SEQUOYAH NUCLEAR PLANT 1311 NRC RO ADMIN A.1.a
1311 NRC RO ADMIN A.1.a Page 2 of 10 SRO JOB PERFORMANCE MEASURE Task:
Calculate Manual Makeup to the Volume Control Tank Task #:
0040250101 Task Standard:
Examinee calculates a manual make up to the VCT to raise level 10% of 260-261 gallons water and 39-40 gallons of boric acid.
Time Critical Task:
YES:
NO:
X K/A Reference/Ratings:
2.1.37 (4.6)
Method of Testing:
Simulated Performance:
Actual Performance:
X Evaluation Method:
Simulator In-Plant Classroom X
Main Control Room Mock-up Performer:
Trainee Name Evaluator:
/
Name / Signature DATE Performance Rating:
SAT:
UNSAT:
Validation Time:
22 minutes Total Time:
Performance Time:
Start Time:
Finish Time:
COMMENTS
1311 NRC RO ADMIN A.1.a Page 3 of 10 SPECIAL INSTRUCTIONS TO EVALUATOR:
- 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
Tools/Equipment/Procedures Needed:
- 1. Calculator
- 2. 0-SO-62-7, Boron Concentration Control.
- 3. TI-44, Boron Tables.
References:
Reference Title Rev No.
- 1.
0-SO-62-7 Boron Concentration Control 68
- 2.
TI-44 Boron Tables 12
========================================================================
Read to the examinee:
DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 2 is in MODE 1, 100%.
- 2. Reactor coolant system boron concentration is 967 ppm.
- 3. BAT boron concentration is 6820 ppm.
- 4. B-10 depletion value is 60 ppm
- 5. REACTF software is not available for boron calculations.
INITIATING CUES:
- 1. You are a Unit 2 RO and are to perform a calculation for a manual blended makeup to the Volume Control Tank level from 44% to 54% using 0-SO-62-7, Boron Concentration Control appendix C.
- 2. Notify the Examiner the results when complete.
1311 NRC RO ADMIN A.1.a Page 4 of 10 Start Time STEP 1
Obtain a copy of 0-SO-62-7 BORON CONCENTRATION CONTROL and TI-44 BORON TABLES SAT UNSAT Standard:
Examinee obtains a copy of 0-SO-62-7 BORON CONCENTRATION CONTROL and TI-44 BORON TABLES.
Cue Provide a copy of 0-SO-62-7 BORON CONCENTRATION CONTROL Appendix C and TI-44 BORON TABLES.
Comment STEP 2
- [1]
OBTAIN Current RCS Boric Acid Concentration.
SAT UNSAT Standard:
Examinee obtains the RCS Boric Acid Concentration of 967 ppm from the initial conditions Comment STEP 3
- [2]
OBTAIN Current BAT Boric Acid Concentration SAT UNSAT Standard:
Examinee obtains the BAT Boric Acid Concentration of 6820 ppm from the initial conditions Comment
1311 NRC RO ADMIN A.1.a Page 5 of 10 STEP 4
- [3]
OBTAIN B-10 depletion value from Rx Eng Information page SAT UNSAT Standard:
Examinee obtains the B-10 depletion value of 60 ppm from the initial conditions Comment Procedure Note:
STEP 5
- [4]
CALCULATE BAT Boric Acid Concentration Ratio (BACR): 6820 ppm Step [2] ppm = _______
SAT UNSAT Standard:
Examinee calculates BAT Boric Acid Concentration Ratio to be 1.0.
CRITICAL Comment Examiner Note:
Step 2 BAT Boric Acid Concentration of 6820 ppm was from the initial conditions.
1311 NRC RO ADMIN A.1.a Page 6 of 10 STEP 6
- [5]
CALCULATE B-10 corrected boron concentration:
_________ - ____________ = ____________
STEP [1]
STEP [3]
B-10 corrected boron SAT UNSAT Standard:
Examinee calculates B-10 corrected boron concentration to be 907 CRITICAL Comment Examiner Note:
Step 1 RCS Boric Acid Concentration of 967 ppm is from the initial conditions Examiner Note:
Step 2 B-10 depletion value of 60 ppm from the initial conditions STEP 7
- [6]
DETERMINE Corrected Boric Acid Flow Rate and Controller Setting using appropriate Table from TI-44 Appendix C.
[a] RECORD Corrected Boric Acid Flow Rate from TI-44 Appendix C Table 1.
SAT UNSAT Standard:
Examinee calculates the Corrected Boric Acid Flow Rate to be 10.62 (10 to 11)
CRITICAL Comment Examiner Note:
The Corrected Boric Acid Flow Rate of was determined by calculating the difference of two points TI-44 BORON TABLES Appendix C Page 3 of 10.
1311 NRC RO ADMIN A.1.a Page 7 of 10 STEP 8
- [6]
DETERMINE Corrected Boric Acid Flow Rate and Controller Setting using appropriate Table from TI-44 Appendix C.
[b] RECORD Corrected Boric Acid Controller Setting from TI-44 Appendix C Table 2.
SAT UNSAT Standard:
Examinee calculates the Corrected Boric Acid Controller Setting to be 21.2 (21)
CRITICAL Comment Examiner Note:
The Corrected Boric Acid Flow Rate of was determined by calculating the difference of two points TI-44 BORON TABLES Appendix C Page 8 of 10.
STEP 9
SAT UNSAT Standard:
Examinee calculates the Corrected Boric Acid Controller Setting to be 21.2 (21).
CRITICAL Comment Examiner Note:
The BACR from step 4 was determined to be 1.0
1311 NRC RO ADMIN A.1.a Page 8 of 10 STEP 10 SAT UNSAT Standard:
Examinee calculates the volume added to be added to the VCT to be 200 gal.
