{{#Wiki_filter:2012 LASALLE COUNTY STATION INITAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-.4352 December 5, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CONFIRMATION OF CHANGE TO INITIAL OPERATOR LICENSE EXAMINATION 2012: LASALLE COUNTY STATION
Dear Mr. Pacilio:
We have received your Station Letter RA11-061, dated November 11, 2011. In that letter, you requested the initial operator licensing examination scheduled at the LaSalle County Station for September 2012 be changed to October 2012. In response, we have canceled the September 2012 initial operator licensing exam and rescheduled an initial operator licensing examination for the weeks of October 22 and 29, 2012, at the LaSalle County Station. An on-site validation is scheduled for the week of October 1, 2012. We understand that your staff will develop the examination. Because your previous corporate letter indicated that there were more than nine applicants being considered for this examination, the examination was scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program. In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document
M. Pacilio -2 Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html{the Public Electronic Reading Room). Sincerely, Docket Nos. 50-373; 50-374 License Nos. NPF 11; NPF18 cc: Distribution via ListServ'
without attachment/enclosure "E" = Co Rill RKWalton:ls JlEI'2fJ 111 \\ M. Pacilio -2 Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF 11; NPF18 cc: Distribution via ListServ' DISTRIBUTION: Amy Snyder RidsNrrDorlLpl3-2 Resource RidsNrrPMLaSalie RidsNrrDirslrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource DOCUMENT NAME: G:\\DRSIII\\DRS\\Work in Progress\\Ltr 11_11 LaSalle Exam Change2012 KW.docx o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a co of this document, indicate in the bo
taSalle GeneratIng StatIon www.exeloncorp.com 2601 North ;mt Road Nuclear Marseflies, It 61341-9757 RA11-061 10CFR55 November 11.,2011 U. S. Nuclear Regulatory Commission Attention: Regional Administrator. Region III 2443 Warrenville Road Suite 210 Lisle, Il 60532-4352 laSalle County Station (lSCS) requests a date change for the CY2012 Initial License Operator Examination. lSCS has previously requested administration of examination starting September 17, 2012. through September 27. 2012. lSCS requests a new start date of October 22,2012 with an end date of November 1. 2012. The requested change in examination date will allow completion of course curriculum commensurate with staffing requirements needed to support the upcoming SCheduled outage starting February 13, 2012. LSCS requests that the Initial Licensing examination. which was administered in 2010, be withheld from public disclosure until completion of the 2012 exam. Should you have any questions concerning this letter. please contact Mr. Terrence Simpkin, Regulatory Assurance Manager, at (815) 415-2800. Respectfully, [)Y(Ze~* David P. Rhoades Site Vice President laSalle County Station cc: NRC Region III Operations Branch Chief - Hironori Peterson NRC Region III Operations Branch - R Keith Walton NRC Sernor Resident Inspector - LaSalle County Station f<u,,'({ VUu 't,.J) ~ NOV~ 1 6 2011
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 1,2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS: LASALLE COUNTY STATION
Dear Mr. Pacilio:
We have received your corporate letter RS-10-130. In that letter, you requested an initial operator licensing examination be scheduled at the LaSalle County Station for October 2014. In response, we have scheduled an initial licensing examination for the weeks of October 13 and 20, 2014, at the LaSalle County Station. On-site validation of this examination is tentatively scheduled to occur the week of September 22, 2014. We note that you were previously scheduled for an initial operator licensing exam the weeks of September 24 and October 1, 2012. These dates have not changed. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations. A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.
M. Pacilio -2 In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA by D. McNeil forI Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF 11; NPF18 cc: Distribution via ListServ
M. Pacilio -2 In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA by D. McNeil fori Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF 11; NPF18 cc: Distribution via ListServ DISTRIBUTION: Daniel Merzke RidsNrrDorlLpl3-2 Resource RidsNrrPMLaSalie RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\\DRSIlI\\DRS\\WORK IN PROGRESS\\OL EXAM CONFIRMATION LEHERS\\LAS 060111 DRS OL.DOCX o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a CODY of this document, indicate in the box: "C" =CODY without attachmentJendosure "E" '" COpy with attachmentJendosure "N" =No copy OFFICE Rill I Rill IN I I NAME RKWalton:co HPeterson DATE 05/13/2011 06/01/2011 OFFICIAL RECORD COPY
Exelon Exekm GeneratlOn wwwexeloncorp.com Nuclear 4300 Winfield Road Warrenville,Il60 555 RS*10-130 July 28,2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF*77 NRC Docket Nos. STN 50-456 and SIN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF*62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR*2, (Renewed) DPR-19 and DPR-25 NRC Docket Nos. 50-10, 50-237. and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket Nos. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 NRC Docket Nos. 50-277 and 50*278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station. Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289
July 28,2010 U. S. Nuclear Regulatory Commission Page 2
Subject:
Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator licenSing Examinations," dated June 28,2010 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2012 through 2015, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2012 and 2013. Attachments 1 through 10 provide responses to RIS 2010-08 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPIRES: 1013112011 (10-20081 Estlmaled burden per res~onse to comply with Ihls voluntary information colledlon request: 1 hoUL his information collection is used to plan budget and resources for operator examinations, Send comments rr.rdln~ burde OPERA TOR LICENSING estimate 10 Ihe Records and FOIAIPrivacy Services Branch
- 5 F 3). U.S Nuclear R~latory Commission. Washington. DC 20555-000
- or brc Intern EXAMINATION DATA
&omailto in collects@nrc.gov, and 10 the Desk Officer, Office of In oflTlalion and RegUlato;!'; Affairs. NE B*10202, (3150-0131). Office of Man~ement an Budget. Wash nglon, DC 20503_ If a means used 10 impose an nformatlo collection does not display a currently valid OMS control number. the NRC may not conduct or sponsor, and a person is not required to respond to. the information collection. n el d n s FACILITY Braidwood Station, Units t and 2 Facility Operating License Nos. NPF*72 and NPF*77 NRC Docket Nos. STN 50-456 and STN 50-457 II NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0 I 1 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 Cy 2014 Cy 2015 NUMBER OF REACTOR OPERATORS 0 8 6 0 NUMBER OF SENIOR REACTOR OPERATORS
- INSTANT 0
12 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 3/25/2013 12/0812014 N/A ALTERNATE DATE N/A 4/8/2013 1/5/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2012 ~~ CY 2013 ~- MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 0 0 12 0 NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour. his information collection is used 10 plen budgets and resources for operator examinations. Send comments r~ardln~ burden OPERA TOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch -5 F 3), U.S. Nuclear Re~ulatOry Commission, Washington. DC 20555-000,or bfc intemet EXAMINATION DATA e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0131). Office of Management and Budget, WashIngton, DC 20503. If a means used to impose an information collection does not display a currenUy valid OMB control number, the NRC may not conduct or sJc0nsor, and a person is not required to respond to, the Information collec on. FACILITY NRC REGION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 III NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF 1 1 1 LICENSEE-PREPARED 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 Cy 2014 Cy 2015 NUMBER OF REACTOR OPERATORS 2 6 6 0 NUMBER OF SENIOR REACTOR 6 6 6 6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 0 1 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA TORS - LIMITED PROPOSED DATES PRIMARY DATE 1123/2012 112112013 1127/2014 1119/2015 ALTERNATE DATE 1116/2012 1128/2013 1120/2014 1126/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 6 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.(J131 EXPIRES: 10/31/2011 (1()'2o<l8) Esilmated burden per response to comply with this voluntary InformatJon collection request: 1 hour. This Information collection is used to plan budget and rescuress for operstor examinations. Send comments r~rdin~ burde OPERA TOR LICENSING estimate to the Records and FOIA/Prlvacy Services Branch I *5 F 3), U.S Nuclear Re1,ulalory Commission, WaShington. DC 20555.(JQ0. or ~ Interne EXAMINATION DATA e-mail to in oCOllects@nrcsov. and to the Desk Officer. Office of In ormation and Regulatory Affairs. NE 8*10202. (3150*0131). Office of Management and Budget. Washington. DC 20503. If a means used to impose an information collection does not display a currently \\/Slid OMB control number. the NRC may not conduct or se,onsor. and a person is not required to respond to. the informatIon collect n. n s t FACILITY Clinton Power Station Facility Operating License No. NPF-62 NRC Docket NO. 50-461 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF lICENSEE*PREPARED EXAMINATIONS 0 I 0 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy2013 CY 2014 CY 2015 NUMBER OF REACTOR OPERATORS 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS
- INSTANT 0
