Exelon Generation www.exeloncorp.com 4300 Winfield Road Warrenville, lL 60555 Nuclear 10 CFR 50.75(f)(I)
RS-1 0-009 January 1 1,201 0 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457
Subject:
Submittal of Braidwood Station Site-Specific SAFSTOR Decommissioning Cost Estimate
Reference:
Letter from Keith R. Jury (Exelon Generation Company) to U.S. NRC, "Decommissioning Funding Assurance Plan,' dated July 29, 2009 In the referenced letter, Exelon Generation Company, LLC (EGC) committed to provide a site-specific SAFSTOR Decommissioning Cost Estimate (DCE) for Braidwood Station, Units 1 and 2. The DCE is provided as Attachment 1, and, in accordance with 10 CFR 50.75(b)(I), is greater than the amount specified in 10 CFR 50.75(c) for both Unit 1 and Unit 2. The DCE has been performed assuming that Braidwood Station, Units 1 and 2 are granted license extension, since it is intended to reflect the most likely decommissioning scenario for Braidwood Station. However, this determination of the minimum funding requirement does not credit the additional 20-year license renewal period. shows the radiological decommissioning (license termination) cash flow based on the DCE in Attachment 1, assuming the SAFSTOR scenario, and does not include the costs of dismantling non-radiological systems and structures or the cost of managing and storing spent fuel onsite. EGC has not made a final determination of the decommissioning approach for Braidwood Station. For the purpose of choosing a decommissioning option to demonstrate adequacy of funding to meet regulatory requirements, the SAFSTOR option has been selected. EGC may choose a different decommissioning option in the future, recognizing that the chosen option must meet NRC requirements for decommissioning funding.
January 1 1,201 0 U.S. Nuclear Regulatory Commission Page 2 The costs presented in Attachment 2 occur 20 years earlier than those in the Attachment 1 DCE to model the current license expiration date. No credit is taken for license renewal. The cash flow analysis assumes a 2% annual real rate of return on trust fund dollars until plant shutdown and on remaining trust fund dollars through the decommissioning period. The site-specific estimate is based on a period of safe storage specifically described in the Attachment 1 DCE. The Attachment 1 DCE presents the results in 2009 dollars. These results are escalated to December 31, 2009 by using the latest site-specific escalation factor, which is re-calculated on an annual basis.
For Braidwood Station Units 1 and 2, the decommissioning funding assurance is provided by the prepayment method, coupled with an external trust fund, in accordance with 10 CFR 50.75(e)(l)(i). There are no additional amounts to be collected from ratepayers for Braidwood Station, nor are there any contracts relied upon to pursuant to 10 CFR 50.75(e)(l )(v).
Per the referenced letter, EGC will perform a calculation of radiological decommissioning funding assurance as of December 31,2009 based on this site-specific SAFSTOR estimate. If this calculation does not show adequate decommissioning funding assurance, EGC will obtain approval from the EGC Board of Directors for, and establish an additional funding assurance mechanism by April 1, 201 0.
There are no new regulatory commitments contained in this letter.
If you have any questions about this letter, please contact me at (630) 657-2823.
k--l Patrick R. Simpson w
Manager - Licensing Exelon Generation Company, LLC Attachments: 1. Braidwood Station, Units 1 and 2, Decommissioning Cost Estimate
- 2. Braidwood Station, Units 1 and 2, Radiological Decommissioning Projected SAFSTOR Cash Flow
ATTACHMENT 1 Braidwood Station, Units 1 and 2 Decommissioning Cost Estimate
Document E16-1555-014, Rev. 0 DECOMMISSIONING COST ANALYSIS for the BRAIDWOOD NUCLEAR POWER STATION prepared for Exelon Generation Company LLC prepared by TLG Services, Inc.
Bridgewater, Connecticut October 2009
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16*1555*014, Rev. 0 Page ii ofxviii APPROVALS
.dV~
Willi<<~".&
TLG Services, Inc.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page iii of xviii TLG Services, Inc.
TABLE OF CONTENTS SECTION PAGE EXECUTIVE
SUMMARY
.............................................................................vii-xviii
- 1.
INTRODUCTION...................................................................................................1-1 1.1 Objectives of Study...........................................................................................1-1 1.2 Site Description.................................................................................................1-1 1.3 Regulatory Guidance........................................................................................1-2 1.3.1 Nuclear Waste Policy Act......................................................................1-4 1.3.2 Low-Level Radioactive Waste Acts......................................................1-6 1.3.3 Radiological Criteria for License Termination....................................1-7
- 2.
DECOMMISSIONING ALTERNATIVES..........................................................2-1 2.1 DECON..............................................................................................................2-2 2.1.1 Period 1 - Preparations.........................................................................2-2 2.1.2 Period 2 - Decommissioning Operations..............................................2-4 2.1.3 Period 3 - Site Restoration....................................................................2-8 2.1.4 ISFSI Operations and Decommissioning............................................2-9 2.2 SAFSTOR and DELAYED DECON................................................................2-9 2.2.1 Period 1 - Preparations.......................................................................2-10 2.2.2 Period 2 - Dormancy............................................................................2-11 2.2.3 Periods 3 and 4 - Delayed Decommissioning.....................................2-12 2.2.4 Period 5 - Site Restoration..................................................................2-13
- 3.
COST ESTIMATE...................................................................................................3-1 3.1 Basis of Estimate..............................................................................................3-1 3.2 Methodology......................................................................................................3-1 3.3 Plant Inventory.................................................................................................3-3 3.3.1 Plant Systems........................................................................................3-3 3.3.2 Plant Structures....................................................................................3-3 3.4 Impact of Decommissioning Multiple Reactor Units.....................................3-4 3.5 Financial Components of the Cost Model.......................................................3-5 3.5.1 Contingency...........................................................................................3-5 3.5.2 Financial Risk........................................................................................3-8 3.6 Site-Specific Considerations.............................................................................3-9 3.6.1 Spent Fuel Management.......................................................................3-9 3.6.2 Reactor Vessel and Internal Components.........................................3-12 3.6.3 Primary System Components.............................................................3-13 3.6.4 Main Turbine and Condenser.............................................................3-14
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page iv of xviii TLG Services, Inc.
TABLE OF CONTENTS (continued)
SECTION PAGE 3.6.5 Transportation Methods.....................................................................3-14 3.6.6 Low-Level Radioactive Waste Disposal.............................................3-15 3.6.7 Site Conditions Following Decommissioning....................................3-16 3.7 Assumptions....................................................................................................3-17 3.7.1 Estimating Basis.................................................................................3-17 3.7.2 Labor Costs..........................................................................................3-17 3.7.3 Design Conditions................................................................................3-18 3.7.4 General.................................................................................................3-18 3.8 Cost Estimate Summary...............................................................................3-20
- 4.
SCHEDULE ESTIMATE......................................................................................4-1 4.1 Schedule Estimate Assumptions.....................................................................4-1 4.2 Project Schedule................................................................................................4-2
- 5. RADIOACTIVE WASTES.....................................................................................5-1
- 6.
RESULTS.................................................................................................................6-1
- 7.
REFERENCES........................................................................................................7-1 TABLES Summary of Decommissioning Cost Elements, DECON............................... xvi Summary of Decommissioning Cost Elements, Delayed DECON................ xvii Summary of Decommissioning Cost Elements, SAFSTOR..........................xviii 3.1a Schedule of Total Annual Expenditures, DECON Unit 1............................ 3-21 3.1b Schedule of Total Annual Expenditures, DECON Unit 2............................ 3-22 3.2a Schedule of Total Annual Expenditures, Delayed DECON Unit 1.............. 3-23 3.2b Schedule of Total Annual Expenditures, Delayed DECON Unit 2.............. 3-24 3.3a Schedule of Total Annual Expenditures, SAFSTOR Unit 1......................... 3-25 3.3b Schedule of Total Annual Expenditures, SAFSTOR Unit 2......................... 3-28 5.1 Decommissioning Waste Summary, DECON................................................. 5-3 5.2 Decommissioning Waste Summary, Delayed DECON................................... 5-4 5.3 Decommissioning Waste Summary, SAFSTOR.............................................. 5-5 6.1 Summary of Decommissioning Cost Elements, DECON............................... 6-4 6.2 Summary of Decommissioning Cost Elements, Delayed DECON................. 6-5 6.3 Summary of Decommissioning Cost Elements, SAFSTOR............................ 6-6
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page v of xviii TLG Services, Inc.
TABLE OF CONTENTS (continued)
SECTION PAGE FIGURES 4.1 DECON Activity Schedule................................................................................ 4-3 4.2 Decommissioning Timeline, DECON.............................................................. 4-5 4.3 Decommissioning Timeline, Delayed DECON................................................ 4-6 4.4 Decommissioning Timeline, SAFSTOR.......................................................... 4-7 APPENDICES A.
Unit Cost Factor Development............................................................................. A-1 B.
Unit Cost Factor Listing...................................................................................... B-1 C.
Detailed Cost Analysis, DECON.......................................................................... C-1 D.
Detailed Cost Analysis, Delayed DECON........................................................... D-1 E.
Detailed Cost Analysis, SAFSTOR...................................................................... E-1
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page vi of xviii TLG Services, Inc.
REVISION LOG No.
CRA No.
Date Item Revised Reason for Revision 0
10-27-2009 Original Issue
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page vii of xviii TLG Services, Inc.
EXECUTIVE
SUMMARY
This report presents estimates of the cost to decommission the Braidwood Nuclear Power Station (Braidwood) for the identified decommissioning scenarios following a scheduled cessation of plant operations. The analysis relies upon site-specific, technical information, developed in an evaluation in 2004,[1] and updated to reflect current assumptions pertaining to the disposition of the nuclear units and relevant industry experience in undertaking such projects. Additionally, the plant systems inventory was completely regenerated from the Byron Nuclear Power Stations site-specific database. This is appropriate since Byron and Braidwood are essentially identical in design and vintage. Byrons plant systems inventory was subsequently modified to reflect design features unique to Braidwood. The updated estimates are designed to provide Exelon Generation Company LLC (Exelon) with sufficient information to assess its financial obligations, as they pertain to the eventual decommissioning of the nuclear station.
The primary goal of the decommissioning is the removal and disposal of the contaminated systems and structures so that the plants operating licenses can be terminated. The analysis recognizes that spent fuel will be stored at the site in the plants storage pool and/or in an independent spent fuel storage installation (ISFSI) until such time that it can be transferred to a Department of Energy (DOE) facility.
Consequently, the estimates also include those costs to manage and subsequently decommission the fuel storage facilities.
The estimates are based on numerous fundamental assumptions, including regulatory requirements, project contingencies, low-level radioactive waste disposal practices, high-level radioactive waste management options, and site restoration requirements.
The estimates incorporate a
minimum cooling period of approximately five and one-half years for the spent fuel in the storage pool at the cessation of Unit 2 operations. In the DECON and SAFSTOR scenarios, any residual fuel remaining in the pool after the cooling period is relocated to the ISFSI to await transfer to a DOE facility (the fuel is assumed to remain in the storage pool for the Delayed DECON scenario and transferred directly from the pool to DOE).
The estimates also include the dismantling of non-essential structures and limited restoration of the site.
1 Decommissioning Cost Analysis for the Braidwood Nuclear Power Station, Document No. E16-1455-013, Rev. 0, TLG Services, Inc., January 2005
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page viii of xviii TLG Services, Inc.
Alternatives and Regulations The Nuclear Regulatory Commission (NRC or Commission) provided initial decommissioning requirements in its rule adopted on June 27, 1988.[2] In this rule, the NRC set forth financial criteria for decommissioning licensed nuclear power facilities. The regulations addressed planning needs, timing, funding methods, and environmental review requirements for decommissioning. The rule also defined three decommissioning alternatives as being acceptable to the NRC: DECON, SAFSTOR, and ENTOMB.
DECON is defined as "the alternative in which the equipment, structures, and portions of a facility and site containing radioactive contaminants are removed or decontaminated to a level that permits the property to be released for unrestricted use shortly after cessation of operations."[3]
SAFSTOR is defined as "the alternative in which the nuclear facility is placed and maintained in a condition that allows the nuclear facility to be safely stored and subsequently decontaminated (deferred decontamination) to levels that permit release for unrestricted use."[4]
Decommissioning is to be completed within 60 years, although longer time periods will be considered when necessary to protect public health and safety.
ENTOMB is defined as "the alternative in which radioactive contaminants are encased in a structurally long-lived material, such as concrete; the entombed structure is appropriately maintained and continued surveillance is carried out until the radioactive material decays to a level permitting unrestricted release of the property."[5] As with the SAFSTOR alternative, decommissioning is currently required to be completed within 60 years.
The 60-year restriction has limited the practicality for the ENTOMB alternative at commercial reactors that generate significant amounts of long-lived radioactive material. In 1997, the Commission directed its staff to re-evaluate this alternative and identify the technical requirements and regulatory actions that would be necessary for entombment to become 2
U.S. Code of Federal Regulations, Title 10, Parts 30, 40, 50, 51, 70 and 72 "General Requirements for Decommissioning Nuclear Facilities," Nuclear Regulatory Commission, Federal Register Volume 53, Number 123 (p 24018 et seq.), June 27, 1988 3
Ibid. Page FR24022, Column 3 4
Ibid.
5 Ibid. Page FR24023, Column 2
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page ix of xviii TLG Services, Inc.
a viable option.
The resulting evaluation provided several recommendations, however, rulemaking has been deferred based upon several factors (e.g., no licensee has committed to pursuing the entombment option, the unresolved issues associated with the disposition of greater-than-Class C material (GTCC), and the NRCs current priorities) at least until after the additional research studies are complete.
The Commission concurred with the staffs recommendation.
In 1996, the NRC amended its decommissioning regulations to clarify ambiguities and codify procedures and terminology as a means of enhancing efficiency and uniformity in the decommissioning process.[6] The amendments allow for greater public participation and better define the transition process from operations to decommissioning. Regulatory Guide 1.184, issued in July 2000, further described the methods and procedures acceptable to the NRC staff for implementing the requirements of the 1996 amendments relating to the initial activities and major phases of the decommissioning process. The costs and schedules presented in this analysis follow the general guidance and processes described in the amended regulations. The format and content of the estimates is also consistent with the recommendations of Regulatory Guide 1.202, issued in February 2005.[7]
Decommissioning Scenarios The following scenarios were evaluated and are representative of the alternatives available to the owner. The scenarios assume that the units operate for 60 years, followed by a planned and scheduled shutdown.
- 1.
DECON: The first scenario assumes that the two units are promptly decommissioned as an integrated activity. Spent fuel is relocated from the wet storage pool to the ISFSI so as to facilitate decontamination and dismantling activities within the fuel handling building. Spent fuel storage operations continue at the site, independent of decommissioning operations, until the transfer of the fuel to the DOE is complete, assumed for purposes of this study to be in the year 2065. At that time, the ISFSI is decommissioned and the site released for alternative use.
- 2.
Delayed DECON: In the second scenario, the units are prepared for an abbreviated period of safe-storage. The spent fuel resident in the fuel handling buildings storage pool, remains in the pool until it can be transferred to the 6
U.S. Code of Federal Regulations, Title 10, Parts 2, 50, and 51, "Decommissioning of Nuclear Power Reactors," NRC, Federal Register Volume 61, (p 39278 et seq.), July 29, 1996 7
Standard Format and Content of Decommissioning Cost Estimates for Nuclear Power Reactors, Regulatory Guide 1.202, U.S. Nuclear Regulatory Commission, February 2005
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page x of xviii TLG Services, Inc.
DOE (i.e., the ISFSI is not used to off-load the pool following the cessation of operations). Spent fuel placed at the ISFSI during operations remains in storage until the pool is emptied at which time the ISFSI is also emptied.
Decommissioning is scheduled to commence once the transfer of the fuel to the DOE is complete (i.e., in the year 2065).
- 3.
SAFSTOR: The units are also placed into safe-storage in the third scenario.
However, decommissioning is deferred beyond the fuel storage period to the maximum extent permitted by the current regulations. Similar to the DECON alternative, the spent fuel in the wet storage pool is relocated to the ISFSI for interim storage. The units remain in protective storage following the removal of spent fuel from the site. Decommissioning operations commence such that license termination is completed within the required 60-year period. As with the first two scenarios, decommissioning activities at the two units are sequenced and integrated so as to minimize the total duration of the physical dismantling process.
Methodology The methodology used to develop the estimates described within this document follows the basic approach originally presented in the cost estimating guidelines [8]
developed by the Atomic Industrial Forum (now Nuclear Energy Institute). This reference describes a unit factor method for determining decommissioning activity costs. The unit factors used in this analysis incorporate site-specific costs and the latest available information on worker productivity in decommissioning.
