Letter Sequence Other |
|---|
|
|
MONTHYEARCNL-16-136, Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ00000020160000412016-09-20020 September 2016 Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041 Project stage: Request ML16265A3172016-09-21021 September 2016 NRR E-mail Capture - (External_Sender) 09/23/2016 Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Post-Submittal Walk-Through - Slides Project stage: Request ML16299A0672016-10-25025 October 2016 NRR E-mail Capture - Accepted for Review - TVA Topical Report Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397 Project stage: Other ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 Project stage: Meeting ML17271A0162017-09-28028 September 2017 Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status Project stage: Request CNL-17-120, Status Regarding the Improved Flood Mitigation System Project2017-09-29029 September 2017 Status Regarding the Improved Flood Mitigation System Project Project stage: Request ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 Project stage: Meeting ML18057A6372018-02-23023 February 2018 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet Topical Report TVA-NPG-AWA16 - EPIC: L-2016-TOP-0011) Project stage: RAI CNL-18-048, Status Regarding the Improved Flood Mitigation System Project2018-04-0202 April 2018 Status Regarding the Improved Flood Mitigation System Project Project stage: Request CNL-18-044, Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation2018-04-19019 April 2018 Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation Project stage: Response to RAI CNL-18-081, Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 12018-06-22022 June 2018 Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 1 Project stage: Request CNL-18-122, Status Regarding the Improved Flood Mitigation System Project2018-09-28028 September 2018 Status Regarding the Improved Flood Mitigation System Project Project stage: Request ML18310A1782018-12-31031 December 2018 Draft Safety Evaluation for Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation CDQ00000016000041 Project stage: Draft Approval CNL-19-013, Comments on the Draft Safety Evaluation for Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation2019-01-11011 January 2019 Comments on the Draft Safety Evaluation for Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation Project stage: Draft Other ML19010A2122019-03-18018 March 2019 Final Safety Evaluation for Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation Project stage: Approval CNL-19-029, Status Regarding the Improved Flood Mitigation System Project2019-03-29029 March 2019 Status Regarding the Improved Flood Mitigation System Project Project stage: Request ML19158A3952019-07-0303 July 2019 Verification Letter of the Approval Version of Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation CDQ0000002016000041, Rev. 1 Project stage: Other CNL-19-094, Status Regarding the Improved Flood Mitigation System Project2019-09-30030 September 2019 Status Regarding the Improved Flood Mitigation System Project Project stage: Other 2018-02-23
[Table View] |
NRR E-mail Capture - Accepted for Review - TVA Topical Report Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397| ML16299A067 |
| Person / Time |
|---|
| Site: |
Browns Ferry, Watts Bar, Sequoyah  |
|---|
| Issue date: |
10/25/2016 |
|---|
| From: |
Andrew Hon Plant Licensing Branch II |
|---|
| To: |
James Shea, Thompson R Tennessee Valley Authority |
|---|
| References |
|---|
| MF8391, MF8392, MF8393, MF8394, MF8395, MF8396, MF8397 |
| Download: ML16299A067 (2) |
|
Text
1 NRR-PMDAPEm Resource From:
Hon, Andrew Sent:
Tuesday, October 25, 2016 8:25 AM To:
Shea, Joseph W; Thompson, Russell R Cc:
Dion, Jeanne
Subject:
Accepted for Review - TVA Topical Report Overall Basin probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF 8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397 By letter dated September 20, 2016 (ADAMS NO. ML16264A454), TVA submitted the subject fleet topical report for Browns Ferry Units 1,2 and 3, Sequoyah Units 1 and 2 and Watts Bar Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Andy Hon, PE Project Manager (Sequoyah Nuclear Plant)
Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN 08H19 Mail Stop O8G-9a andrew.hon@nrc.gov
Hearing Identifier:
NRR_PMDA Email Number:
3121 Mail Envelope Properties (Andrew.Hon@nrc.gov20161025082400)
Subject:
Accepted for Review - TVA Topical Report Overall Basin probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF 8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397 Sent Date:
10/25/2016 8:24:30 AM Received Date:
10/25/2016 8:24:00 AM From:
Hon, Andrew Created By:
Andrew.Hon@nrc.gov Recipients:
"Dion, Jeanne" <Jeanne.Dion@nrc.gov>
Tracking Status: None "Shea, Joseph W" <jwshea@tva.gov>
Tracking Status: None "Thompson, Russell R" <rrthompson@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1830 10/25/2016 8:24:00 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: