ML13232A277

From kanterella
Jump to navigation Jump to search

Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3
ML13232A277
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/26/2013
From: Richard Ennis
Plant Licensing Branch 1
To: Pacilio M
Exelon Nuclear
Ennis R
References
TAC ME9631, TAC ME9632
Download: ML13232A277 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 26, 2013 Mr. Michael J. Pacilio.

President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3 (TAC NOS. ME9631 AND ME9632)

Dear Mr. Pacilio:

By letter to the Nuclear Regulatory Commission (NRC) dated July 31, 2013, Exelon Generation Company, LLC (Exelon) submitted a GE-Hitachi Nuclear Energy Americas LLC (GEH) affidavit dated July 25,2013, executed by Mr. James F. Harrison (Attachment 3 to Exelon's letter).

Exelon requested that the information contained in Attachment 1 to its letter be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR)

Section 2.390. Specifically, Exelon requested that the following docum~nt be withheld:

Response to Request for Additional Information - SCVB A non-proprietary copy of the document (Attachment 2 to Exelon's letter) has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(4)a.

Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license fromGEH constitutes a competitive economic advantage over other companies; and (4)b.

Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the deSign, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuanJ to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

M.Pacilio

- 2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the'document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1420.

Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc:

Mr. James F. Harrison Vice President, Fuel Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv

M. Pacilio

- 2 Withholding from public inspection shall not affect the right. if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1420.

Sincerely, IRAJ Richard B. Ennis, Senior Project Manager Plant licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc:

Mr. James F. Harrison Vice President, Fuel Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv DISTRIBUTION:

PUBLIC LPL 1-2 RlF RidsNrrDorlLpl1-2 Resource RidsNrrLAABaxter Resource RidsNrrPMPeachBottom Resource RidsOgcMailCenter Resource RidsAcrsAcnw_MailCTR Resource RidsRgn1 MailCenter Resource ADAMS Accession No*.. ML13232A277

  • via email OFFICE LPL 1-2/PM LPL3-1/LAiT LPL1-2/LA*

LPL1-2/BC(A)

NAME REnnis MHenderson ABaxter VRodriguez DATE 08/20/13 08/21/13 08/21/13 08/26/13 OFFICIAL RECORD COpy