An activity duration critical path is used to determine the total decommissioning program schedule. The schedule is relied upon in calculating the carrying costs, which include program management, administration, field engineering, equipment rental, and support services such as quality control and security. This systematic approach for assembling decommissioning estimates ensures a high degree of confidence in the reliability of the resulting cost estimate.
Contingency Consistent with standard cost estimating practice, contingencies are applied to the decontamination and dismantling costs as "specific provision for unforeseeable elements of cost within the defined project scope, particularly important where previous experience relating estimates and actual costs has shown that 8
T.S. LaGuardia et al., "Guidelines for Producing Commercial Nuclear Power Plant Decommissioning Cost Estimates," AIF/NESP-036, May 1986
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page xi of xviii TLG Services, Inc.
unforeseeable events which will increase costs are likely to occur.[9] The cost elements in the estimates are based on ideal conditions; therefore, the types of unforeseeable events that are almost certain to occur in decommissioning, based on industry experience, are addressed through a percentage contingency applied on a line-item basis. This contingency factor is a nearly universal element in all large-scale construction and demolition projects. It should be noted that contingency, as used in this analysis, does not account for price escalation and inflation in the cost of decommissioning over the remaining operating life of the station.
The use and role of contingency within decommissioning estimates is not a safety factor issue. Safety factors provide additional security and address situations that may never occur. Contingency funds, by contrast, are expected to be fully expended throughout the program. Inclusion of contingency is necessary to provide assurance that sufficient funding will be available to accomplish the intended tasks.
Low-Level Radioactive Waste Disposal The contaminated and activated material generated in the decontamination and dismantling of a commercial nuclear reactor is classified as low-level (radioactive) waste, although not all of the material is suitable for shallow-land disposal. With the passage of the Low-Level Radioactive Waste Policy Act in 1980,[10] and its Amendments of 1985,[11] the states became ultimately responsible for the disposition of low-level radioactive waste generated within their own borders.
Until recently, there were two facilities available to Exelon for the disposal of low-level radioactive waste generated by Braidwood. As of July 1, 2008, however, the facility in Barnwell, South Carolina was closed to generators outside the Atlantic Compact (comprised of the states of Connecticut, New Jersey and South Carolina).
This leaves the facility in Clive, Utah, operated by EnergySolutions, as the only available destination for low-level radioactive waste requiring controlled disposal.
EnergySolutions does not have a license to dispose of the more highly radioactive waste (Class B and C as defined by 10 CFR §61) generated in the decontamination and dismantling of the reactor vessel. In the interim (at least until new waste disposal options become available) and for purposes of this analysis, waste disposal costs for this material are based upon Exelons previously negotiated cost of disposal at the Barnwell site.
9 Project and Cost Engineers Handbook, Second Edition, American Association of Cost Engineers, Marcel Dekker, Inc., New York, New York, p. 239 10 Low-Level Radioactive Waste Policy Act of 1980, Public Law 96-573, 1980 11 Low-Level Radioactive Waste Policy Amendments Act of 1985, Public Law 99-240, 1986
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page xii of xviii TLG Services, Inc.
Material exceeding Class C limits (limited to material closest to the reactor core and comprising a small percentage of the total waste volume) is generally not suitable for shallow-land disposal. This material is packaged in the same multipurpose canisters used for spent fuel storage/transport and designated for geologic disposal.
A significant portion of the metallic waste generated during decommissioning may only be potentially contaminated by radioactive materials. This waste can be surveyed on site or shipped off site to licensed facilities for further analysis, for processing and/or for conditioning/recovery. Reduction in the volume of low-level radioactive waste requiring disposal in a licensed low-level radioactive waste disposal facility can be accomplished through a variety of methods, including analyses and surveys or decontamination to eliminate the portion of waste that does not require disposal as radioactive waste, compaction, incineration or metal melt.
The estimates reflect the savings from waste recovery/volume reduction.
High-Level Radioactive Waste Management Congress passed the Nuclear Waste Policy Act [12] (NWPA) in 1982, assigning the responsibility for disposal of the spent nuclear fuel created by the commercial nuclear generating plants to the DOE. Two permanent disposal facilities were envisioned, as well as an interim storage facility. To recover the cost, the legislation created a Nuclear Waste Fund through which money is collected from the sale of electricity generated by the power plants. The NWPA, along with the individual disposal contracts with the utilities, specified that the DOE was to begin accepting spent fuel by January 31, 1998.
Since the original legislation, the DOE has announced several delays in the program schedule. By January 1998, the DOE had failed to initiate the disposal of spent nuclear fuel and high level waste, as required by the NWPA and the utility contracts. As a result, utilities initiated legal action against the DOE. While legal actions continue, the DOE has no plans to receive spent fuel prior to completing the construction of its geologic repository.
Operation of DOEs yet-to-be constructed repository is contingent upon the review and approval of the facilitys license application by the NRC and the successful resolution of pending litigation. The DOE submitted its license application to the NRC on June 3, 2008, seeking authorization to construct the repository at Yucca Mountain, Nevada. The NRC formally docketed the DOEs license application on September 8, 2008, triggering a three-year deadline, with a possible one-year 12 Nuclear Waste Policy Act of 1982 and Amendments, U.S. Department of Energys Office of Civilian Radioactive Management, 1982
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page xiii of xviii TLG Services, Inc.
extension, set by Congress for the NRC to decide on whether to authorize construction.
Construction, if adequately funded, could take five to six years after the DOE receives authorization to proceed. For purposes of this analysis, Exelon has assumed that DOE would begin to receive commercial spent fuel in 2018.
Once the repository is operational, fuel acceptance will be prioritized and spent fuel assemblies will need to meet certain acceptance criteria, including heat output.
These conditions require that the fuel discharged upon the cessation of operations be actively cooled and stored for a minimum period at the generating site prior to transfer (a minimum of five years as defined in 10CFR§961 for standard fuel). As such, the NRC requires that licensees establish a program to manage and provide funding for the management of all irradiated fuel at the reactor until title of the fuel is transferred to the Secretary of Energy, pursuant to 10CFR§50.54(bb).[13] This funding requirement is fulfilled through inclusion of certain cost elements in the decommissioning estimates, for example, associated with the isolation and continued operation of the plants fuel storage pool and/or ISFSI.
At shutdown, the plants storage pool is expected to contain freshly discharged assemblies (from the most recent refueling cycles) as well as the final reactor cores.
In the DECON and SAFSTOR scenarios the assemblies are packaged into multipurpose canisters for transfer to an existing ISFSI. A five and one-half year cooling period following the cessation of Unit 2 operations is provided for the final core to meet the conditions for dry storage.
Once the storage pool is emptied, the fuel handling building can be either decontaminated and dismantled or prepared for long-term storage. The ISFSI, which can be operated under the stations general license, will be expanded to accommodate the dry storage casks needed to off-load the wet storage pool. In the Delayed DECON scenario, the storage pool remains operational and used for the interim storage of the fuel. No additional dry storage capacity is assumed to be constructed for decommissioning. The transfer of spent fuel to DOE is performed first from the storage pool and is completed from the ISFSI.
The DOEs generator allocation/receipt schedules are based upon the oldest fuel receiving the highest priority. With a large fleet of reactors, Exelon is able to re-assign allocations between its units to minimize on-site storage costs. Assuming spent fuel from the older units is given priority and with a maximum rate of 13 U.S. Code of Federal Regulations, Title 10, Part 50, Domestic Licensing of Production and Utilization Facilities, Subpart 54 (bb), Conditions of Licenses
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page xiv of xviii TLG Services, Inc.
transfer of 3,000 metric tons of uranium (MTU)/year), the assemblies residing in the Braidwood storage pool at the time of shutdown would be scheduled for pickup in the years 2061 through 2065 (assuming the cessation of plant operations in 2046 and 2047 for Units 1 and 2, respectively). This equates to 93 multi-purpose canisters (at 32 assemblies per canister), in addition to the 26 on the pad from operations.
Exelons strongly held position is that the DOE has a contractual obligation to accept Braidwoods fuel in a timely manner and consistent with its contract commitments. No assumption made in this study should be interpreted to be inconsistent with this claim. However, at this time, including the cost of storing spent fuel in this study is the most reasonable approach because it insures the availability of sufficient decommissioning funds at the end of the stations life if, contrary to its contractual obligation, the DOE has not performed.
Site Restoration The efficient removal of the contaminated materials at the site will result in damage to many of the site structures. Blasting, coring, drilling, and the other decontamination activities will substantially damage power block structures, potentially weakening the footings and structural supports. Prompt demolition once the license is terminated is clearly the most appropriate and cost-effective option. It is unreasonable to anticipate that these structures would be repaired and preserved after the radiological contamination is removed. The cost to dismantle site structures with a work force already mobilized is more efficient and less costly than if the process were deferred. Experience at shutdown generating stations has shown that plant facilities quickly degrade without maintenance, adding additional expense and creating potential hazards to the public and the demolition work force.
Consequently, this analysis assumes that non-essential site structures within the restricted access area are removed to a nominal depth of three feet below the local grade level wherever possible. The site is then graded and stabilized.
Summary The costs to decommission Braidwood were evaluated for several decommissioning scenarios, incorporating the attributes of both the DECON and SAFSTOR decommissioning alternatives. Regardless of the timing of the decommissioning activities, the estimates assume the eventual removal of all the contaminated and activated plant components and structural materials, such that the facility operator may then have unrestricted use of the site with no further requirement for an operating license. Delayed decommissioning is initiated after the spent fuel has been removed from the site and is accomplished within the 60-year period required
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page xv of xviii TLG Services, Inc.
by current NRC regulations. In the interim, the spent fuel remains in storage at the site until such time that the transfer to a DOE facility can be completed. Once the transfer is complete, the storage facilities are also decommissioned.
The scenarios analyzed for the purpose of generating the estimates are described in Section 2. The assumptions are presented in Section 3, along with schedules of annual expenditures. The major cost contributors are identified in Section 6, with detailed activity costs, waste volumes, and associated manpower requirements delineated in Appendices C, D, and E. Cost summaries for the various scenarios are provided at the end of this section for the major cost components.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page xvi of xviii TLG Services, Inc.
SUMMARY
OF DECOMMISSIONING COST ELEMENTS DECON (thousands of 2009 dollars)
Cost Element Unit 1 Unit 2 Total Decontamination 14,448 21,998 36,446 Removal 104,588 144,778 249,366 Packaging 15,773 14,220 29,993 Transportation 11,326 9,460 20,786 Waste Disposal 60,720 58,964 119,684 Off-site Waste Processing 3,959 4,151 8,110 Program Management [1]
266,127 325,124 591,251 Spent Fuel Pool Isolation 0
11,143 11,143 Spent Fuel Management [2]
82,444 81,847 164,291 Insurance and Regulatory Fees 12,512 11,019 23,532 Energy 8,640 9,062 17,702 Characterization and Licensing Surveys 17,727 15,561 33,288 Property Taxes 19,878 19,235 39,113 Miscellaneous Equipment 6,307 6,614 12,921 Site O&M 2,838 2,670 5,508 Total [3]
627,287 735,847 1,363,134 Cost Element NRC License Termination 442,250 528,878 971,127 Spent Fuel Management 119,415 118,817 238,232 Site Restoration 65,622 88,152 153,775 Total [3]
627,287 735,847 1,363,134
[1]
Includes security and engineering costs
[2] Excludes program management costs (staffing) but includes costs for spent fuel loading/transfer/spent fuel pool O&M and EP fees
[3] Columns may not add due to rounding
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page xvii of xviii TLG Services, Inc.
SUMMARY
OF DECOMMISSIONING COST ELEMENTS DELAYED DECON (thousands of 2009 dollars)
Cost Element Unit 1 Unit 2 Total Decontamination 12,825 18,676 31,501 Removal 103,154 141,706 244,860 Packaging 12,150 10,566 22,717 Transportation 9,988 7,824 17,812 Waste Disposal 42,046 39,076 81,123 Off-site Waste Processing 4,467 4,999 9,465 Program Management [1]
326,717 373,992 700,709 Spent Fuel Pool Isolation 0
11,143 11,143 Spent Fuel Management [2]
26,667 27,589 54,256 Insurance and Regulatory Fees 18,427 16,527 34,954 Energy 14,505 15,114 29,619 Characterization and Licensing Surveys 19,197 17,031 36,228 Property Taxes 24,872 24,229 49,101 Miscellaneous Equipment 10,181 11,461 21,642 Site O&M 4,141 3,973 8,115 Total [3]
629,338 723,907 1,353,245 Cost Element NRC License Termination 424,316 511,430 935,745 Spent Fuel Management 137,704 122,649 260,353 Site Restoration 67,318 89,829 157,147 Total [3]
629,338 723,907 1,353,245
[1]
Includes security and engineering costs
[2] Excludes program management costs (staffing) but includes costs for spent fuel loading/transfer/spent fuel pool O&M and EP fees
[3] Columns may not add due to rounding
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Page xviii of xviii TLG Services, Inc.
SUMMARY
OF DECOMMISSIONING COST ELEMENTS SAFSTOR (thousands of 2009 dollars)
Cost Element Unit 1 Unit 2 Total Decontamination 12,690 18,439 31,130 Removal 107,121 145,708 252,829 Packaging 12,086 10,470 22,556 Transportation 9,757 7,448 17,205 Waste Disposal 40,497 37,352 77,849 Off-site Waste Processing 4,528 5,060 9,589 Program Management [1]
371,647 410,241 781,887 Spent Fuel Pool Isolation 0
11,143 11,143 Spent Fuel Management [2]
80,765 80,168 160,933 Insurance and Regulatory Fees 35,717 33,338 69,055 Energy 17,975 18,489 36,464 Characterization and Licensing Surveys 19,197 17,031 36,228 Property Taxes 43,384 42,741 86,125 Miscellaneous Equipment 15,647 19,086 34,732 Site O&M 8,981 8,813 17,793 Total [3]
779,992 865,527 1,645,519 Cost Element NRC License Termination 598,915 654,337 1,253,252 Spent Fuel Management 113,746 121,347 235,093 Site Restoration 67,331 89,843 157,173 Total [3]
779,992 865,527 1,645,519
[1]
Includes security and engineering costs
[2] Excludes program management costs (staffing) but includes costs for spent fuel loading/transfer/spent fuel pool O&M and EP fees
[3] Columns may not add due to rounding
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 1, Page 1 of 8 TLG Services, Inc.
- 1. INTRODUCTION This report presents estimates of the cost to decommission the Braidwood Nuclear Power Station (Braidwood), for the scenarios described in Section 2, following a scheduled cessation of plant operations. The analysis relies upon site-specific, technical information from an earlier evaluation prepared in 2004,[1] updated to reflect current assumptions pertaining to the disposition of the nuclear units and relevant industry experience in undertaking such projects. Additionally, the plant systems inventory was completely regenerated from the Byron Nuclear Power Stations site-specific database. This is appropriate since Byron and Braidwood are essentially identical in design and vintage. Byrons plant systems inventory was subsequently modified to reflect design features unique to Braidwood. The current estimates are designed to provide Exelon Generation Company LLC (Exelon), with sufficient information to assess their financial obligations, as they pertain to the eventual decommissioning of the nuclear units. It is not a detailed engineering document, but a financial analysis prepared in advance of the detailed engineering that will be required to carry out the decommissioning 1.1 OBJECTIVES OF STUDY The objectives of this study are to prepare comprehensive estimates of the cost to decommission Braidwood, to provide a sequence or schedule for the associated activities, and to develop waste stream projections from the decontamination and dismantling activities. Operating licenses were issued on October 17, 1986, for Unit 1 and December 18, 1987, for Unit 2. A sixty year operating lifetime has been assumed for the purpose of this study. As such, the cessation of operations would then be October 17, 2046, for Unit 1 and December 18, 2047, for Units 1 and 2, respectively. These dates were used to schedule the decommissioning activities.
1.2 SITE DESCRIPTION Braidwood is located near the Kankakee River, approximately 6 line miles southwest of Wilmington, Illinois. The station is comprised of two essentially identical pressurized water reactors with supporting facilities.
The primary coolant system for each unit consists of a pressurized water reactor system designed by the Westinghouse Corporation. The reactor coolant system is comprised of the reactor vessel and four heat transfer loops. Each loop contains a reactor coolant pump, steam generator, and associated piping and valves. In addition, the system includes a pressurizer, a pressurizer relief
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 1, Page 2 of 8 TLG Services, Inc.
tank, interconnected piping, and the instrumentation necessary for operational control. All components of the reactor coolant system are located in the containment building. The design reactor thermal power level is 3,587 Megawatts thermal (MWth). The corresponding electrical outputs are approximately 1,178 Megawatts electric (MWe) and 1152 MWe for Units 1 and 2, respectively.
The containment structure at Braidwood Station is a prestressed concrete shell structure made up of a cylinder with a shallow dome roof and a flat foundation slab. The entire structure is lined on the inside with steel plate, which acts as a leaktight membrane. The containment completely encloses the entire primary coolant system, including portions of the auxiliary and engineered safety features systems.
Heat produced in the reactor is converted to electrical energy by the power conversion system. A turbine-generator system converts the thermal energy of steam produced in the reactor into mechanical shaft power and then into electrical energy. The main turbine consists of one double-flow, high-pressure turbine and three double-flow, low-pressure turbines. The generator is driven at 1800 rpm and is rated at 1300 MVA. The exhaust steam from the turbine is condensed and deaerated in the main condenser. The heat rejected to the main condenser is removed by the circulating water system.
The circulating water system provides the heat sink required for removal of waste heat in the power plants thermal cycle. The system has the principal function of removing heat by absorbing this energy in the main condenser.
Water is withdrawn from a cooling lake by the circulating water pumps via the intake pipes. After passing through the plant condensers, the discharge is routed back to the cooling lake.
1.3 REGULATORY GUIDANCE The Nuclear Regulatory Commission (NRC or Commission) provided initial decommissioning requirements in its rule "General Requirements for Decommissioning Nuclear Facilities," issued in June 1988.[2]* This rule set forth financial criteria for decommissioning licensed nuclear power facilities.
The regulation addressed decommissioning planning needs, timing, funding methods, and environmental review requirements. The intent of the rule was to ensure that decommissioning would be accomplished in a safe and timely manner and that adequate funds would be available for this purpose.
- Annotated references for citations in Sections 1-6 are provided in Section 7.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 1, Page 3 of 8 TLG Services, Inc.
Subsequent to the rule, the NRC issued Regulatory Guide 1.159, Assuring the Availability of Funds for Decommissioning Nuclear Reactors,[3] which provided additional guidance to the licensees of nuclear facilities on the financial methods acceptable to the NRC staff for complying with the requirements of the rule. The regulatory guide addressed the funding requirements and provided guidance on the content and form of the financial assurance mechanisms indicated in the rule.
The rule defined three decommissioning alternatives as being acceptable to the NRC: DECON, SAFSTOR, and ENTOMB. The DECON alternative assumes that any contaminated or activated portion of the plants systems, structures, and facilities are removed or decontaminated to levels that permit the site to be released for unrestricted use shortly after the cessation of plant operations.
The rule also placed limits on the time allowed to complete the decommissioning process. For SAFSTOR, the process is restricted in overall duration to 60 years, unless it can be shown that a longer duration is necessary to protect public health and safety. The guidelines for ENTOMB are similar, providing the NRC with both sufficient leverage and flexibility to ensure that these deferred options are only used in situations where it is reasonable and consistent with the definition of decommissioning. At the conclusion of a 60-year dormancy period (or longer for ENTOMB if the NRC approves such a case), the site would still require significant remediation to meet the unrestricted release limits for license termination.
The ENTOMB alternative has not been viewed as a viable option for power reactors due to the significant time required to isolate the long-lived radionuclides for decay to permissible levels. However, with recent rulemaking permitting the controlled release of a site, the NRC has re-evaluated this alternative.[4] The resulting feasibility study, based upon an assessment by Pacific Northwest National Laboratory, concluded that the method did have conditional merit for some, if not most, reactors. However, the staff also found that additional rulemaking would be needed before this option could be treated as a generic alternative. The NRC had considered rulemaking to alter the 60-year time for completing decommissioning and to clarify the use of engineered barriers for reactor entombments.[5] However, the NRCs staff has recommended that rulemaking be deferred, based upon several factors, e.g., no licensee has committed to pursuing the entombment option, the unresolved issues associated with the disposition of greater-than-Class C material (GTCC), and the NRCs current priorities, at least until after the additional research studies are complete. The Commission concurred with the staffs recommendation.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 1, Page 4 of 8 TLG Services, Inc.
The NRC published amendments to its decommissioning regulations in 1996.[6]
When the regulations were originally adopted in 1988, it was assumed that the majority of licensees would decommission at the end of the facilitys operating licensed life. Since that time, several licensees permanently and prematurely ceased operations. Exemptions from certain operating requirements were required once the reactor was defueled to facilitate the decommissioning. Each case was handled individually, without clearly defined generic requirements.
The NRC amended the decommissioning regulations in 1996 to clarify ambiguities and codify procedures and terminology as a means of enhancing efficiency and uniformity in the decommissioning process. The new amendments allow for greater public participation and better define the transition process from operations to decommissioning.
Under the revised regulations, licensees will submit written certification to the NRC within 30 days after the decision to cease operations. Certification will also be required once the fuel is permanently removed from the reactor vessel.
Submittal of these notices will entitle the licensee to a fee reduction and eliminate the obligation to follow certain requirements needed only during operation of the reactor. Within two years of submitting notice of permanent cessation of operations, the licensee is required to submit a Post-Shutdown Decommissioning Activities Report (PSDAR) to the NRC. The PSDAR describes the planned decommissioning activities, the associated sequence and
- schedule, and an estimate of expected costs.
Prior to completing decommissioning, the licensee is required to submit applications to the NRC to terminate the license, which will include a License Termination Plan (LTP).
1.3.1 Nuclear Waste Policy Act Congress passed the Nuclear Waste Policy Act[7] (NWPA) in 1982, assigning the responsibility for disposal of the spent nuclear fuel created by the commercial nuclear generating plants to the DOE. Two permanent disposal facilities were envisioned, as well as an interim storage facility. To recover the cost, the legislation created a Nuclear Waste Fund through which money is collected from the sale of electricity generated by the power plants. NWPA, along with the individual disposal contracts with the utilities, specified that the DOE was to begin accepting spent fuel by January 31, 1998.
Since the original legislation, the DOE has announced several delays in the program schedule. By January 1998, the DOE had failed to initiate the disposal of spent nuclear fuel and high level waste, as required by the NWPA and utility contracts. Delays continue and, as a result,
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 1, Page 5 of 8 TLG Services, Inc.
generators have initiated legal action against the DOE in an attempt to resolve the impasse.[8]
Operation of DOEs yet-to-be constructed repository is contingent upon the review and approval of the facilitys license application by the NRC and the successful resolution of pending litigation. The DOE submitted its license application to the NRC on June 3, 2008, seeking authorization to construct the repository at Yucca Mountain, Nevada. The NRC formally docketed the DOEs license application on September 8, 2008, triggering a three-year deadline, with a possible one-year extension, set by Congress for the NRC to decide on whether to authorize construction.
Construction, if adequately funded, could take five to six years after the DOE receives authorization to proceed. For purposes of this analysis, Exelon has assumed that DOE would begin to receive commercial spent fuel in 2018.
Once the repository is operational, fuel acceptance will be prioritized and spent fuel assemblies will need to meet certain acceptance criteria, including heat output. These conditions require that the fuel discharged upon the cessation of operations be actively cooled and stored for a minimum period at the generating site prior to transfer (five years as defined in 10CFR§961 for standard fuel). As such, the NRC requires that licensees establish a program to manage and provide funding for the management of all irradiated fuel at the reactor until title of the fuel is transferred to the Secretary of Energy, pursuant to 10CFR§50.54(bb).[9]
This funding requirement is fulfilled through inclusion of certain cost elements in the decommissioning estimate, for example, associated with the isolation and continued operation of the spent fuel pool and ISFSI.
At shutdown, the fuel storage pool is expected to contain freshly discharged assemblies (from the most recent refueling cycles) as well as the final reactor core. Over the next five and one-half years (from the cessation of Unit 2 operations) the assemblies are packaged into multipurpose canisters for transfer to the ISFSI. It is assumed that this period provides the necessary cooling for the final core to meet on site storage system requirements for decay heat.
An independent spent fuel storage installation (ISFSI) has been constructed to support plant operations. It is expected that this facility will also be available to support decommissioning operations. In two of the scenarios evaluated, the ISFSI is expanded to accommodate the inventory
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 1, Page 6 of 8 TLG Services, Inc.
of spent fuel residing in the plants storage pool at the conclusion of the required cooling period. Once emptied, the fuel handling building can be either decontaminated and dismantled or prepared for long-term storage.
In the Delayed DECON scenario, the storage pool remains operational and is used for the interim storage of the fuel, concurrent with the ISFSI operations.
The DOEs generator allocation/receipt schedules are based upon the oldest fuel receiving the highest priority. For purposes of this analysis, the acceptance of commercial spent fuel by the DOE is expected to begin in 2018. Given this scenario and an anticipated rate of transfer, spent fuel is projected to remain at the Braidwood site for approximately 18 years after the cessation of operations at Unit 2. Consequently, costs are included within the analysis for the continued operation of the storage pool and the expansion of the ISFSI, as required, and for the long-term caretaking of the spent fuel at the site until the year 2065.
Exelons strongly held position is that the DOE has a contractual obligation to accept Braidwoods fuel in a timely manner and consistent with its contract commitments. No assumption made in this study should be interpreted to be inconsistent with this claim. However, at this time, including the cost of storing spent fuel in this study is the most reasonable approach because it insures the availability of sufficient decommissioning funds at the end of the stations life if, contrary to its contractual obligation, the DOE has not performed.
1.3.2 Low-Level Radioactive Waste Acts The contaminated and activated material generated in the decontamination and dismantling of a commercial nuclear reactor is classified as low-level (radioactive) waste, although not all of the material is suitable for shallow-land disposal. Congress passed the Low-Level Radioactive Waste Policy Act in 1980,[10] declaring the states as being ultimately responsible for the disposition of low-level radioactive waste generated within their own borders. The federal law encouraged the formation of regional groups or compacts to implement this objective safely, efficiently, and economically, and set a target date of 1986 for implementation. After little progress, the Low-Level Radioactive Waste Policy Amendments Act of 1985,[11] extended the implementation schedule, with specific milestones and stiff sanctions for non-compliance. However, to date, no new compact facilities have been successfully sited, licensed, and constructed.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 1, Page 7 of 8 TLG Services, Inc.
Until recently, there were two facilities available to Exelon for the disposal of low-level radioactive waste generated by Braidwood. As of July 1, 2008, however, the facility in Barnwell, South Carolina was closed to generators outside the Atlantic Compact (comprised of the states of Connecticut, New Jersey and South Carolina). This leaves the facility in Clive, Utah, operated by EnergySolutions, as the only available destination for low-level radioactive waste requiring controlled disposal.
EnergySolutions does not have a license to dispose of the more highly radioactive waste (Class B and C as defined by 10 CFR §61) generated in the dismantling of the reactor vessel. In the interim (at least until new waste disposal options become available) and for purposes of this analysis, waste disposal costs for this material are based upon Exelons previously negotiated cost of disposal at the Barnwell site.
Material exceeding Class C limits (limited to material closest to the reactor core and comprising a small percentage of the total waste volume) is generally not suitable for shallow-land disposal. This material is packaged in the same multipurpose canisters used for spent fuel storage/transport and designated for geologic disposal.
A significant portion of the metallic waste generated during decommissioning may only be potentially contaminated by radioactive materials. This waste can be surveyed on site or shipped off site to licensed facilities for further analysis, for processing and/or for conditioning/recovery. Reduction in the volume of low-level radioactive waste requiring disposal in a licensed low-level radioactive waste disposal facility can be accomplished through a variety of methods, including analyses and surveys or decontamination to eliminate the portion of waste that does not require disposal as radioactive waste, compaction, incineration or metal melt. The estimates reflect the savings from waste recovery/volume reduction.
1.3.3 Radiological Criteria for License Termination In 1997, the NRC published Subpart E, Radiological Criteria for License Termination,[12] amending 10 CFR §20. This subpart provides radiological criteria for releasing a facility for unrestricted use. The regulation states that the site can be released for unrestricted use if radioactivity levels are such that the average member of a critical group would not receive a Total Effective Dose Equivalent (TEDE) in excess of
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 1, Page 8 of 8 TLG Services, Inc.
25 millirem per year, and provided that residual radioactivity has been reduced to levels that are As Low As Reasonably Achievable (ALARA).
The decommissioning estimates for Braidwood assume that the site will be remediated to a residual level consistent with the NRC-prescribed level.
It should be noted that the NRC and the Environmental Protection Agency (EPA) differ on the amount of residual radioactivity considered acceptable in site remediation. The EPA has two limits that apply to radioactive materials. An EPA limit of 15 millirem per year is derived from criteria established by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA or Superfund).[13]
An additional limit of 4 millirem per year, as defined in 40 CFR §141.16, is applied to drinking water.[14]
On October 9, 2002, the NRC signed an agreement with the EPA on the radiological decommissioning and decontamination of NRC-licensed sites. The Memorandum of Understanding (MOU)[15] provides that EPA will defer exercise of authority under CERCLA for the majority of facilities decommissioned under NRC authority. The MOU also includes provisions for NRC and EPA consultation for certain sites when, at the time of license termination, (1) groundwater contamination exceeds EPA-permitted levels; (2) NRC contemplates restricted release of the site; and/or (3) residual radioactive soil concentrations exceed levels defined in the MOU.
The MOU does not impose any new requirements on NRC licensees and should reduce the involvement of the EPA with NRC licensees who are decommissioning. Most sites are expected to meet the NRC criteria for unrestricted use, and the NRC believes that only a few sites will have groundwater or soil contamination in excess of the levels specified in the MOU that trigger consultation with the EPA. However, if there are other hazardous materials on the site, the EPA may be involved in the cleanup. As such, the possibility of dual regulation remains for certain licensees. The present study does not include any costs for this occurrence.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 1 of 13 TLG Services, Inc.
- 2. DECOMMISSIONING ALTERNATIVES Detailed cost estimates were developed to decommission Braidwood for three variations of the approved decommissioning alternatives: DECON and SAFSTOR.
Although the scenarios differ with respect to technique, process, cost, and schedule, they attain the same result: the ultimate release of the site for unrestricted use.
The following scenarios were evaluated and are representative of the alternatives available to the owner. The scenarios assume that the units operate for 60 years, followed by a planned and scheduled shutdown.
- 1.
DECON: The first scenario assumes that the two units are promptly decommissioned as an integrated activity. Spent fuel in the wet storage pool is relocated to the ISFSI so as to facilitate decontamination and dismantling activities within the fuel handling building. Spent fuel storage operations continue at the site, independent of decommissioning operations, until the transfer of the fuel to the DOE is complete, assumed for purposes of this study to be in the year 2065. At that time, the ISFSI is decommissioned and the site released for alternative use.
- 2.
Delayed DECON: In the second scenario, the units are prepared for an abbreviated period of safe-storage. The spent fuel resident in the fuel handling buildings storage pool, remains in the pool until it can be transferred to the DOE (i.e., the ISFSI is not used to off-load the pool following the cessation of operations). Spent fuel placed at the ISFSI during operations remains in storage until the pool is emptied at which time the ISFSI is also emptied.
Decommissioning is scheduled to commence once the transfer of the fuel to the DOE is complete (i.e., in the year 2065).
- 3.
SAFSTOR: The units are also placed into safe-storage in the third scenario.
However, decommissioning is deferred beyond the fuel storage period to the maximum extent permitted by the current regulations. Similar to the DECON alternative, the spent fuel in the wet storage pool is relocated to the ISFSI for interim storage. The units remain in protective storage following the removal of spent fuel from the site. Decommissioning operations commence such that license termination is completed within the required 60-year period. As with the first two scenarios, decommissioning activities at the two units are sequenced and integrated so as to minimize the total duration of the physical dismantling process.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 2 of 13 TLG Services, Inc.
The following sections describe the basic activities associated with each alternative.
Although detailed procedures for each activity identified are not provided, and the actual sequence of work may vary, the activity descriptions provide a basis not only for estimating but also for the expected scope of work (i.e., engineering and planning at the time of decommissioning).
The conceptual approach that the NRC has described in its regulations divides decommissioning into three phases. The initial phase commences with the effective date of permanent cessation of operations and involves the transition of both plant and licensee from reactor operations (i.e., power production) to facilitate de-activation and closure. During the first phase, notification is to be provided to the NRC certifying the permanent cessation of operations and the removal of fuel from the reactor vessel. The licensee would then be prohibited from reactor operation.
The second phase encompasses activities during the storage period or during major decommissioning activities, or a combination of the two. The third phase pertains to the activities involved in license termination. The decommissioning estimates developed for Braidwood are also divided into phases or periods; however, demarcation of the phases is based upon major milestones within the project or significant changes in the projected expenditures.
2.1 DECON The DECON alternative, as defined by the NRC, is "the alternative in which the equipment, structures, and portions of a facility and site containing radioactive contaminants are removed or decontaminated to a level that permits the property to be released for unrestricted use shortly after cessation of operations." This study does not address the cost to dispose of the spent fuel residing at the site; such costs are funded through a surcharge on electrical generation. However, the study does estimate the costs incurred with the interim on-site storage of the fuel pending shipment by the DOE to an off-site disposal facility.
2.1.1 Period 1 - Preparations In anticipation of the cessation of plant operations, detailed preparations are undertaken to provide a smooth transition from plant operations to site decommissioning. Through implementation of a staffing transition plan, the organization required to manage the intended decommissioning activities is assembled from available plant staff and outside resources. Preparations include the planning for permanent defueling of the reactor, revision of technical specifications
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 3 of 13 TLG Services, Inc.
applicable to the operating conditions and requirements, a
characterization of the facility and major components, and the development of the PSDAR.
Engineering and Planning The PSDAR, required within two years of the notice to cease operations, provides a description of the licensees planned decommissioning activities, a timetable, and the associated financial requirements of the intended decommissioning program. Upon receipt of the PSDAR, the NRC will make the document available to the public for comment in a local meeting to be held in the vicinity of the reactor site. Ninety days following submittal and NRC receipt of the PSDAR, the licensee may begin to perform major decommissioning activities under a modified 10 CFR §50.59 procedure, i.e., without specific NRC approval. Major activities are defined as any activity that results in permanent removal of major radioactive components, permanently modifies the structure of the containment, or results in dismantling components (for shipment) containing GTCC, as defined by 10 CFR §61. Major components are further defined as comprising the reactor vessel and internals, large bore reactor coolant system piping, and other large components that are radioactive. The NRC includes the following additional criteria for use of the §50.59 process in decommissioning. The proposed activity must not:
foreclose release of the site for possible unrestricted use,
significantly increase decommissioning costs,
cause any significant environmental impact, or
violate the terms of the licensees existing license.
Existing operational technical specifications are reviewed and modified to reflect plant conditions and the safety concerns associated with permanent cessation of operations.
The environmental impact associated with the planned decommissioning activities is also considered. Typically, a licensee will not be allowed to proceed if the consequences of a particular decommissioning activity are greater than that bounded by previously evaluated environmental assessments or impact statements. In this instance, the licensee would have to submit a license amendment for the specific activity and update the environmental report.
The decommissioning program outlined in the PSDAR will be designed to accomplish the required tasks within the ALARA guidelines (as
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 4 of 13 TLG Services, Inc.
defined in 10 CFR §20) for protection of personnel from exposure to radiation hazards. It will also address the continued protection of the health and safety of the public and the environment during the dismantling activity. Consequently, with the development of the PSDAR, activity specifications, cost-benefit and safety analyses, and work packages and procedures, would be assembled to support the proposed decontamination and dismantling activities.
Site Preparations Following final plant shutdown, and in preparation for actual decommissioning activities, the following activities are initiated:
Characterization of the site and surrounding environs. This includes radiation surveys of work areas, major components (including the reactor vessel and its internals), internal piping, and biological shield cores.
Isolation of the spent fuel storage pool and fuel handling systems, such that decommissioning operations can commence on the balance of the plant. Decommissioning operations are scheduled around the fuel handling areas to optimize the overall project schedule. The fuel is transferred to the ISFSI as it decays to the point that it meets the heat load criteria of the containers. Consequently, it is assumed that the fuel pool remains operational for approximately five and one-half years following the cessation of Unit 2 operations.
Specification of transport and disposal requirements for activated materials and/or hazardous materials, including shielding and waste stabilization.
Development of procedures for occupational exposure control, control and release of liquid and gaseous effluent, processing of radwaste (including dry-active waste, resins, filter media, metallic and non-metallic components generated in decommissioning), site security and emergency programs, and industrial safety.
2.1.2 Period 2 - Decommissioning Operations This period includes the physical decommissioning activities associated with the removal and disposal of contaminated and activated components and structures, including the successful termination of the 10 CFR §50 operating license. Significant decommissioning activities in this phase include:
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 5 of 13 TLG Services, Inc.
Construction of temporary facilities and/or modification of existing facilities to support dismantling activities. This may include a centralized processing area to facilitate equipment removal and component preparations for off-site disposal.
Reconfiguration and modification of site structures and facilities as needed to support decommissioning operations. This may include the upgrading of roads (on-and off-site) to facilitate hauling and transport. Modifications may be required to the containment structure to facilitate access of large/heavy equipment. Modifications may also be required to the refueling area of the building to support the segmentation of the reactor vessel internals and component extraction.
Design and fabrication of temporary and permanent shielding to support removal and transportation activities, construction of contamination control envelopes, and the procurement of specialty tooling.
Procurement (lease or purchase) of shipping canisters, cask liners, and industrial packages.
Decontamination of components and piping systems as required to control (minimize) worker exposure.
Removal of piping and components no longer essential to support decommissioning operations.
Removal of control rod drive housings and the head service structure from reactor vessel head. Segmentation of the vessel closure head.
Removal and segmentation of the upper internals assemblies.
Segmentation will maximize the loading of the shielded transport casks (i.e., by weight and activity). The operations are conducted under water using remotely operated tooling and contamination controls.
Disassembly and segmentation of the remaining reactor internals, including the core former and lower core support assembly. Some material is expected to exceed Class C disposal requirements. As such, the segments will be packaged in modified fuel storage canisters for geologic disposal.
Segmentation of the reactor vessel. A shielded platform is installed for segmentation as cutting operations are performed in-air using remotely operated equipment within a contamination control envelope. The water level is maintained just below the cut to
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 6 of 13 TLG Services, Inc.
minimize the working area dose rates. Segments are transferred in-air to containers that are stored under water, for example, in an isolated area of the refueling canal.
Removal of the activated portions of the concrete biological shield and accessible contaminated concrete surfaces. If dictated by the steam generator and pressurizer removal scenarios, those portions of the associated steam generator cubicles necessary for access and component extraction are removed.
Removal of the steam generators and pressurizer for material recovery and controlled disposal. These components can serve as their own burial containers provided that all penetrations are properly sealed and the internal contaminants are stabilized (e.g.,
with lightweight grout). Steel shielding is added, as necessary, to those external areas of the package to meet transportation limits and regulations.
Transfer of the spent fuel from the storage pool to the ISFSI pad for interim storage.
Expansion of the ISFSI and transfer of the spent fuel from the storage pool to the ISFSI pad for interim storage. Spent fuel storage operations continue throughout the active decommissioning period.
Fuel transfer is expected to begin in 2061 and to be completed by the end of the year 2065.
At least two years prior to the anticipated date of license termination, an LTP is required. Submitted as a supplement to the Final Safety Analysis Report (FSAR) or its equivalent, the plan must include: a site characterization, description of the remaining dismantling activities, plans for site remediation, procedures for the final radiation survey, designation of the end use of the site, an updated cost estimate to complete the decommissioning, and any associated environmental concerns. The NRC will notice the receipt of the plan, make the plan available for public comment, and schedule a local meeting. LTP approval will be subject to any conditions and limitations as deemed appropriate by the Commission. The licensee may then commence with the final remediation of site facilities and services, including:
Removal of remaining plant systems and associated components as they become nonessential to the decommissioning program or worker health and safety (e.g., waste collection and treatment systems, electrical power and ventilation systems).
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 7 of 13 TLG Services, Inc.
Removal of the steel liners from the refueling canal, disposing of the activated and contaminated sections as radioactive waste. Removal of any activated/ contaminated concrete.
Surveys of the decontaminated areas of the containment structures.
Removal of the contaminated equipment and material from the auxiliary and fuel buildings, and any other contaminated facility.
Use radiation and contamination control techniques until radiation surveys indicate that the structures and equipment can be released for unrestricted access and conventional demolition. This activity may necessitate the dismantling and disposition of most of the systems and components (both clean and contaminated) located within these buildings. This activity will facilitate surface decontamination and subsequent verification surveys required prior to obtaining release for demolition.
Removal of the remaining components, equipment, and plant services in support of the area release survey(s).
Routing of material removed in the decontamination and dismantling to a central processing area. Material certified to be free of contamination is released for unrestricted disposition (e.g., as scrap, recycle, or general disposal). Contaminated material is characterized and segregated for additional off-site processing (disassembly, chemical cleaning, volume reduction, and waste treatment), and/or packaged for controlled disposal at a low-level radioactive waste disposal facility.
Incorporated into the LTP is the Final Survey Plan. This plan identifies the radiological surveys to be performed once the decontamination activities are completed and is developed using the guidance provided in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM).[16] This document incorporates the statistical approaches to survey design and data interpretation used by the EPA. It also identifies commercially available instrumentation and procedures for conducting radiological surveys. Use of this guidance ensures that the surveys are conducted in a manner that provides a high degree of confidence that applicable NRC criteria are satisfied. Once the survey is complete, the results are provided to the NRC in a format that can be verified. The NRC then reviews and evaluates the information, performs an independent confirmation of radiological site conditions, and makes a determination on final termination of the license.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 8 of 13 TLG Services, Inc.
The NRC will terminate the operating license when it determines that site remediation has been performed in accordance with the LTP, and that the terminal radiation survey and associated documentation demonstrate that the facility is suitable for release.
2.1.3 Period 3 - Site Restoration Following completion of decommissioning operations, site restoration activities will begin. Efficient removal of the contaminated materials and verification that residual radionuclide concentrations are below the NRC limits will result in substantial damage to many of the structures.
Although performed in a controlled, safe manner, blasting, coring, drilling, scarification (surface removal), and the other decontamination activities will substantially degrade power block structures including the reactor and auxiliary buildings. Under certain circumstances, verifying that subsurface radionuclide concentrations meet NRC site release requirements will require removal of grade slabs and lower floors, potentially weakening footings and structural supports. This removal activity will be necessary for those facilities and plant areas where historical records, when available, indicate the potential for radionuclides having been present in the soil, where system failures have been recorded, or where it is required to confirm that subsurface process and drain lines were not breached over the operating life of the station.
Prompt dismantling of site structures is clearly the most appropriate and cost-effective option. It is unreasonable to anticipate that these structures would be repaired and preserved after the radiological contamination is removed. The cost to dismantle site structures with a work force already mobilized on site is more efficient than if the process were deferred. Site facilities quickly degrade without maintenance, adding additional expense and creating potential hazards to the public as well as to future workers. Abandonment creates a breeding ground for vermin infestation as well as other biological hazards.
This cost study presumes that non-essential structures and site facilities are dismantled as a continuation of the decommissioning activity.
Foundations and exterior walls are removed to a nominal depth of three feet below grade. The three-foot depth allows for the placement of gravel for drainage, as well as topsoil, so that vegetation can be established for erosion control. Site areas affected by the dismantling activities are
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 9 of 13 TLG Services, Inc.
restored and the plant area graded as required to prevent ponding and inhibit the refloating of subsurface materials.
Concrete rubble produced by demolition activities is processed to remove rebar and miscellaneous embedments. The processed material is then used on site to backfill voids. Excess materials are trucked to an off-site area for disposal as construction debris.
2.1.4 ISFSI Operations and Decommissioning The ISFSI will continue to operate under the general license provisions of 10 CFR §72 following the termination of the §50 operating license.
Assuming the DOE starts accepting fuel in 2018, transfer of spent fuel from Braidwood is anticipated to begin in 2061 and continue through the year 2065.
At the conclusion of the spent fuel transfer process, the ISFSI will be decommissioned. The Commission will terminate the §72 license when it determines that the remediation of the ISFSI has been performed in accordance with an ISFSI license termination plan and that the final radiation survey and associated documentation demonstrate that the facility is suitable for release. Once the requirements are satisfied, the NRC can terminate the license for the ISFSI.
The assumed design for the ISFSI is based upon the use of a multi-purpose canister and a concrete overpack for pad storage. For purposes of this cost analysis, it is assumed that once the inner canisters containing the spent fuel assemblies have been removed, any required decontamination performed, and the license for the facility terminated, the modules can be dismantled using conventional techniques for the demolition of reinforced concrete. The concrete storage pad will then be removed, and the area graded and landscaped to conform to the surrounding environment.
2.2 SAFSTOR and DELAYED DECON The NRC defines SAFSTOR as "the alternative in which the nuclear facility is placed and maintained in a condition that allows the nuclear facility to be safely stored and subsequently decontaminated (deferred decontamination) to levels that permit release for unrestricted use." The facility is left intact (during the dormancy period), with structures maintained in a sound condition. Systems not required to operate in support of the spent fuel pool or
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 10 of 13 TLG Services, Inc.
site surveillance and security are drained, de-energized, and secured. Minimal cleaning/removal of loose contamination and/or fixation and sealing of remaining contamination are performed. Access to contaminated areas is secured to provide controlled access for inspection and maintenance.
The engineering and planning requirements are similar to those for the DECON alternative. Site preparations are also similar to those for the DECON alternative. However, with the exception of the required radiation surveys and site characterizations, the mobilization and preparation of site facilities is less extensive.
The following discussion is appropriate for both the SAFSTOR and Delayed DECON scenarios, the primary differences being in the length of the dormancy period. In the Delayed DECON scenario, the fuel remains in the fuel handling buildings storage pool until such time that the transfer to a DOE facility is complete. Decommissioning operations are assumed to begin once fuel is off site. By contrast, in the SAFSTOR scenario, the spent fuel is relocated to the ISFSI. The plant remains in safe-storage even after the fuel is removed from site. Decommissioning operations are initiated such that the license is terminated within the required 60-year time period.
2.2.1 Period 1 - Preparations Preparations for long-term storage include the planning for permanent defueling of the reactors, revision of technical specifications appropriate to the operating conditions and requirements, a characterization of the facility and major components, and the development of the PSDAR.
The process of placing the plant in safe-storage includes, but is not limited to, the following activities:
Isolation of the spent fuel storage services and fuel handling systems located in the fuel handling building so that safe-storage operations may commence on the balance of the plant. This activity may be carried out by plant personnel in accordance with existing operating technical specifications. Activities are scheduled around the fuel handling systems to the greatest extent possible.
Draining and de-energizing of the non-contaminated systems not required to support continued site operations or maintenance.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 11 of 13 TLG Services, Inc.
Disposing of contaminated filter elements and resin beds not required for processing wastes from layup activities for future operations.
Draining of the reactor vessel, with the internals left in place and the vessel head secured.
Draining and de-energizing non-essential, contaminated systems with decontamination as required for future maintenance and inspection.
Preparing lighting and alarm systems whose continued use is required; de-energizing portions of fire protection, electric power, and HVAC systems whose continued use is not required.
Cleaning of the loose surface contamination from building access pathways.
Performing an interim radiation survey of plant, posting warning signs where appropriate.
Erecting physical barriers and/or securing all access to radioactive or contaminated areas, except as required for inspection and maintenance.
Installing security and surveillance monitoring equipment and relocating security fence around secured structures, as required.
2.2.2 Period 2 - Dormancy The second phase identified by the NRC in its rule addresses licensed activities during a storage period and is applicable to the dormancy phases of the deferred decommissioning alternatives. Dormancy activities include a 24-hour security force, preventive and corrective maintenance on security systems, area lighting, general building maintenance, heating and ventilation of buildings, routine radiological inspections of contaminated structures, maintenance of structural integrity, and a site environmental and radiation monitoring program.
Resident maintenance personnel perform equipment maintenance, inspection activities, routine services to maintain safe conditions, adequate lighting, heating, and ventilation, and periodic preventive maintenance on essential site services.
An environmental surveillance program is carried out during the dormancy period to ensure that releases of radioactive material to the environment are prevented and/or detected and controlled. Appropriate
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 12 of 13 TLG Services, Inc.
emergency procedures are established and initiated for potential releases that exceed prescribed limits. The environmental surveillance program constitutes an abbreviated version of the program in effect during normal plant operations.
Security during the dormancy period is conducted primarily to prevent unauthorized entry and to protect the public from the consequences of their own actions. The security fence, sensors, alarms, and other surveillance equipment provide security. Fire and radiation alarms are also monitored and maintained. While remote surveillance is an option, it does not offer the immediate response time of a physical presence.
The transfer of the spent fuel to a DOE facility continues during this period until complete. Fuel is shipped exclusively from the ISFSI in the SAFSTOR scenario and from both the pool and the ISFSI in the Delayed DECON scenario.
After an optional period of storage (such that license terminations are accomplished within 60 years of final shutdown), it is required that the licensee submit applications to terminate the license, along with an LTP (described in Section 2.1.2), thereby initiating the third phase.
2.2.3 Periods 3 and 4 - Delayed Decommissioning Prior to the commencement of decommissioning operations, preparations are undertaken to reactivate site services and prepare for decommissioning. Preparations include engineering and planning, a detailed site characterization, and the assembly of a decommissioning management organization. Final planning for activities and the writing of activity specifications and detailed procedures are also initiated at this time.
Much of the work in developing a termination plan is relevant to the development of the detailed engineering plans and procedures. The activities associated with this phase and the follow-on decontamination and dismantling processes are detailed in Sections 2.1.1 and 2.1.2. The primary difference between the sequences anticipated for the DECON and deferred scenarios is the absence, in the latter, of any constraint on the availability of the fuel storage facilities located within the fuel handling building for decommissioning.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 2, Page 13 of 13 TLG Services, Inc.
Variations in the length of the dormancy period are expected to have little effect upon the quantities of radioactive wastes generated from system and structure removal operations. Given the levels of radioactivity and spectrum of radionuclides expected from sixty years of plant operation, no plant process system identified as being contaminated upon final shutdown will become releasable due to the decay period alone (i.e., there is no significant reduction in the waste generated from the decommissioning activities). However, due to the lower activity levels, a greater percentage of the waste volume can be designated for off-site processing and recovery.
The delay in decommissioning also yields lower working area radiation levels. As such, the estimates for the delayed scenarios incorporate reduced ALARA controls for the lower occupational exposure potential.
Although the initial radiation levels due to 60Co will decrease during the dormancy period, the internal components of the reactor vessel will still exhibit sufficiently high radiation dose rates to require remote sectioning under water due to the presence of long-lived radionuclides such as 94Nb, 59Ni, and 63Ni. Therefore, the dismantling procedures described for the DECON alternative would still be employed during deferred scenarios. Portions of the biological shield will still be radioactive due to the presence of activated trace elements with long half-lives (152Eu and 154Eu). Decontamination will require controlled removal and disposal. It is assumed that radioactive corrosion products on inner surfaces of piping and components will not have decayed to levels that will permit unrestricted use or allow conventional removal.
These systems and components will be surveyed as they are removed and disposed of in accordance with the existing radioactive release criteria.
2.2.4 Period 5 - Site Restoration Following completion of decommissioning operations, site-restoration activities can begin. If the site structures are to be dismantled, dismantling as a continuation of the decommissioning process is clearly the most appropriate and cost-effective option, as described in Section 2.1.3. The basis for the dismantling cost in the deferred scenarios is consistent with that described for DECON, removal of structures and site facilities to a nominal depth of three feet below grade and limited restoration of the site.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 1 of 30 TLG Services, Inc.
- 3. COST ESTIMATE The cost estimates prepared for decommissioning Braidwood consider the unique features of the site, including the NSSS, power generation systems, support services, site buildings, and ancillary facilities. The basis of the estimates, including the sources of information relied upon, the estimating methodology employed, site-specific considerations, and other pertinent assumptions, is described in this section.
3.1 BASIS OF ESTIMATE The estimates were developed with site-specific, technical information developed in an evaluation prepared for Exelon in 2004. The information was reviewed for the current analysis and updated as deemed appropriate. The site-specific considerations and assumptions used in the previous evaluation were also revisited. Modifications were incorporated where new information was available or experience from ongoing decommissioning programs provided viable alternatives or improved processes.
3.2 METHODOLOGY The methodology used to develop the estimates follows the basic approach originally presented in the AIF/NESP-036 study report, "Guidelines for Producing Commercial Nuclear Power Plant Decommissioning Cost Estimates,"[17]
and the DOE "Decommissioning Handbook."[18]
These documents present a unit factor method for estimating decommissioning activity costs, which simplifies the estimating calculations. Unit factors for concrete removal ($/cubic yard), steel removal ($/ton), and cutting costs ($/inch) were developed using local labor rates. The activity-dependent costs were estimated with the item quantities (cubic yards and tons), developed from plant drawings and inventory documents. Removal rates and material costs for the conventional disposition of components and structures relied upon information available in the industry publication, "Building Construction Cost Data," published by R.S. Means.[19]
This analysis reflects lessons learned from TLGs involvement in the Shippingport Station Decommissioning Project, completed in 1989, as well as the decommissioning of the Cintichem reactor, hot cells, and associated facilities, completed in 1997. In addition, the planning and engineering for the Pathfinder, Shoreham, Rancho Seco, Trojan, Yankee Rowe, Big Rock Point, Maine Yankee, Humboldt Bay-3, Oyster Creek, Connecticut Yankee, and San
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 2 of 30 TLG Services, Inc.
Onofre-1 nuclear units have provided additional insight into the process, the regulatory aspects, and the technical challenges of decommissioning commercial nuclear units.
The unit factor method provides a demonstrable basis for establishing reliable cost estimates. The detail provided in the unit factors, including activity duration, labor costs (by craft), and equipment and consumable costs, ensures that essential elements have not been omitted. Appendix A presents the detailed development of a typical unit factor. Appendix B provides the values contained within one set of factors developed for this analysis.
Work Difficulty Factors TLG has historically applied work difficulty adjustment factors (WDFs) to account for the inefficiencies in working in a power plant environment. WDFs were assigned to each unique set of unit factors, commensurate with the inefficiencies associated with working in confined, hazardous environments.
The ranges used for the WDFs are as follows:
Access Factor 10% to 20%
Respiratory Protection Factor 10% to 50%
Radiation/ALARA Factor 10% to 40%
Protective Clothing Factor 10% to 30%
Work Break Factor 8.33%
The factors and their associated range of values were developed in conjunction with the AIF/NESP-036 study. The application of the factors is discussed in more detail in that publication.
Scheduling Program Durations The unit factors, adjusted by the WDFs as described above, are applied against the inventory of materials to be removed in the radiologically controlled areas.
The resulting man-hours, or crew-hours, are used in the development of the decommissioning program schedule, using resource loading and event sequencing considerations. The scheduling of conventional removal and dismantling activities are based upon productivity information available from the "Building Construction Cost Data" publication.
An activity duration critical path is used to determine the total decommissioning program schedule. The schedule is relied upon in calculating the carrying costs, which include program management, administration, field
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 3 of 30 TLG Services, Inc.
engineering, equipment rental, and support services such as quality control and security. This systematic approach for assembling decommissioning estimates ensures a high degree of confidence in the reliability of the resulting cost estimate.
3.3 PLANT INVENTORY The basis for any site-specific decommissioning estimate is the plant inventory. The inventory dictates the decontamination, removal, packaging, transport and disposal requirements and the associated performance cost.
Material disposition requirements impact the project schedule and are reflected in the level of management needed to support the project.
Consequently, it is important to delineate the inventory of material and components to be dispositioned during decommissioning, which in most instances is a subset of the total quantity of material placed during construction. In addition, the plant inventory needs to be defined in units that are compatible with the intended removal methods. For example, while sample panels may contain hundreds of subassemblies, the panels are removed in bulk. The disposition cost may be based upon the total weight of the panel and the lifting devices required rather than by disassembly of the individual components. In contrast to plant operations, the most important parameter in decommissioning can be the components mass or materials of construction and not its design performance.
3.3.1 Plant Systems The plant systems inventory was completely regenerated from the Byron Nuclear Power Stations site-specific database that was developed in 2009. This is appropriate since Byron and Braidwood are essentially identical in design and vintage. Byrons plant systems inventory was subsequently modified to reflect design features unique to Braidwood. Where new information was not available, the basis for the previous estimate was reviewed and, once validated, used to supplement the new inventory.
3.3.2 Plant Structures Structure inventories for the major power block structures relied upon the data from the 2004 study. A site inspection conducted in 2009 identified new buildings and security improvements at the site since the previous study was performed. These structures and site improvements were incorporated into the current estimate.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 4 of 30 TLG Services, Inc.
3.4 IMPACT OF DECOMMISSIONING MULTIPLE REACTOR UNITS In estimating the near simultaneous decommissioning of two co-located reactor units there can be opportunities to achieve economies of scale, by sharing costs between units, and coordinating the sequence of work activities. There will also be schedule constraints, particularly where there are requirements for specialty equipment and staff, or practical limitations on when final status surveys can take place. For purposes of the estimate, Units 1 and 2 are assumed to be essentially identical. Common facilities have been assigned to Unit 2. A summary of the principal impacts are listed below.
The sequence of work generally follows the principal that the work is done at Unit 1 first, followed by similar work at Unit 2. This permits the experience gained at Unit 1 to be applied by the workforce at the second unit. It should be noted however, that the estimates do not consider productivity improvements at the second unit, since there is little documented experience with decommissioning two units simultaneously The work associated with developing activity specifications and procedures can be considered essentially identical between the two units, therefore the second unit costs are assumed to be a fraction of the first unit (~ 43%).
Segmenting the reactor vessel and internals will require the use of special equipment. The decommissioning project will be scheduled such that Unit 2s reactor internals and vessel are segmented immediately after the activities at Unit 1 have been completed.
Some program management and support costs, particularly costs associated with the more senior positions, can be avoided with two reactors undergoing decommissioning simultaneously. As a result, the estimate is based on a lead unit that includes these senior positions, and a second unit that excludes these positions. The designation as lead is based on the unit undertaking the most complex tasks (for instance vessel segmentation) or performing tasks for the first time.
The final radiological survey schedule is also affected by a two-unit decommissioning schedule. It would be considered impractical to try to complete the final status survey of Unit 1, while Unit 2 still has ongoing radiological remediation work and waste handling in process. As such, the transfer of the spent fuel from the storage pool and subsequent decontamination of the fuel handling building is coordinated so as to synchronize the final status survey for the station.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 5 of 30 TLG Services, Inc.
The final demolition of buildings at Units 1 and 2 are considered to take place concurrently. This is considered a reasonable assumption since access to the buildings is considered good at the station.
Unit 1, as the first unit to enter decommissioning, incurs the majority of site characterization costs.
Shared systems and structures are generally assigned to Unit 2.
Station costs such as emergency response fees, regulatory agency fees, corporate overhead, and insurance are generally allocated on an equal basis between the two units.
3.5 FINANCIAL COMPONENTS OF THE COST MODEL TLGs proprietary decommissioning cost model, DECCER, produces a number of distinct cost elements. These direct expenditures, however, do not comprise the total cost to accomplish the project goal, i.e., license termination and site restoration.
Inherent in any cost estimate that does not rely on historical data is the inability to specify the precise source of costs imposed by factors such as tool breakage, accidents, illnesses, weather delays, and labor stoppages. In the DECCER cost model, contingency fulfills this role. Contingency is added to each line item to account for costs that are difficult or impossible to develop analytically. Such costs are historically inevitable over the duration of a job of this magnitude; therefore, this cost analysis includes funds to cover these types of expenses.
3.5.1 Contingency The activity-and period-dependent costs are combined to develop the total decommissioning cost. A contingency is then applied on a line-item basis, using one or more of the contingency types listed in the AIF/NESP-036 study. "Contingencies" are defined in the American Association of Cost Engineers Project and Cost Engineers' Handbook[20]
as "specific provision for unforeseeable elements of cost within the defined project scope; particularly important where previous experience relating estimates and actual costs has shown that unforeseeable events which will increase costs are likely to occur." The cost elements in this analysis are based upon ideal conditions and maximum efficiency; therefore, consistent with industry practice, a contingency factor has been applied. In the AIF/NESP-036 study, the types of unforeseeable events that are likely to occur in decommissioning are discussed and
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 6 of 30 TLG Services, Inc.
guidelines are provided for percentage contingency in each category. It should be noted that contingency, as used in this analysis, does not account for price escalation and inflation in the cost of decommissioning over the remaining operating life of the station.
The use and role of contingency within decommissioning estimates is not a safety factor issue. Safety factors provide additional security and address situations that may never occur. Contingency funds are expected to be fully expended throughout the program. They also provide assurance that sufficient funding is available to accomplish the intended tasks. An estimate without contingency, or from which contingency has been removed, can disrupt the orderly progression of events and jeopardize a successful conclusion to the decommissioning process.
For
- example, the most technologically challenging task in decommissioning a commercial nuclear station is the disposition of the reactor vessel and internal components, now highly radioactive after a lifetime of exposure to core activity. The disposition of these components forms the basis of the critical path (schedule) for decommissioning operations. Cost and schedule are interdependent, and any deviation in schedule has a significant impact on cost for performing a specific activity.
Disposition of the reactor vessel internals involves the underwater cutting of complex components that are highly radioactive. Costs are based upon optimum segmentation, handling, and packaging scenarios.
The schedule is primarily dependent upon the turnaround time for the heavily shielded shipping casks, including preparation, loading, and decontamination of the containers for transport. The number of casks required is a function of the pieces generated in the segmentation activity, a value calculated on optimum performance of the tooling employed in cutting the various subassemblies. The expected optimization, however, may not be achieved, resulting in delays and additional program costs. For this reason, contingency must be included to mitigate the consequences of the expected inefficiencies inherent in this complex activity, along with related concerns associated with the operation of highly specialized tooling, field conditions, and water clarity.
Contingency funds are an integral part of the total cost to complete the decommissioning process. Exclusion of this component puts at risk a
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 7 of 30 TLG Services, Inc.
successful completion of the intended tasks and, potentially, subsequent related activities. For this study, TLG examined the major activity-related problems (decontamination, segmentation, equipment handling, packaging, transport, and waste disposal) that necessitate a
contingency. Individual activity contingencies ranged from 10% to 75%,
depending on the degree of difficulty judged to be appropriate from TLGs actual decommissioning experience. The contingency values used in this study are as follows:
Decontamination 50%
Contaminated Component Removal 25%
Contaminated Component Packaging 10%
Contaminated Component Transport 15%
Low-Level Radioactive Waste Disposal 25%
Reactor Segmentation 75%
NSSS Component Removal 25%
Reactor Waste Packaging 25%
Reactor Waste Transport 25%
Reactor Vessel Component Disposal 50%
GTCC Disposal 15%
Non-Radioactive Component Removal 15%
Heavy Equipment and Tooling 15%
Supplies 25%
Engineering 15%
Energy 15%
Characterization and Termination Surveys 30%
Construction 15%
Taxes and Fees 10%
Insurance 10%
Staffing 15%
The contingency values are applied to the appropriate components of the estimates on a line item basis. A composite value is then reported at the end of each estimate. For example, the composite contingency values reported for the DECON alternative are 18.3% and 18.2% for Units 1 and 2, respectively. Values for the other alternatives are delineated within the detailed cost tables in Appendices D and E.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 8 of 30 TLG Services, Inc.
3.5.2 Financial Risk In addition to the routine uncertainties addressed by contingency, another cost element that is sometimes necessary to consider when bounding decommissioning costs relates to uncertainty, or risk.
Examples can include changes in work scope, pricing, job performance, and other variations that could conceivably, but not necessarily, occur.
Consideration is sometimes necessary to generate a level of confidence in the estimate, within a range of probabilities. TLG considers these types of costs under the broad term financial risk. Included within the category of financial risk are:
Transition activities and costs: ancillary expenses associated with eliminating 50% to 80% of the site labor force shortly after the cessation of plant operations, added cost for worker separation packages throughout the decommissioning program, national or company-mandated retraining, and retention incentives for key personnel.
Delays in approval of the decommissioning plan due to intervention, public participation in local community meetings, legal challenges, and national and local hearings.
Changes in the project work scope from the baseline estimate, involving the discovery of unexpected levels of contaminants, contamination in places not previously expected, contaminated soil previously undiscovered (either radioactive or hazardous material contamination), variations in plant inventory or configuration not indicated by the as-built drawings.
Regulatory changes (e.g., affecting worker health and safety, site release criteria, waste transportation, and disposal).
Policy decisions altering national commitments (e.g., in the ability to accommodate certain waste forms for disposition or in the timetable for such, for example, in the start and rate of acceptance of spent fuel by the DOE).
Pricing changes for basic inputs, such as labor, energy, materials, and burial.
This cost study does not add any additional cost to the estimate for financial risk since there is insufficient historical data from which to project future liabilities. Consequently, the areas of uncertainty or risk
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 9 of 30 TLG Services, Inc.
are revisited periodically and addressed through repeated revisions or updates of the base estimate.
3.6 SITE-SPECIFIC CONSIDERATIONS There are a number of site-specific considerations that affect the method for dismantling and removal of equipment from the site and the degree of restoration required. The cost impacts of the considerations identified below are included in this cost study.
