ML13007A077

From kanterella
Jump to navigation Jump to search
Submittal of Evacuation Time Estimates
ML13007A077
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 12/20/2012
From: Halnon G
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-12-441
Download: ML13007A077 (2)


Text

341 White Pond Dr.

tEnNuO Akron, Ohio 44320 December 20, 2012 L-12-441 10 CFR 50, Appendix E ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket Nos. 50-334, 50-412; License Nos. DPR-66, NPF-73 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Submittal of Evacuation Time Estimates Pursuant to 10 CFR 50, Appendix E, the FirstEnergy Nuclear Operating Company is submitting the enclosed Evacuation Time Estimates (ETEs) for Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1.

The ETEs were developed using the guidance contained in NUREG/CR-7002 (SAND2010-0016P), "Criteria for Development of Evacuation Time Estimate Studies,"

November 2011. The estimates use 2010 census data.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -

Fleet Licensing, at (330) 315-6810.

Sincrely, DGrego F

alnon Director, Fleet Regulatory Affairs

Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station, Unit No. 1 Perry Nuclear Power Plant, Unit No. 1 L-12-441 Page 2

Enclosures:

A. Beaver Valley Power Station Development of Evacuation Time Estimates B. Davis-Besse Nuclear Power Station Development of Evacuation Time Estimates C. Perry Nuclear Power Plant Development of Evacuation Time Estimates cc:

NRC Region I Administrator NRC Region III Administrator NRC Project Manager - Beaver Valley Power Station NRC Project Manager - Davis Besse Nuclear Power Station NRC Project Manager - Perry Nuclear Power Plant NRC Resident Inspector - Beaver Valley Power Station NRC Resident Inspector - Davis Besse Nuclear Power Station NRC Resident Inspector - Perry Nuclear Power Plant Director BRP/DEP Site Representative BRP/DEP Utility Radiological Safety Board