Text
FM 8.2 Exhibit RB Temperature Data from 1992 BS Event 1 pg 1 of 4 The attached graph is from strip chart recorder AH-1003-TIR. Among many other data points, there are four RB temperature thermocouples that monitor containment temperature:
Point 5:
Point 6:
Point 7:
Point 8:
AH-536-TE El. 102'-9" AH-537-TE El. 125'-0" AH-538-TE El. 180'-6" AH-539-TE El. 235'-0" The data indicates that Point 7 and Point 8 each dropped about 6 degrees during the spray event. The other two points actually increased about 2 degrees.
The data points monitored by AH-1003-TIR are shown on the attached Instrument Data Sheet, and the actual locations of the thermocouples are shown on attached drawing 308-695.
C.L. Miller 11/27/09 911g?
'S FM 8.2 Exhibit 1 MOO S LEDS Tt P AT WM.1 OF UERU. SIM HUE IN U SA Pg 2 of 4 4
- ....J m~-~-~
DESCRIPTION MISCELLANEOUS TEMPERATURES AND FLOWS TAG NO.
AH-1003-TIR SHEET 2 OF 5 JFM 8.2 Exhibit 1 pg 3 of 4 CONTINUED -
PT SERVICE TAG NUMBER TYPE CIRCUIT ALRM ALRM COND SW.
PT.
1 CC AIR SUPPLY AH-035-FIR SEE NOTE 1 2
RB PURGE EXH AH-294-FIR SEE NOTE 1 3
AB & FH EXH AH-032-FIR SEE NOTE 1 4
RB TOTAL PURGE AH-717-FIR SEE NOTE 1 5
RB TEMPERATURE AH-536-TIR 0-10 VDC AHS175 6
RB TEMPERATURE AH-537-TIR 0-10 VDC AHS176 7
RB TEMPERATURE AH-538-TIR 0-10 VDC AHS177 8
RB TEMPERATURE AH-539-TIR 0-10 VDC AHS178 9
AHF-1A FAN AH-728-TE J
AHS152 N.O.
175 0 F HIGH INBD 10 AHF-1A FAN AH-729-TE I
AHS154 N.O.
175°F HIGH OUTBD 11 AHF-1B FAN AH-730-TE J
AHS156 N.O.
175 0 F HIGH INBD 12 AHF-1B FAN AH-731-TE J
AHS158 N.O.
175 0 F HIGH OUTBD 13 AHF-lC-FAN AH-732-TE J
AHS160 N.O.
175 0 F HIGH INBD 14 AHF-lC FAN AH-733-TE J
AHS162 N.O.
175 0 F HIGH OUTBD 15 MS LINE PEN AH-417-TE J
AHS89
AHS94
- 423 17 PRZ AUX SPRAY DH-61-TT 0-5 VDC DHR24 LINE 18 AMB TEMP DH-62-TT 0-5 VDC DHR24 TRIANGLE ROOM 19 DH DROPLINE DH-60-TT 0-5 VDC DHR21 20 PROCEDURALLY CONTROLLED BY ENGINEERING FOR THROUGH SELECTION, CONNECTION, AND CALIBRATION PER 761 0P0409 NOTE 1: POINTS 1-4 ARE EQUATION TYPE POINTS.
SEE PAGES 3, 4,
AND 5 FOR FORMULAE.
PROGRESS ENERGY CORPORATION INSTRUMENT DATA SHEET REV.
CRYSTAL RIVER, FLORIDA NO.
CRYSTAL RIVER UNIT 3 RECORDER 4
FM 8.2 Exhibit 1 pg 4 of 4 C.
CRANE ACCESS PLATFORM EL. Z35'-O" O UT s' oeSI
.S.W.
3~8 OCOLUMN R.6-320 ElL.
IE E'0" I ý QCOLUMN R.e. - 3PO EL. 10Z 5' I
SEE SECTIONU"
" -C'T 1 TI "1WAo)
I I
- 3EEDETAIL'K'
~COPPLING, N.R.T.
-FOR ELEV.
CSECTION.C-c).
STSEL 8
PLATE SECTION E,---'
" 8 *OUPLINO....
-E.COUPLING S'X4f STEEL.'PLATE..
SECTION
'B AH-53G-TE A JAS BUILT PER MAR 90-O li-O-
_12F._
Fi6j IU týAý SBUICTPERFAAR p o
-of-,R 2 AS BUILT PER MAR 8Z-05-03-02 SC id.%
11-'7-REVIEWED PER MAR 78 -
05 "DCKI&A1rK2-/?E2 SECTION "C "-"C' T8 TERMINATIOIJ H.tAP A53Y MICKEL PLATECO CAST ZROA 3 POST CERAN'41 TERfMIIAIL HLOCK OT#11 A VITO. 0-R#1I SEAL
-~
PLAN "B'-"'
SIAIGLE GROVONED TYPr E."
T/C PROBE 304 SST SO*4TH MI0 INSULATED WIITHI POL'YSULFONE COLD
...EDID SEALANT o i RELEASED FOR CONSTRUCTION! I &C FEl 187A I^t,&t N4O REVISIONS I.BY.
DATE FLORIDA POWER CORPORATION ST. PETERSBURG, FLORIDA CRYSTAL RIVER PLANT UNIT NO. 3 855,000 KW REACTOR BUILDING INSTRUMENT DETAIL AIR HANDLING TEMPERATURE ELEMENTS AH-536-TE, AH-,537-TE, AH-538-TE, AH-539-TE MOTES:
- 1. GROMPI SCREW RED'D IN TERMIkWI HEAL'
- 2. SEE CO!JAX DRAYVIIUC 7()Z2-IOoo DETAIL "X" GILBERT ASSOCIATES, INC.
)
TRNNA.
ENGINIEERS AND CONSULTANTS u
,Il.-
'0"1 CONSTRUCTION I
i 1
APPROVED FOR CONSTRUCTION BY FLORWID EfCORPORATION I
I
.IMITED CO.NSTRU.CTIOlN:
A. N....
I E GINEER APPA*IA I
I I
I I PRELIMINARY NOT FOR CONSTRUCTION I r8y 5ý 4f SBIDDING PURPOSES ONLY DATE RELEASED FOR ENGR.
'ffNE1 403
[ B30-69 1 IIIC-308-695 I
i I....
DRAWING I REV. H FPC DRAWING NUMBER SCALE WORK ORDER SIZE DIENUNS$
N
-,Mglilt" 6"~l,
c-0o-8