4 0 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 08119/13 N/A 08117/15 ALTERNATE DATE N/A 08126/13 N/A 08/24/15 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 20U CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 10 0 0 0 0 0 0 NRC FORM 536 (10*2008) PRINTED ON RECYCLEO PAPER Exelon Generation Company. LLC Response to Regulatory Issue Summary 2010*08 Page 1 of 1 /IoIRC FORM 53fI U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150~131 EXPIRES: 1013112011 ('0-2008) Estimated burden nr re$~onse to comply with tills yoluntlll)" information coUedlan requa,l:
- hour, hie informallon collection is used 10 plen budg4ll$
OPERATOR LICENSING and..sourata for operalot' examlnatJont., Send comments ~ardlng bur<fen esllmale 10 the RecordS and FOIAIPrivacy Servlcu Branch -5 F 3). U.S. Nudear ~utatoty Commission. Washington. OC 20555-000. or bk Inteme\\ EXAMINATION DATA ..mail 10 In OOOllei:ls@nrom". and to the Desk Officer, ONlce olin ormation and Regu= Alfan. NE 8-10202. (3150..0131). Off'1Ce 01 ManllQ6mllnl and Budget. W ngbJn. DC 20503. If a mean8 used to impoee an Information collection does not dlaplay a currenlly valid OMS control number. !he NRC may not conduct or sponsor. and a person i8 nol required to respond 10, Ihe Infonnation cotladlon, FACIlITY NRCRfGION Dresden Nudear Power Station, Units 2 and 3 Renewed FaeUity Operating Lleense Nos. DPR-I' and DPR-15 III NRC Doeket No** 50-137 aDd 50-14' A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 20U Cy 1013 CY 20}4 CY 201S ESTIMATED NUMBER OF t 1 0 I LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC-PREPAREO 0 EXAMINATIONS B. INITIAL OPERATOR I-ICENSE EXAMINATIONS PROPOSED NUMBER CY 2011 CY2013 CY2014 CY 2015 NUMBER OF ReACTOR 5 OPERATORS 4 0 4 NUMBER OF SENIOR REACTOR 7 7 0 7 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 0 1 0 I OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED OATES PRIMARY DATE 816/11 10/14113 N/A 3/Z/15 ALTERNATE DATE 8120/12 10118/13 N/A 3/23/15 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 1012 CY 1013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH ~ -;;;CEMBER ESTIMATED 0 NUMBER OF U 0 0 0 0 0 II CANDIDATES NFle '01W:l3e (1O-:!OOS) PRINTEO ON FlEevClEO PAPI!FI Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (1().2008) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour. his Information collection is used to plan budgets and resources for operator examinations. Send comments ~rdln~ burden OPERA TOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch -5 F 3), U.S. Nuclear R~UlalOry Commission, Washington, DC 20555-0001, or bYc internet EXAMINATION DATA e-mail to in ocoliectS@nrc.~, and 10 Ihe Desk OffICer, Office of In ormallon and Regulatory Affairs, NE 10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to Impose an information collecllon does not display a currenlly valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond 10, the Infonnation collection. FACILITY NRC REGION LaSalle County Station, Units 1 and 2 FaciJity Operating License Nos. NPF-ll and NPF-18 NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 Cy 2013 CY 2014 Cy 2015 ESTIMATED NUMBER OF LlCENSEE*PREPARED 1 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy2013 Cy2014 CY 2015 NUMBER OF REACTOR 8 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR S 0 6 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2 0 2 0 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 9/24/2012 N/A 10/13/2014 N/A ALTERNATE DATE 10/112012 N/A 10/20/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ~-..- NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 12 0 0 CANDIDATES NRC FORM 536 (10*2008) PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 pO-zOO8) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour. his information collection Is used to plan budget and resources for operator examinatlons. Send comments re~arding burde OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch -5 F 3). U.S Nuclear Re?,ulatOry Commission, Washington, DC 20555-000,or br, interne EXAMINATION DATA e-mail to In ocollects@nrc-g0v, and to the Desk Officer, Office of In ormation and RegUlato~ Affairs, NE B-10202, (3150-0131), Office of Management an Budget, Wash ngton, DC 20503. If a means used to impose an informatio collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection. n d n s t FACILITY Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 NRC REGION 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 0 1 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 NUMBER OF REACTOR OPERATORS 8 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 7 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/08/2012 N/A 10/06/2014 N/A ALTERNATE DATE 1011512012 N/A 10/13/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 0 14 0 0 NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Exelon Generation Company. LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVeD BY OMS: NO. 3150-0131 EXPIRES; 1013112011 (10-2008) Estimated burden per rea~onse to complv wilh Ihls voluntary Inlormallotl collection request: 1 nour. his Informalion COlIIlClIOl'l is used 10 plan budget and rBsourcas for opeflllor examinations Sand comments ~ardl~ burde OPERATOR LICENSING eslimate to the Record. and FOIA!Prlvacy S.rvI~. 8nsneh
- 5 F 3). U.S Nudut R~utalOry Cammlhlon, Washington, DC 20555-000, or ~ Internet EXAMINATION DATA
..mill \\0 In OcotlllCls@nn:.s:, and to the O..k 0fIk;er, 0f!I~ olin otmallo and RaguJa~ Affairs, NE 10202. (3150-0131), Office of Managamtrnt an BudgIl4. WUIIll1glon, DC 20503, I( a means uSed to lmpoe an informatio coIlacIion does not displllly
- currently valid OMS control number. lIle NRC may nol conduct or sponlCt. and a person is nol,equlred to nsspond 10. the Information coftectoon, FACILITY Oyster Creek Nuclear Generating Station Renewed Fac:1l1ty OperatiDIl License No. DPR-16 NRC Docket ND. 50-219 NRC REGION
( s n n d n A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy10U Cy ZOB CY Z014 CY 1015 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS I 0 I 0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY ZOIl CY 1013 CY ZOl4 Cy 2015-NUMBER OF REACTOR OPERATORS 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 3 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE Z 0 5 0 NUMBER OF SENIOR REACTOR OPERATORS* UMiTED 0 0 0 0 PROPOSED DATES PRIMARY DATE 05129/2012 N/A 06102/2014 N/A ALTERNATE DATE 06/04/2011 N/A 06/0911014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 20U Cy ZOU MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 13 0 0 0 NRC FORM 538 (10-200II) PRINTED ON RECYClEO PAP£R Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.()131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per res~onse to comply with this voluntary information collectIOn requesl: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments ~ardlng buraen OPERATOR LICENSING estimate to the Records and FOIAJPrlvBcy Services Branch -5 F 3). U.S. Nuclear R~ulatory Commission. Washington, DC 20555-000,or b1c internet EXAMINATION DATA e-mail to in ocoliects@nrc.gov, and to the Desk OffICer, Office of In onmalion and Regulatory Affairs, NE B-10202, (3150.()131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an infonmation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is no! required to respond to, the Inforrna~on collection. FACILITY NRC REGION Peach Bottom Atomic Power Station; Units 2 and 3 Facility Operating License Nos. DPR-12; (Renewed) DPR-44; and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 Cy 2013 CY 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy 2013 Cy 2014 Cy 2015 NUMBER OF REACTOR 0 8 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 10 0 6 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR
- ' See LGS
- ' See LGS
- ' See LGS
- ' See LGS OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 211112013 NIA 2/9/2015 ALTERNATE DATE N/A 3/2512013 N/A 3/23/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2012 Cy 2013 PROPOSED
-~- NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 12 0 CANDIDATES NRC FORM 5J6 (10-2008) PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/3112011 (10-2008) Estimated burden per res~onse to comply with this voluntary informatio collection request: 1 hour. his Information collection is used to;~~fg;~~~ and resources for operator examinations. Send comments ar OPERATOR LICENSING estimate to the Records and FOIAIPrivscy Services Branch -5 Nuclear R~Ula!ory Commission. Washington. DC 20555-o<ror or ~ internat EXAMINATION DATA e-mail to in OCOllects@nrc'gov, and to the Desk Officer. Office of In onmation and Regulatory Affairs. NE 8-10202, (3150-0131). Office of Management an Budget. WaShington. DC 20503. If a means used to impose an information collection does not display a currenUy valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the Information collectIOn, n d FACILITY Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy20p CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LlCENSEE*PREPARED EXAMINATIONS 1 I 0 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY2014 Cy2015 NUMBER OF REACTOR OPERATORS 4 5 0 5 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 9 5 0 5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 0 0 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 3/26/2012 9/2312013 N/A 219/2015 ALTERNATE DATE 4123/2012 10114/2013 N/A 2/2312015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2012 ~.---.- CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 10 0 0 0 0 0 10 NRC FORM 536 (1()'2008) PRINTEO ON RECYCLED PAPER 0 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-{)131 EXPIRES: 1013112011 (10-2008) Estimated burden per res~onse to comply with this voluntary Information collection request; 1 hour. his information collection is used to plan budget and resources for operator examinations. Send comments ~arding burde OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch
- 5 F 3). U.S Nuclear R~ulatory Commission. Washington. DC 20555-000
- or ~ intern EXAMINATION DATA e-mail to in ocollec!S@nrC'gov, and to the Desk Officer. Office of I ormatio and Regulat~ AIIeirs, NE 6*10202, (3150-0131), Office of Management an Budget, Washmgton, DC 20503.
