Letter Sequence RAI | |
|---|---|
TAC:ME4907, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME4908, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) | |
Initiation Questions Answers Results Other: L-2012-118, Response to NRC ITSB RAI Regarding Clean TS Changes for EPU LAR No. 205 and Incorporation of Amendments 247 and 243 TS Changes on Relocation of Cycle Specific Parameters to the Core Operating Limits Report, L-2012-263, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report, L-2012-293, FPL Review Comments on Extended Power Uprate Safety Evaluation Report, L-2012-426, Extended Power Uprate Cycle 26 Startup Report, ML110960521, ML110960523, ML112280292, ML12074A248, ML12074A251, NRC-2011-0094, Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information. | |
MONTHYEARL-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate (LAR 205)2010-10-21021 October 2010
[Table View]Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate (LAR 205) Project stage: Request ML1035601692010-10-21021 October 2010 License Amendment Request for Extended Power Uprate (LAR 205) Project stage: Request L-2010-160, Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS)2010-10-29029 October 2010 Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS) Project stage: Supplement L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods Project stage: Request ML1035601742010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes Project stage: Request ML1035601832010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report Project stage: Supplement L-2010-303, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA)2010-12-21021 December 2010 Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA) Project stage: Supplement ML1036400512010-12-26026 December 2010 Logbook Entry for 12/26/2010 Project stage: Request ML1036400522010-12-27027 December 2010 Logbook Entry for 12/27/2010 Project stage: Request L-2011-004, Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues2011-01-0707 January 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues Project stage: Response to RAI ML1103101842011-01-12012 January 2011 Crocodile Log Book 1/12/2011 Project stage: Request L-2011-005, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Instrumentation & Control (I&C) Issues - Round 12011-01-28028 January 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Instrumentation & Control (I&C) Issues - Round 1 Project stage: Response to RAI L-2011-027, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues2011-02-22022 February 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues Project stage: Response to RAI L-2011-030, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 12011-03-0303 March 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 1 Project stage: Response to RAI ML1107000212011-03-11011 March 2011 Acceptance for Review of License Amendment Request for Extended Power Uprate Project stage: Acceptance Review L-2011-102, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues2011-03-25025 March 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues Project stage: Response to RAI L-2011-081, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues2011-03-31031 March 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues Project stage: Response to RAI ML1108907262011-03-31031 March 2011 Slides for Turkey Point, 3 and 4, Regarding Extended Power Uprate and Spent Fuel Criticality Project stage: Request ML11095A0122011-04-21021 April 2011 Summary of Public Meeting with Florida Power & Light Company, on Turkey Points, Units 2 and 4 Extended Power Uprate License Amendment Request Currently Under Review Project stage: Meeting L-2011-135, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Environmental Review Issues2011-04-22022 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Environmental Review Issues Project stage: Response to RAI L-2011-153, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues2011-04-22022 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Response to RAI L-2011-084, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues2011-04-28028 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues Project stage: Response to RAI L-2011-142, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues2011-04-29029 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues Project stage: Response to RAI NRC-2011-0094, Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information.2011-05-0202 May 2011 Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information. Project stage: Other ML1109605232011-05-0202 May 2011 Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information Project stage: Other ML1109605212011-05-0606 May 2011 Letter, Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information Project stage: Other L-2011-170, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues2011-05-19019 May 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues Project stage: Response to RAI L-2011-210, Regarding Supplementary Information Related to FPLs Response to NRC Request for Additional Information (RAI) IHPB-1.52011-06-0707 June 2011 Regarding Supplementary Information Related to FPLs Response to NRC Request for Additional Information (RAI) IHPB-1.5 Project stage: Supplement ML11188A0702011-06-21021 June 2011 Response to NRC Request for Additional Information from Reactor System Branch (Srxb) Concerning Retran Related to Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Project stage: Response to RAI L-2011-190, Turkey Point, Units 3 and 4 - Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues2011-06-21021 June 2011 Turkey Point, Units 3 and 4 - Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Request