ML12278A014
| ML12278A014 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 09/28/2012 |
| From: | St.Onge R Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML12278A014 (2) | |
Text
SOUTHERN CALIFORNIA SAFEGUARDS INFORMATION Richard 1. St. Onge EDISON Director, Nuclear Regulatory Affairs and EO Emergency Planning An EDISON INTERNA'TIONA0L' Company 10 CFR 50.54(p)
September 28, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket Nos. 50-361, 50-362 and 72-41 San Onofre Nuclear Generating Station, Units 2 and 3, and Independent Spent Fuel Storage Installation
Dear Sir or Madam:
Southern California Edison (SCE) has made changes to the Physical Security Plan for the San Onofre Nuclear Generating Station (SONGS) that SCE has determined does not decrease the safeguards effectiveness of this plan.
In accordance with 10 CFR 50.54(p)(2), a report containing a description of these changes is enclosed for your information and a record of the changes has been made and is available for inspection at SONGS.
There are no new regulatory commitments made by this letter or its enclosures.
Note that the enclosures to this letter contain Safeguards Information. This letter may be decontrolled upon separation from its enclosures.
If you have any questions regarding this matter, please contact Mr. Ryan Pettus at (949) 368-9315.
Sincerely,-
Enclosures (SGI) cc:
E. E. Collins, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 & 3 C. M. Staab, NRC Project Manager, San Onofre ISFSI G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 & 3 SAFEGUARDS INFORMATION Notice: Decontrolled upon separation from the enclosure.
San Clemente, CA 92672
SAFEGUARDS INFORMATION 10 CFR 50.54(p) REPORT San Onofre Nuclear Generation Station (SONGS)
Physical Security Plan (PSP)
Revision 10, July 2012 Training & Qualification Plan Revision 5, July 2012 Safeguards Contingency Plan Revision 6, July 2012 This report contains a description of affected changes in the following enclosures: : Screening Criteria Form : PSP Changed Pages, Line-in/Line-out Version : PSP Changed Pages, Clean Version : T&Q Changed Pages, Line-in/Line-out Version : T&Q Changed Pages, Clean Version : SCP Changed Pages, Line-in/Line-out Version : SCP Changed Pages, Clean Version : SONGS PSP, T&Q, and SCP Deviation from NEI 03-12, Revision 6 Tables WARNING Violation of 10 CFR 73.21, Safeguards Information determination made by:
"Requirements of the Protection of Safeguards Information," is subject to civil and criminal Name: Ryan Pettus penalties.
Organization: SONGS Nuclear Regulatory Affairs Basis: 10 CFR 73.21 Date of Determination: 26 July 2012 SAFEGUARDS INFORMATION Notice: Decontrolled Upon Separation From the Enclosures