If a means used to impose an informatio collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person Is nol required to respond to, the informadon collection. et n d s n n FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 I NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 Cy 2013 CY 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 1 1 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy2013 CY 2014 CY2015 NUMBER OF REACTOR OPERATORS 4 5 4 6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 5 5 5 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 02/6/2012 6110/2013 611612014 6/15/2015 ALTERNATE DATE 02/13/2012 6117/2013 6/23/2014 6/2212015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 -~-- MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 10 0 0 0 9 0 0 0 NRC FORM 536 (1()"2008) PRINTED ON RECYCLED PAPER
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 19, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION 11\\ EXELON STATIONS
Dear Mr. Pardee:
In a letter dated August 13, 2009 (RS-09-109), your staff responded to Regulatory Issue Summary (RIS) 2009-11. and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated March 19, 2009 (U-603882), Clinton Power Station requested an examination be administered in October or November 2010 that was not included in your RIS response letter. That examination has been added to your examination schedule. In a separate letter dated November 18,2009 (U-603924), Clinton Power Station requested we not schedule the examination requested in December 2011 per your letter, but retain an August 2011 examination scheduled from your response to the 2008 RIS for examination scheduling. In a separate letter dated January 6, 2010 (Byron 2010-0003), Byron Station requested we change the dates of their examinations proposed for 2011,2012, and 2013 to other dates. We were unable to accommodate the April 2013 examination requested for Quad Cities Nuclear Power Station. It is currently listed as "To Be Determined" as we are currently negotiating a mutually acceptable examination date with Quad Cities training department personnel. This letter confirms scheduling of the requested examinations at the Region III Exelon power plants and incorporates the changes requested by Clinton Power Station and Byron Station. We have tentatively scheduled the requested examinations to occur as follows: Station 2010 2011 2012 2013 2014 Braidwood NIR 06/20 NIR 03/25 NIR i Byron 9/27 NIR 01/16 01/14 01/27 I Clinton 11/1 8122 NIR 8/19 I NIR I Dresden 03/08 03/07 3105 3/04 I NIR LaSalle 09113 NIR 09/24 NIR NIR Quad Cities NIR 5/30 I 3/26 TBD NIR N/R - None Requested TBD - To Be Determined On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
C. Pardee -2 We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks. Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations. a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. N PF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ
C. Pardee We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks. Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ DISTRIBUTION: See next page OFFICE NAME DATE RIII:DRS HPeterson 02119110 OFFICIAL RECORD COpy
Letter to Mr. Charles G. Pardee from Mr. Hironori Peterson, dated February 19, 2010.
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION: RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMClinton Resource RidsNrrPMDresden Resource RidsNrrPMLaSalle RidsNrrPMQuad Cities RidsNrrDirsirib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano linda linn Patricia Buckley Tammy Tomczak
helon Nuclear www.exeioncorp.(om Nuclear 4300 Wlnneld Read Warrenvllle,lL 60555 RS-09-109 August 13, 2009 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-45§ and STN 50-457 Byron Station, Units 1 and 2 Facility Operating license Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating license No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating license Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station. Units 1 and 2 - F 'Y ~ ()/2. Facility Operating license Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 limerick Generating Station, Units 1 and 2 Facility Operating license Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating license No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station. Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 AUG 172009
August 13, 2009 U. S. Nuclear Regulatory Commission Page 2
Subject:
Response to NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009-11 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. Je Man ger - licensing and Regulatory Affairs - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 (1Q.2(108) Estimated burden per re5~onse to comply with this voluntary Information collection request: 1 hour. his information collection is used kl plan budgets and resources for operator examinations. Send comments rf.ardln~ burde OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch
- 5 F 3), U.S.
Nuclaar R~ulatory CommiSSion. Washington, DC 20555-000,or blc Intarne EXAMINATION DATA e-maU 10 in ocouectS@nrc.~v. and \\0 the Desk OffICer, Office olin ormaUon and Regulatory Affairs, NE 8*10202, (3150-0131). Office of Manll!{emenl and Budget. WaShington, DC 20503. If a means used to impose an Information collection does not display a currenliy valid OMS control number, the NRC may not conduct or sFc0nsor, and a person Is not required to respond to, the Information collect on. n t FACILITY Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 NRC REGION HI A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0 1 0 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 Cy2011 CY 2012 CY 2013 NUMBER OF REACTOR OPERATORS 0 7 0 5 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 12 0 12 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 06/20/2011 N/A 03/24/2013 AlTERNATE DATE N/A 07/1112011 N/A 04/08/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 21 0 0 0 0 0 0 19 NRC FORM 536 (10-200l1) PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 1013112011 (10-2008) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour. his information collection is used to ptan budgets and resources for operator examinations. Send comments r~arding burden OPERATOR LICENSING estimate to the Records and FOIAIPriliacy SONices Branch -5 F 3), U.S. Nuclear R:;?ulatory Commission, Washington, DC 20555-000,or brr '"temel EXAMINATION DATA e*mail to in ocollec!S@nrc'gov, and 10 Ihe Desk Officer. Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0131). Office of Management and Budget, Washington. DC 20503. If a means used to impose an information collection does not display II currently valid OMS oontrol number. Ihe NRC may not conduct or sponsor. and a person is not required to respond to, the information collectIOn. FACILITY NRC REGION Byron Station, Units I and 2 Facility Operating License Nos. NPF-37 and NPF-66 III NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 Cy 2011 Cy 2012 CY 20B ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC-PREPARED 0 EXAMINATIONS
- 8. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2011 CY 20ll Cy20lJ NUMBER OF REACTOR 8
OPERATORS 0 0 6 NUMBER OF SENIOR REACTOR 8 OPERATORS - INSTANT (I (I (I NUMBER OF SENIOR REACTOR 1 1 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 09/27/2010 09/26/2011 09/24/2012 09/23/2013 ALTERNATE DATE N/A 10/03/2011 10/0112012 10/07/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 6 0 0 0 6 0 0 CANDIDATES NRC FORM 536 (10-200&) PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Page 1 of 1 NRC FORM 538 u.s. NUCLEAR REGULATORY COMMISSION APPROVEO BY OMS: NO.315().0131 EXPIRES: 081311200 !$-200$) I:IUmited burdenn' re~n.. to comply with thle voluntlry Inform.io CDI1edion reqlllllll: hO\\l" II Informallon coll4K:Uon ill ueed to plan budge and,etOUI'CIN lot operltor elQllmlnlllionl. Send commenll ~rdlnLburile OPERATOR LICENSING IIllImate 10 the Recorda end FOlAlPrivacy SeMcel Branch -6 F ). U. Nud_ R~UIaIcxy Commillion, WuhI"IIton. DC 201565-000
- 0' =.temeI EXAMINATION DATA
_:~d and to the 0 ** Otllcer. 0fIIce oIt lio III1d R AlIa 202. (3150-013'). orne:. 01 M"'~ ~ Budget. 20503. If I meetll u$eel 10 IITIpOIII an fOrmatIo CClllec:tlOI1 I culTllnlly wild OMB conUOI number.1he NRC ma not conduct o~n.or. Ind. perllOll II not required 10 r..pond to, th Inlormallon col S. 8 n
- t.
