SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 8 of 11
ML12355A056
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/26/2012
From: Stewart W
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-12-2268 SNCH082-RPT-01, Ver. 1.0
Download: ML12355A056 (55)


Text

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 7 Status: YM N[] U[

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1P70-AOO2B Equip. Class, Equipment Description, Emergency N2 Bottle Location: Bldg. REACTOR Floor El. 130 Room, Area RL-R9 Manufacturer, Model, Etc. (optional but recommended)

Instructions, for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting: other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YZ NEI

2. Is.theanchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing H-43368 Rev. 0

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YEI NO U" N/AU1 YI Nil UI-N/AU YN NEI ULI N/AU' YO NE Ur-N/AU YZ NI UE3

'Enter the equipment class name from Appendix B: Classes of Equipment.

Page 382 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: YM Nn] Uri Equipment-ID No. 1P70-A.f2B eEquip.

Class' 0 Equipment Description EmercencV N2 Bottle Interaction.Effects

7. Are soft targets free from impact by nearby equipment or structures?

.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines, have adequate: flexibility to. avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YZ NI] UtI] N/AL]

YZ NEI UE-N/AE-YN NEI UWE NIAEl YN NEI UE1 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UL]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

There are several housekeeping issues with Emergency N2 Bottle Rack 1P70-AOO2B. There does not appear to be an NPL tag affixed toi the rack to aid in identifying the item (CR 516094); there is a rolled up sheet ofpaper with a metal tool of some sort (it appears to be a wrench) in the top left tube steel horizontal member; there is a bottle cap sitting between two of the bottles at-the base of the rack; and there is a bottle cap sitting in the back of the rack near the diagonal support. In addition, there is a section of chain at the back of the rack at the same location as the bottle cap. All of these items are small and4relatively light. During a seismic eyent, it. is likely: that the items will move from their existing locations, but do not have the potential to strike anything other than the bottle rack supports due to the location of the rack and its distance from any safety related SSCs. Therefore, it isjudged to have: no potentially adverse seismic condition.

Evaluated by: John McFarland Jeff Horton Date: 09/12/2012 09/12/2012.

Page 383 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: Y] Nil] U[]

Seismic Walkdown Checklist ($WC).

Equipment ID No. 1P70-A002B Equip. Class, 0 Equipment Description Emergency N2 Bottle Photographs Tag missing, so no picture available.

Figure 1 - Equipment 1D No (1P70-AO02B)

Page 384 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 7 Figure 2 - Equipment Elevation (1P70-AO02B)

Page 385 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 7 Figure 3 -Tool and Paper in Top Tube Steel Horizontal (I P70-AO02B)

Page 386 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0

_Sheet 6 of 7 Figure 4 - Bottle Cap near Rack Base (IP70-AO02B)

Page 387 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCHO82-RPT-01, VERSION 1.0 Sheet 7 of 7 Figure 5 - Bottle Cap between Bottles (1P70-AO02B)

Page 388 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

Equipment ID No. 1Z41-FOO9B Equip. Class' Equipment Description AIR-ACTUATED DAMPER B003 NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 9 Status: Yfl N23 UL]

3B IN Location: Bldg. :CONTROL Floor El. 180 Root Manufacturer, Model, Etc. (optional but recommended)

.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic% Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklistfor documenting othercomments.

Anchorage

1. Is the anchorage configuration Verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

This component is a inline air operated HVAC Damper that is insulated.

These components are manufacturer supplied components which come designed for seismic conditions described by the plant seismic response.

2. Is the anchorage free of bent, broken, missing or loose~hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

Inline air operated HVAC damper not anchored in concrete.

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the. item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE NO YLI NEI UE" N/AZ YE-NEI UE NIAZ YE-NEI UEI N/AO YEI NEI UE-N/AO YZ NEI UEi I Enter the equipment class name from Appendix B: Classes.of Equipment,.

Page 389 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 9 Status: YE] NE U-]

Seismic Walkdown :Checklist (SWC)

Equipment ID No; 1Z41-F009B Equip. Class- 0 7 Equipment Description AIR-ACTUATED DAMPER B003B IN Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YI NEI U0- N/A[l

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI Ur-N/AEl and masonry block walls not likely to collapse onto the equipment?