3.6.1 Spent Fuel Management The cost to dispose of spent fuel generated from plant operations is not reflected within the estimates to decommission the Braidwood site.
Ultimate disposition of the spent fuel is within the province of the DOEs Waste Management System, as defined by the NWPA. As such, the disposal cost is financed by a 1 mill/kWhr surcharge paid into the DOEs waste fund during operations. However, the NRC requires licensees to establish a program to manage and provide funding for the management of all irradiated fuel at the reactors until title of the fuel is transferred to the Secretary of Energy. This funding requirement is fulfilled through inclusion of certain high-level waste cost elements within the estimate, as described below.
The total inventory of assemblies that will require handling during decommissioning is based upon several assumptions. The pickup of commercial fuel is assumed to begin in the year 2018. The maximum rate at which the fuel is removed from the commercial sites is based upon an annual capacity at the geologic repository of 3,000 metric tons of uranium (MTU). Any delay in the startup of the repository or decrease in the rate of acceptance will correspondingly prolong the transfer process and result in the fuel remaining at the site longer.
In all three scenarios, the ISFSI will continue to operate until such time that the transfer of spent fuel to the DOE can be completed. Assuming that the DOE commences repository operation in 2018, fuel is projected to be removed from the Braidwood site by the year 2065. In the Delayed DECON scenario, the ISFSI is only used to store fuel placed during plant operations. Spent fuel off-loaded from the reactors after operations cease, remains in the pool during the transfer period. The inventory of fuel assemblies located in the spent fuel pool is preferentially off-loaded as the allocations permit.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 10 of 30 TLG Services, Inc.
Operation and maintenance costs for the storage facilities (the ISFSI and the pool for the Delayed DECON scenario) are included within the estimates and address the cost for staffing the facilities, as well as security, insurance, and licensing fees. The estimates include the costs to purchase (DECON and SAFSTOR scenarios), load, and transfer the fuel storage canisters. Costs are also provided for the final disposition of the facilities once the transfer is complete.
Repository Startup Operation of the DOEs yet-to-be constructed geologic repository is contingent upon the review and approval of the facilitys license application by the NRC, the successful resolution of pending litigation, and the development of a national transportation system. The DOE submitted its license application to the NRC on June 3, 2008, seeking authorization to construct the repository at Yucca Mountain, Nevada.
The NRC formally docketed the DOEs license application on September 8, 2008, triggering a three-year deadline, with a possible one-year extension, set by Congress for the NRC to decide on whether to grant a construction authorization.
Construction, if adequately funded, could take five to six years after the DOE receives authorization to proceed. As such, the spent fuel management plan described in this section is predicated upon the DOE initiating the pickup of commercial fuel in the year 2018.
Spent Fuel Management Model The Exelon nuclear fleet consists of 21 units at 11 sites in Illinois, Pennsylvania, and New Jersey, including the inactive units at Dresden, Peach Bottom, and Zion. The ability to complete the decommissioning of these units, particularly for the DECON and Delayed DECON alternatives, is highly dependent upon when the DOE is assumed to remove spent fuel from the sites.
The DOE's repository program assumes that spent fuel will be accepted for disposal from the nation's commercial nuclear plants in the order (the "queue") in which it was removed from service ("oldest fuel first").[21]
A computer model developed by Exelon Nuclear was used to determine when the DOE would provide allocations in the queue for removal of spent fuel from the individual sites. Repository operations were based upon annual industry-wide receipt of 400 Metric Tons Heavy Metal
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 11 of 30 TLG Services, Inc.
(MTHM) in the first year of operation, a total of 3,800 MTHM in years 2 through 4 and 3,000 MTHM for year 5 and beyond.[22]
ISFSIs are constructed as necessary to maintain full-core discharge capability at the individual sites. Once the DOE begins repository operations, queue allocations are used to ship spent fuel from Exelon's operating sites.
Spent fuel shipments are then made from decommissioning sites in the order of retirement.
Canister Design The design and capacity of the ISFSI is based upon a vertical cask system, with a 32-fuel assemblies capacity, is assumed for future cask acquisitions. A unit cost of $500,000 is used for pricing the internal multi-purpose canister (MPC), with an additional cost of $250,000 for the concrete storage module. The DOE is assumed to provide the MPC for fuel transferred directly from the pool to the DOE at no cost to the owner.
Canister Loading and Transfer An average cost of $250,000 is used for the labor to load/transport the spent fuel from the pool to the ISFSI pad, based upon Exelon experience.
For estimating purposes, 50% of this cost is used to estimate the cost to transfer the fuel from the ISFSI to the DOE.
Operations and Maintenance Annual costs (excluding labor) of approximately $763,000 and $88,000 are used for operation and maintenance of each spent fuel pool and the ISFSI, respectively.
ISFSI Design Considerations A multi-purpose (storage and transport) dry shielded storage canister with a vertical, reinforced concrete storage module is used as a basis for the cost analysis. The final core off load from each unit, equivalent to 14 modules, are assumed to have some level of neutron-induced activation as a result of the long-term storage of the fuel (i.e., to levels exceeding free-release limits). The cost of the disposition of this material, as well as the demolition of the ISFSI facility, is included in the estimate.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 12 of 30 TLG Services, Inc.
3.6.2 Reactor Vessel and Internal Components The NSSS (reactor vessel and reactor coolant system components) will be decontaminated using chemical agents prior to the start of cutting operations (for DECON alternative only). A decontamination factor (average reduction) of 10 is assumed for the process.
The reactor pressure vessel and internal components are segmented for disposal in shielded, reusable transportation casks. Segmentation is performed in the refueling canal, where a turntable and remote cutter are installed. The vessel is segmented in place, using a mast-mounted cutter supported off the lower head and directed from a shielded work platform installed overhead in the reactor cavity. Transportation cask specifications and transportation regulations will dictate segmentation and packaging methodology.
The dismantling of the reactor internals will generate radioactive waste considered unsuitable for shallow land disposal (i.e., GTCC). Although the material is not classified as high-level waste, the DOE has indicated it will accept this waste for disposal at the future high-level waste repository.[23] However, the DOE has not been forthcoming with an acceptance criteria or disposition schedule for this material, and numerous questions remain as to the ultimate disposal cost and waste form requirements. As such, for purposes of this study, the GTCC has been packaged and disposed of as high-level waste, at a cost equivalent to that envisioned for the spent fuel. It is not anticipated that the DOE would accept this waste prior to completing the transfer of spent fuel.
Therefore, until such time the DOE is ready to accept GTCC waste, it is reasonable to assume that this material would remain in storage at the Braidwood site.
Intact disposal of the reactor vessel and internal components can provide savings in cost and worker exposure by eliminating the complex segmentation requirements, isolation of the GTCC material, and transport/storage of the resulting waste packages. Portland General Electric (PGE) was able to dispose of the Trojan reactor as an intact package. However, its location on the Columbia River simplified the transportation analysis since:
the reactor package could be secured to the transport vehicle for the entire journey, i.e., the package was not lifted during transport,
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 13 of 30 TLG Services, Inc.
there were no man-made or natural terrain features between the plant site and the disposal location that could produce a large drop, and
transport speeds were very low, limited by the overland transport vehicle and the river barge.
As a member of the Northwest Compact, PGE had a site available for disposal of the package - the US Ecology facility in Washington State.
The characteristics of this arid site proved favorable in demonstrating compliance with land disposal regulations.
It is not known whether this option will be available when Braidwood ceases operation. Future viability of this option will depend upon the ultimate location of the disposal site, as well as the disposal site licensees ability to accept highly radioactive packages and effectively isolate them from the environment. Consequently, the study assumes the reactor vessel will require segmentation, as a bounding condition.
3.6.3 Primary System Components The following discussion deals with the removal and disposition of the steam generators, but the techniques involved are also applicable to other large components, such as heat exchangers, component coolers, and the pressurizer. The steam generators size and weight, as well as their location within the reactor building, will ultimately determine the removal strategy.
A trolley crane will be set up for the removal of the generators. It can also be used to move portions of the steam generator cubicle walls and floor slabs from the reactor building to a location where they can be decontaminated and transported to the material handling area.
Interferences within the work area, such as grating, piping and other components, will be removed to create sufficient laydown space for processing these large components.
The generators will be rigged for removal, disconnected from the surrounding piping and supports, and maneuvered into the open area where they will be lowered onto a dolly. Once each steam generator has been placed in the horizontal position, nozzles and other openings will be welded closed. The lower shell will have a carbon steel membrane welded to its outside surface for shielding, if required, during transport.
The interior volume will be filled with low-density cellular concrete for
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 14 of 30 TLG Services, Inc.
stabilization of the internal contamination and to satisfy burial ground packaging requirements. When this stage has been completed, each generator will be moved out of containment and lowered onto a multi-wheeled transporter to be staged at an on-site storage area and await transport to the disposal facility. The pressurizer will be removed using the same technique. Each component will then be loaded onto a railcar for transport to the disposal facility.
Reactor coolant piping is cut from the reactor vessel once the water level in the vessel (used for personnel shielding during dismantling and cutting operations in and around the vessel) is dropped below the nozzle zone. The piping is boxed and transported by shielded van. The reactor coolant pumps and motors are lifted out intact, packaged, and transported for disposal.
Braidwood Unit 1 has replaced its original set of steam generators; this original set is still on site, stored within a concrete protective structure.
The cost for transportation and disposal of this original set of Unit 1 steam generators has been included in this analysis.
3.6.4 Main Turbine and Condenser The main turbine will be dismantled using conventional maintenance procedures. The turbine rotors and shafts will be removed to a laydown area. The lower turbine casings will be removed from their anchors by controlled demolition. The main condensers will also be disassembled and moved to a laydown area. Clean material is released on site as scrap metal; radioactive or potentially radioactive material is then prepared for transportation to an off-site recycling facility where it will be surveyed and designated for either decontamination or volume reduction, conventional disposal, or controlled disposal. Components will be packaged and readied for transport in accordance with the intended disposition.
3.6.5 Transportation Methods Contaminated piping, components, and structural material other than the highly activated reactor vessel and internal components will qualify as LSA-I, II or III or Surface Contaminated Object, SCO-I or II, as described in Title 49.[24] The contaminated material will be packaged in Industrial Packages (IP 1, IP-2, or IP-3, as defined in subpart 173.411) for transport unless demonstrated to qualify as their own shipping
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 15 of 30 TLG Services, Inc.
containers. The reactor vessel and internal components are expected to be transported in accordance with §71, as Type B. It is conceivable that the reactor, due to its limited specific activity, could qualify as LSA II or III. However, the high radiation levels on the outer surface would require that additional shielding be incorporated within the packaging so as to attenuate the dose to levels acceptable for transport.
Transport of the highly activated metal, produced in the segmentation of the reactor vessels and internal components, will be by shielded truck cask. Cask shipments may exceed 95,000 pounds, including vessel segment(s), supplementary shielding, cask tie-downs, and tractor-trailer. The maximum level of activity per shipment assumed permissible was based upon the license limits of the available shielded transport casks. The segmentation scheme for the vessel and internal segments is designed to meet these limits.
The transport of large intact components (e.g., large heat exchangers and other oversized components) will be by a combination of truck, rail, and/or multi-wheeled transporter. Truck transport costs were estimated using published tariffs from Tri-State Motor Transit.[25]
3.6.6 Low-Level Radioactive Waste Disposal To the greatest extent practical, metallic material generated in the decontamination and dismantling processes is treated to reduce the total volume requiring controlled disposal. The treated material, meeting the regulatory and/or site release criterion, is released as scrap, requiring no further cost consideration. Conditioning and recovery of the waste stream is performed off site at a licensed processing center.
The mass of radioactive waste generated during the various decommissioning activities is reported by line-item in Appendices C, D and E, and summarized in Section 5. The Section 5 waste summaries are consistent with 10 CFR §61 classifications. Commercially available steel containers are used for the disposal of piping, small components, and concrete. Larger components can serve as their own containers, with proper closure of all openings, access ways, and penetrations. The waste volumes are calculated on the exterior package dimensions for containerized material or a dimensional calculation for components serving as their own waste containers.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 16 of 30 TLG Services, Inc.
The more highly activated reactor components are transported in reusable, shielded truck casks with disposable liners. In calculating disposal costs, the burial fees are applied against the liner volume, with surcharges added for the special handling requirements and the radiological characteristics of the payload. Packaging efficiencies are lower for the highly activated materials (greater than Type A quantity waste), where high concentrations of gamma-emitting radionuclides limit the capacity of the shipping canisters.
Disposal fees are calculated using current disposal agreements, with surcharges added for the highly activated components, for example, generated in the segmentation of the reactor vessel. The cost to dispose of the majority of the material generated from the decontamination and dismantling activities is based upon Exelons current disposal agreement with EnergySolutions for its facility in Clive, Utah.
Since the EnergySolutions facility is not able to accept the higher activity waste (Class B and C) generated in the decontamination of the reactor vessel and segmentation of the components closest to the core, the cost of disposal of this material at a yet-to-be determined facility were based upon Exelons last negotiated rates for the Barnwell facility.
Material exceeding Class C limits (limited to material closest to the reactor core and comprising a small percentage of the total waste volume) is generally not suitable for shallow-land disposal. This material is packaged in the same multipurpose canisters used for spent fuel storage/transport and designated for geologic disposal.
3.6.7 Site Conditions Following Decommissioning The NRC will terminate (or amend) the site license when it determines that site remediation has been performed in accordance with the license termination plan, and that the terminal radiation survey and associated documentation demonstrate that the facility is suitable for release. The NRCs involvement in the decommissioning process will end at this point. Building codes and environmental regulations will dictate the next step in the decommissioning process, as well as the owners own future plans for the site.
Non-essential structures or buildings severely damaged in decontamination process are removed to a nominal depth of three feet below grade. Concrete rubble generated from demolition activities is
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 17 of 30 TLG Services, Inc.
processed and made available as clean fill. The excavations will be regraded such that the power block area will have a final contour consistent with adjacent surroundings.
3.7 ASSUMPTIONS The following are the major assumptions made in the development of the estimates for decommissioning the site.
3.7.1 Estimating Basis The study follows the principles of ALARA through the use of work duration adjustment factors. These factors address the impact of activities such as radiological protection instruction, mock-up training, and the use of respiratory protection and protective clothing. The factors lengthen a task's duration, increasing costs and lengthening the overall schedule. ALARA planning is considered in the costs for engineering and planning, and in the development of activity specifications and detailed procedures. Changes to worker exposure limits may impact the decommissioning cost and project schedule.
3.7.2 Labor Costs The craft labor required to decontaminate and dismantle the nuclear units will be acquired through standard site contracting practices. The current cost of labor at the site is used as an estimating basis. Costs for site administration, operations, construction, and maintenance personnel are based upon average salary information provided by Exelon or from comparable industry information.
Exelon will hire a Decommissioning Operations Contractor (DOC) to manage the decommissioning. The owner will provide site security, radiological health and safety, quality assurance and overall site administration during the decommissioning and demolition phases.
Contract personnel will provide engineering services (e.g., for preparing the activity specifications, work procedures, activation, and structural analyses) under the direction of Exelon.
3.7.3 Design Conditions Any fuel cladding failure that occurred during the lifetime of the plant is assumed to have released fission products at sufficiently low levels that
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 18 of 30 TLG Services, Inc.
the buildup of quantities of long-lived isotopes (e.g., 137Cs, 90Sr, or transuranics) has been prevented from reaching levels exceeding those that permit the major NSSS components to be shipped under current transportation regulations and disposal requirements.
The curie contents of the vessel and internals at final shutdown are derived from those listed in NUREG/CR-3474.[26] Actual estimates are derived from the curie/gram values contained therein and adjusted for the different mass of the Braidwood components, projected operating life, and different periods of decay. Additional short-lived isotopes were derived from CR-0130[27] and CR-0672,[28] and benchmarked to the long-lived values from CR-3474.
The control elements are disposed of along with the spent fuel (i.e., there is no additional cost provided for their disposal).
Activation of the reactor building structures is confined to the biological shield. More extensive activation (at very low levels) of the interior structures within containment has been detected at several reactors and the owners have elected to dispose of the affected material at a controlled facility rather than reuse the material as fill on site or send it to a landfill. The ultimate disposition of the material removed from the reactor building will depend upon the site release criteria selected, as well as the designated end use for the site.
3.7.4 General Transition Activities Existing warehouses will be cleared of non-essential material and remain for use by Exelon and its subcontractors. The plants operating staff will perform the following activities at no additional cost or credit to the project during the transition period:
Drain and collect fuel oils, lubricating oils, and transformer oils for recycle and/or sale.