o n n y e FACIUTY Clinton Power Station, Unit 1 Facility Operating Ucense No. NPF-62 NRC Docket No. 50-461 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 1 0 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INrrlAL OPERATOR I.ICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 NUMBER OF REACTOR OPERATORS 6 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS
- INSTANT 0
4 0 4 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS* UMrrED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1012512010 1210512011 N/A 08119/2013 ALTERNATE DATE 11/0112010 12/11/2011 N/A 08J26I2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINAnON (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 -~ MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 9 0 0 0 0 0 I'RINTEtI ON RECYCLED PIij>ER Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 10131/2011 (1 ()'2008) Estimated burden per res~onse to comply wilh Ihis voluntary informatio collection request: 1 hour. his infonnalion collection is used to plan budget and resources lor operator examinations. Send commenls rerardlng burde OPERATOR LICENSING estimate to the Records and FOIAlPrivacy Services Branch -5 F 3). U.S Nuclear ReVculatOry Commission. Washington. DC 20555-000,or b~ Interne EXAMINATION DATA e-mail to in ocollects@nrc'gov, and 10 Ihe Desk Officer, Office of In ormation and Regulatory Affairs. NE B-10202, (3150-0131). Office of Management an Budget, Washington, DC 20503. If a means used to Impose an informatio collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection. n n d n s t FACILITY Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-2S NRC Docket Nos. 50-237 and 50-249 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 Cy 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 1 1 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 NUMBER OF REACTOR OPERATORS 2 3 3 3 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6 9 9 9 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 1 1 1 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 03/08/2010 03/07/2011 03/05/2012 03/04/2013 ALTERNATE DATE 04/05/2010 04/04/2011 04/02/2012 04/01/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 12 0 0 0 12 NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150~131 EXPIRES: 10131/2011 (10*2008) Estimated burden per res~onse to complv with this voluntary information collection request: 1 hour. his Informallon collection is used to plan budgets and resources for operator examinatiOns. Send comments r~ardin~ burden OPERATOR LICENSING estimate to the Records and FOllVPrlvacy Services Branch \\ *5 F 3), U.S. Nuclear R~ulatory Commission, Washington, DC 20555-000
- or bl,internet EXAMINATION DATA e-mail 10 in ocollects@nrc'gov. and to the Desk Officer. Office of tn rmallon and Regulato~ Affairs. NE B*10202. (3150~131). Office of Management and Budgst. Wash ngton. DC 20503.
If II means used to impose an Information collection dOllS nol display a currently valid OMS contrOl number. the NRC may not conduct or sponsor. and a person is not required to respond to. the Information collection. FACiliTY NRC REGIOI-I LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF*t 1 and NPF-18 III NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 1010 Cy lOll CY 1012 Cy 1013 ESTIMATED NUMBER OF 1 0 1 0 LICENSEE*PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC*PREPARED 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 NUMBER OF REACTOR 3 OPERATORS 0 6 0 NUMBER OF SENIOR REACTOR 11 OPERATORS -INSTANT 0 8 0 NUMBER OF SENIOR REACTOR 0 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 09/14/2010 N/A 09/24/2012 N/A ALTERNATE DATE 09/2112010 N/A 10/01/1011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cy 2010 CY lOll PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCleD PAPER Response to RIS 2009-11 Page 1 of2 ~'0IUIS3I u.s. NUCIJ!AR REGULATORY COIIIIIIIllON 10..2001) OPERATOR UCENSINO EXAMINAnON DATA APPRO'JEC) IV 0Iie: NO. 3111G413' EXPIRES: 1013112011 &tIrM1lld buI'deftf: ~ to ~willi_ YOIun!8ry ~ edIedbI NqUeiII: hoW. InfomtdDi'I ~ III1Md to "... ~ .nd ~." 0fIIIIIIDr.....1doI... Send ~dIILbuiiI ...... 10 IIw ReCofdI.nd fCM~ s.mc. a-dI '8 F ). u.s. ,...,~CommIIIo1on. ~ DC .<<:z,...... ..... " ~d'.nd" \\lie DMIc OIIIc:<<, 0III0t til IImIllllo .nd~~ 'F;(3111G4131). OIIIottil~ ~ W 20G03.. _1IIiId" /rnpaM all 110 ~ do-. nat dI.rjji8y * ~WIIId or.e --. tUnbIr, !he NRC IIWY lICIt COndu~_, and
- pel'lOll III.. r.cpllnld to,._pond to, IN Infllmwllon M
tl ft FN1ffV Umertek Geaeradal Statio., V.1ta 1 ad 2 FadJItJ Oper.c:t.q Licea.. NO&. NPF-39'" NPF-15 NRC Docbt NOlI. 50-352 ad 50-353 NACReOIOM I A. PROPOSED EXAMINATION PREPARAnON SCHEDULE PROPOSED NUMBER cy 2011 CY 2.11 Cy2012 ev 2113 ESTIMATED NUMBER OF UCENSEE-PREPARED EXAMINATIONS 1 I ESTIMATED NUMSER OF NRC-PREPARED EXAMINATIONS 0 0 B. INITIAL OPERATOR LICENSE EXAMIHAnONS PROPOSED NUMBER CY201. Cy20U ev 20U ev ll13 NUMBER OF REACTOR OPERATORS 0 11 1 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 7 0 5 1 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 5 1 1 1 NUMBER OF SENIOR REACTOR OPERATORS* UMITED 1 1 0 PROPOSED DATES PRIMARY DATE 1110412011 N/A 11101/2111 N/A ALTERNATE DATE 1111812010 N/A 09J2.412OU N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (OFE) SCHEDULE PROPOSED NUMBER CV 2011 CV 2011 MARCH JUNE IsEPTEMBER DECEMBER MARCH JUNE ISEPTEMBER DECEMBER ESTIMATED NUMSEROF CANDIDATES 1 0 1 0 0 16 0 0 Response to RIS 2009-11 Page 2 of 2 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315Q'()131 EXPIRES: 1013112011 (10*2008) Estimated burden per res~onse to comply with this lIoluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments rer.rdln~ burden OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch
- 5 F 3). U,S.
Nuclear Re~ulatOry Commission, Washington. DC 20555-000
- or b~ internet EXAMINATION DATA e*mall to in ocoliects@nrc'BilIl. and to the Desk Ollicer, Office of In ormation and Regulatory Affairs. NE B*10202. (3150*0131). Office of Management and Budget, Washongton. DC 20503.
if a means used to impose an information collection does not display a currenUy lIalid OMB control number. the NRC may nol conduct or sponsor. and a person is not required to respond 10, the informatlon collection. FACILITY NRC REGION limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF LICENSEE*PREPARED 1 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC*PREPARED 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010 CY 2011 Cy 2012 Cy2013 NUMBER OF REACTOR OPERATORS 0 0 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS
- INSTANT NUMBER OF SENIOR REACTOR 0
0 0 0 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR 8 0 0 0 OPERATORS* LIMITED PROPOSED OATES PRIMARY DATE 06/14/2010 N/A N/A N/A ALTERNATE DATE 06/0712010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (1()"2008) PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10*2001l1 Esllmated burden per res~on$E' to comply with this voluntary information collection requesl: 1 hour. his informalion collection is used to plan budget and resources for operator examinations. Send comments re~arding burden OPERATOR LICENSING estimale to the Records and FOIAlPrivacy Services Branch
- 5 F 3). U.S.