Scafolding above component is tied down and judged seismically adequate by the SWE's

9. Do-attached lines have adequateflexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y1Z NEI U0- N/A[E]

YN NE] UE-Other Adverse Conditions

11. Have you looked for and found~no other seismic conditions that could adversely affect the safety functions of the equipment?

Because the duct is insulated at the damper flange connection the flange connection bolts could not be checked for broken, missing or loose hardware. All visible surfaces were inspected and no potential adverse conditions were found. Disassembly of the insulation would be required to inspect the flange connection bolts, which are not considered to be anchorage for the component.

In addition, The seismic support of the Air Line identified as an iPEEE vulnerability described in DCR 93-055 has apparently not been completed because the Air pipe is not adequately supported for seismic loads. The end of the hard pipe needs to be attached to an existing Unistrut with a P2558 or equivalent 2 bolt pipe clamp (See Figures 4, 5 and 6 for details). CR 525292 has been written to address this condition.

YE] NE UE]

Page 390 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 9 Status: Y[] NO U-Seismic Walkdown Checklist (SWC)

Equipment ID No, iZ41-FO09B Equip. C Equipment Description AIR-ACTUATED DAMPER, Comments (Additional pages may be added as necessar' None

-I Evaluated by: John McFarland Jeff Horton Date: 09/26/2012 09/26/2012 Page 391 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 9 Status: YE[

NM Uj]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1Z41-FOO9B Equip. Class, 0.7 Equipment Description AIR-ACTUA TED DAMPER B003B IN Photographs Figure 1 - Equipment ID No (I Z4 I -F009B)

Page 392 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 9 Figure 2 Component Picture Page 393 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of g Figure 3 Scaffolding Above Component.

Page 394 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 7 of 9 Figure 4 Missing Support on Air Line Hard Pipe to Valve IZ41-FO09B Page 395 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 8 of g Figure 5 Air Line Pipe to Valve IZ41-F009B at Floor Level showing Pipe Supports Page 396 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 9 of 9 Figure 6 Air Line to Valve I Z41 -F009B at Floor Level showing additional Pipe Supports Page 397 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 5 Status: Y[

N-] U[-

Seismic Walkdown Checklist (SWC)

Equipment'ID No. 1E21-COO1A Equip. Classi 5 Equipment Description Core Spray Pump 1A Location: Bldg. REACTOR Floor El. 87 Room, Area SEDiagonal Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This. checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the. results ofjudgments. and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoratge

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that Ms more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Dwgs. H-15138 Rev. 6 and H-5019 Rev, 7

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YI9 NO UO N/AE-YlZ NO UD N/AC Y0 NO UC N/A]

YZ NE UO N/AC YN NEI UOI-Enter the equipment.ciass name from Appendix B: Classes of Equipment.

Page 398 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2.of 5 Status: YZ NI] UE]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1E21-COOIA Equip. Class, Equipment Description Core Sprav Pump 1A Interaction Effects

7. Are soft.targets free from impact by nearby equipmentor structures?
8. Areoverhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?

There is a flexible conduit section between the top of the pump and a rigid conduit section above the pump that is fairly tight. It is judged that the flex conduit can deflect 1" without putting significant stress on the conduit. SWE'sjudge that the pump will move less than. 0.5" during a seismic event.due to the elevation. and rigidity of the equipment Calculation SCNH-91-069 Rev. Ofor the adjacent RH7R pump of the same type gives a maximum pwnp deflection of less than 0.2" at thetop of the pump, Therefore, it isjudged that the line has adequate flexibility for the pump seismic deflections.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effebts?

YZ NO! UO N/AD YO NE UEJ N/AD YO NEI U] N/AQ YZ NEI UO Other Adverse Conditions

11. Have you looked for and. found no other seismic conditions that could Y0 NO UO adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Since the component extends between two grating pladforms, Area Walk-bys were performedfor both EL. 87'-0" and EL. 95'-0".

