ML16182A514
| ML16182A514 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 06/30/2016 |
| From: | Eric Duncan Region 3 Branch 3 |
| To: | Entergy Nuclear Operations |
| References | |
| Download: ML16182A514 (13) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 30, 2016 LICENSEE:
Entergy Nuclear Operations, Inc.
FACILITY:
Palisades Nuclear Plant
SUBJECT:
SUMMARY
OF THE JUNE 23, 2016, PUBLIC MEETING REGARDING PALISADES NUCLEAR PLANT On June 23, 2016, the NRC held a public meeting to discuss the 2015 annual assessment results for Palisades Nuclear Plant. The meeting was held at the Beach Haven Event Center in South Haven, Michigan. The enclosure is a list of attendees for the meeting. The copies of the slides used by the NRC staff during the meeting are located in ADAMS (ML16167A372).
The first part of the meeting was conducted as an open house poster session in which members of the public could ask questions about NRC inspection activities and Palisades plant performance to NRC representatives. The second part of the meeting started with the NRC providing an overview of the reactor oversight process and the results of the 2015 annual assessment for Palisades Nuclear Plant. The third part of the meeting was a town hall discussion where the NRC listened to comments and answered questions from the public.
/RA/__________________
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-255;72-007 License No. DPR-20
Enclosure:
Meeting Attendees cc: Distribution via LISTSERV
June 30, 2016 LICENSEE:
Entergy Nuclear Operations, Inc.
FACILITY:
Palisades Nuclear Plant
SUBJECT:
SUMMARY
OF THE JUNE 23, 2016, PUBLIC MEETING REGARDING PALISADES NUCLEAR PLANT On June 23, 2016, the NRC held a public meeting to discuss the 2015 annual assessment results for Palisades Nuclear Plant. The meeting was held at the Beach Haven Event Center in South Haven, Michigan. The enclosure is a list of attendees for the meeting. The copies of the slides used by the NRC staff during the meeting are located in ADAMS (MLML16167A372).
The first part of the meeting was conducted as an open house poster session in which members of the public could ask questions about NRC inspection activities and Palisades plant performance to NRC representatives. The second part of the meeting started with the NRC providing an overview of the reactor oversight process and the results of the 2015 annual assessment for Palisades Nuclear Plant. The third part of the meeting was a town hall discussion where the NRC listened to comments and answered questions from the public.
/RA/
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-255;72-007 License No. DPR-20
Enclosure:
Meeting Attendees cc: Distribution via LISTSERV DISTRIBUTION:
See next page ADAMS Accession Number: ML16182A514 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII NAME CHunt:bw EDuncan DATE 06/30/2016 06/30/2016 OFFICIAL RECORD COPY
Memorandum from Eric R. Duncan dated June 30, 2016
SUBJECT:
SUMMARY
OF THE JUNE 23, 2016, PUBLIC MEETING REGARDING PALISADES NUCLEAR PLANT DISTRIBUTION:
Jeremy Bowen RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII ROPassessment.Resource@nrc.gov
Palisades Nuclear Plant 2015 Annual Assessment Meetl
.L Enclosure
Palisades Nuclear Plant 2015 Annual Assessment q
Srrfar \\
A4t t4
- a3o T,)
J¿
¿l+r¿
(
2
Palisades Nuclear Plant 2015 AnnualAsseesme
-1^
n 7
ç N\\^ n,, r.,^ I\\,t "{.(.,,, ",L' 1,Çgapp--
r (uu", Gøu..yt, n,¿/fA
\\ 4e,a ^t frt-e P t/,k l(t,4u% øç.il hr¿l f nru
\\¿r,r '/
la
&t( "r'//
3 I
Palisades Nuclear Plant 2015 AnnualAssess M
l
,J' ).,
t ttjboo a I l.l.s.N l( l U. S. Nuclear Regulatory' Ccmmission 4
Palisades Nuclear Plant 2015 Annual Aesessment c
L l
5
Palisades Nuclear Plant 2015 Annual Assessment
(
[\\cL<,ç V-
,'rlr4 Aj Kuz<-t L
tth 8e¿ zLi c¿ ¿ u&'
É"1t"'
\\
, *ltlS.Nll(;
'\\-,.,.,
U. S. Nuclear Regulatory C,cmmiss,on 6
Palisades Nuclear Plant 2015 Annual Assessment
, 'fl4 E.L.A Lv,
\\
Ct\\
(nrt
¿ko
('
ffi¿.'a,r*rJ N"td Ns{zr-tû (r\\.
c t\\
ti
(
/
lrv'\\
'C', rr e tJ.s.N tt(l U.S. Nuclear Regulatory Commiss,on c
ou
/or I.D",Jq /8
/c, 7
/,1 s oy'c
Palisades N clea 201 nual Assessmen u
r la P
nt 5 An t
toa\\s
(- L lA
\\AJ
\\e\\\\
/o lr,A^ -./
.4
'â 4
V.
fWrkt erf U: N RC U. S. Nuclear Regulator.y Commission r Çí I
Palisades Nuclear Plant 2015 Annual Asgesgment M Lou v
Ar f¿_
I b
I ta Vân\\¿r-+-
)
lnq.l,ow tJ.s.N lt(l U.S. Nuclear Regulatory Commission
\\,,,,.,,.,
r.-
I
Palisades Nuclear Plant 2015 AnnualAsegsme M
{ A.^u-'
.U
(-c',to*--,
^ n,^o\\91^,,)*
'R.t,ç L
i/A"û."nI rn.-^,,,-.1 Ya L,^ {ç'u'i 7
' /rl
' --)
' ( te.>.,
9/-uo",-,
\\:s
á4
(^o^.-
+
Ttrt(
./
Pq,^l l
, - r Ll.s.Nll(l U. S. Nuclear Regulatory, Commission 10