Drain and collect acids, caustics, and other chemical stores for recycle and/or sale.
Processes operating waste inventories, i.e., the estimates do not address the disposition of any legacy wastes; the disposal of
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 19 of 30 TLG Services, Inc.
operating wastes during this initial period is not considered a decommissioning expense.
Scrap and Salvage The existing plant equipment is considered obsolete and suitable for scrap as deadweight quantities only. Exelon will make economically reasonable efforts to salvage equipment following final plant shutdown.
However, dismantling techniques assumed by TLG for equipment in this analysis are not consistent with removal techniques required for salvage (resale) of equipment. Experience has indicated that some buyers wanted equipment stripped down to very specific requirements before they would consider purchase. This required expensive rework after the equipment had been removed from its installed location. Since placing a salvage value on this machinery and equipment would be speculative, and the value would be small in comparison to the overall decommissioning expenses, this analysis does not attempt to quantify the possible salvage value that an owner may realize based upon those efforts.
It is assumed, for purposes of this analysis, that any value received from the sale of scrap generated in the dismantling process would be more than offset by the on-site processing costs. The dismantling techniques assumed in the decommissioning estimates do not include the additional cost for size reduction and preparation to meet furnace ready conditions. For example, the recovery of copper from electrical cabling may require the removal and disposition of any contaminated insulation, an added expense. With a volatile market, the potential profit margin in scrap recovery is highly speculative, regardless of the ability to free release this material. This assumption is an implicit recognition of scrap value in the disposal of clean metallic waste at no additional cost to the project.
Furniture, tools, mobile equipment such as forklifts, trucks, bulldozers, and other property will be removed at no cost or credit to the decommissioning project. Disposition may include relocation to other facilities. Spare parts will also be made available for alternative use.
Energy For estimating purposes, the plant is assumed to be de-energized, with the exception of those facilities associated with spent fuel storage.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 20 of 30 TLG Services, Inc.
Replacement power costs are used for the cost of energy consumption during decommissioning for tooling, lighting, ventilation, and essential services.
Insurance Costs for continuing coverage (nuclear liability and property insurance) following cessation of plant operations and during decommissioning are included and based upon current operating premiums. Reductions in premiums, throughout the decommissioning process, are based upon the guidance and the limits for coverage defined in the NRCs proposed rulemaking Financial Protection Requirements for Permanently Shutdown Nuclear Power Reactors.[29] NRCs financial protection requirements are based on various reactor (and spent fuel) configurations.
Taxes Property taxes are included for all decommissioning periods. Exelon provided a schedule of decreasing tax payments against the current tax assessment. These reductions continue until reaching a minimum property tax payment of $1 million per year for the site; this level is maintained for the balance of the decommissioning program.
Site Modifications The perimeter fence and in-plant security barriers will be moved, as appropriate, to conform to the Site Security Plan in force during the various stages of the project.
3.8 COST ESTIMATE
SUMMARY
A schedule of expenditures for each scenario is provided in Tables 3.1 through 3.3. Decommissioning costs are reported in the year of projected expenditure; however, the values are provided in thousands of 2009 dollars. Costs are not inflated, escalated, or discounted over the period of expenditure. The annual expenditures are based upon the detailed activity costs reported in Appendices C through E, along with the schedules discussed in Section 4.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 21 of 30 TLG Services, Inc.
TABLE 3.1a BRAIDWOOD NUCLEAR POWER STATION, UNIT 1 DECON ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES (thousands, 2009 dollars)
Equipment &
Year Labor Materials Energy Burial Other Total 2046 11,255 1,947 316 9
2,908 16,434 2047 57,778 11,041 1,833 1,798 14,742 87,193 2048 64,764 23,085 1,912 21,927 14,337 126,025 2049 56,634 22,182 1,369 21,464 10,621 112,269 2050 40,935 12,172 1,138 2,497 3,350 60,093 2051 40,935 12,172 1,138 2,497 3,350 60,093 2052 12,925 3,603 330 730 1,987 19,576 2053 1,455 95 0
7 1,424 2,982 2054 22,422 1,445 243 25 2,024 26,157 2055 17,444 6,475 152 0
1,298 25,369 2056 17,492 6,493 152 0
1,301 25,438 2057 7,956 2,484 58 0
1,330 11,828 2058 2,053 0
0 0
1,350 3,403 2059 2,053 0
0 0
1,350 3,403 2060 2,059 0
0 0
1,354 3,412 2061 2,484 1,294 0
0 1,350 5,128 2062 2,484 1,294 0
0 1,350 5,128 2063 2,484 1,294 0
0 1,350 5,128 2064 2,490 1,294 0
0 1,354 5,137 2065 2,484 1,323 0
0 2,323 6,130 2066 1,729 1,093 0
112 14,026 16,960 Total 372,317 110,786 8,640 51,065 84,479 627,287
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 22 of 30 TLG Services, Inc.
TABLE 3.1b BRAIDWOOD NUCLEAR POWER STATION, UNIT 2 DECON ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES (thousands, 2009 dollars)
Equipment &
Year Labor Materials Energy Burial Other Total 2047 1,826 324 58 2
526 2,736 2048 48,127 8,841 1,583 354 14,640 73,546 2049 63,206 20,857 2,174 16,083 21,934 124,253 2050 67,829 23,207 1,420 21,889 9,960 124,305 2051 62,104 13,596 1,138 3,622 3,885 84,345 2052 62,275 13,633 1,141 3,632 3,896 84,577 2053 51,973 9,069 850 3,316 3,657 68,865 2054 31,994 2,648 336 493 2,142 37,613 2055 22,912 9,089 152 0
1,299 33,450 2056 22,974 9,113 152 0
1,302 33,542 2057 10,054 3,486 58 0
1,330 14,928 2058 2,053 0
0 0
1,350 3,403 2059 2,053 0
0 0
1,350 3,403 2060 2,059 0
0 0
1,354 3,412 2061 2,448 1,186 0
0 1,350 4,984 2062 2,484 1,294 0
0 1,350 5,128 2063 2,484 1,294 0
0 1,350 5,128 2064 2,490 1,294 0
0 1,354 5,137 2065 2,484 1,323 0
0 2,323 6,130 2066 1,729 1,093 0
112 14,026 16,960 Total 465,559 121,347 9,062 49,502 90,377 735,847
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 23 of 30 TLG Services, Inc.
TABLE 3.2a BRAIDWOOD NUCLEAR POWER STATION, UNIT 1 DELAYED DECON ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES (thousands, 2009 dollars)
Equipment &
Year Labor Materials Energy Burial Other Total 2046 8,655 232 316 9
538 9,749 2047 43,276 3,172 1,517 430 4,413 52,807 2048 8,309 1,613 657 461 4,872 15,912 2049 5,134 261 303 27 2,313 8,037 2050 5,134 261 303 27 2,313 8,037 2051 5,134 261 303 27 2,313 8,037 2052 5,148 261 304 27 2,319 8,059 2053 5,134 261 303 27 2,313 8,037 2054 5,134 261 303 27 2,313 8,037 2055 5,134 261 303 27 2,313 8,037 2056 5,148 261 304 27 2,319 8,059 2057 5,134 261 303 27 2,313 8,037 2058 5,134 261 303 27 2,313 8,037 2059 5,134 261 303 27 2,313 8,037 2060 5,148 261 304 27 2,319 8,059 2061 6,787 5,220 303 27 2,313 14,649 2062 6,849 5,436 303 27 2,310 14,924 2063 1,602 254 152 26 1,411 3,444 2064 1,643 362 152 26 1,415 3,598 2065 2,141 1,551 155 26 1,411 5,284 2066 40,924 1,532 1,517 36 1,322 45,331 2067 55,742 11,425 1,479 10,244 13,622 92,512 2068 50,596 15,147 1,390 17,126 15,962 100,221 2069 34,063 4,774 1,138 2,019 3,078 45,072 2070 34,063 4,774 1,138 2,019 3,078 45,072 2071 2,353 262 41 79 972 3,706 2072 16,773 726 191 22 1,430 19,142 2073 17,133 5,890 170 4
834 24,030 2074 15,897 6,564 152 0
706 23,319 2075 9,582 3,956 91 0
425 14,055 Total 418,033 76,017 14,505 32,900 87,884 629,338
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 24 of 30 TLG Services, Inc.
TABLE 3.2b BRAIDWOOD NUCLEAR POWER STATION, UNIT 2 DELAYED DECON ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES (thousands, 2009 dollars)
Equipment &
Year Labor Materials Energy Burial Other Total 2047 1,746 43 58 2
89 1,938 2048 46,478 1,587 1,521 128 2,699 52,413 2049 21,186 3,921 859 1,057 17,689 44,710 2050 6,047 276 303 27 2,344 8,998 2051 6,047 276 303 27 2,344 8,998 2052 6,064 277 304 27 2,351 9,022 2053 6,047 276 303 27 2,344 8,998 2054 6,047 276 303 27 2,344 8,998 2055 6,047 276 303 27 2,344 8,998 2056 6,064 277 304 27 2,351 9,022 2057 6,047 276 303 27 2,344 8,998 2058 6,047 276 303 27 2,344 8,998 2059 6,047 276 303 27 2,344 8,998 2060 6,064 277 304 27 2,351 9,022 2061 6,047 276 303 27 2,344 8,998 2062 6,047 276 303 27 2,344 8,998 2063 7,772 5,451 303 27 2,344 15,898 2064 7,363 5,128 291 27 2,270 15,079 2065 2,730 1,564 152 26 1,394 5,867 2066 4,360 444 350 27 1,221 6,403 2067 27,288 2,064 1,517 34 1,703 32,606 2068 48,409 12,760 1,472 10,300 11,986 84,927 2069 54,459 13,072 1,341 11,595 11,801 92,268 2070 51,576 5,635 1,138 2,894 2,983 64,227 2071 51,576 5,635 1,138 2,894 2,983 64,227 2072 37,744 2,932 615 1,098 2,046 44,434 2073 22,356 8,209 170 4
803 31,541 2074 21,365 9,177 152 0
707 31,401 2075 12,877 5,531 91 0
426 18,926 Total 497,947 86,744 15,114 30,462 93,640 723,907
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 25 of 30 TLG Services, Inc.
TABLE 3.3a BRAIDWOOD NUCLEAR POWER STATION, UNIT 1 SAFSTOR ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES (thousands, 2009 dollars)
Equipment &
Year Labor Materials Energy Burial Other Total 2046 9,193 1,849 316 9
2,908 14,275 2047 45,804 10,758 1,517 430 13,427 71,937 2048 10,320 8,841 657 461 5,688 25,967 2049 7,016 7,587 303 27 3,458 18,391 2050 7,016 7,587 303 27 3,458 18,391 2051 7,016 7,587 303 27 3,458 18,391 2052 4,146 2,386 196 26 2,009 8,764 2053 2,961 256 152 26 1,411 4,806 2054 2,961 256 152 26 1,411 4,806 2055 2,961 256 152 26 1,411 4,806 2056 2,969 257 152 26 1,415 4,819 2057 2,961 256 152 26 1,411 4,806 2058 2,961 256 152 26 1,411 4,806 2059 2,961 256 152 26 1,411 4,806 2060 2,969 257 152 26 1,415 4,819 2061 3,392 1,550 152 26 1,411 6,531 2062 3,392 1,550 152 26 1,411 6,531 2063 3,392 1,550 152 26 1,411 6,531 2064 3,400 1,551 152 26 1,415 6,544 2065 3,389 1,550 152 26 1,410 6,527 2066 1,968 254 152 26 1,219 3,618 2067 1,968 254 152 26 1,219 3,618 2068 1,973 254 152 26 1,222 3,628 2069 1,968 254 152 26 1,219 3,618 2070 1,968 254 152 26 1,219 3,618 2071 1,968 254 152 26 1,219 3,618 2072 1,973 254 152 26 1,222 3,628 2073 1,968 254 152 26 1,219 3,618 2074 1,968 254 152 26 1,219 3,618 2075 1,968 254 152 26 1,219 3,618
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 26 of 30 TLG Services, Inc.
TABLE 3.3a (continued)
BRAIDWOOD NUCLEAR POWER STATION, UNIT 1 SAFSTOR ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES (thousands, 2009 dollars)
Equipment &
Year Labor Materials Energy Burial Other Total 2076 1,973 254 152 26 1,222 3,628 2077 1,968 254 152 26 1,219 3,618 2078 1,968 254 152 26 1,219 3,618 2079 1,968 254 152 26 1,219 3,618 2080 1,973 254 152 26 1,222 3,628 2081 1,968 254 152 26 1,219 3,618 2082 1,968 254 152 26 1,219 3,618 2083 1,968 254 152 26 1,219 3,618 2084 1,973 254 152 26 1,222 3,628 2085 1,968 254 152 26 1,219 3,618 2086 1,968 254 152 26 1,219 3,618 2087 1,968 254 152 26 1,219 3,618 2088 1,973 254 152 26 1,222 3,628 2089 1,968 254 152 26 1,219 3,618 2090 1,968 254 152 26 1,219 3,618 2091 1,968 254 152 26 1,219 3,618 2092 1,973 254 152 26 1,222 3,628 2093 1,968 254 152 26 1,219 3,618 2094 1,968 254 152 26 1,219 3,618 2095 1,968 254 152 26 1,219 3,618 2096 1,973 254 152 26 1,222 3,628 2097 1,968 254 152 26 1,219 3,618 2098 1,968 254 152 26 1,219 3,618 2099 11,569 570 492 28 1,237 13,896 2100 44,606 2,497 1,517 37 3,082 51,739 2101 55,753 14,481 1,460 14,300 16,253 102,247 2102 45,886 11,851 1,306 11,463 11,867 82,374 2103 34,061 4,736 1,138 1,888 3,085 44,908 2104 26,588 3,681 879 1,460 2,590 35,197 2105 1,182 95 0
7 894 2,178
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 27 of 30 TLG Services, Inc.
TABLE 3.3a (continued)
BRAIDWOOD NUCLEAR POWER STATION, UNIT 1 SAFSTOR ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES (thousands, 2009 dollars)
Equipment &
Year Labor Materials Energy Burial Other Total 2106 22,951 2,206 260 24 1,493 26,933 2107 16,221 6,610 152 0
706 23,689 2108 16,266 6,629 152 0
708 23,754 2109 4,355 1,775 41 0
190 6,360 Total 475,587 119,905 17,975 31,413 135,111 779,992
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 28 of 30 TLG Services, Inc.
TABLE 3.3b BRAIDWOOD NUCLEAR POWER STATION, UNIT 2 SAFSTOR ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES (thousands, 2009 dollars)
Equipment &
Year Labor Materials Energy Burial Other Total 2047 1,835 307 58 2
526 2,728 2048 48,785 8,506 1,521 128 13,647 72,587 2049 24,390 11,064 859 1,057 18,404 55,773 2050 8,979 7,604 303 27 3,662 20,576 2051 8,979 7,604 303 27 3,662 20,576 2052 9,004 7,625 304 27 3,672 20,633 2053 5,789 3,626 221 27 2,432 12,094 2054 3,097 271 152 26 1,394 4,940 2055 3,097 271 152 26 1,394 4,940 2056 3,106 271 152 26 1,398 4,954 2057 3,097 271 152 26 1,394 4,940 2058 3,097 271 152 26 1,394 4,940 2059 3,097 271 152 26 1,394 4,940 2060 3,106 271 152 26 1,398 4,954 2061 3,493 1,457 152 26 1,394 6,521 2062 3,529 1,564 152 26 1,394 6,665 2063 3,529 1,564 152 26 1,394 6,665 2064 3,537 1,565 152 26 1,398 6,679 2065 3,526 1,564 152 26 1,394 6,662 2066 1,980 268 152 26 1,214 3,639 2067 1,980 268 152 26 1,214 3,639 2068 1,985 268 152 26 1,217 3,649 2069 1,980 268 152 26 1,214 3,639 2070 1,980 268 152 26 1,214 3,639 2071 1,980 268 152 26 1,214 3,639 2072 1,985 268 152 26 1,217 3,649 2073 1,980 268 152 26 1,214 3,639 2074 1,980 268 152 26 1,214 3,639 2075 1,980 268 152 26 1,214 3,639
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 29 of 30 TLG Services, Inc.
