ML14178A076

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/90-30 on 901211-910110 & Notice of Violation.Response Should Describe Actions Taken or Planned to Improve Effectiveness of Maint Procedure Upgrade Program
ML14178A076
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/01/1991
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
Shared Package
ML14178A077 List:
References
NUDOCS 9102130097
Download: ML14178A076 (3)


See also: IR 05000261/1990030

Text

FEB 0 11991

Docket No:

50-261

License No:

DPR-23

Carolina Power and Light Company

ATTN: Mr. Lynn W. Eury

Executive Vice President

Power Supply

P. -0.

Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-261/90-30)

This refers to the inspection conducted by L. W. Garner on December 11, 1990

January 10, 1991. The inspection included a review of activities authorized

for your H. B. Robinson facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed inspection report.

.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).We are concerned about the violation because the procedure

in question failed to require characterization and documentation of the

condition of a residual heat removal check valve component which is known to be

associated with a potential valve failure mode.

In addition to the need for corrective action regarding the specific matters

identified in the enclosed Notice, we are concerned about the implementation

of your maintenance procedure upgrade program that permitted this situation to

develop. Consequently, your response should describe those particular actions

taken or planned to improve the effectiveness of your maintenance procedure

upgrade program.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

9102130097 910201

PDR ADOCK 05000261

G

PDR

/No v

Carolina Power and Light Company

2

FF8 011991

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to

the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls:

C. R. Dietz, Manager

Robinson Nuclear Project Department

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

J. J. Sheppard, Plant General Manager

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

Heyward G. Shealy, Chief

Bureau of Radiological Health

Dept. of Health and Environmental

Control

2600 Bull Street

Columbia, SC 29201

(cc w/encls continued -

See page 3)

Carolina Power and Light Company

3

rCC 0 11991

(cc w/encls cont'd)

Dayne H. Brown, Director

Division of Radiation Protection

N. C. Department of Environment,

Health & Natural Resources

P. 0. Box 27687

Raleigh, NC 27611-7687

McCuen Morrell, Chairman

Darlington County Board of Supervisors

County Courthouse

Darlington, SC 29535

Richard E. Jones, General Counsel

Carolina Power and Light Company

P. 0. Box 1551

Raleigh, NC 27602

H. A. Cole

Special Deputy Attorney General

State of North Carolina

P. 0. Box 629

Raleigh, NC 27602

Robert Gruber

Executive Director

Public Staff -

NCUC

P. 0. Box 29520

Raleigh, NC 27626-0520

J. D. Kloosterman, Director

Regulatory Compliance

H. B. Robinson Steam

Electric Plant

P. 0. Box 790

Hartsville, SC 29550

,Veb

l /nc

1s:

'Document Control Desk

H. Christensen, RH

R. Lo, NRR

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 5, Box 413

Hartsville, SC 29550

R H

RII:DRP

a rol

HChristensen

1,/ / /91

0/1 /91