ML12347A271
| ML12347A271 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 12/12/2012 |
| From: | Diane Jackson Operations Branch I |
| To: | Rausch T Susquehanna |
| Shared Package | |
| ML12347A266 | List: |
| References | |
| Download: ML12347A271 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COITIITIISSION REGION I 21OO RENAISSANCE BOULEVARD, SUITE 1OO KING OF PRUSSiA, PENNSYLVANIA 1940G2713 December 12, 20Lz Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603-0467
SUBJECT:
SENIOR REACTOR AND REACTOR OPERATOR lNlTlAL EXAMINATIONS -
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2
Dear Mr. Rausch:
f n a telephone conversation on December 6,2012, between Mr. John G. Caruso, Senior Operations Engineer/Examiner, and Mr. Ronald Streeper, Operations Training Manager, arrangements were made for the administration of licensing examinations at Susquehanna Steam Electric Station, during the week of May 13,2013.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by February 8,2013. The written examinations, operating tests, and the supporting reference materials identified in Attachment 3 of ES-201 will be due by March 4,2013.
Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.9., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix "E" of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
T. Rausch To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. lf the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that alltraining has been completed should be submitted at least 14 days before the first examination date.
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.oov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-1 0202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.qov/readinq:
rm/adams/web-based. htm l.
T. Rausch Thank you for your cooperation in this matter. Mr. Streeper has been advised of the policies and guidelines referenced in this letter. lf you have any questions regarding the NRG's examination procedures and guidelines, please contact Mr. John Caruso at (610) 337-5389, or me at (610) 337-5046.
Sincerely,mfw Donatd e. tacrso[,./ier Operations Branch Division of Reactor Safety DocketNos. 50-387,50-388 License Nos. NPF-14, NPF-22 cc: Distribution via ListServ
T. Rausch Thank you for your cooperation in this matter. Mr. Streeper has been advised of the policies and guidelines referenced in this letter. lf you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. John Caruso at (610) 337-5389, or me at (610) 337-5046.
Sincerely,
/RN Donald E. Jackson, Chief Operations Branch Division of Reactor Safety DocketNos. 50-387,50-388 License Nos. NPF-14, NPF-22 Distribution via ListServ Distribution:
W. Dean, RA (RIORAMAIL Resource)
D. Lew, DRA (RIORAMAIL Resource)
D. Roberts, DRP (RIDRPMAIL Resource)
P. Wilson, DRP (RlDRPMail Resource)
C. Miller, DRS (RlDRSMail Resource)
J. Clifford, DRS (RlDRSMail Resource)
M. Gray, DRP D. Jackson, DRS J. Caruso. Chief Examiner, DRS A. Rosebrook, DRP S. lbarrola, DRP P. Finney, DRP, SRI J. Greives, DRP, Rl S. Farrell, DRP, AA C. Santos, Rl OEDO RidsNrrPMSusquehanna Resource Rids N rrDorlLpll -2 Resou rce ROPreports Resource C. Bixler) (w/concurrences)
DOCUMENT NAME: G:\\DRS\\Operations Branch\\CARUSO\\Exam FY13-SUSQ May 13 (U01868)\\Susql20dayexamltr.docx ADAMS PKG: M112347A266 ADAMS ACCESSION NUI!4BER: ML12 17M71 g SUNSI Review g
Non-Sensitive tr Sensitive g
tr Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS NAME JCaruso DJackson DATE 12t11t12 12t12t12 OFFICIAL RECORD COPY