CRITICAL Comment Examiner Note:
The desired value of 54% and the actual value of 44% were given in the initial conditions.
STEP 11 SAT UNSAT Standard:
Examinee calculates the total flow rate to be 80.6 (80 to 81).
CRITICAL Comment Examiner Note:
The Corrected Boric Acid Flow Rate calculated in procedure step 6a was 10.91 (10.8-10.93). The BACR calculated in procedure step 4 was 1.0.
STEP 12 SAT UNSAT Standard:
Examinee calculates the Boric Acid Integrator setting to be 26.3 (26-27)
CRITICAL Comment
1311 NRC RO ADMIN A.1.a Page 9 of 10 STEP 13 SAT UNSAT Standard:
Examinee calculates the Primary Water Integrator setting to be 173.7 (173-175)
CRITICAL Comment Examiner Note:
The total flow rate calculated in procedure step 9 was 80.6. The total volume calculated in procedure step 8 was 200 gallons.
STEP 14 Calculation check: Step [10] results + Step [11] results should = Step [8]
results SAT UNSAT Standard:
Examinee verifies the calculation result Comment Terminating Cue:
The JPM is complete when the Examinee returns the JPM briefing sheet to the examiner.
STOP
- 1.
Stop Time
JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:
The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 2 is in MODE 1, 100%.
- 2. Reactor coolant system boron concentration is 967 ppm.
- 3. BAT boron concentration is 6820 ppm.
- 4. B-10 depletion value is 60 ppm
- 5. REACTF software is not available for boron calculations.
INITIATING CUES:
- 1. You are a Unit 2 RO and are to perform a calculation for a manual blended makeup to the Volume Control Tank level from 44% to 54% using 0-SO-62-7, Boron Concentration Control appendix C.
- 2. Notify the Examiner the results when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 1311 NRC SRO ADMIN A.1.a
1311 NRC JPM SRO A.1.a Page 2 of 6 SRO JOB PERFORMANCE MEASURE Task:
Report safety limit violations and reportable occurrences.
Task #:
3410130302 Task Standard:
The examinee determines the severity of the event as a Level 3 Minor Reactivity Management Event using NPG-SPP-10.4 Reactivity Management Program and that site operations management and duty plant manager are the required internal notifications using NPG-SPP-3.5.
Time Critical Task:
YES:
NO:
X K/A Reference/Ratings:
2.1.37 (4.3/4.6)
Method of Testing:
Simulated Performance:
Actual Performance:
X Evaluation Method:
Simulator In-Plant Classroom X
Main Control Room Mock-up Performer:
Trainee Name Evaluator:
/
Name / Signature DATE Performance Rating:
SAT:
UNSAT:
Validation Time:
15 min Total Time:
Performance Time:
Start Time:
Finish Time:
COMMENTS
1311 NRC JPM SRO A.1.a Page 3 of 6 SPECIAL INSTRUCTIONS TO EVALUATOR:
Tools/Equipment/Procedures Needed:
- 1. Non LAN connected computer
References:
Reference Title Rev No.
- 1.
NPG-SPP-3.5 Regulatory Reporting Requirements 46
- 2.
NPG-SPP-10.4 Reactivity Management Program 2
- 3.
1-SO-62-9 CVCS PURIFICATION SYSTEM 44
========================================================================
Read to the examinee:
DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1 at 100% power.
- 2. An improper operator action was made while placing a Mixed Bed Demineralizer in service, a transient occurred that resulted in a TAVG rise of 1.2 OF and a power rise of 0.6%.
- 3. The Mixed Bed Demineralizer was subsequently bypassed and plant conditions were stabilized below 100% using appropriate plant procedures.
INITIATING CUES:
- 1. You have been directed to determine all required action(s) and all required Shift Manager onsite notification(s), (if any).
- 2. Notify the Examiner the results when complete.
1311 NRC JPM SRO A.1.a Page 4 of 6 Start Time STEP 1
- Obtain a copy of NPG-SPP-3.5, Regulatory Reporting Requirements, NPG-SPP-10.4, Reactivity Management Program, and 1-SO-62-9, CVCS PURIFICATION SYSTEM.
SAT UNSAT Standard:
Copies of NPG-SPP-3.5, Regulatory Reporting Requirements, NPG-SPP-10.4, Reactivity Management Program, and 1-SO-62-9, CVCS PURIFICATION SYSTEM are obtained.
Cue Provide copies of NPG-SPP-3.5, Regulatory Reporting Requirements, NPG-SPP-10.4, Reactivity Management Program, and 1-SO-62-9, CVCS PURIFICATION SYSTEM.
Comment STEP 2
From 1-SO-62-9, CVCS PURIFICATION SYSTEM.
SAT UNSAT Standard:
The examinee determines an unanticipated TAVG change greater than
+/-1°F occurred and refers to NPG-SPP-10.4, Reactivity Management Program.
Critical Step Comment
1311 NRC JPM SRO A.1.a Page 5 of 6 STEP 3
From NPG-SPP-10.4, Reactivity Management Program SAT UNSAT Standard:
The examinee determines a Significance Level 3: Minor Reactivity Management Events event has occurred.
Critical Step Comment STEP 4
From NPG-SPP-3.5, Regulatory Reporting Requirements SAT UNSAT Standard:
The examinee determines Site Operations management and the Duty Plant Manager are required to be notified.
Critical Step Examiner Note; The examinee may also determine the Site VP, Plant Manager, and Corporate Duty Officer need to be notified. Notifications of these people also meets the required standard.
Comment Terminating Cue:
The JPM is complete when the Examinee returns the cue sheet to the Evaluator.
STOP
- 1.
Stop Time
JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:
The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1 at 100% power.
