ML14310A300

From kanterella
Jump to navigation Jump to search
Ltr 11/5/14 Duane Arnold Confirmation of Initial Exam
ML14310A300
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 11/05/2014
From: Hironori Peterson
Operations Branch III
To: Vehec T
NextEra Energy Duane Arnold
Raymond K. Walton
References
Download: ML14310A300 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 November 5, 2014 Mr. Thomas A. Vehec Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785

SUBJECT:

DUANE ARNOLD ENERGY CENTER CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Vehec:

During our onsite, in person conversation between, Mr. C. D Zoia, Chief Examiner and Mr. B.

Udell, Operations Training Instructor on October 27, 2014, arrangements were made for the administration of licensing examinations at the Duane Arnold Energy Center, during the weeks of April 6 and 13, 2015. In addition, the U. S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of March 16, 2015.

As agreed during the conversation, the NRC staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Furthermore, NRC will visit your facility the week of February 23, 2015, for a pre-onsite validation visit with the intent to develop the operating test.

Your staff has furnished the reference materials identified in Attachment 3 to ES-201 on October 30, 2014. We request that any additional personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the February 23, 2015. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

T. Vehec 2

Your staff should submit preliminary reactor operator and senior reactor operator license applications (e.g., Office of Management and Budget (OMB) Approval Number 3150-0090),

medical certifications (OMB Approval Number 3150-0024), and waiver requests (if any, OMB Approval Number 3150-0090) at least 30 days before the first examination date, so as to ensure a timely NRC review and evaluation process. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget Approval Number 3150-0018. The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to Infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, nor require an applicant to respond to a collection of information unless it displays a currently valid OMB Control Number.

In accordance with Title 10, Code of Federal Regulations (CFR) "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. B. Udell has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Chuck Zoia at 630-829-9863, or I can be reached at 630-829-9707.

Sincerely,

/RA by B. Palagi Acting For/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 cc: Distribution via LISTSERV

T. Vehec 2

Your staff should submit preliminary reactor operator and senior reactor operator license applications (e.g., Office of Management and Budget (OMB) Approval Number 3150-0090), medical certifications (OMB Approval Number 3150-0024), and waiver requests (if any, OMB Approval Number 3150-0090) at least 30 days before the first examination date, so as to ensure a timely NRC review and evaluation process. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget Approval Number 3150-0018. The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to Infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, nor require an applicant to respond to a collection of information unless it displays a currently valid OMB Control Number.

In accordance with Title 10, Code of Federal Regulations (CFR) "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. B. Udell has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Chuck Zoia at 630-829-9863, or I can be reached at 630-829-9707.

Sincerely,

/RA by B. Palagi Acting For/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 ccl: Distribution via LISTSERV DISTRIBUTION:

See next page DOCUMENT NAME: G:\\DRSIII\\DRSLtr 10 14 DAEC Confirmation of Exam CDZ.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS RIII:DRS RIII RIII NAME CZoia:ls HPeterson DATE 11/05/14 11/05/14 OFFICIAL RECORD COPY

Letter to Thomas Vehec from Hironori Peterson dated November 5, 2014.

SUBJECT:

DUANE ARNOLD ENERGY CENTER CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION:

John Jandovitz RidsNrrDorlLpl3-1 Resource RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Carmen Olteanu Scott Sloan