure of SECY 82-414 as modified by your Figure 1 of your December 3, 1982 etter.
As discussed by the staff at t e Commission meeting we do not anticipate any difficulties in utilizing th two step licensing approach for re instatement of the suspended license f Diablo Canyon Unit 1 (i.e.,
) fue loading and cold system testing a d (2) criticality and low power testing) prior to the third step of is ance of a full power license.
cc.
See next page Darrell G. Eisenhut, Director Division of Licensing OFFICE/
SURNAME/
DATE Q DL:LBg3
~ ~ ~
~
~ ~ ~ ~ ~
~
~
Sch ierl ing/p
'i2'jgjj8'2""""
DL:
~ ~
~
on 12/jP/82
~ ~ ~ ~
~
~I~ ~ ~
~
~ 0
~
TMN ya
~
~ ~ ~ ~
~ 0 ~ 0 ~ ~ 1 ~ 0 12/
82 DL:DIR
~
~ 0 ~ 0 ~
~
~
~
~ SO ~
DGEipyflh 12/
/82 OEL LChandler
~
~
~ ~
~ ~ IJ ~ ~ 0 ~ 0 ~ 0 ~ ~ ~ 0 ~ 0 1 2/$ l/82 NRC FORM 318 (10-80) NRCM 0240 OFFlClAL RECORD COPY USOPO; 1981~5-960
~
A Ds'l'!
~
y II gCyP\\
~,,
II
~i' I
Diablo Canyon Mr. Malcolm H. Furbush Vice President - General Counsel Pacific Gas 5 Electric Company P. 0.
Box 7442 San Francisco, California 94120 CC:
Philip A. Crane, Jr.,
Esq.
Pacific Gas 5 Electric Company P. 0.
Box 7442 San Francisco, California 94120 Janice E. Kerr, Esq.
California Public Utilities Commission 350 McAllister Street San Francisco, California 94102 Mr. Frederick Eissl er, Presi dent Scenic Shoreline Preservation Conference, Inc.
4623 More Mesa Drive Santa Barbara, California 93105 Ms. Elizabeth Apfelberg 1415 Cozadero San Luis Obispo, CA 93401 Mr. Gordon A. Silver Ms. Sandra A. Silver 1760 Alisal Street San Luis Obispo, CA 93401 Harry M. Willis, Esq.
Seymour 5 Willis 601 California Street, Suite 2100 San Francisco, CA 94108 Mr. Richard Hubbard MHB Technical Associates Suite K
1725 Hamilton Avenue San Jose, CA 96125 Mr. John Marrs, Managing Editor San Luis Obispo County Telegram Tribune 1321 Johnson Avenue P.
O.Box 112 San Luis Obispo, CA 93406 Resident Inspector/Diablo Canyon NPS c/o U. S. Nuclear Regulatory Coranission P. 0.
Box 369 Avila Beach, California 93424 Ms.
Raye Fleming 1920 Mattie Road SheTl Beach, California 93440 Joel
- Reynolds, Esq.
John R. Phillips, Esq.
Center for Law in the Public Interest 10951 West Pico Boulevard, Third Floor Los Angeles, California 90064 Paul C. Valentine, Esq.
321 Lytton Avenue Palo Alto, California 94302 Mr. Byron S. Georgiou Legal Affairs Secretary Governor's Office State Capitol Sacramento, California 95814 Herbert H. Brown, Esq.
Hill, Christopher 8 Phillips, P.C.
1900 M Street,. N.W.
Washington,'.
C.
20036 Mr. Dick Blankenburg Editor 5 Co-Publisher South County Publishing Company P. 0.
Box 460 Arroyo Grande, California 93420 Mr. James
- 0. Schuyler Vice President - Nuclear Generation Department Pacific Gas 8 Electric Company P. 0.
Box 7442 San Francisco, California 94120
0 1
4
.Mr. Malcolm H. Furbush l
Bruce Norton, Esq.
Suite 202
.<.3216 North 3rd Street Phoenix, Arizona 85012 Mr. W. C. Gangloff "'"--.'.
'estinghouse Electric Corporation P. 0.
Box 355 Pittsburg, Pennsylvania 15230 David F. Fleischaker, Esq.
P. 0.
Box 1178 Oklahoma City, Oklahoma 73101 Arthur C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center
- Phoenix, Arizona 85073 Mr. Owen H. Davis, Director Federal Agency Relations Pacific Gas and Electric Company 1050 17th Street, N.W.
Suite 1180 Washington, D. C.
20036 Regional Administrator Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Dr. Jose Roesset 3506. Duval Road Austin, Texas 78759 P
Diablo Canyon
E
~I t