- 2. An improper operator action was made while placing a Mixed Bed Demineralizer in service, a transient occurred that resulted in a TAVG rise of 1.2 OF and a power rise of 0.6%.
- 3. The Mixed Bed Demineralizer was subsequently bypassed and plant conditions were stabilized below 100% using appropriate plant procedures.
INITIATING CUES:
- 1. You have been directed to determine all required action(s) and all required Shift Manager onsite notification(s), (if any).
- 2. Notify the Examiner the results when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 1311 NRC RO/SRO ADMIN A.1.b
1311 NRC JPM SRO A.1.b Page 2 of 10 SRO JOB PERFORMANCE MEASURE Task:
Determine Maintenance of Active License Status Task #:
3410970302 Task Standard:
The Examinee determines Operator #2, #3, and #4 have maintained an active license status and that Operator #1 and #5 has not accumulated sufficient time required to maintain an active license status.
Time Critical Task:
YES:
NO:
X K/A Reference/Ratings:
2.1.4 (3.8)
Method of Testing:
Simulated Performance:
Actual Performance:
X Evaluation Method:
Simulator In-Plant Classroom X
Main Control Room Mock-up Performer:
Trainee Name Evaluator:
/
Name / Signature DATE Performance Rating:
SAT:
UNSAT:
Validation Time:
12 min Total Time:
Performance Time:
Start Time:
Finish Time:
COMMENTS
1311 NRC JPM SRO A.1.b Page 3 of 10 SPECIAL INSTRUCTIONS TO EVALUATOR:
Tools/Equipment/Procedures Needed:
- 1. Non LAN connected computer
References:
Reference Title Rev No.
- 1.
OPDP 10 License Status Maintenance, Reactivation and Proficiency for Non-Licensed Positions 6
- 2.
Read to the examinee:
DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
1311 NRC JPM SRO A.1.b Page 4 of 10 INITIAL CONDITIONS:
- 1. Five Senior Reactor Operators have the following license status and time on shift for this quarter as listed as below.
Operator 1 License was active the previous quarter.
11/01/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/02/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/04/2013 Worked 0700-1900 shift as Unit 2 SRO.
11/06/2013 Worked 0700-1900 shift as Unit 2 SRO. Reported to the STC to perform an NRC Simulator Exam Validation for several hours.
11/14/2013 Worked 1900-0700 shift as Unit 1 SRO.
Operator 2 License was active the previous quarter.
11/07/2013 Worked 0700-1900 shift as Unit 1 CRO.
11/08/2013 Worked 0700-1900 shift as Unit 1 SRO. Absent from the Control Room for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> while conducting a plant tour with Operator 4 during license reactivation.
11/09/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/11/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/15/2013 Worked 0700-1900 shift as Unit 1 SRO.
Operator 3 License was issued this quarter.
11/01/2013 Worked 0700-1900 shift as Unit 2 SRO.
11/02/2013 Worked 0700-1900 shift in the WCC.
11/03/2013 Worked 0700-1900 shift as Unit 1 CRO.
11/05/2013 Worked 0700-1900 shift as Unit 2 SRO.
11/14/2013 Worked 1900-0700 shift as Unit 2 SRO.
Operator 4 License was inactive in the previous quarter.
11/5/2013 thru 11/09/2013 worked 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> under the direction of the Unit 1 SRO and completed all requirements for license reactivation.
11/12/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/13/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/15/2013 Worked 0700-1900 shift as Unit 2 SRO.
11/21/2013 Worked 1900-0700 shift as Unit 1 SRO.
Operator 5 License was active previous quarter.
11/21/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/22/2013 Worked 0700-1900 shift as the Floor US/STA.
11/23/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/25/2013 Worked 0700-1900 shift as Unit 2 SRO.
11/29/2013 Worked 1900-0700 shift as Unit 1 SRO.
- 2. None of the operators work on shift for the rest of this quarter.
INITIATING CUES:
- 1. Accounting only for on shift time, determine the status of each Senior Reactor Operators License Status at the beginning of the first quarter of 2014.
- 2. Notify the Examiner the results when complete.
1311 NRC JPM SRO A.1.b Page 5 of 10 Start Time STEP 1
Obtain a copy of OPDP-10 License Status Maintenance, reactivation and Proficiency for Non-Licensed Positions.
SAT UNSAT Standard:
Copy of OPDP-10 License Status Maintenance, reactivation and Proficiency for Non-Licensed Positions is obtained.
Cue Provide a copy of OPDP-10 License Status Maintenance, reactivation and Proficiency for Non-Licensed Positions.
Comment
1311 NRC JPM SRO A.1.b Page 6 of 10 STEP 2
SAT UNSAT Standard:
The Examinee reviews OPDP 10 License Status Maintenance, reactivation and Proficiency for Non-Licensed Positions.
Comment
1311 NRC JPM SRO A.1.b Page 7 of 10 STEP 3
- Status of Operator 1 License.
SAT UNSAT Standard:
The Examinee determines Operator 1 license status will be inactive the first quarter of 2014.
CRITICAL Examiner Note:
Operator #1 reported to the STC to perform an NRC Simulator Exam Validation for several hours therefore 11/6/2013 did not count toward the total of 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> per quarter.
Comment STEP 4
- Status of Operator 2 License.
SAT UNSAT Standard:
The Examinee determines Operator 2 license status will be active the first quarter of 2014.
CRITICAL Comment STEP 5
- Status of Operator 3 License.
SAT UNSAT Standard:
The Examinee determines Operator 3 license status will be active the first quarter of 2014.
CRITICAL Comment
1311 NRC JPM SRO A.1.b Page 8 of 10 STEP 6
- Status of Operator 4 License.
SAT UNSAT Standard:
The Examinee determines Operator 4 license status will be active the first quarter of 2014.