Nuclear Re~ulatOry Commission. Washington. DC 20555-000
- or by' inlerne EXAMINATION DATA e-mail to in ¢COllecls@nrc.~II. and to the Desk Officer. Office of In ormation and ReQutatoif, Affairs. NE B-10202. (3150-0131). Office of Management an Budget. Wash nglon. DC 20503.
If a means used to impose an informatiO collection does not display a currently valid OMB control number. Ihe NRC may not conduct or s~nsor. and a person Is not required 10 respond to. the information collect d n s l FACILITY NRC REGION Oyster Creek Nuclear Generating Station I Renewed Facility Operating License No. DPR*16 NRC Docket No. 50*219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 Cy 2011 CY 2012 Cy 2013 ESTIMATED NUMBER OF LlCENSEE*PREPARED EXAMINATIONS I I 1 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 Cy2011 CY 2012 Cy2013 NUMBER OF REACTOR OPERATORS 6 6 6 0 NUMBER OF SENIOR REACTOR OPERATORS
- INSTANT 7
7 8 0 NUMBER OF SENIOR REACTOR OPERA~RS*UPGRADE 2 1 2 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 05/17/2010 07111/2011 05128/2011 N/A ALTERNATE DATE 05124/2010 07/1812011 06/04/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 2010 Cy 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 13 0 0 0 14 0 0 0 NRC FORM 536 (IQ.2008) PRINTED ON RECYCLEO PAPER Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 (10-200e) E$liml.lled burden per res~onse to comply with this voluntary information collection raquest: 1 hour. his information collection is u$ed to plan budgets Bnd resources for operator examinations. Send comment$ r~ardlnH burden OPERATOR LICENSING estimate to the Record" and FOIA/Prlvacy Services Branch -5 F 3). U.S. Nuclear REI~ulatory Commission. Washington. DC 20555-000
- or brc intennel EXAMINATION DATA E~~~ocollecls@nrc.sov. and to Ihe Desk OffICer. Office of In ormation lato~ Alfair1!, NE B*l0202, (3150-0131). Omce of ManagefT1$ot and ash nglon, DC 20503.
II a means used 10 impose an Information oeS not dIsplay a currently valid OMB control number, Ihe NRC may not conduct or s~onsor. and a person Is not required to respond to. the ,nformaUon collect on. FACILITY NRC REGION Peach Bottom Atom Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20JO Cy 2011 CY 201l CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INl'rlAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010 Cy2011 CY 2011 CY 2013 NUMBER OF REACTOR 0 OPERATORS 6 0 8 NUMBER OF SENIOR REACTOR 0 OPERATORS
- INSTANT 8
0 10 NUMBER OF SENIOR REACTOR 0 3 0 2 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* UMITED PROPOSED DATES PRIMARY DATE 01131/2011 N/A 02/1112013 ALTERNATE DATE 03/21/2011 N/A 02/04/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 J8 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER "'See Attachment 6 (Limerick Generating Station) for Limited SRO numbers and exam dates Response to RIS 2009-11 Page 1 of 1 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED 8Y OM8: NO. 3150-0131 EXPIRES: 1013112011 (lG-2008) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budget and resources for operator examinations. Send comments refrd,ng burden OPERA TOR LICENSING estlmate to the Records and FOINPrivacy Services 8ranch -5 F 3), U.S Nuclear R~ulatory Commission. Washington, DC 20555-000,or b" interne EXAMINATION DATA e-mail to in OCOliects@nrc'gov, and 10 the Desk Officer, Office of In ormation and Regulatory Affairs, NE 8*10202, (3150'{)131). OffICe of Management an Budget, Washlnglon, DC 20503. If a means used to impose an informatio collection does not display a currently \\lalid OM8 control number. the NRC may not conduct or sponsor, and a person is nOI required to respond to, the information collection. d n s t FACILITY Quad Cities Nuclear Power Station, Units 1 and 2 Renewed FaciUty Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 NRC REGION 1II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF L1CENSEE*PREPARED EXAMINATIONS 0 1 1 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 Cy 2012 Cy2013 NUMBER OF REACTOR OPERATORS 0 6 4 3 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 11 10 10 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 0 1 1 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 05/30/2011 03/1212012 04115/2013 ALTERNATE DATE N/A 06/13/2011 03126/2012 04/29/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 14 0 0 0 0 NRC FORM 538 (10-2008) PRINTED ON RECYCLED PAPER 0 Response to RIS 2009-11 Page 1 of 1 NRC FORM 53. U.S. NUCLEAR REGULATORY COMMISSION (10-2001) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3160'()131 EXPIRES: 1013112011 EIUmaied burdan nr ra.~n.a 10 comply with thla voluntary informallo oo/Iedlon Alquast: hour. hi Infol'matlOn col!e<:1lon III ullad 10 plan budge IIIId rellOU/QaI for operator alUll'lllna!lona. Sand commanw r~1:1 burdlt .tlim.la to the Recorda lind FOIAJPlivacy Servlcu Brancll -5 F 3). U. Nucla.r R~latory COtmlllllion. Washington. DC 20fi6l>.000
- 01' ~
a-malI to In c:oIleCtsOnn:s:' and 10 llIe Delk Ofllctr. 0III0a 011 and Reouta:Yr Alran. NE 10202. (3160-0131). Olllce cJ MIII:11III Budgtl. W. nglon. DC 20503. If " meant uead to mpotMO an alla coIlIiCtIon doN nol dlaplay a Cl.llT8fttly VIIIid OWl conlrQl numbar. Ihe NRC m. not conduct ~nlOr. and a paraon is not requIred to ra.pond to. llI Infol'matlon col S. d n ll n n y e FACIUTY Three MU. Islaad Nuclear Statio_, Unit 1 Fac:Wty Operatln. License DO. DPR-50 NRC Docket No. 50-189 NRCRIilGlON I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 Cy 1011 CY 1011 CY 1013 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 1 0 I ESTIMATED NUMBER OF NRC-PREPARED EXAMtNATlONS 0 0 0 0 B. INlnAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 1010 Cylon-CylOll-CylOIJ NUMBER OF REACTOR OPERATORS 1 10 0 NUMBER OF SENIOR REACTOR OPERATORS
- INSTANT 1
10 0 8 NUMBER OF SENIOR REACTOR OPERATORS UPGRADE 0 I 0 1 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 0111111010 09/1%1%011 N/A 09/0'!lOU AlTERNATE DATE Oll2811010 09/1911011 N/A 09n6lZ0J3
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 2010
--~,-- Cy 101% MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ~EPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 11 0 0 0 18 0 0 0 NRC FORM 538 (10.2001) PRINTED ON RECYClEO PAPER
October 7, 200B Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS
Dear Mr. Pardee:
In a letter dated July 22, 200B, (RS-OB-092) your staff responded to Regulatory Issue Summary 200B-16 and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated July 11, 200B, (KKM-OB-001) the Quad Cities Nuclear Power Station Training Manager requested a change to the start date of the Station's 2009 examination. This letter confirms scheduling of the requested examinations at the Region III power plants and the change requested for the Quad Cities Nuclear Power Station 2009 examination. We have tentatively scheduled the requested examinations to occur as follows: Station 2009 2010 2011 2012 Braidwood 10/05 NIR 6/20 NIR Byron NIR 9/27 9/12 9/10 Clinton B/24 NIR B/22 NIR Dresden 03/09 03/0B 3107 3/05 LaSalle NIR 09113 NIR 9/17 Quad Cities 11/30 NIR 5/30 3/26 N/R - None Requested On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. Because the examinations have greater than nine anticipated applicants, each examination is scheduled for two weeks. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.
