UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 September 21, 2015

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 -

SUMMARY

OF SITE AUDIT TO SUPPORT THE REVIEW OF THE LICENSE AMENDMENT REQUEST TO TRANSITION TO THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 FIRE PROTECTION LICENSING BASIS (TAC. NO. MF2993, MF2994)

Dear Mr. Hanson:

The purpose of this summary is to document the results of an audit performed at Calvert Cliffs Nuclear Power Plant Unit Nos. 1 and 2 (CCNPP) associated with the National Fire Protection Association Standard 805 (NFPA 805) license amendment request (LAR) dated September 24, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos.

ML13301A673 and ML13301A674), as supplemented by letters dated February 9, 2015 (ADAMS Accession No. ML15043A249), March 11, 2015 (ADAMS Accession No. ML15075A110), and April 13, 2015 (ADAMS Accession No. ML15107A029).

A review team, consisting of U.S. Nuclear Regulatory Commission (NRC) staff and contractors from the Pacific Northwest National Laboratory (PNNL), and the Center for Nuclear Waste Regulatory Analyses (CNWRA) conducted a regulatory audit of the Constellation Energy Nuclear Group (CENG) CCNPP. The regulatory audit took place at the plant site located in Lusby, Maryland from December 8 - 11, 2014. The regulatory audit supports the review of the LAR filed by CENG 1 to transition the plant's fire protection licensing basis to Title 10 of the Code of Federal Regulations (10 CFR) 50.48(c), which endorses with exceptions the NFPA 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," 2001 Edition.

The purpose of the audit was to gain an understanding of the information needed to support the staff's licensing decision regarding the LAR and to develop high quality requests for additional information (RAI), as needed. The information submitted in support of the Calvert Cliffs LAR is under final review, and any additional information needed to support the LAR review has been formally requested by the staff using the RAI process in accordance with Office of Nuclear Reactor Regulation Office Instruction LIC-101, "License Amendment Review Procedures."

1By Order dated March 24, 2014 (ADAMS Accession No. ML14105A472), the NRC staff ordered the direct transfer of operating authority from Calvert Cliffs, LLC (a subsidiary of CENG), to Exelon Generation, LLC.

The audit team consisted of 12 NRC staff members, 2 NRC contractors from PNNL, and 1 NRC contractor from CNWRA. Enclosure 1 provides the schedules of activities during the audit. lists personnel from the NRC, PNNL, CNWRA, and Exelon Generation, LLC (the licensee), and their contractors who participated in the audit.

The audit team held an entrance meeting on Monday, December 8, 2014, with the licensee's staff and contractors. During the remainder of the audit, team members participated in technical discussions based on their discipline according to the audit plan available in the ADAMS under Accession No. ML14336A256. Technical discussions were focused on five major areas: Fire Protection Engineering, Safe Shutdown/Circuit Analyses, Fire Probabilistic Risk Assessment, Fire Modeling, and programmatic review. The audit team participated in plant walk-downs, tours, and technical presentations focusing on these topical areas. contains a list of documents reviewed by the team. In addition, attendance lists for entrance and exit meetings are provided in Enclosure 4 and Enclosure 5. At the conclusion of the audit, the audit team participated in a summary exit meeting with the licensee on December 11, 2014. The NRC staff provided a brief conclusion of the team goals, objectives, walk-downs, and technical discussions.

If you have any questions regarding this matter, please contact me at (301) 415-2549.

Docket Nos. 50-317 and 50-318

Enclosures:

As stated cc w/encl: Distribution via Listserv Sincerely, Alexander N. Chereskin, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

REGULA TORY AUDIT

SUMMARY

REGARDING TRANSITION TO NFPA 805 LICENSE AMENDMENT REQUEST CALVERT CLIFFS NUCLEAR POWER PLANT. LLC.

EXELON GENERATION COMPANY, LLC CALVERT CLIFFS NUCLEAR POWER PLANT. UNIT NOS. 1 AND 2 DOCKET NOS. 50-317 AND 50-318 Schedule of Activities Monday, December 8, 2014 8:00 am 8:30 am 9:00 am 9:30 am 10:00 am 1 :00 pm 12:30 pm 4:00 pm 4:30 pm Arrive on site Audit team members established computer connections and setup wireless connections in the assigned conference room.

NRC team briefing All team members participate in a virtual tour - final walk-down areas were identified for the upcoming plant tour.

Entrance meeting in classroom 13 Breakout sessions initiated Technical Discussions Breakout Sessions continued: review and clarification of RAls, fire modeling (FM), radioactive release, safe shutdown analysis (SSA), fire probabilistic risk assessment (PRA), main control room abandonment (MCR), multiple spurious operations (MSO), recovery actions, non-power operations (NPO),

Nuclear Safety Capability Assessment (NSCA), fire protection engineering (FPE).