CRITICAL Comment Examiner Note:
STEP 7
- Status of Operator 5 License.
SAT UNSAT Standard:
The Examinee determines Operator 5 license status will be inactive the first quarter of 2014.
CRITICAL Examiner Note:
Operator #5 was the Floor US/STA which are not accredited positions therefore 11/22/2013 did not count toward the total of 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> per quarter.
Comment Terminating Cue:
The JPM is complete when the Examinee returns the cue sheet to the Evaluator.
STOP
- 1.
Stop Time
JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:
The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Five Senior Reactor Operators have the following license status and time on shift for this quarter as listed as below.
Operator 1 License was active the previous quarter.
11/01/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/02/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/04/2013 Worked 0700-1900 shift as Unit 2 SRO.
11/06/2013 Worked 0700-1900 shift as Unit 2 SRO. Reported to the STC to perform an NRC Simulator Exam Validation for several hours.
11/14/2013 Worked 1900-0700 shift as Unit 1 SRO.
Operator 2 License was active the previous quarter.
11/07/2013 Worked 0700-1900 shift as Unit 1 CRO.
11/08/2013 Worked 0700-1900 shift as Unit 1 SRO. Absent from the Control Room for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> while conducting a plant tour with Operator 4 during license reactivation.
11/09/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/11/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/15/2013 Worked 0700-1900 shift as Unit 1 SRO.
Operator 3 License was issued this quarter.
11/01/2013 Worked 0700-1900 shift as Unit 2 SRO.
11/02/2013 Worked 0700-1900 shift as the WCC SRO.
11/03/2013 Worked 0700-1900 shift as Unit 1 CRO.
11/05/2013 Worked 0700-1900 shift as Unit 2 SRO.
11/14/2013 Worked 1900-0700 shift as Unit 2 SRO.
Operator 4 License was inactive in the previous quarter.
11/5/2013 thru 11/09/2013 worked 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> under the direction of the Unit 1 SRO and completed all requirements for license reactivation.
11/12/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/13/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/15/2013 Worked 0700-1900 shift as Unit 2 SRO.
11/21/2013 Worked 1900-0700 shift as the WCC SRO.
Operator 5 License was active previous quarter.
11/21/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/22/2013 Worked 0700-1900 shift as the Floor US/STA.
11/23/2013 Worked 0700-1900 shift as Unit 1 SRO.
11/25/2013 Worked 0700-1900 shift as Unit 2 SRO.
11/29/2013 Worked 1900-0700 shift as Unit 1 SRO.
- 2. None of the operators work on shift for the rest of this quarter.
1311 NRC JPM SRO A.1.b Page 10 of 10 INITIATING CUES:
- 1. Accounting only for on shift time, determine the status of each Senior Reactor Operators License Status at the beginning of the first quarter of 2014.
- 2. Notify the Examiner the results when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 1311 NRC RO ADMIN A.2
1311 NRC JPM RO A.2 Page 2 of 9 SRO JOB PERFORMANCE MEASURE Task:
Perform a Defense-In-Depth Assessment Task #:
0001550301 Task Standard:
The Examinee performs a Defense-In-Depth Assessment and determines a RED condition exists on Decay Heat removal and an ORANGE condition exists on Power Availability and that Decay Heat Removal is the most significant challenged safety function.
Time Critical Task:
YES:
NO:
X K/A Reference/Ratings:
2.2.18 (3.9)
Method of Testing:
Simulated Performance:
Actual Performance:
X Evaluation Method:
Simulator In-Plant Classroom X
Main Control Room Mock-up Performer:
Trainee Name Evaluator:
/
Name / Signature DATE Performance Rating:
SAT:
UNSAT:
Validation Time:
15 min Total Time:
Performance Time:
Start Time:
Finish Time:
COMMENTS
1311 NRC JPM RO A.2 Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:
Tools/Equipment/Procedures Needed:
- 1. Non LAN connected computer
- 2. 1-PI-OPS-000-020.2, OPERATOR AT THE CONTROLS DUTY STATION CHECKLISTS-MODES 5, 6 AND DE-FUELED, Appendix C.
References:
Reference Title Rev No.
- 1. 1-PI-OPS-000-020.2 OPERATOR AT THE CONTROLS DUTY STATION CHECKLISTS-MODES 5, 6 AND DE-FUELED 28
- 2. NPG-SPP-07.2.11 Shutdown Risk Management 4
- 3.
SEQUOYAH NUCLEAR PLANT UNIT 1 TECHNICAL SPECIFICATIONS
========================================================================
Read to the examinee:
DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 5 following a Refueling Outage.
- 2. S/G Manways are installed.
- 3. RCP sweeps have not been performed.
- 4. RCS Boron concentration sufficient for Shutdown Margin requirements.
- 5. The RCS is in a Partial Drain Condition.
- 6. The Switchyard is protected.
- 7. The 1A Charging pump is out of service for maintenance.
- 8. The 1B 6.9 kv Shutdown Board de-energized and locked out due to differential while performing work.
INITIATING CUES:
- 1. The Shift manager has directed you to perform 1-PI-OPS-000-020.2 Appendix C, SQN DEFENSE-IN-DEPTH ASSESSMENT to identify any Red or Orange Safety Functions.
- 2. Notify the Examiner the results when complete.
1311 NRC JPM RO A.2 Page 4 of 9 Start Time STEP 1
- Obtain a copy of 1-PI-OPS-000-020.2, OPERATOR AT THE CONTROLS DUTY STATION CHECKLISTS-MODES 5, 6 AND DE-FUELED, Appendix C.
SAT UNSAT Standard:
Copy of 1-PI-OPS-000-020.2, OPERATOR AT THE CONTROLS DUTY STATION CHECKLISTS-MODES 5, 6 AND DE-FUELED, Appendix C is obtained.