Evaluated by: John McFarland Jeff Horton iey z

09/0612012 Page 399 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YE N[] Uf-Seismic Walkdown Checklist (SWC)

Equipment ID No. IE21-COOIA Equip. Class, 5 Equipment Description Core Swray Pump 1A Photographs Figure I - Equipment ID No (I E21 -COO IA)

Page 400 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 5 Figure 2 - Equipment Elevation (1 E21 -COO I A)

Page 401 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 5 Figure 3 - Attached Flex Conduit (1 E2 I-COO 1 A)

Page 402 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

NO. SNCH082-RPT-01, VERSION 1.0 Sheet I Of 7 Status: YE] NO U[-

Equipment ID No. 1HI 1-P652 Equip. Class' 20 EquipmentlDescription Elec. Aux. PWR Control Console Location: Bldg. CONTROL Floor El. 164 Room, Area Unit 1 Control Room Manufacturer,, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the:

SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklistfor documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e.,. is the item one of the 50% of SWEL items requiring such verification)?

YZ NEI

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage, free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

The as-found anchorage configuration is consistent with SEWS package (Dated: 10/23/1988). All anchors were determined to be installed and free. of adverse seismic conditions..

Y0 NI] UE] N/AL)

YZ NEI UtI N/AL)

YZ NEI U"] N/AEl YE NEI ULI N/AL]

Enter the equipment class name from Appendix B: Classes of Equipment, Page 403 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: Y[1 NO U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1Hi 1-P652 Equip. Class' 20 Equipment Description Elec. AUX. PWR Control Console

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse, seismic conditions?

YO NEI Ur-Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Long florescent light bulbs inside the panel have no covers or restraints., The florescent light bulbs may become loose during a seismic event and impact wires and components inside the cabinet.

According to the SEWS package, this panel contains essential relays that could be potentially impacted. CR # 520462 was initiated to evaluate and resolve this condition.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

A ladder was used and permission obtained to remove the ceiling panels near 1-H11-P652. The frames for the ceiling tiles are judged to be adequate to prevent the tiles from falling during a seismic event.

The overhead equipment, distribution systems, and lighting were installed with rigid restraints or rod hung with multiple tie wires to limit horizontal movement. The tie wires are also consistent with the IPEEE outlier resolution to prevent the light fixtures from falling (DCR 90-010).

9. Do attached lines have adequate flexibility to avoid damage?

YEI NO UE1 N/All YZ NEI U-l N/A[I YZ NEI UEl N/AU Page 404 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: YE] NZ U--]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1HII-P652 Equip. Class, Equipment Description Elec. Aux. PWR Control Console

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

There were no bolts at rear vertical side connection of Panel 1-HI 1-P652 to Panel 1-HI 11-P651. Five bolts were intalled in the middle vertical support member. Also, the bottom bolt on the rear vertical side connection of Panel 1-Hl I-P652 to Panel 1-HI 1-P600 does not have full thread engagement. Only approximately 2 threads are engaged in the nut' (See Picture #3). All other bolts were properly installed. The details of these connections areý not specified in the available design documents. Per review of the SEWS package,, the panel weight is conservatively approximated to be 8300/bs. The maximum horizontal acceleration of the panels 0.75g. The evaluation included in the SEWS package concluded that the floor anchors have sufficient capacity to resist the maximum horizontal acceleration. Therefore, the bolts which connect the panels are required to only restrain the cabinets so that there is no differential movement and consequent banging of the panels.

Both. sides of Panel 1-HI I-P652 are also attached to the adjacent panels at the lower front sides with two 518" diameter bolts. The loading of the sides of the panels are distributed due to the attached terminal strips, electrical components and wires. There are no significant concentrated loads at the rear edge of the panels.

Therefore, considering the maximum capacity of the existing bolts (518" diameter), the loads associated with differential movement of the cabinets are judged to be adequately restrained. The rear vertical connection of Panel 1-H1 I-P652 to Panel 1-HI 1-P652 does not need to be enhanced and the bolt with less than optimal thread engagement does not need to be replaced.

YM NEI U-Other Adverse Conditions

11. Haveyou looked for and found no other seismic conditions that could YN NEI UI-adversely affect the safety functions of the equipment?

Components inside the panel were inspected visually in accordance with the direction provided in the FAQ related to opening panels.

