Letter Sequence Response to RAI |
|---|
TAC:ME4907, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: L-2012-118, Response to NRC ITSB RAI Regarding Clean TS Changes for EPU LAR No. 205 and Incorporation of Amendments 247 and 243 TS Changes on Relocation of Cycle Specific Parameters to the Core Operating Limits Report, L-2012-263, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report, L-2012-293, FPL Review Comments on Extended Power Uprate Safety Evaluation Report, L-2012-426, Extended Power Uprate Cycle 26 Startup Report, ML110960521, ML110960523, ML112280292, ML12074A248, ML12074A251, NRC-2011-0094, Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information.
|
MONTHYEARL-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate (LAR 205)2010-10-21021 October 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate (LAR 205) Project stage: Request ML1035601692010-10-21021 October 2010 License Amendment Request for Extended Power Uprate (LAR 205) Project stage: Request L-2010-160, Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS)2010-10-29029 October 2010 Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS) Project stage: Supplement L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods Project stage: Request ML1035601742010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes Project stage: Request ML1035601832010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report Project stage: Supplement L-2010-303, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA)2010-12-21021 December 2010 Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA) Project stage: Supplement ML1036400512010-12-26026 December 2010 Logbook Entry for 12/26/2010 Project stage: Request ML1036400522010-12-27027 December 2010 Logbook Entry for 12/27/2010 Project stage: Request L-2011-004, Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues2011-01-0707 January 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues Project stage: Response to RAI ML1103101842011-01-12012 January 2011 Crocodile Log Book 1/12/2011 Project stage: Request L-2011-005, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Instrumentation & Control (I&C) Issues - Round 12011-01-28028 January 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Instrumentation & Control (I&C) Issues - Round 1 Project stage: Response to RAI L-2011-027, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues2011-02-22022 February 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues Project stage: Response to RAI L-2011-030, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 12011-03-0303 March 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 1 Project stage: Response to RAI ML1107000212011-03-11011 March 2011 Acceptance for Review of License Amendment Request for Extended Power Uprate Project stage: Acceptance Review L-2011-102, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues2011-03-25025 March 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues Project stage: Response to RAI L-2011-081, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues2011-03-31031 March 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues Project stage: Response to RAI ML1108907262011-03-31031 March 2011 Slides for Turkey Point, 3 and 4, Regarding Extended Power Uprate and Spent Fuel Criticality Project stage: Request ML11095A0122011-04-21021 April 2011 Summary of Public Meeting with Florida Power & Light Company, on Turkey Points, Units 2 and 4 Extended Power Uprate License Amendment Request Currently Under Review Project stage: Meeting L-2011-135, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Environmental Review Issues2011-04-22022 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Environmental Review Issues Project stage: Response to RAI L-2011-153, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues2011-04-22022 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Response to RAI L-2011-084, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues2011-04-28028 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues Project stage: Response to RAI L-2011-142, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues2011-04-29029 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues Project stage: Response to RAI NRC-2011-0094, Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information.2011-05-0202 May 2011 Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information. Project stage: Other ML1109605232011-05-0202 May 2011 Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information Project stage: Other ML1109605212011-05-0606 May 2011 Letter, Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information Project stage: Other L-2011-170, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues2011-05-19019 May 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues Project stage: Response to RAI L-2011-210, Regarding Supplementary Information Related to FPLs Response to NRC Request for Additional Information (RAI) IHPB-1.52011-06-0707 June 2011 Regarding Supplementary Information Related to FPLs Response to NRC Request for Additional Information (RAI) IHPB-1.5 Project stage: Supplement ML11188A0702011-06-21021 June 2011 Response to NRC Request for Additional Information from Reactor System Branch (Srxb) Concerning Retran Related to Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Project stage: Response to RAI L-2011-190, Turkey Point, Units 3 and 4 - Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues2011-06-21021 June 2011 Turkey Point, Units 3 and 4 - Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Request ML11174A1652011-06-21021 June 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Response to RAI ML11178A0672011-06-23023 June 2011 Outline, Turkey Point Nuclear Plant, Units 3 and 4, Outline Epitome/Containment Volume RAI Response Project stage: RAI ML11178A0682011-06-23023 June 2011 Meeting Slides, Turkey Point Nuclear Plant, Units 3 and 4, Extended Power Uprate (Epu), NRC and FPL Public Meeting Project stage: Meeting L-2011-223, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues2011-07-0707 July 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues Project stage: Response to RAI ML11203A2532011-07-21021 July 2011 Logbook Entry for 7/21/2011 Project stage: Request ML11195A1522011-07-22022 July 2011 Summary Public Meeting Florida Power & Light Company, on Turkey Point Units 3 and 4 Extended Power Uprate License Amendment Request Currently Under Review Project stage: Meeting L-2011-237, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues2011-07-22022 July 2011 Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues Project stage: Supplement L-2011-278, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review (Snpb) Issues2011-07-29029 July 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review (Snpb) Issues Project stage: Response to RAI L-2011-233, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-08-0505 August 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-305, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-08-19019 August 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-334, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-08-25025 August 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-302, Response to NRC RAI Regarding EPU LAR No. 205 Technical Specification and Instrumentation and Control Issues2011-08-29029 August 2011 Response to NRC RAI Regarding EPU LAR No. 205 Technical Specification and Instrumentation and Control Issues Project stage: Response to RAI ML1122802922011-09-0909 September 2011 Request to Initiate Informal Section 7 Consultation for the Proposed Turkey Point Plant Units 3 and 4 Extended Power Uprate Project stage: Other ML11270A3792011-11-0404 November 2011 Transmittal Letter - Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML11270A3802011-11-0404 November 2011 FRN: General Notice. Turkey Point Units 3 and 4 - Federal Register Notice - Draft Environmental Assessment Project stage: Request L-2011-539, Draft Environmental Assessment Review Supporting Extended Power Uprate License Amendment Request No. 2052011-12-0909 December 2011 Draft Environmental Assessment Review Supporting Extended Power Uprate License Amendment Request No. 205 Project stage: Draft Request ML12027A0422012-01-12012 January 2012 Westinghouse Input to NRC Frapcon Models Related to the Turkey Point Unit 3 & 4 Extended Power Uprate (EPU) License Amendment Request (LAR) (Cover Letter) Project stage: Request NRC-2011-0259, Comment (2) of Gordon Wissinger, on Behalf of the National Park Service, Opposing Turkey Point Units 3 and 4 Draft Environmental Assessment (Dea) and Finding of No Significant Impact (Fonsi) Related to the Proposed Extended Power Uprat2012-01-12012 January 2012 Comment (2) of Gordon Wissinger, on Behalf of the National Park Service, Opposing Turkey Point Units 3 and 4 Draft Environmental Assessment (Dea) and Finding of No Significant Impact (Fonsi) Related to the Proposed Extended Power Uprate Project stage: Request L-2012-019, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation2012-01-16016 January 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation Project stage: Request L-2012-020, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation2012-01-17017 January 2012 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation Project stage: Response to RAI 2011-04-28
[Table View] |
Text
Florida Power & Light, 9760 S.W. 344 ST. Florida City, FL 33034 APR 2 2 2011 0
L-2011-135 FPL.
10 CFR 50.90 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Environmental Review Issues
References:
(1) M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2010-113), "License Amendment Request No. 205: Extended Power Uprate (EPU)," (TAC Nos. ME4907 and ME4908), Accession No. ML103560169, October 21, 2010.
(2) Email from J. Paige (NRC) to T. Abbatiello (FPL), "Turkey Point EPU - Environmental Review (RERB) Request for Additional Information - Round 1", Accession No. ML110950083, April 1, 2011.
By letter L-2010-113 dated October 21, 2010 [Reference 1], Florida Power and Light Company (FPL) requested to amend Renewed Facility Operating Licenses DPR-31 and DPR-41 and revise the Turkey Point Units 3 and 4 Technical Specifications (TS). The proposed amendment will increase each unit's licensed core power level from 2300 megawatts thermal (MWt) to 2644 MWt and revise the Renewed Facility Operating Licenses and TS to support operation at this increased core thermal power level. This represents an approximate increase of 15% and is therefore considered an extended power uprate (EPU).
By email from the U.S. Nuclear Regulatory Commission (NRC) Project Manager (PM) dated April 1, 2011 [Reference 2], additional information regarding management, storage, and disposal of low-level radioactive waste (LLRW) was requested by the NRC staff in the Environmental Review Branch (RERB) to support their review of the EPU License Amendment Request (LAR).
The Request for Additional Information (RAI) consisted of one (1) question regarding LLRW.
The RAI question and FPL response are documented in the Attachment to this letter.
In accordance with 10 CFR 50.91(b)(1), a copy of this letter is being forwarded to the State Designee of Florida.
This submittal does not alter the significant hazards consideration or environmental assessment previously submitted by FPL letter L-2010-113 [Reference 1].
This submittal contains no new commitments and no revisions to existing commitments.
Should you have any questions regarding this submittal, please contact Ms. Olga Hanek, Acting Licensing Manager, at (305) 246-6607.
Turkey Point Units 3 and 4 L-2011-135 Docket Nos. 50-250 and 50-251 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on April,h,,2, 2011.
Very truly yours, Michael Kiley Site Vice President Turkey Point Nuclear Plant Attachment cc:
USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Resident Inspector, Turkey Point Nuclear Plant Mr. W. A. Passetti, Florida Department of Health
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2011-135 Attachment Page 1 of 3 Turkey Point Units 3 and 4 RESPONSE TO NRC RAI REGARDING EPU LAR NO. 205 AND RERB ENVIRONMENTAL REVIEW ISSUES ATTACHMENT
Turkey Point Units 3 and 4 L-2011-135 Docket Nos. 50-250 and 50-251 Attachment Page 2 of 3 Response to Request for Additional Information The following information is provided by Florida Power and Light Company (FPL) in response to the U. S. Nuclear Regulatory Commission's (NRC) Request for Additional Information (RAI).