Cue Provide a copy of 1-PI-OPS-000-020.2, OPERATOR AT THE CONTROLS DUTY STATION CHECKLISTS-MODES 5, 6 AND DE-FUELED, Appendix C.
Comment STEP 2
SAT UNSAT Standard:
The examinee determines the Reactivity Key Safety Function is GREEN.
Comment
1311 NRC JPM RO A.2 Page 5 of 9 STEP 3
SAT UNSAT Standard:
The examinee determines the Decay Heat Removal Key Safety Function is RED.
CRITICAL Comment STEP 4
SAT UNSAT Standard:
The examinee determines the Containment Key Safety Function is YELLOW.
Comment
1311 NRC JPM RO A.2 Page 6 of 9 STEP 5
SAT UNSAT Standard:
The examinee determines the Inventory Key Safety Function is YELLOW.
Comment STEP 6
SAT UNSAT Standard:
The examinee determines the Power Availability Key Safety Function is ORANGE.
CRITICAL Comment
1311 NRC JPM RO A.2 Page 7 of 9 STEP 7
SAT UNSAT Standard:
The examinee determines the Spent Fuel Cooling Key Safety Function is GREEN.
Comment STEP 8
SAT UNSAT Standard:
The Examinee identifies Decay Heat Removal is the most significant challenged safety function and is RED.
CRITICAL Comment
1311 NRC JPM RO A.2 Page 8 of 9 Terminating Cue:
The JPM is complete when the Examinee returns the cue sheet to the Evaluator.
STOP
- 1.
Stop Time
JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:
The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 5 following a Refueling Outage.
- 2. S/G Manways are installed.
- 3. RCP sweeps have not been performed.
- 4. RCS Boron concentration sufficient for Shutdown Margin requirements.
- 5. The RCS is in a Partial Drain Condition.
- 6. The Switchyard is protected.
- 7. The 1A Charging pump is out of service for maintenance.
- 8. The 1B 6.9 kv Shutdown Board de-energized and locked out due to differential while performing work.
INITIATING CUES:
- 1. The Shift manager has directed you to perform 1-PI-OPS-000-020.2 Appendix C, SQN DEFENSE-IN-DEPTH ASSESSMENT to identify any Red or Orange Safety Functions.
- 2. Notify the Examiner the results when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 1311 NRC SRO ADMIN A.2
1311 NRC JPM SRO A.2 Page 2 of 9 SRO JOB PERFORMANCE MEASURE Task:
Review a Defense-In-Depth Assessment Task #:
0001720302 Task Standard:
The Examinee reviews a Defense-In-Depth Assessment and determines a RED condition exists on Decay Heat removal and an ORANGE condition exists on Power Availability and that Decay Heat Removal is the most significant challenged safety function.
Time Critical Task:
YES:
NO:
X K/A Reference/Ratings:
2.2.18 (3.9)
Method of Testing:
Simulated Performance:
Actual Performance:
X Evaluation Method:
Simulator In-Plant Classroom X
Main Control Room Mock-up Performer:
Trainee Name Evaluator:
/
Name / Signature DATE Performance Rating:
SAT:
UNSAT:
Validation Time:
25 min Total Time:
Performance Time:
Start Time:
Finish Time:
COMMENTS
1311 NRC JPM SRO A.2 Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:
Tools/Equipment/Procedures Needed:
- 1. Non LAN connected computer
- 2. 1-PI-OPS-000-020.2, OPERATOR AT THE CONTROLS DUTY STATION CHECKLISTS-MODES 5, 6 AND DE-FUELED, Appendix C.
References:
Reference Title Rev No.
- 1. 1-PI-OPS-000-020.2 OPERATOR AT THE CONTROLS DUTY STATION CHECKLISTS-MODES 5, 6 AND DE-FUELED 28
- 2. NPG-SPP-07.2.11 Shutdown Risk Management 4
- 3.
SEQUOYAH NUCLEAR PLANT UNIT 1 TECHNICAL SPECIFICATIONS
========================================================================
Read to the examinee:
DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 5 following a Refueling Outage.
- 2. S/G Manways are installed.
- 3. RCP sweeps have not been performed.
- 4. RCS Boron concentration sufficient for Shutdown Margin requirements.
- 5. The RCS is in a Partial Drain Condition.
- 6. The Switchyard is protected.
- 7. The 1A Charging pump is out of service for maintenance.
- 8. The 1B 6.9 kv Shutdown Board was de-energized and locked out while performing work.
INITIATING CUES:
- 1. The Shift manager has directed you to review the completed 1-PI-OPS-000-020.2 Appendix C, SQN DEFENSE-IN-DEPTH ASSESSMENT.
- 2. Notify the Examiner the results when complete.
1311 NRC JPM SRO A.2 Page 4 of 9 Start Time STEP 1
- Obtain a completed copy of 1-PI-OPS-000-020.2, OPERATOR AT THE CONTROLS DUTY STATION CHECKLISTS-MODES 5, 6 AND DE-FUELED, Appendix C.
SAT UNSAT Standard:
Completed copy of 1-PI-OPS-000-020.2, OPERATOR AT THE CONTROLS DUTY STATION CHECKLISTS-MODES 5, 6 AND DE-FUELED, Appendix C is obtained.
Cue Provide a completed copy of 1-PI-OPS-000-020.2, OPERATOR AT THE CONTROLS DUTY STATION CHECKLISTS-MODES 5, 6 AND DE-FUELED, Appendix C.
Comment STEP 2
SAT UNSAT Standard:
The examinee determines the Reactivity Key Safety Function is GREEN.