ML11174A1652011-06-21021 June 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Response to RAI ML11178A0672011-06-23023 June 2011 Outline, Turkey Point Nuclear Plant, Units 3 and 4, Outline Epitome/Containment Volume RAI Response Project stage: RAI ML11178A0682011-06-23023 June 2011 Meeting Slides, Turkey Point Nuclear Plant, Units 3 and 4, Extended Power Uprate (Epu), NRC and FPL Public Meeting Project stage: Meeting L-2011-223, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues2011-07-0707 July 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues Project stage: Response to RAI ML11203A2532011-07-21021 July 2011 Logbook Entry for 7/21/2011 Project stage: Request ML11195A1522011-07-22022 July 2011 Summary Public Meeting Florida Power & Light Company, on Turkey Point Units 3 and 4 Extended Power Uprate License Amendment Request Currently Under Review Project stage: Meeting L-2011-237, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues2011-07-22022 July 2011 Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues Project stage: Supplement L-2011-278, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review (Snpb) Issues2011-07-29029 July 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review (Snpb) Issues Project stage: Response to RAI L-2011-233, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-08-0505 August 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-305, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-08-19019 August 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-334, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-08-25025 August 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-302, Response to NRC RAI Regarding EPU LAR No. 205 Technical Specification and Instrumentation and Control Issues2011-08-29029 August 2011 Response to NRC RAI Regarding EPU LAR No. 205 Technical Specification and Instrumentation and Control Issues Project stage: Response to RAI ML1122802922011-09-0909 September 2011 Request to Initiate Informal Section 7 Consultation for the Proposed Turkey Point Plant Units 3 and 4 Extended Power Uprate Project stage: Other ML11270A3792011-11-0404 November 2011 Transmittal Letter - Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML11270A3802011-11-0404 November 2011 FRN: General Notice. Turkey Point Units 3 and 4 - Federal Register Notice - Draft Environmental Assessment Project stage: Request L-2011-539, Draft Environmental Assessment Review Supporting Extended Power Uprate License Amendment Request No. 2052011-12-0909 December 2011 Draft Environmental Assessment Review Supporting Extended Power Uprate License Amendment Request No. 205 Project stage: Draft Request ML12027A0422012-01-12012 January 2012 Westinghouse Input to NRC Frapcon Models Related to the Turkey Point Unit 3 & 4 Extended Power Uprate (EPU) License Amendment Request (LAR) (Cover Letter) Project stage: Request NRC-2011-0259, Comment (2) of Gordon Wissinger, on Behalf of the National Park Service, Opposing Turkey Point Units 3 and 4 Draft Environmental Assessment (Dea) and Finding of No Significant Impact (Fonsi) Related to the Proposed Extended Power Uprat2012-01-12012 January 2012 Comment (2) of Gordon Wissinger, on Behalf of the National Park Service, Opposing Turkey Point Units 3 and 4 Draft Environmental Assessment (Dea) and Finding of No Significant Impact (Fonsi) Related to the Proposed Extended Power Uprate Project stage: Request L-2012-019, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation2012-01-16016 January 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation Project stage: Request L-2012-020, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation2012-01-17017 January 2012 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation Project stage: Response to RAI 2011-04-28 |
| ML11178A067 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/23/2011 |
| From: | Jason Paige Plant Licensing Branch II |
| To: | |
| Shared Package | |
| ML11195A170 | List: |
| References | |
| TAC ME4907, TAC ME4908 | |
| Download: ML11178A067 (2) | |
Similar Documents at Turkey Point | |
|---|---|
Text
OUTLINE EPITOME/CONTAINMENT VOLUME RAI RESPONSE Cover Letter Attachment
- 1. RAI Introduction
- 2. Summary of EPITOME Issue
- 3. Other Input Considerations (Containment Volume, other changes, etc.)
- 4. Analyses
- 5. Summary of LOCA Results
- a. Containment Integrity
- b. PressurelTemperature Curves
- 6. Summary of MSLB Results
- a. Containment Integrity
- b. PressurelTemperature Curves
- 7. Areas Requiring Revised Analyses (applicable LAR sections in parentheses)
- a. Reactor Auxiliary Cooling Water Systems (Component Cooling Water System) (2.5.4.3)
- b. Primary Containment Functional Design (2.6.1)
- c. Mass and Energy Release (2.6.3)
- d. Containment Heat Removal (2.6.5)
- 8. Other Areas Reviewed with no Impact (applicable LAR sections in parentheses)
- a. Protective Coating Systems (Paints) - Organic Materials (2.1.7)
- b. Balance of Plant Piping, Components and Supports (2.2.2.2)
- c. Safety-Related Valves and Pumps (2.2.4)
- d. Environmental Qualification of Electrical Equipment (2.3.1)
- e. Pressure Analysis for Emergency Core Cooling System Performance Capability (2.6.6)
- f.
Containment Ventilation System (2.7.7)
- g. Emergency Core Cooling System and Loss-of-Coolant Accidents (2.8.4.4)
- h. Radiological Consequences Analyses Using Alternative Source Terms (2.9.2)
- 9. Conclusions
- 10. Proposed Technical Specification Change
- a. Description of Change and Justification
- b. No Significant Hazards Determination Fig. 1 - Marked-up Technical Specification Pages Fig. 2 - Marked-up Technical Specification Bases Pages (for information only)