STEVEN D. CAPPS Duke Vice President 0Energy McGuire Nuclear Station Duke Energy MGO1 VP I 1 2700 Hagers Ferry Rd.
Huntersville, NC 28078 980-875-4805 980-875-4809 fax September 1 0, 201 2 Steven. Capps@duke-energy. corn Mr. Victor M. McCree Regional Administrator, Region II U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree CenterAve., NE Suite 1200 Atlanta, Georgia 30303-1257
Subject:
Duke Energy Carolinas, LLC McGuire Nuclear Station, Units I and 2 Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 05000369/201 2301 and 05000370/2012301 The enclosed information is provided per the requirements of NUREG-1 021 (Operator Licensing Standards for Power Reactors) Section ES-501 (Initial Post-Examination Activities) Part C.1, related to submission of post-examination documentation.
Specific items provided include:
Student answer sheets and exam cover pages Master copy of the RO and SRO Examinations and answer keys List of student comments and proctor responses Student Seating Chart ES-403-1, Written Examination Grading Quality Checklist ES 201-3, Examination Security Agreement Post-Exam Comments Questions or comments should be directed to Kay Crane at (980) 875-4306 or Clark Fletcher at (980) 875-5302.
Steven D. Capps Attachments 3 2012 www. duke-energy, corn
U. S. Nuclear Regulatory Commission September 10, 2012 Page 2 Mr. Malcolm T. Widmann, Chief U.S. Nuclear Regulatory Commission Operator Licensing and Human Performance Branch Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Michael Meeks U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1 257
U. S. Nuclear Regulatory Commission September 10, 2012 Page 3 bxc:
RGC File ECO5O-ELL
2012 MNS NRC Examination Post-Exam Comments Reference Issue Recommended Resolution SIM JPM C JPM C Step 19 (Procedure Step 3.44.1O), is listed as a Remove the Critical Step notation from Step 19 of critical step on the final revision. Step 19 is NOT a critical JPM C.
step.
The critical task is placing the PZR Pressure Master Controller in AUTO in Step 20. If the applicant fails to lower the output signal in MANUAL in Step 19 to cause the C PZR spray valves to close, going to AUTO on the PZR Pressure Master Controller in Step 20 has the same effect. Output will lower causing the C PZR Heaters to cycle on and the Spray Valves receive a signal to close.
Since there is no consequence to performing Step 19 incorrectly, it is NOT a critical step.
Submitted by (Exam Author):
Approved by (Training Supervisor):
C1aidL/Q Jji Print/Signature Date Print/Signature Date Concurrence (Operations Representative):
$1ve 14sk//c Print / Signature Date Page lof 1