This information was requested to support License Amendment Request (LAR) 205, Extended Power Uprate (EPU), for Turkey Point Nuclear Plant (PTN) Units 3 and 4 that was submitted to the NRC by FPL via letter (L-2010-113) dated October 21, 2010 [Reference 1].
By email from the U.S. Nuclear Regulatory Commission (NRC) Project Manager dated April 1, 2011 [Reference 2], additional information regarding the management, storage, and disposal of low-level radioactive waste (LLRW) was requested by the NRC staff in the Environmental Review Branch (RERB) to support their review of the EPU License Amendment Request (LAR).
The Request for Additional Information (RAI) consisted of one question regarding LLRW. The RAI question and the FPL response are documented below.
RERB-1.1 The Supplemental Environmental Report (ER), Section 8.2.2, Offsite Doses at EPU conditions, discusses the projected offsite doses from the proposed power uprate. The ER states that the evaluation of the post-EPU total dose to an offsite member of the public includes the dose contribution from low-level radioactive waste (LLRW). Specifically, the ER's dose evaluation considered the following: radioactive decay of stored waste, stored waste being routinely moved offsite for disposal, and waste generated post-EPU entering storage.
The State of South Carolina's licensed low-level radioactive waste disposal facility, located in Barnwell, South Carolina, has limited access to radioactive waste generators in States that are not part of the Atlantic Low-Level Waste Compact. Since the State of Florida is not a member of the Atlantic Low-Level Waste Compact, the disposal of LLRW from Turkey Point Units 3 & 4 may be impacted. The ER's assumption that stored waste will be routinely moved offsite for disposal may need to be reevaluated in light of the Barnwell facility's limited access. However, the ER does not contain sufficient information about LLRW management, storage, and disposal capabilities at the Turkey Point Units 3& 4 for the NRC staff to determine whether the dose impact from the long-term storage of LLRW needs to be considered in the post-EPU dose evaluation.
Provide additional information on the management, storage, and disposal of LLRW as it relates to the potential impact on offsite doses to members of the public from the proposed EPU. The evaluation of the post-EPU total dose to an offsite member of the public should be revised as appropriate.
Turkey Point Units 3 and 4 have not been able to dispose of LLRW at the Barnwell Low-Level Radioactive Waste Disposal Facility since July 1, 2008 because Florida is not part of the Atlantic compact. FPL does, however, manage LLRW contractually and continues to ship Class A, B and C LLRW offsite for processing and disposal. Turkey Point Units 3 and 4 are currently covered under an FPL contract with EnergySolutions, Inc. for the shipment of operational and decommissioning Class A LLRW offsite for processing and disposal and with Studsvik, Inc. for the shipment of Class B & C LLRW offsite for processing, storage and ultimate disposal.
Turkey Point Units 3 and 4 L-2011-135 Docket Nos. 50-250 and 50-251 Attachment Page 3 of 3 Further, as provided in Attachment 7, Supplemental Environmental Report (ER) and in Attachment 4, Licensing Report (LR), of the EPU LAR, the impact of the EPU on LLRW generation rate and offsite dose is negligible. ER Section 8.1.1, Radiological Waste Streams - Solid Waste, and LR Sections 2.5.6.3, Solid Waste Management Systems, and 2.10.1, Occupational and Public Radiation Doses, conclude that the proposed EPU has no significant effect on the generation of solid waste volume from the primary and secondary side systems since the systems functions are not changing and the volume of inputs remains the same.
ER Section 8.2.2, Offsite Doses at Power Uprate Conditions, and LR Section 2.10.1 conclude that offsite doses from solid LLRW, as a result of the projected increase in activity due to the EPU, is effectively controlled and that direct shine doses due to accumulation of stored solid radioactive waste would remain negligible.
In summary, FPL finds that it is unnecessary to revise the post-EPU total dose to an offsite member of the public for the following reasons:
" FPL contractually manages LLRW to allow for continued offsite processing, storage and disposal of Turkey Point Units 3 and 4 Class A, B and C LLRW;
" The LAR concludes that there will be no significant change to the volume of LLRW from the EPU; and
" The LAR concludes that the impact to offsite doses due to the EPU will remain negligible.
In addition, the State of Texas has also recently made progress with regard to siting a new LLRW disposal facility. Specifically, in January 2011, the Texas Commission on Environmental Quality approved the commencement of construction on the planned Waste Control Specialists LLC low-level radioactive waste disposal facility and the Texas Low-Level Radioactive Waste Disposal Compact Commission approved Preliminary Rules on the Exportation and Importation of Waste.
References
- 1. M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2010-113), "License Amendment Request No. 205: Extended Power Uprate (EPU)," (TAC Nos. ME4907 and ME4908), Accession No. ML103560169, October 21, 2010.
- 2. Email from J. Paige (NRC) to T. Abbatiello (FPL), "Turkey Point EPU - Environmental Review (RERB) Request for Additional Information - Round 1", Accession No. ML110950083, April 1,2011.