Comment
1311 NRC JPM SRO A.2 Page 5 of 9 STEP 3
SAT UNSAT Standard:
The examinee determines the Decay Heat Removal Key Safety Function is not YELLOW and is RED.
CRITICAL Comment STEP 4
SAT UNSAT Standard:
The examinee determines the Containment Key Safety Function is YELLOW.
Comment
1311 NRC JPM SRO A.2 Page 6 of 9 STEP 5
SAT UNSAT Standard:
The examinee determines the Inventory Key Safety Function is YELLOW.
Comment STEP 6
SAT UNSAT Standard:
The examinee determines the Decay Heat Removal Key Safety Function is not YELLOW and is ORANGE.
CRITICAL Comment
1311 NRC JPM SRO A.2 Page 7 of 9 STEP 7
SAT UNSAT Standard:
The examinee determines the Spent Fuel Cooling Key Safety Function is GREEN.
Comment STEP 8
SAT UNSAT Standard:
The Examinee identifies Decay Heat Removal is the most significant challenged safety function and is not ORANGE but RED.
CRITICAL Comment
1311 NRC JPM SRO A.2 Page 8 of 9 Terminating Cue:
The JPM is complete when the Examinee returns the cue sheet to the Evaluator.
STOP
- 1.
Stop Time
JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:
The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 5 following a Refueling Outage.
- 2. S/G Manways are installed.
- 3. RCP sweeps have not been performed.
- 4. RCS Boron concentration sufficient for Shutdown Margin requirements.
- 5. The RCS is in a Partial Drain Condition.
- 6. The Switchyard is protected.
- 7. The 1A Charging pump is out of service for maintenance.
- 8. The 1B 6.9 kv Shutdown Board was de-energized and locked out while performing work.
INITIATING CUES:
- 1. The Shift manager has directed you to review the completed 1-PI-OPS-000-020.2 Appendix C, SQN DEFENSE-IN-DEPTH ASSESSMENT.
- 2. Notify the Examiner the results when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 1311 NRC SRO ADMIN A.3
1311 NRC JPM SRO A.3 Page 2 of 10 SRO JOB PERFORMANCE MEASURE Task:
Authorize a Radioactive Gas Release.
Task #:
5030010102 Task Standard:
After a review for a liquid release with 0-RE-90-118 inoperable, the Examinee determines the following requirements for a Waste Gas Decay Tank B release and maintenance Purge required prior to maintenance.
ABGTS B will be used for the release.
Identification of all items to be in compliance with ODCM Section 1.1.2 Action 40 Time Critical Task:
YES:
NO:
X K/A Reference/Ratings:
2.3.6 (2.0/3.8)
Method of Testing:
Simulated Performance:
Actual Performance:
X Evaluation Method:
Simulator In-Plant Classroom X
Main Control Room Mock-up Performer:
Trainee Name Evaluator:
/
Name / Signature DATE Performance Rating:
SAT:
UNSAT:
Validation Time:
20 min Total Time:
Performance Time:
Start Time:
Finish Time:
COMMENTS
1311 NRC JPM SRO A.3 Page 3 of 10 SPECIAL INSTRUCTIONS TO EVALUATOR:
Tools/Equipment/Procedures Needed:
- 1. Non LAN connected computer
References:
Reference Title Rev No.
- 1.
0-SI-CEM-077-410.4 Waste Gas Decay Tank Release 18
- 2.
0-SO-77-15 WASTE GAS DECAY TANK RELEASE 16 SEQUOYAH NUCLEAR PLANT OFFSITE DOSE CALCULATION MANUAL 58
========================================================================
Read to the Examinee:
DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. A release of the B Waste Gas Decay Tank is scheduled for this shift in preparation for intrusive maintenance.
- 2. 0-RE-90-118 is inoperable.
- 3. The release path will be through the Unit 2 Shield Building.
- 4. You are the Unit SRO.
INITIATING CUES:
- 1. List all requirements (if any) required to release the B Waste Gas Decay Tank and prepare for maintenance given the current plant conditions.
- 2. Notify the Examiner of the results when complete.
1311 NRC JPM SRO A.3 Page 4 of 10 Start Time STEP 1
Obtain a copy of 0-SI-CEM-077-410.4, Waste Gas Decay Tank Release and 0-SO-77-15, WASTE GAS DECAY TANK RELEASE.
SAT UNSAT Standard:
Copy of 0-SI-CEM-077-410.4, Waste Gas Decay Tank Release and 0-SO-77-15, WASTE GAS DECAY TANK RELEASE are obtained.
Cue Provide a copy of 0-SI-CEM-077-410.4, Waste Gas Decay Tank Release and 0-SO-77-15, WASTE GAS DECAY TANK RELEASE Comment STEP 2
SAT UNSAT Standard:
The Examinee determines WGDT needs to be purged prior to initiating maintenance.
CRITICAL Comment
1311 NRC JPM SRO A.3 Page 5 of 10 STEP 3
SAT UNSAT Standard:
The Examinee determines the Unit 2 Shield Building is the designated release path from the initial conditions.
Comment STEP 4
SAT UNSAT Standard:
The Examinee designates the ABGTS fan B to be used for the release.
CRITICAL Comment
1311 NRC JPM SRO A.3 Page 6 of 10 STEP 5
SAT UNSAT Standard:
The Examinee determines an independent verification of the discharge valve checklist is required.
CRITICAL Comment
1311 NRC JPM SRO A.3 Page 7 of 10 STEP 6
SAT UNSAT Standard:
The Examinee determines ODCM 1.1.2 Action 40 is required.
CRITICAL Comment
1311 NRC JPM SRO A.3 Page 8 of 10 STEP 7
SAT UNSAT Standard:
The Examinee determines two independent samples must be taken from the Tank.