C. Pardee -2 A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station
C. Pardee -2 A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station See Attached Distributions DOCUMENT NAME: G:\\DRS\\WORK IN PROGRESS\\EXELON 100708 DRS OL.DOC o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive T' o receive a cop: 0f tb'IS dotument, *ID d"lI:ate In tbe box "C; COPY WI0 attaehieoeI "E"'; COPY Wit'h attaehieoeI UN". ;No copy OFFICE RIII:DRS I Rill: DRS I RIII:DRS I I NAME JKweiser:co DMcNeil HPeterson DATE 10102/08 10102/08 10107/08 OFFICIAL RECORD COPY
C. Pardee -3 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission Site Training Director - Byron Station B. Quigley, Byron Station Docket No. 50-461 License No. NPF-62 cc: Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Manager Licensing - Clinton, Dresden and Quad Cities Site Training Director - Clinton Power Station Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Site Training Director - Dresden Nuclear Power Station Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc: Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Site Training Director - LaSalle County Station Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager Quad Cities Nuclear Power Station Vice President - Law and Regulatory Affairs D. Tubbs, Manager of Nuclear Associate General Counsel M. Rasmusson, State Liaison Officer, State of Iowa Chief Radiological Emergency Preparedness Section, Dept. of Homeland Security Site Training Director - Quad Cities Nuclear Power Station
Letter to Charles G. Pardee from Hironori Peterson dated October 7,2008
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION: Russell Gibbs Tamara Bloomer Meghan Thorpe-Kavanaugh Joel Wiebe Stephen Sands Christopher Gratton RidsNrrDirslrib Resource Mark Satorius Kenneth OBrien Jared Heck Roland Lickus Carole Ariano Linda Linn Patricia Buckley DRPIII DRSIII Patricia Buckley Tammy Tomczak
Janet Kweiser From: Carmen Olteanu Sent: Tuesday, October 21,2008 11 :22 AM To: Russell Gibbs; Tamara Bloomer; Meghan Thorpe~Kavanaugh; Joel Wiebe; Stephen Sands; Christopher Gratton; RidsNrrDirslrib Resource; Mark Satonus; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; Patricia Buckley; DRPIII; DRSIII; Patricia Buckley; Tammy Tomczak
Subject:
Exelon Letter Re Confirmation of Initial Exam Attachments: Exelon 100708 DRS OL.doc The subject document has been completed and has been submitted to ope to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession
- ML082880559.
1
AmerGen~ An belon Company www,exeloncorp,(om Nuclear AmelCen Energy Company, LLC 4300 Wmfield Road Exelon Generatlon Warrenvllle, IL 60555 4300 Wmfield Road WarrenVl!le, ll60555 RS-08-092 July 22, 2008 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPA-19 and DPA-~5 _, NRC Docket Nos. 50-237 and 50-249 laSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket NQs. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278
July 22, 2008 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR~29 and DPR-30 NRC Docket Nos. 50-254 and 50~265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50~289
Subject:
Response to NRC Regulatory Issue Summary 2008~16, "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations," dated June 27, 2008 The referenced Regulatory Issue Summary requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2009 through 2012, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2009 and 2010. Attachments 1 through 10 provide responses for the Exelon Generation Company, LLC and AmerGen Energy Company, LLC plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2009, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual~site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for PBAPS. Attachment 6 for LGS references Attachment 8 where appropriate. There are no regulatory commitments contalned within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. Respectfully, ~Yv1~L-Darin M. Benyak Director - Licensing and Regulatory Affairs
July 22, 2008 U. S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 tor Three Mile Island Nuclear Station - Unit 1
Response to RIS 2008-16 Page 1 of 1 SRCFORMSJ6 II.S NUCLEU REGlLATORY COMMISSION APPROVED BY OMB: NO. J150*lllll EXPIRES Oll/J Ilems III-ZOOS) E~lim;lted burden per re..pofl.'< to "'\\Impl~ with thl~ vol':'J1I3J)' in(nnnarion L'ullel'tKln requeM: 1 hour. ThIs inform':ltJull L'oUe~tit)n I" U:.N (u plan budg:ef.'; OPERATOR LICENSING ~~~~~~I:~;~~11~~d~~~rao1~;;~~:sr::~~;:'Be;~,~fT~I~f~r~s. Nuc~ar Regulalut)' Olml'rwo!\\M')n. Washmglon. DC ~OSSS~(XXJ l. I'f b~' tnttmd EXAMINATION DATA e* "",,I I fo 1nli.)(illle1.'I!'I@nrc,'i)w, tlnd 10 tht Df!\\k Oflker, Offl1:e' ojf In otmJ[1(1n ane Re~ulal"')! Affa;". NE B*IO~()1.,J 151).0131). Otfo<e (If 1'4..,111,,"1 and BlJd8~. Wa:o.hmgton. OC >>50:t If J means u~ In Impur.e' an IOtilrIDah.1D ~\\.,ne... tk)n due~ nul dl!!>play a t.'umruly vahd OMS uHltmlnumber. the NRC may ont L'ooooct or, *.pon~K. and a perMJII i!O flU' requlI"td ttl r~r.pImd 10, the tnl(lnnaikill t:olle\\.1ktfl, F,\\CILITY NRC REGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY 2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER Of NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo9 CY 2010 CY 2011 CY2012 NUMBER OF REACTOR 1 0 7 0 OPERATORS NUMBER OF SENIOR REACTOR 12 0 12 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATFS PRIMARY DATE 10/05/2009 NlA 6120/2011 N/A ALTERNATE DATE 10/19/2009 NlA 711112011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cv2Q09 cv2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER I MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 21 0 0 0 CANDIDATES
Response to RIS 2008-16 Page 1 of 1 NRC FORMSJ/i u.s NUCLEAR REGULATORV COMMISSION 18*21105) OPERATOR LICENSING EXAMINATION DATA FACILITY Byron Station, Units 1 and 2 APPROVED BY OMS: NO. 3150*01)1 EXPIRES: OW] 1/21XlII El-limatro burden ~r res~n.~ 10 t'umply wl!h (nip;.,,'olulltary Ininrm;Ulfln t:nUet.1ttlR n-que$l: I M'Uf. 'fl'u~ information t:uUechnn i:'!o used to pfan budgl't~
- ~!~~~)cf~tW~t
- d~~){J~~i~:ci:~~~":;:*~ri~i~rt~~~.