Comments (Additional pages may be added as necessary)

None Page 405 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

Equipment ID No. 1HII-P652 Equip. Classl 20 Equipment Description Elec. Aux. PWR Control Console NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 Of 7 Status: YE[] N[M U-]

Evaluated by:

Date: 09119/2012 09/19/2012 Page 406 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

Equipment ID No. tHI,-P652 Equip. Class' 20 Equipment Description Elec. Aux. PWR Control Console NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 7 Status: YO] NO UM]

Photographs 1: Equipment MPL# 1H11-P652 (

Page 407 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 7 2: Equipment MPL# 1H11-P652 (back)

Page 408 of 436 I

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 7 of 7 3: Lack of Thread Engagement Page 409 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet iof 6 Status: Y[Z NEI U-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R42-S028 Equip. Class:

Equipment Description 125V BATTERY CHARGER IC Location: Bldg. CONTROL Floor El. 130 Rooi Manufacturer, Model, Etc. (optional but recommended),

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other cornments, Anchorasze

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y0 NEI

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

Small amount of surface roughness on the concrete that has no effect on the anchor embedment. Therefore, the SWE's have determined that this has no effect on the seismic capacity of the anchorage.

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Calculation SCNH-91-026 Rev. 2

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YN NEI UI N/Al YZ NO U0I N/Ar YI NilO UE N/All YZ NO U0 N/A0 YZ NE U0 IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 410 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 6 Status-YM NO [- ]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R42-S028, Equip. Class' 16 Equipment Description 125V BATTERY CHARGER IC interaction, ffects

7. Are soft targets free from impact by nearby equipment or structures?

YN NEI Ur'D N/Ar

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YER NO ULIE N/AD and masonry block walls not likely to collapse onto the equipment?

The seismic capacity of the concrete block walls C130-009A, C130-.

010B, CI30-011A and C130-012B were verified using Drawing H-40383, Rev. 2 and Hatch Unit 2 UFSAR Table 3.8-20.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations,,is equipment free of potentially adverse seismic interactioneffects?

YO ND U.

NMAD YN NEI U-Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NO U-adversely affect the'safety functions of the equipment?

Components inside the battery charger were inspected visually in.

accordance with the direction provided in the FAQ related to opening panels per Work Qrder SNC436314. There is one empty hole at the top of the battery charger for an additional grounding line that is not being utilized, so no bolt is missing from the hole. Therefore, this is not a potentially adverse seismic condition, and no other potentially adverse seismic conditions were identified.

Comments (Additional pages maybe added as necessary)

None.

Evaluated by: John McFarland Jeff Horton Date: 09/2512012 09/2512012 Page 411 of 436

ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

Equipment ID No. IR42-S028 Equip. Class, Equipment Description 125V BATTERY CHARGER IC NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 6 Status: YZ NE] UM]

Photographs Figure 1 Equipment ID 1R42-S028 Page 412 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 6 Figure 2 Component Picture Page 413 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 6 Figure 3 Concrete Surface Roughness under Charger Page 414 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 6 Figure 4 Empty Grounding Line Socket Page 415 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0

ýSheet 1 of 5 Status: Y[

NR] U-Seismic Walkdown Checklist (SWC)

Equipment lID No. 1R42-S057 Equip. Class' 16 Equipment Description BATTERY CHARGER lAB Location: Bldg. CONTROL Floor El. 130 Rooi Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofj udgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YF-NO

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO NEl UE0 N/A[l YO NEl UI-N/All Y[

NEl U[- N/AEl YEI NEI UEI N/AO YN NEI U-]

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 416 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 5 Status: YZ NI-- U-Seismic Walkdown Checklist (SWC)

Equipment DD No. IR42-S057 Equip. Class, 16 Equipment Description BATTERY CHARGER 1AB Enteraction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

The seismic capacity of the concrete block wall C130-050A. which the Battery Charger is anchored and the closest remaining concrete block wall: C130-047F were verified using Drawing H-40383, Rev. 2 and Hatch Unit 2 UFSAR Table 3.8-20.

