S' Entegy-Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 John A. Dent, Jr.
Site Vice President July 11, 2014 Attn: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 ISFSI Docket No. 72-1044 Notification of Intent to Apply Previously-Approved Quality Assurance Program to the On-site Independent Spent Fuel Storage Installation (ISFSI) at Pilgrim Nuclear Power Station Entergy Letter No. 2.13.087, Intention to Store Spent Fuel in an Independent Spent Fuel Storage Installation (ISFSI) at Pilgrim Nuclear Power Station Per 10 CFR 72.212, dated November 19, 2013
REFERENCE:
ENTERGY LETTER: 2.14.049
Dear Sir or Madam,
Pursuant to 10 CFR 72.140(d), Entergy hereby is providing notification of intent to apply its previously-approved Quality Assurance Program to the Pilgrim Nuclear Power Station (PNPS)
On-site,idependent Spent Fuel Storage Installation (ISFSI). Entergy notified the NRC its intent to install an ISFSI at PNPS via the referenced letter.
This letter does not make new regulatory commitments.
If you have any questions concerning the above subject matter, please contact Pilgrim Regulatory Assurance Manager, Mr. Joseph Lynch at (508) 830-8403.
Sincerely, o
A. Dent, Jr.
Site Vice President r
- C04 I..
Entergy Letter No 2.14.049 Page 2 of 2 cc:
Ms. Catherine Haney, Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Ms. Nadiyah Morgan, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North O-8C2A 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 NRC Senior Resident Inspector Pilgrim Nuclear Power Station
AEntergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 1.1.6 i t,
i ii i
i..
02 IP 000.480 o0004667999 JUL 15 2014 MAILED FROM ZIP CODE 02360 Attn: Document Control Desk Director of Spent Fuel Storage and Transportatio Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 205SS$0001