Nuclear Re"UlJh.HY Commi~"k}ll. Wa~hington. DC ~0555~OIx)I.tlr bX mttrnel e-mail '0 in \\h;lIlte;;t~@nr"l>>)V' and tu Ihe De.'\\k Officer. OtT.cc nt In nrmalion aod Regu",lOty Afr.i", NE B-W~02. iJ 150-01 311. Office "rM.h.~emern aod BOOgtel._ Washlflptnn. DC ~OS03. If a means used In imJX}~ ;u1 mfhrrnarion ('ollt!cfxln doe~ not dL'Ptay acurrently villid OMS l'ontrnl number, the NRC may ~f~~'!iW;itriJ~~.:Uld a peN)n i~ nol required tu respclfld In. the NRC REGION III Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY2010 CY 2011 CY2012 ESTIMATED NUMBER OF LICENSEE*PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY 2010 CY2011 CY2012 NUMBER OF REACTOR 0 9 0 7 OPERATORS NUMBER OF SENIOR REACTOR 0 8 12 6 OPERATORS-INSTANT NUMBER OF SENIOR OPERATORS-UPGRADE 0 1 1 2 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE NlA 9/27/2010 9/1212011 9/10/2012 ALTERNATE DATE NlA 10/04/2010 912612011 9/24/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2009 CY2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 17 0 0 0 12 0 0 CANDIDATES
Response to RIS 2008-16 Page 1 of 1 NRC FORM S.l6 ll.S )jUCLF.AR RE(;ULATOR'I' COMMISSION 18* 2410S) OPERATOR LICENSING EXAMINATION DATA FACILITY Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 APPROVfD BY OMS NO. ) 150*0131 EXPIRES: ORl31!~(lOll E~im.lI('d hlJn:ien per resp(lnor.e 10 lornpl)' w~h Ihi., volunlal y infonnalion ..:ulleclion request: I hour. Thi~ Informallon l'Illie(."tkln IS u~d In plan budgets ~.~~~~~~~~~fR~~d~I~';JF&1~:~;c;~~~~~tfr~~~efT.~if!!f~r8~g. Nuclear R:e~ulatu.ry Cummis:o;inn. Wa)\\hm~tnn. DC ;0555*qOOI. or bt: mren:.e' t"-mailro In oC(lllec:ts@nrc.~)V. J.nd In Ille Ot>~k Otl,cer, Offk.'t' o( In ormation
- lIld Regulatory AffaiN. NE 8-IOW:!. (3150*0131), Onke of Manat!emenr iUld Budgr!, Wu!oohmglnn. DC ~OS03. If ;a mtan:o, lI~d to impose ;10 inlonnalk)ft l'olltclion d\\)c,~s not display a currenlly v"lId OMB <<':IJI.ml number. the NRC may
~)I conduct or 1\\.ptlO~)r. and a per-*,on is not required to respmd 10. the mf(lrmalion l."olieLtion. NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC* PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo9 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR 6 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 6 0 3 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2 0 3 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 8/24/2009 N/A 8/2212011 N/A ALTERNATE DATE 8/17/2009 N/A 8/29/2011 N/A C. PROPOSED GENERIC FUNDAlVIENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cv2oo9 cv2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 0 0 NlIMBEROF 0 0 9 0 0 CANDIDA'rnS
Response to RIS 2008-16 Page 1 of 1 NR<:.*ORM SJ6 IJ.S Nl,ClEAR REGULA TORY ('OIltMISSION ,\\PPROVED BY OMB: NO, Jl~O-OIJJ EXPIRES: ()llJJI/~(~>>I 18*lOOS; E.... imated burden ptr fe"pnn"-e r~l o1mply with tltis V1111l1.ary inhmnat~1n L'illtectkln reqlJe....t. I ~Jur, TIm. Iflfl)~llnn ~tlilecttnn I," u..ed h) pl.. n budget\\ OPERATOR LICENSING ~~~~~~:;:~~tY[e~~rd~~~}Ol~~i~~~is~~~~~"Br~~~fT~~f~f~r~s. Nudtar Rt1.Ubtllry C~'1mmi)..~inn. Wa....hlogton, DC.:!055~-iMXll.l~r b~ mtemet EXAMINATION DATA e>>f1\\;.Ilt ttl 1I1lx'-llleCb@nrc.f)'v, and to IDe De~ Officer. Ofti,,:e!lt ~n ormation "nd R<gulaillry Affairs.:'>IE B* W:l62. () ISO-'lIl!). om"" "fM,,,,,..,,ment,nd Bud~~I. Wa~hmglon. DC ~503, Jf" mei\\l1l1o used (I) impn!<e JO m(ormallon ,,'tiUe...1xm doe" not dj"'play.. l:urrently valid OMS,;ol1uul number. the f'RC mil)' Ilut conduct nr ~pon~lr,.and il person I~ Imt required to re."Pmd tHo the inf\\)(f1litflon {IIUecllon. FACIUTV NRC REGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating Ucense Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE* PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC* PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY?01? NUMBER OF REACTOR 6 4 4 4 OPERATORS NUMBER OF SENIOR REAcroR 4 10 8 8 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 0 1 1 1 OPERATORS* UPGRADE NUMBER OF SENIOR REAcroR 0 0 0 0 OPERATORS*LIMITED PROPOSED DATES PRIMARY DATE 3/09/2009 310812010 3107/2011 3/05/2012 ALTERNATE DATE 4/06/2009 4/05/2010 4/04/2011 4/0212012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2009 CY2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMB-; ESTIMATED 0 0 12 0 0 0 14 0 NUMBER OF CANDIDATES
Response to RIS 2008-16 Page 1 of 1 NKCfOKM S.16 u.s NUCLEAR REGULATORY COMMISSION tll-ZOOSI OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO. JI5()'IlI.H EXPIRES: OIV311~{J()N E~tm,tled burdel1 pc'r rt::,plln~ t.l' ('umpiy with Ihb; Vt11untary inil.lrm.llinn t.:!)JJel:110n reque.... : I hour. 'nus mt('Jrmallon,;ulleclttln IS used ftl plan budj,!et:<' ~~1::~~~t:;.::rR~~~~:.Jf9I~~:~~~s;!~~:n;:r~~h'f~i~f)~1f,~. Nurlr.lr Re~ulawry ('llmmiSSIIHt. W,t'i.hmgwn, DC ~f}jS5*.t0l1. or bllnternef e-mail to 1Il OfHlle..:t!.@nrl"t>>)V.>lndlothe Desk Offk:er. OHh.:eo( 10 Hmiukm "'IOf)' Affairs. Nil B* iO':02. ()15O*0131). OIlke of Ma"""emel1l and .. :!fJ503. If a means: used tu imJXlt.e: 311 m{ucmatJUn lay", "..urrem'): valid OMB contnll number. U\\e NRC may not l.'ondUt1 of ~pllrn;or. and ;J. per5un ~ nut required to re"pnnd to. the Information Clllfcl.'uon. FACILITY LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 NRC REGION III A. PROPOSED EXAMINAnON PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY 2010 Cy 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0 1 0 1 ESTIMATED NUMBER OF NRC-PREPARED EXAM INATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY 2012 NUMBER OF REACTOR OPERATORS 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 9/14/2010 NlA 9/18/2012 ALTERNATE DATE NlA 9/21/2010 N/A 9/25/2012 C. PROPOSED GENERIC FUNDAlVIENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY2009 CY 2010 MARCH JI EPTEMBER DECEMBER MARCH JUNE SEPfEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 12 0 0 0 0 0 0
Response to RIS 2008-16 Page 1 of 1 APPROVED BY OMB. NO. 3151),0131 EXPIRES: OIV31121)01l NRC.*ORM SJ6 U.S NUCLEAR REGULATORY COMMISSION 'M-2fMlSl OPERATOR LICENSING EXAMINATION DATA ~-"CILITY E~lmaled burdtn ptr re!>p-Jn~ I!' olmply wirh Ihi)' volunlary inli)rmauon ":1J1~1ion reqUC'.,1:, tuur. This mlmmalKlO (ul~fI(ln I.... u~d In plan budgels .100 re~}urt'~S ror operator u;Jmm:l1 ions. Send commenl,' regardi~ hurd~n ~sumaJt In 1he Reclll'd~ and FOIAIPriv:u:y Servln~.. Branch (1*5.3), U.S. Nudtar ReoGulalnry O~mmi)l,!I!~ln. Wa.... hinlllOn. OC 2055S*0nOI. (~r bl inlernel e-mulllll jnlocnlJef,;I~@nrc fjv..uld tu the De...k. Offic~r. OITi,,-e of In ~lrmalion and Regulatory AffaiN. NE B-)()2U2, (3150-0131). Otlk~ IIC M:uugemenl.md Budge!. Wa:o.hmgton. DC :0503. If oJ mean!\\. u.<tI 10 Impose an Inf(lrm:mon "':tJllet:liun ~s not display a currenlly valid OMS L:lmlmJ number. the NRC In.1y nOll"llndUl"t or sponsor. and a perMln is T'lC.H reqUIred 10 respond w. lhe intiJrm:Uk)fi <.:oIJectinn. NRC REGION Limerick Generating Station, Units 1 and 2 I Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos_ 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY2010 CY 2011 CY 2012 NUMBER OF REACTOR 0 6 0 4 OPERATORS NUMBER OF SENIOR REACTOR 0 10 0 6 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 2 0 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10104/2010 N/A 10108/2012 ALTERNATE DATE 10/18/2010 NIA 10/15/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cv2oo9 cv2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPfEMBER DECEMBER ESTIMATED 0 16 0 0 0 0 0 0 NUMBER OF CAl"JDIDATES