9. Do attached lines have adequate flexibility to avoid damage?

The conduit interconnecting the chargers shown in Figure 3 is not a seismic concern because the chargers are anchored to the same wall so there will be no seismic differential. movements between the two Battery Chargers.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y[3 NE] UE] N/AD YN NO] UE N/AO YZ NO UE NIAO YO NE] UE]

Other Adverse Conditions 1.1. Have you looked for and found no other seismic conditions that could YZ NE] UE-adversely-affect the safety functions of the equipment?

Components inside the battery charger were inspected visually in accordance with the direction provided in the FAQ related toý opening panels per Work Order SNC436314. No potentially adverse seismic conditions were identified..

Comments (Additional pages may be added as necessary)

None Evaluated by: John McFarland dq Jeff Horton,,~~

Date: 09/25/2012 09/25/2012 Page 417 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

NO, SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YN Nn UE]

Equipment ID No. 1R42-S057 Equip. Class, 16 Equipment Description BATTERY CHARGER lAB Photographs Figure I Equipment ID: 1R42-S057 Page 418 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 5 Figure 2 Component Picture Page 419 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 5 Figure 3 Conduit Tied between Battery Chargers on the same wall Page 420 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

Equipment ID No. 1P52-AOOI Equip. Class' Equipment Description ESS Air ACC NO. SNCH082-RPT-01, VERSION 1.0 Sheetil1 of 5 Status: Y[

NE] U[]

Location: Bldg. REACTOR Floor El. 130 Room, Area. Torus Room Bay 3 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is providedat the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?

The equipment is an inline component, so there is no anchorage.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the: anchorage free of potentiallyadverse seismic conditions?

Y-I NO YO NE] Ur] N/AZ Y0 NE] UE] N/A[Q YZ NEI Ur-N/ArZ YE] NC] Ui] N/AE YO NEI UE-

'Enter the equipment class name from AppendixB: Classes of Equipment.

Page 421 of 436

ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

Equipment ID No.

1P52-AOOI Equip. Class, Equipment Description ESS Air ACC NO. SNCHO82-RPT-01, VERSION 1.0 Sheet 2 of 5 Status: YZ N[-] UF]

Interaction Efffects

7. Are.soft.targets free from impact by nearby equipment or structures?

8.. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?

10., Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y!

NE] U-1 N/AE]

YZ N[l] Ur N/A[']

Y0 NEI UE1 N/AE" Y

NErI UE]

OtherAdverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 NO' UEI adversely affect the safety functions of the equipment?

There isa fall protection strap left on theESSAirACC (CR 519465).

The strap is wedged between the component and the support steel and is not attached to any other fall protection equipment. It appears that the strap could not be removed from the support and was. abandoned The strap is very light and is not near any sensitive parts of the component, so it isjudged that the strap does not have the ability to create a*potentially adverse seismic condition.

Comments (Additional pages may be added as necessary)

There does not appear to be an MPL tag affixed to the ESS AirACC 1P52-AO01 to aid in identifying the item (CR 519468).,

Evaluated by: John McFarland Jeff Horton Date: 09/17/2012 09/17/2012 Page 422 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: Y]. NEI] U-Equipment ID No. IP52-AO 01 Equip. Class1 I Equipment Description ESS Air ACC Photographs There is no MPLnumber, so this picture is not available..

Figure 1 -Equipment ID No (IP52-AOO1)

Page 423 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCHO82-RPT-01, VERSION 1.0 Sheet 4 of 5 Figure 2 - Equipment Elevation (I P52-AOO 1)

Page 424 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-gl,, V V6ft 1.0 A

Figure 3 - Abar'doflc Fall Pctr-t~ifl) Strap (1P52-AO0l)

Page 425 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 4 Status: YZ N']. uE]

Equipment ID No. 1P51F548 Equip. Class, Equipment Description TORX CA V/FUEL PL GT SEAL Location: Bldg. REACTOR Floor El. 228 Room, Area Refueling Floor Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on. the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage L, Is the anchorage configuration verification required (i.e,, is the item one YE] NO of the 50% of SWEL items requiring such verification)?

This is an in-line component and has no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YE] NEI UE] N/AO YE] NEI UE] N/AN

4. Is the anchorage free of visible cracks in the concrete near the anchors?

YEI NEI UE] N/AO

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE] NE] UE] N/AO YO NO-UE 1 Enter the equipment class name from Appendix B3: Classes of Equipment.