CRITICAL Comment
1311 NRC JPM SRO A.3 Page 9 of 10 STEP 8 :
SAT UNSAT Standard:
The Examinee determines an independent verification of the allowable differential pressure across 0-FE-77-290 is required.
CRITICAL Comment Terminating Cue:
The JPM is complete when the Examinee returns the cue sheet to the Evaluator.
STOP
- 1.
Stop Time
JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:
The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. A release of the B Waste Gas Decay Tank is scheduled for this shift in preparation for intrusive maintenance.
- 2. 0-RE-90-118 is inoperable.
- 3. The release path will be through the Unit 2 Shield Building.
- 4. You are the Unit SRO.
INITIATING CUES:
- 1. List all requirements (if any) required to release the B Waste Gas Decay Tank and prepare for maintenance given the current plant conditions.
- 2. Notify the Examiner of the results when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 1311 NRC RO ADMIN A.4
1311 NRC JPM RO A.4 Page 2 of 9 SRO JOB PERFORMANCE MEASURE Task:
Perform RO Actions During Aircraft Probable Threat AOP-T.01 App D Task #:
0000100501 Task Standard:
The Examinee will notify the SM to classify an ALERT based on EAL 4.6, determine that adequate time for rapid evacuation is not available and determine REP Responders are dispatched using the REP Paging system.
Time Critical Task:
YES:
NO:
X K/A Reference/Ratings:
2.4.39 (3.9)
Method of Testing:
Simulated Performance:
Actual Performance:
X Evaluation Method:
Simulator In-Plant Classroom X
Main Control Room Mock-up Performer:
Trainee Name Evaluator:
/
Name / Signature DATE Performance Rating:
SAT:
UNSAT:
Validation Time:
10 min Total Time:
Performance Time:
Start Time:
Finish Time:
COMMENTS
1311 NRC JPM RO A.4 Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:
Tools/Equipment/Procedures Needed:
- 1. A hard copy of AOP-T.01, SECURITY EVENTS.
- 2. AOP-T.01, SECURITY EVENTS is SECURITY SENSITIVE INFORMATION, do not leave unattended and return all copies to SQN Exam Group personnel when complete.
References:
Reference Title Rev No.
- 1.
AOP-T.01 SECURITY EVENTS 18
========================================================================
Read to the examinee:
DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1.
- 2. AOP-T.01, SECURITY EVENTS is in progress.
- 3. Fire Operations, Radiation Protection Security, off-site assistance casualty and fire were previously notified using Appendix E, AIRCRAFT INFORMATIONAL THREAT (SECTION 2.4)
NOTIFICATIONS.
- 4. The Shift Manager has escalated to an Aircraft PROBABLE Threat due to notification that an inbound airliner will arrive at Sequoyah in 25 minutes.
- 5. The ODS is not available.
INITIATING CUES:
- 1. The Shift Manager has directed you to perform AOP-T.01, SECURITY EVENTS, Appendix D Aircraft PROBABLE Threat Notifications.
- 2. Determine all actions required to be performed.
- 3. Notify the Examiner of the results when complete.
1311 NRC JPM RO A.4 Page 4 of 9 Start Time STEP 1
Obtain a copy of AOP-T.01, SECURITY EVENTS SAT UNSAT Standard:
Copy of AOP-T.01, SECURITY EVENTS is obtained.
Cue Provide a copy of AOP-T.01, SECURITY EVENTS.
Examiner Note:
AOP-T.01, SECURITY EVENTS is SECURITY SENSITIVE INFORMATION, do not leave unattended and return all copies to SQN Exam Group personnel when complete.
Comment STEP 2
SAT UNSAT Standard:
The Examinee performs Appendix D as directed by the Initiating Cue.
Comment
1311 NRC JPM RO A.4 Page 5 of 9 STEP 3
SAT UNSAT Standard:
The Examinee notifies the SM to declare an ALERT based on EAL 4.6.
CRITICAL Comment STEP 4
SAT UNSAT Standard:
The Examinee notes two operators need to be called to the Control Room.
Comment
1311 NRC JPM RO A.4 Page 6 of 9 STEP 5
SAT UNSAT Standard:
The examinee addresses steps 3, 4 and 5 as N/A due to Note 1 Comment STEP 6
SAT UNSAT Standard:
The Examinee determines adequate time is NOT available for rapid evacuation and that an announcement will be made.
CRITICAL Comment
1311 NRC JPM RO A.4 Page 7 of 9 STEP 7
SAT UNSAT Standard:
The Examinee notes that off-site agencies should be notified of the probable aircraft threat.
Comment STEP 8
SAT UNSAT Standard:
The Examinee determines REP Paging System needs to be activated to dispatch REP Responders.
CRITICAL Comment
1311 NRC JPM RO A.4 Page 8 of 9 STEP 9
SAT UNSAT Standard:
The Examinee determines continuous communication needs to be established with the NRCOC due to the Aircraft PROBABLE Threat and the ALERT based on EAL 4.6.
Comment Terminating Cue:
The JPM is complete when the Examinee returns the cue sheet to the Evaluator.
STOP
- 1.
Stop Time
JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:
The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1.
- 2. AOP-T.01, SECURITY EVENTS is in progress.
- 3. Fire Operations, Radiation Protection Security, off-site assistance casualty and fire were previously notified using Appendix E, AIRCRAFT INFORMATIONAL THREAT (SECTION 2.4)
NOTIFICATIONS.
- 4. The Shift Manager has escalated to an Aircraft PROBABLE Threat due to notification that an inbound airliner will arrive at Sequoyah in 25 minutes.
- 5. The ODS is not available.
INITIATING CUES:
- 1. The Shift Manager has directed you to perform AOP-T.01, SECURITY EVENTS, Appendix D Aircraft PROBABLE Threat Notifications.
