ML14178A076
| ML14178A076 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 02/01/1991 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Eury L Carolina Power & Light Co |
| Shared Package | |
| ML14178A077 | List: |
| References | |
| NUDOCS 9102130097 | |
| Download: ML14178A076 (3) | |
See also: IR 05000261/1990030
Text
FEB 0 11991
Docket No:
50-261
License No:
Carolina Power and Light Company
ATTN: Mr. Lynn W. Eury
Executive Vice President
Power Supply
P. -0.
Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/90-30)
This refers to the inspection conducted by L. W. Garner on December 11, 1990
January 10, 1991. The inspection included a review of activities authorized
for your H. B. Robinson facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).We are concerned about the violation because the procedure
in question failed to require characterization and documentation of the
condition of a residual heat removal check valve component which is known to be
associated with a potential valve failure mode.
In addition to the need for corrective action regarding the specific matters
identified in the enclosed Notice, we are concerned about the implementation
of your maintenance procedure upgrade program that permitted this situation to
develop. Consequently, your response should describe those particular actions
taken or planned to improve the effectiveness of your maintenance procedure
upgrade program.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
9102130097 910201
PDR ADOCK 05000261
G
/No v
Carolina Power and Light Company
2
FF8 011991
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to
the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosures:
2. NRC Inspection Report
cc w/encls:
C. R. Dietz, Manager
Robinson Nuclear Project Department
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
J. J. Sheppard, Plant General Manager
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
Heyward G. Shealy, Chief
Bureau of Radiological Health
Dept. of Health and Environmental
Control
2600 Bull Street
Columbia, SC 29201
(cc w/encls continued -
See page 3)
Carolina Power and Light Company
3
rCC 0 11991
(cc w/encls cont'd)
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Health & Natural Resources
P. 0. Box 27687
Raleigh, NC 27611-7687
McCuen Morrell, Chairman
Darlington County Board of Supervisors
County Courthouse
Darlington, SC 29535
Richard E. Jones, General Counsel
Carolina Power and Light Company
P. 0. Box 1551
Raleigh, NC 27602
H. A. Cole
Special Deputy Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC 27602
Robert Gruber
Executive Director
Public Staff -
NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
J. D. Kloosterman, Director
Regulatory Compliance
H. B. Robinson Steam
Electric Plant
P. 0. Box 790
Hartsville, SC 29550
,Veb
l /nc
1s:
'Document Control Desk
H. Christensen, RH
R. Lo, NRR
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 5, Box 413
Hartsville, SC 29550
R H
RII:DRP
a rol
HChristensen
1,/ / /91
0/1 /91