- See Attachment 8 (Peach Bottom AtomiC Power Station) for LSRO numbers and exam dates
Response to RIS 2008*16 Page 1 of 1 APPROVED BY OMS; NO. JI5{)*1l13! EXPIRES; OlVj 1i"00lI ,"*.!OIIS) NRCFORMS)6 u.s :-IIICLEAR REGLLA TORY COMMISSION E>JimatttJ bu<<k'n per re:o.p'-lO:;.t: I~) l'Omply V.'jltl thi.'I YoluntaJ)' infonnatiun (:{)1let.1~:m request: I hour. This 1.llto~aJtOn (UIte\\'titH'I I~ ur..ed to.plan budgets ~~~~~~~*~ht~!:~~~;J~~~~*;~~*~~~~~S~~rT1'W!:~~. OPERATOR LICENSING NUl'ie.ar R~~ulatnry Cllmmi:'>l>iun. Wa;;.hrn~lnn. DC ~0555-(kl:)J. ur bl tl1lemet t;*mail hI to \\)I.:ullectS,@l1tcE£,w.andtJ,}lhe Desk Oaker. Office ~}f In lrmatlOR and R.~ul""')' Arf.",. N S*Hl202.I}150*0I})). Om"e ()rM'~""'"1 and Budget. Wa...hang{(ln. DC ~05f)3, If amean!\\, ur.ed w impose In infnnnallOn ""l)JJecllun dnes ncH d;spla.y a currently valtd OMB....onrrnl number, the NRC may ~~L~r::~~ ~{~jt.~~~:. and i\\ ~r.'iun I.~ (KIt requ,rcd to re~p(lM 1\\), lhe EXAMINATION DATA NRC REGION fACILITY Oyster Creek Nuclear Generating Station I Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 CY2011 CY2012 CY2009 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. IMTIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2011 CY2009 CY 2010 CY2012 NUMBER OF REACTOR 6 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 10 10 8 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2 0 2 0 OPERATOR~UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 5/17/2010 5/1612011 5/04/2009 N/A ALTERNATE DATE 5/11/2009 5/2412010 5/23/2011 NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2009 CY2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 0 16 0 0 0 0 0 CANDIDATES
Response to RIS 2008-16 Page 1 of 1 NRC FORM S3(o U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 31 5[)'0 13 1 EXPIRES; IllVJ1 1'!(JOIi f~*ZOO5) E"'lIm;.)fecl I:xIrdcn per re~pnnse 10 ulmpiy wilh Ihi~ "'lh..ultary infonnalktQ cOIiel:,:tM,)f! reque~l: 1 hour, TIti:.: i.nfu~ma1Jnn cnlle\\."lkln~" It'td fO plan bUd~ets OPERATOR LICENSING
- 1~~~~c~h/ke~~~d~~rJ}~N:1::~;cr~~~~~r~~hf.f.~i~r~~~,
~~~r:,)R,~i~~;t~~t~0~:'i,i~~~~n~~~~~t:~k~*~;:'1)~~~ ~;;,tl:~I~:,:,:n EXAMINATION DATA .nd R<gul310ry Aff..." NE!QB. lO;:!ll'2.,3 I 5O-1ll3 Il. Office (If M.n.ge"",rn and Budget, WJ...hlngtHn. DC' :!OS03, If a means u~ itt jmpll~ an mtnrmatMJO c{\\lIet1JOi\\d~s nor di~la)' a.;:url'tmly valid OMS CUnlltll number, the NRC may ~1I cond....:r or SPUllfo(.)}". "nd a ~I'son i.. nut requited {O re~md 10, 1he mthnn::n ion collecr Inn. FACILITV NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating License Nos. DPR-44 and DPR-S6 NRC Docket Nos. SO-277 and S0-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2oo9 CY 2010 CY 2011 CY2012 ESTIMATED NUMBER Of l..lCENSEE-PREPARED 1 and 1 LSRO 1 0 1 EXAMINATIONS ESTIMATED NUMBER Of NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo9 CY2010 CY2011 CY 2012 NUMBER OF REACTOR 2 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 9 10 0 10 OPERATORS-INSTANT NUMBER OF SENIOR REACfOR 1 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACfOR 6 0 0 0 OPERATORS-LIMITED PROPOSED DATES 12107/2009 1210612010 N/A 12103/2012 PRIMARY DATE 8/0312009
- LSRO 1211412009 NlA ALTERNATE DATE 1211312010 12110/2012 8/10/2009
- LSRO C. PROPOSED GENERIC FUNDAl\\1ENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cv 2009 cv2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0
0 16 NUMBER OF 0 0 0 0 0 CANDIDATES
Response to RIS 2008-16 Page 1 of 1 NRCI'ORM 5.16 U,S NUCLEAR REGULATORY COMMISSION ,K*211115) OPERATOR LICENSING EXAMINATION DATA FACILITY APPROVED IIY 0"111: NO. J ISO*IlI] I EXPIRES,,llv.\\I/COOI! bttmattd (lurdt'11 per I't"pttnse iu ~'omply wifh 'hi~ \\'t't\\.mtary infl)rmatlon llllteCI km reqO!!sa: I httUT, 11\\1, lUhlrm.ltJlltll\\III('l.'l.lI1l!1o u)i('"d In plan budi!C'iJi ~~~~~~~~be'~~~~~::J~~AfP~:~;c:S~;~~)8~~~f,~~j~~~rets. Nw.:k-!l1' Re~ul:LI()n (\\)mmi~~lo", Wa...hmgltln. lX' :!05S5~(nH. or b~ inlernet e~mall 10 In I'w.:('lIe~'I"~l1r('.~lv. :lI1rd II) rhe r>t"k DUker. Offk:e lIf 'n urm.llion .and Re~ul..tol')' Affajf~ NE 8 A 1OJ02. () ISo..0131}. OfrK.'t of Managemt!nf and 8udlo'tt. Wa,I'Ho8Wn. DC 10:;03, If,ll m~...ns u~d to impose.m mthnnahm \\,'1)I'e':I"," duc~ llI,t ol:--pla)' a t,"ln1cnlly valJd OMS curJlml number. the NRC may .,,It L:ondtu.:t ur 'ptl",,",U, J.ild <A person i" "'-u reqUired It) re...pund to. the Inthrmitt ** n \\,,'nUection. NRCREGJON Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 5()"265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY~ CY 2010 CY 2011 CY 2012 NUMBER OF REAcroR 6 0 6 4 OPERATORS NUMBER OF SENIOR REACTOR 10 0 10 10 OPERATORS-INSTANT NUMBER OF SENIOR REAcroR 0 0 1 1 OPERATORS*UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 11/30/2009 NlA 512912011 3/1212012 ALTERNATE DATE 12107/2009 NlA 611212011 312612012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cv2009 cv2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 0 0 16 0 0 0 14 NUMBER OF CANDIDATES
Response to AIS 2008-16 0 Page 1 of 1 APPROVED BYOMB: NO. 3151).01.11 EXPIRES, 01<131111I0Il NRf:rORM !<Jti u.s NUCLEAR REGULATORY COMMISSION 111-2111") E...timJfed hllrden per resp}nse tn (ompl:y with Ihi~ votuotary Information wllet:t~m req\\le~: J huur. Th~ mfo~mauon ('ul(e(tlon j" IJ~ tn plan budget~ OPERATOR LICENSING ~:i:.u~~:)cf;:'/f{eZ~r:~J~~::~:Se~~~~~er~~r~'~~~~s. Nut:Jtar ReiU~luryO)mm'!\\!o.':\\pt. Wa.... hlfigtun. DC :()5S5.(OOI.tJrb~ Internet EXAt\\1lNATION DATA e-mall to in lColle.Cf~@nrl"'l)lv. <100 to (he ()e-lok OffJ('er, Oftke of In hrmatklfJ .I'd Re~ul3t"l')1 AII"rs.)lE 8*10202. () ISO*t)! lll. Olfi<:e o( M.nagement arMl 8ud&el. Wa.4Jungton. DC ~n503, If is means used to impo:<. an intill'lnatton ~()llect1Qn does not di-.play aL:ulTtntly v.tlw OMS l,'nmruf numl'M:r. the NRC!1lOlY 001 ~unduCl or spon,~m**uld a per~)h i" not requIred ttl respwxs to. lhe il11hnna1 inn t:{llla"tic:m. FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 I Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY 2010 CY 2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 0 1 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY2010 CY2011 CY2012 NUMBER OF REACIOR OPERATORS 8 0 8 0 NUMBER OF SENIOR REACIOR OPERATORS-INSTANT 6 0 7 0 NUMBER OF SENIOR REACIOR OPERATORS-UPGRADE 0 0 2 0 NUMBER OF SENIOR REACIOR OPERATORS-UMffED 0 0 0 0 PROPOSED DATFS PRIMARY DATE 5/25/2009 N/A 5/30/2011 N/A ALTERNATE DATE 6/01/2009 N/A 610612011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2009 CY2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 15 0 0 0}}