- 2. Determine all actions required to be performed.
- 3. Notify the Examiner of the results when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 1311 NRC SRO ADMIN A.4
1311 NRC JPM SRO A.4 Page 2 of 8 SRO JOB PERFORMANCE MEASURE Task:
Classify the Event using the EPIP-1 and Complete a TVA INITIAL NOTIFICATION.
Task #:
3440190302 Task Standard:
During a MODE 5 LOCA, the Examinee classifies the event as a SITE AREA EMERGENCY based on EAL 6.1 and the Examinee completes a TVA Initial Notification for Site Area Emergency form with no errors on items noted with an *.
Time Critical Task:
YES:
X NO:
K/A Reference/Ratings: 2.4.41. (2.9/4.6)
Method of Testing:
Simulated Performance:
Actual Performance:
X Evaluation Method:
Simulator In-Plant Classroom X
Main Control Room Mock-up Performer:
Trainee Name Evaluator:
/
Name / Signature DATE Performance Rating:
SAT:
UNSAT:
Validation Time:
20 minutes Total Time:
Performance Time:
Start Time:
Finish Time:
COMMENTS
1311 NRC JPM SRO A.4 Page 3 of 8 SPECIAL INSTRUCTIONS TO EVALUATOR:
Tools/Equipment/Procedures Needed:
- 1. EPIP-1, EMERGENCY PLAN CLASSIFICATION MATRIX
- 2. EPIP-4 SITE AREA EMERGENCY.
- 3. A clock must be available in classroom that all examinees and evaluator can see
References:
Reference Title Rev No.
- 1.
EPIP-1 Emergency Plan Classification Matrix 50
- 2.
EPIP-4 SITE AREA EMERGENCY 36
========================================================================
Read to the examinee:
DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
1311 NRC JPM SRO A.4 Page 4 of 8 INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 5.
- 2. An event is in progress and the correct procedure has been implemented by the crew.
- 3. Both RHR pumps were manually tripped.
- 4. All RCPs were manually tripped.
- 5. Rx Vessel Vessel Lower Range indicates 40% on both channels.
- 6. All operable Core Thermocouples indicate greater than 210 degrees.
- 7. The Containment Coordinator reports the Containment Equipment hatch cannot be closed.
INITIATING CUES:
- 1. Using the data provided and the applicable procedure (s) classify the event.
- 2. Do not use SED Judgment as the basis for your classification.
- 3. Raise your hand when you have classified the event.
- 4. Complete the required INITIAL NOTIFICATION FORM.
- 5. Raise your hand when you have completed the Complete the required INITIAL NOTIFICATION FORM.
- 6. Record your answers on the JPM briefing sheet.
- 7. There are elements of this task that are time critical.
- 8. For the purposes of this JPM, initial event time zero and the start time for classification will begin when the examiner tells you to begin.
1311 NRC JPM SRO A.4 Page 5 of 8 Start Time STEP 1
Obtain a copy of EPIP-1, EMERGENCY PLAN CLASSIFICATION MATRIX.
SAT UNSAT Standard:
Examinee obtains a copy of EPIP-1, EMERGENCY PLAN CLASSIFICATION MATRIX.
Cue Provide a copy of EPIP-1, EMERGENCY PLAN CLASSIFICATION MATRIX.
Comment Examiner Note Annotate start time when the examinee acknowledges the task is understood. Start time____________
1311 NRC JPM SRO A.4 Page 6 of 8 STEP 3
SAT UNSAT Standard:
The examinee evaluates and classifies the event as a Site Area Emergency EAL 6.1 within 15 minutes of starting the task.
CRITICAL Comment EXAMINER NOTE:
Annotate the stop time for the event classification here.
EXAMINER NOTE:
Annotate the start time for the TVA Initial Notification for Site Area Emergency here. ______
EXAMINER NOTE:
The start data is provided to the examinee on the JPM briefing sheet.
EXAMINER NOTE:
Examinee transitions to EPIP-4, SITE AREA EMERGENCY
1311 NRC JPM SRO A.4 Page 7 of 8 STEP 4
EPIP-4 SITE AREA EMERGENCY.
SAT UNSAT Standard:
Examinee obtains a copy of EPIP-4 SITE AREA EMERGENCY.
Cue Provide a copy of EPIP-4 SITE AREA EMERGENCY.
Comment STEP 6
SAT UNSAT Standard:
The examinee completes an Appendix A, TVA Initial Notification for SITE AREA EMERGENCY with no errors on items noted with an
- on the answer key within 15 minutes of event declaration.
CRITICAL Comment Terminating Cue:
The task is complete when the Examinee completes the TVA Initial Notification for Site Area Emergency.
STOP Stop Time
JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:
The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 5.
- 2. An event is in progress and the correct procedure has been implemented by the crew.
- 3. Both RHR pumps were manually tripped.
- 4. All RCPs were manually tripped.
- 5. Rx Vessel Vessel Lower Range indicates 40% on both channels.
- 6. All operable Core Thermocouples indicate greater than 210 degrees.
- 7. The Containment Coordinator reports the Containment Equipment hatch cannot be closed.
INITIATING CUES:
- 1. Using the data provided and the applicable procedure (s) classify the event.
- 2. Do not use SED Judgment as the basis for your classification.
- 3. Raise your hand when you have classified the event.
- 4. Complete the required INITIAL NOTIFICATION FORM.
- 5. Raise your hand when you have completed the Complete the required INITIAL NOTIFICATION FORM.
- 6. Record your answers on the JPM briefing sheet.
- 7. There are elements of this task that are time critical.
- 8. For the purposes of this JPM, initial event time zero and the start time for classification will begin when the examiner tells you to begin.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.