Page 426 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YM NE] UF]

Equipment ID No. 1P51F548 Equip. Class' 0 Equipment Description TORX CA V/FUEL PL GT SEAL Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YN NEI UEI1 N/Arl

8. Are overhead equipment, distribution sYstems, ceiling tiles and lighting, YJR NEI ULI N/AEl and masonry block walls not likely to collapse onto the equipment?

9, Do attached lines have adequate flexibility to avoid damage?

1.0. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YN NO U-' N/AE-YZ NE U0I Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Some parts of the line is wrapped in duct tape. This is judged not to be a seismic concern. Area walk by was performed within the package for 1P51-F555.

Evaluated by: KURSA T KINALI A,

WESLEY WILLAMS Date: 9/18/2012 9/18/2012 Page 427 of 436

,ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YN N[E] U-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1P51F548 Equip. Class1 0 Equipment Description TQRX CAVIUEL PL GT SEAL.

Photographs Page 428 of 436

0, ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 Page 429 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 3 Status: YN NE] U[]

Seismic Walkdown Checklist (SWC)

EquipmentID No. 1P51F555 Equip. Class Equipment Description GATE SEAL 1' 150# BALL VLV Location: Bldg. REACTOR Floor El. 228 Room, Area Refueling Floor Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraae

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

This is an in-line equipment and has no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant. documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage. free of potentially adverse seismic conditions?

Y-I NO YUI NEI UI-' N/AZ YEll NO] UE-NIAN YE] NEI UE] NIAN YD1 NEI UE] N/AI YO NEI UE1 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 430 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 3 Status: Y* N[:] U-]

Seismic Walkdown Checklist (SWC)

Equipment ID No.

E P51F555 Equip. Class Equipment Description GATE SEAL 1' 1604 BALL VLV Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YN NEl U-] N/A["I

8. Are overhead equipment, distribution systems, ceilingtiles and lighting, YZ NEI UL N/A0 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility tb avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YN NI U-- N/AU Y0 NEI UEU Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YlZ N-], UU adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk by was performed within: the package for 1P51-F555.

Evaluated by: KURSAT KINALI

,42"0 WESLEY WILLIAMS/

I/

Date: 9/18/2012 9/18/2012 Page 431 of 436

  • 'ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS Seismic Waikdown Checklist (SWC)

Equipment ID: No. 1P51F555 Equip. Class, Equipment Description GATE SEAL 1' 150# BALL VLV NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 3 Status: YN NEI U"]

Photographs Page 432 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 4 Status: YN Nn UW[

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1P51F558 Equip. ClassO 0 Equipment Description GATE SEAL I' 150# BALL VLV Location: Bldg. REACTOR Floor El. 228 Room, Area Refueling Floor Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be'used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] NN of the 50% of SWEL items requiring such verification)?

This is an in-line component and has no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YEI NEI UE] N/At YE] NE] UE] N/A21

4. Is the anchorage free of visible cracks in the concrete near the anchors?

YE] NE] UE] N/AN

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.):

6.. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YEI] NEI UE] N/AN Y] NEI UEI

'Enter the equipmentclass name from Appendix B: Classes of Equipment.

Page 433 of 436

ATTACHMENT 3:. SEISMIC WALKIDOWN CHECKLISTS Seismic, W~alkdown Checklist (SWC)

Equipment ID No.

1P51F558 Equip. Class, Equipment Description GATE SEAL 1' 150# BALL VLV NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YM Nr-U--

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Y1Z NO-UL1 N/AE]

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NEI U-1 N/AE3 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluationsi is equipment free of potentially adverse seismic interaction effects?

YV NEI Ur] N/AE]

YE NE-I UI-1 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YM NEI U-1 adversely affectthe safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk by was performed within the package for 1P5I-F555.

LL Evaluated by: KURSA T KINALI 2

Date: 9118/2012 9/18/2012 WESLEY WILLIAMS Page 434 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YI N[] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1P51F558 Equip. Class' 0 Equipment Description GATE SEAL 1' 150# BALL VLV Photographs Page 435 of 436

0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 Page 436 of 436