NRC team debrief Licensee wrap up Tuesday,December9,2014 8:00 am 10:00 am 1:30 pm 2:00 pm 4:00 pm 4:30 pm Plant tour - Tour preparation, safety briefing, break into tour groups, Radiation Protection breakout Fire Modeling I PRA /SSA breakout RAI Timelines NRC team debrief Licensee wrap up Wednesday, December 10, 2014 8:30 am Presentation - Modifications and Implementation Items 10:00 am Fire Modeling breakout, SSA breakout 12:30 MCR I self-induced station blackout, SSA and FM I PRA breakouts 2:30 Final RAI meetings 4:00 pm Final RAI closeouts for three groups

Thursday, December 11, 2014 9:00 am RAI closeouts completed 10:00 am PRA final RAI meeting 12:30 pm Audit Exit meeting

list of Participants U.S. Nuclear Regulatory Commission (NRC) Team

  • Alex Klein NRC Branch Chief Hossein Hamzehee NRC Branch Chief Leslie Fields NRC Audit Team Leader Harold Barrett NRC ORA/Quality Assurance (QA)

Pete Lee NRC FPE Bernard Litkett NRC SSA James Downs NRC Observer Charles Moulton NRC FM/FPE Todd Hilsmeier NRC Fire PRA Stephen Dinsmore NRC Fire PRA/QA Steven Garry NRC Radiological Release Richard Clement NRC Radiological Release Pacific Northwest National Laboratory (PNNL) Team Fleur de Peralta PNNL FPE/SSD

  • William Evans PNNL PRA Center for Nuclear Waste Regulatory Analyses (CNWRA) Team Jason Huczek CNWRA Fire Modeling Calvert Cliffs Response Team Pat Furia CCNPP Licensing Jim McQuighan NFPA 805 Project Manager Paul Darby NFPA 805 Engineer Jeff Stone Sr.

Engineering Manager-Risk Management Chris Dobry Fire Protection Frank Bazyk Manager-Operations Support Pat Pringle PRA Engineering Analyst Jim Landale Senior Staff Engineer-Risk Management Rob Cavedo Senior Staff Engineer-Risk Management Carl Turner Senior Engineer Gerard Gryczkowski Principle Engineer-Power Fuel Services Roland Courtney Supervisor Radiation Protection Bob Bleacher Operations Tech Writer Dwayne Robertson Simulator Coordinator Ryan Haley Fire Marshall Mark Graham PRA Consulting Engineer Jeff Quinn Consulting Engineer/SSA Ervin Lyson Senior Reactor Operator

  • Tim Huber Senior Reactor Operator Kiang Zee Consulting PRA Engineer Usama Farradj Consulting PRA Engineer Mark Wishart Consulting PRA Engineer Beth Meade Consulting Engineer/FM-FP Mark Schairer Consulting Engineer/FM-FP Steve Southard Consulting Engineer/FM-FP Industry Representatives Greg Kvamme Xcel Energy

List of Documents Reviewed during the audit

1. CO-FSS-004, Rev. 1, Detailed Fire Modeling Notebook
2. CO-FSS-005, Rev. 2, Structural Failure Analysis
3. CO-FSS-007, Rev. 1, MCR Abandonment
4. CO-FSS-008, Rev. 2, MCA [Multi-Compartment Analysis]
5. Product data sheet and installation instructions/details for plume impingement barrier (3M lnteramTM Endothermic Mat) used in Cable Spreading Rooms
6. 3M lnteram' Endothermic Data Sheet

Calvert Cliffs LIST OF MEETING ATTENDEES (Entrance)

Name Organization Leslie Fields NRC Jeff Stone Exelon Hossein Hamzehee NRC Rob Cavedo Exelon Doug Lauver Exelon Todd Hilsmeier NRC Ben Scott Exelon Todd Tierney Exelon Fleur de Peralta PNNL Mark Moore Exelon Tim Riti Exelon Bernard Litkett NRC Mark Flaherty Exelon Charles Moulton NRC Harry Barrett NRC Mitch Beckman Calvert Stephen Dinsmore NRC Kiang Zou Exelon Ken Robinson Exelon Usama Farrod Exelon Mark Wishart Exelon Jeff Quinn EPM Pat Pringle Exelon Jeff York Exelon James McQuighan Exelon Mark Schairer EPM Chris Doby Exelon Beth Meade EPM Steven Southard EPM Ryan Haley Exelon Pete Lee NRC Jason Huczek SWRI James Downs NRC

Calvert Cliffs LIST OF MEETING ATTENDEES (Exit)

Name Organization Mark Wishart Exelon Pat Pringle NRC Jeff Quinn EPM Frank Bazyk OPS Roland Courtney Exelon Stephen Dinsmore NRC Rob Cavedo Exelon Jim Landale PRP Gerard Gryzkowski Fuels Bernard Litkett NRC Harry Barrett NRC Todd Tierney Exelon Mark Flaherty Exelon Mack Moore Exelon Doug Lauvier Exelon Ken Robinson ENG Ben Scott ENG Tim Riti Work Mgmt Hossein Hamzehee NRC Alex Klein NRC Jeff Stone Exelon Fleur deParalta PNNL William Ivans PNNL Charles Moulton NRC Jason Huczek SWRI Beth Meade EPM Steve Southard EPM Mark Schairer EPM Ryan Haley OPS Paul Darby Exelon Susan Reichard Regional Assistance

ML15231A596

  • See dated memo OFFICE DORL/LPLl-1 /PM DORL/LPLl-1 /LA DRNAFPB/BC DRNAPLNBC DORL/LPLl-1 /BC NAME AChereskin KGoldstein AKlein*

SRosenberg*

BBeasley DATE 8/24/2015 8/24/2015 5/11/2015 5/11/2015 9/21/2015