TABLE 3.3b (continued)
BRAIDWOOD NUCLEAR POWER STATION, UNIT 2 SAFSTOR ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES (thousands, 2009 dollars)
Equipment &
Year Labor Materials Energy Burial Other Total 2076 1,985 268 152 26 1,217 3,649 2077 1,980 268 152 26 1,214 3,639 2078 1,980 268 152 26 1,214 3,639 2079 1,980 268 152 26 1,214 3,639 2080 1,985 268 152 26 1,217 3,649 2081 1,980 268 152 26 1,214 3,639 2082 1,980 268 152 26 1,214 3,639 2083 1,980 268 152 26 1,214 3,639 2084 1,985 268 152 26 1,217 3,649 2085 1,980 268 152 26 1,214 3,639 2086 1,980 268 152 26 1,214 3,639 2087 1,980 268 152 26 1,214 3,639 2088 1,985 268 152 26 1,217 3,649 2089 1,980 268 152 26 1,214 3,639 2090 1,980 268 152 26 1,214 3,639 2091 1,980 268 152 26 1,214 3,639 2092 1,985 268 152 26 1,217 3,649 2093 1,980 268 152 26 1,214 3,639 2094 1,980 268 152 26 1,214 3,639 2095 1,980 268 152 26 1,214 3,639 2096 1,985 268 152 26 1,217 3,649 2097 1,980 268 152 26 1,214 3,639 2098 1,980 268 152 26 1,214 3,639 2099 1,980 268 152 26 1,214 3,639 2100 13,596 860 810 30 1,233 16,529 2101 30,088 3,368 1,517 35 2,709 37,717 2102 55,589 16,442 1,443 14,006 15,804 103,283 2103 53,086 9,309 1,240 6,636 7,359 77,630 2104 51,714 5,573 1,141 2,739 2,944 64,110 2105 51,572 5,557 1,138 2,731 2,936 63,934
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 3, Page 30 of 30 TLG Services, Inc.
TABLE 3.3b (continued)
BRAIDWOOD NUCLEAR POWER STATION, UNIT 2 SAFSTOR ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES (thousands, 2009 dollars)
Equipment &
Year Labor Materials Energy Burial Other Total 2106 28,645 3,128 304 128 1,377 33,583 2107 21,689 9,224 152 0
707 31,771 2108 21,748 9,249 152 0
709 31,858 2109 5,823 2,477 41 0
190 8,530 Total 547,975 130,242 18,489 28,800 140,021 865,527
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 4, Page 1 of 7 TLG Services, Inc.
- 4. SCHEDULE ESTIMATE The schedules for the decommissioning scenarios considered in this study follow the sequence presented in the AIF/NESP-036 study, with minor changes to reflect recent experience and site-specific constraints. In addition, the scheduling has been revised to reflect the spent fuel management plans described in Section 3.4.1.
A schedule or sequence of activities is presented in Figure 4.1 for the DECON decommissioning alternative. The schedule is also representative of the work activities identified in the delayed dismantling scenarios, absent any spent fuel constraints. The scheduling sequence assumes that fuel is removed from the spent fuel pool within the first five and one-half years after operations cease at Unit 2.
The key activities listed in the schedule do not reflect a one-to-one correspondence with those activities in the cost tables, but reflect dividing some activities for clarity and combining others for convenience. The schedule was prepared using the "Microsoft Project 2003" computer software.[30]
4.1 SCHEDULE ESTIMATE ASSUMPTIONS The schedule reflects the results of a precedence network developed for the site decommissioning activities, i.e., a PERT (Program Evaluation and Review Technique) Software Package. The work activity durations used in the precedence network reflect the actual man-hour estimates from the cost tables, adjusted by stretching certain activities over their slack range and shifting the start and end dates of others. The following assumptions were made in the development of the DECON decommissioning schedule:
The fuel handling building is isolated until such time that all spent fuel has been discharged to the ISFSI. Decontamination and dismantling of the storage pool are initiated once the transfer of spent fuel to the ISFSI is complete.
All work (except vessel and internals removal) is performed during an 8-hour workday, 5 days per week, with no overtime. There are eleven paid holidays per year.
Reactor and internals removal activities are performed by using separate crews for different activities working on different shifts, with a corresponding backshift charge for the second shift.
Multiple crews work parallel activities to the maximum extent possible, consistent with optimum efficiency, adequate access for cutting, removal
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 4, Page 2 of 7 TLG Services, Inc.
and laydown space, and with the stringent safety measures necessary during demolition of heavy components and structures.
For plant systems removal, the systems with the longest removal durations in areas on the critical path are considered to determine the duration of the activity.
4.2 PROJECT SCHEDULE The period-dependent costs presented in the detailed cost tables are based upon the durations developed in the schedule for decommissioning Braidwood.
Durations are established between several milestones in each project period; these durations are used to establish a critical path for the entire project. In turn, the critical path duration for each period is used as the basis for determining the period-dependent costs. A second critical path is also shown for the spent fuel cooling period, which determines the release of the fuel handling building for final decontamination.
Project timelines are provided in Figures 4.2 through 4.4; the milestone dates are based on this same shutdown date. The start of decommissioning activities in the Delayed Decommissioning scenario is concurrent with the end of the fuel transfer activity (i.e. to an off-site DOE facility).
Braidwood Nuclear Power Station Decommiuioning Cosl Anoly.;'
Document 816-1555-014, Hell. 0 Section 4, Page 3 of7 FIGURE 4.1 DECON ACTPnTY SCHEDULE
~I-l***i I-l**:.IIL I~=
6li f'GoI 1
BnI~_
mol.2..bodulo
~
__.U I
3
_1.U I...utd.... "'--olo __
4 Owto&>
ol__ ol__.....
6
"""_,..1_
6 o.,.n.I__
"'-'~
I f'wl'_...__
19
,.0All..-...
II
..._-w.-.ol_...-.,__W
~
__ I
'........__..-....t IS OOC 14
_lloU
,1 o-..m__***
O __
16
~vol
,... _h"'"
16 17 Dr,.n.I__
18
"."..,.~"-lo<I IU Doo""NI3SB
\\Ill loolo.lo..._
fuol,...l
~I P...... 2nU.lt 1. L.rp..."
nl,.."..ol
~vol........ pool 1:1 0.,. f\\ool. *__..!_
- lot
".."........ b,__ool...........
'Jl\\
~
Ull88__..__
71
..U"'"
- x N
~ ----
~ --
31 t.-_.... _
la
_30UoulI 0
t-.. ~
33 S<l 0.,.
~
",__ b1_
!II>
o.-~~
S'I 311
,..01
....e..lo,..~_.! r.
~
40 Ura"o..-_
__n UNO,
G P.riod I. UfU'~' III"M.""............."...
e Ooo<l&oIod..............
01.,..
44 F..1 pool.",,~
41; Dry fllOl
",....1_
"-nil 01..,*
- 7 lJ'~_
rIB Poof G
PllIlAJ!
ro ol ot__
11 5:l ooc::
&'I au_, 0
....-o-W l'\\ool_ _
6li
~
TLG Seruice", Inc.
Braidwood Nru:/ePT PoweT Station Decommissioning Cost Ano/y.i8 DocumenJ EI6*I555-014. &v. 0 Section 4, Page 4 0(7 FIGURE 4.1 DECON ACTIVITY SCHEDULE (continued)
IooIalo _
ftool","
P<onod ~lt."t* r-....,.....'..."..01 P...J.-;.....O'OOI_.
D.,.f,..J._...-1"",
""'...011.., ",..,_ot _"1"",,_
-.....01.,0......
R.n"""""'l.-..NlllllI_........~...
N......ntSooI __*
u.u, twIo"..l...._
Lioo-o-...- pI..,.-It,.
P.no>oI:a u,.;, t_ ~ lwol "-oIl I'\\0oI_ _....
D<:tf...l
__..._lIool_
O-~~
t-oo
.... oIu",,~
p"'"'-,....I *..-"".
_~v...t*D H
l<Ao-la;_trlOl_
D<:t
~--
~.... ""'-l__
toU.... I.2.__"
"r~_.,...
P....l_........
.-:l_.___
111__
,,-3loU..uI.t __
D<:tf....__
........... _,~_...~loto_....
TLG Service.. Inc.
t
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 4, Page 5 of 7 TLG Services, Inc.
FIGURE 4.2 DECOMMISSIONING TIMELINE DECON (not to scale)
Unit 1 (Shutdown October 17, 2046)
Unit 2 (Shutdown December 18, 2047)
ISFSI Operations Pool and ISFSI Operations Storage Pool Empty 06/2053 Period 1 Transition and Preparations 10/2046 04/2048 05/2057 07/2066 Period 2 Decommissioning Period 3 Site Restoration ISFSI Operations 12/2065 ISFSI D&D 11/2054 Period 1 Transition and Preparations 12/2047 06/2049 05/2057 07/2066 Period 2 Decommissioning Period 3 Site Restoration ISFSI Operations 12/2065 ISFSI D&D 11/2054
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 4, Page 6 of 7 TLG Services, Inc.
FIGURE 4.3 DECOMMISSIONING TIMELINE DELAYED DECON (not to scale)
Unit 1 (Shutdown October 17, 2046)
Unit 2 (Shutdown December 18, 2047)
Spent Fuel Storage ISFSI/ Storage Pool Empty 12/2065 Period 1 Transition and Preparations 10/2046 04/2048 02/2073 08/2075 07/2067 Period 2 Dormancy 12/2065 Period 3 Delayed Preparations Period 4 Decommissioning Period 5 Site Restoration Period 1 Transition and Preparations 12/2047 06/2049 02/2073 08/2075 05/2068 Period 2 Dormancy 11/2066 Period 3 Delayed Preparations Period 4 Decommissioning Period 5 Site Restoration
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 4, Page 7 of 7 TLG Services, Inc.
FIGURE 4.4 DECOMMISSIONING TIMELINE SAFSTOR (not to scale)
Unit 1 (Shutdown October 17, 2046)
Unit 2 (Shutdown December 18, 2047)
ISFSI Empty 12/2065 Spent Fuel Storage Period 1 Transition and Preparations 10/2046 04/2048 10/2106 04/2109 04/2101 Period 2 Dormancy 10/2099 Period 3 Delayed Preparations Period 4 Decommissioning Period 5 Site Restoration Period 1 Transition and Preparations 12/2047 06/2049 10/2106 04/2109 01/2102 Period 2 Dormancy 07/2100 Period 3 Delayed Preparations Period 4 Decommissioning Period 5 Site Restoration Storage Pool Empty 06/2053
Braidwood Nuclear Power Station Document E16-1555-014 Rev. 0 Decommissioning Cost Analysis Section 5, Page 1 of 5 TLG Services, Inc.
- 5. RADIOACTIVE WASTES The objectives of the decommissioning process are the removal of all radioactive material from the site that would restrict its future use and the termination of the NRC license(s). This currently requires the remediation of all radioactive material at the site in excess of applicable legal limits. Under the Atomic Energy Act,[31] the NRC is responsible for protecting the public from sources of ionizing radiation. Title 10 of the Code of Federal Regulations delineates the production, utilization, and disposal of radioactive materials and processes. In particular, §71 defines radioactive material as it pertains to packaging and transportation and §61 specifies its disposition.
Most of the materials being transported for controlled burial are categorized as Low Specific Activity (LSA) or Surface Contaminated Object (SCO) materials containing Type A quantities, as defined in 49 CFR §173-178. Shipping containers are required to be Industrial Packages (IP-1, IP-2 or IP-3, as defined in subpart 173.411). For this study, commercially available steel containers are presumed to be used for the disposal of piping, small components, and concrete. Larger components can serve as their own containers, with proper closure of all openings, access ways, and penetrations.
The volumes of radioactive waste generated during the various decommissioning activities at the site is shown on a line-item basis in Appendices C, D, and E and summarized in Tables 5.1 through 5.3. The quantified waste volume summaries shown in these tables are consistent with §61 classifications. The volumes are calculated based on the exterior dimensions for containerized material and on the displaced volume of components serving as their own waste containers.
The reactor vessel and internals are categorized as large quantity shipments and, accordingly, will be shipped in reusable, shielded truck casks with disposable liners.
In calculating disposal costs, the burial fees are applied against the liner volume, as well as the special handling requirements of the payload. Packaging efficiencies are lower for the highly activated materials (greater than Type A quantity waste),
where high concentrations of gamma-emitting radionuclides limit the capacity of the shipping canisters.
No process system containing/handling radioactive substances at shutdown is presumed to meet material release criteria by decay alone, i.e., systems radioactive at shutdown will still be radioactive over the time period during which the decommissioning is accomplished, due to the presence of long-lived radionuclides.
Braidwood Nuclear Power Station Document E16-1555-014 Rev. 0 Decommissioning Cost Analysis Section 5, Page 2 of 5 TLG Services, Inc.
While the dose rates decrease with time, radionuclides such as 137Cs will still control the disposition requirements.
The waste material generated in the decontamination and dismantling of Braidwood is primarily generated during Period 2 of the DECON alternative and Period 4 of the deferred alternatives. Material that is considered potentially contaminated when removed from the radiologically controlled area is sent to processing facilities in Tennessee for conditioning and disposal. Heavily contaminated components and activated materials are routed for controlled disposal. The disposal volumes reported in the tables reflect the savings resulting from reprocessing and recycling.
Disposal fees are calculated using current disposal agreements, with surcharges added for the highly activated components, for example, generated in the segmentation of the reactor vessel. The cost to dispose of the majority of the material generated from the decontamination and dismantling activities is based upon Exelons current disposal agreement with EnergySolutions for its facility in Clive, Utah.
Since the EnergySolutions facility is not able to accept the higher activity waste (Class B and C) generated in the decontamination of the reactor vessel and segmentation of the components closest to the core, the cost of disposal of this material at a yet-to-be determined facility are based upon Exelons previously negotiated cost of disposal at the Barnwell site.
Braidwood Nuclear Power Station Document E16-1555-014 Rev. 0 Decommissioning Cost Analysis Section 5, Page 3 of 5 TLG Services, Inc.
TABLE 5.1 DECOMMISSIONING WASTE
SUMMARY
DECON Waste Cost Basis Class [1]
Waste Volume (cubic feet)
Mass (pounds)
EnergySolutions A
217,956 20,704,885 Barnwell B
8,007 997,337 Low-Level Radioactive Waste (near-surface disposal)
Barnwell C
918 96,896 Greater than Class C (geologic repository)
Spent Fuel Equivalent GTCC 1,010 208,292 Processed/Conditioned (off-site recycling center)
Recycling Vendors A
383,743 14,849,524 Total [2]
611,635 36,856,934 Scrap Metal 269,440,000
[1]
Waste is classified according to the requirements as delineated in Title 10 CFR, Part 61.55
[2]
Columns may not add due to rounding.
Braidwood Nuclear Power Station Document E16-1555-014 Rev. 0 Decommissioning Cost Analysis Section 5, Page 4 of 5 TLG Services, Inc.
TABLE 5.2 DECOMMISSIONING WASTE
SUMMARY
DELAYED DECON Waste Cost Basis Class [1]
Waste Volume (cubic feet)
Mass (pounds)
EnergySolutions A
182,891 16,363,111 Barnwell B
6,260 803,190 Low-Level Radioactive Waste (near-surface disposal)
Barnwell C
918 96,896 Greater than Class C (geologic repository)
Spent Fuel Equivalent GTCC 1,010 208,292 Processed/Conditioned (off-site recycling center)
Recycling Vendors A
444,838 17,357,515 Total [2]
635,917 34,829,004 Scrap Metal 269,696,000
[1]
Waste is classified according to the requirements as delineated in Title 10 CFR, Part 61.55
[2]
Columns may not add due to rounding.
Braidwood Nuclear Power Station Document E16-1555-014 Rev. 0 Decommissioning Cost Analysis Section 5, Page 5 of 5 TLG Services, Inc.
TABLE 5.3 DECOMMISSIONING WASTE
SUMMARY
SAFSTOR Waste Cost Basis Class [1]
Waste Volume (cubic feet)
Mass (pounds)
EnergySolutions A
204,378 16,591,472 Barnwell B
5,258 692,576 Low-Level Radioactive Waste (near-surface disposal)
Barnwell C
939 95,516 Greater than Class C (geologic repository)
Spent Fuel Equivalent GTCC 1,010 208,292 Processed/Conditioned (off-site recycling center)
Recycling Vendors A
446,895 17,585,892 Total [2]
658,481 35,173,748 Scrap Metal 269,696,000
[1]
Waste is classified according to the requirements as delineated in Title 10 CFR, Part 61.55
[2]
Columns may not add due to rounding.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 6, Page 1 of 6 TLG Services, Inc.
- 6. RESULTS The analysis to estimate the costs to decommission Braidwood relied upon the site-specific, technical information developed for a previous analysis prepared in 2004.
While not an engineering study, the estimates provide Exelon with sufficient information to assess its financial obligations, as they pertain to the eventual decommissioning of the nuclear station.
The estimates described in this report are based on numerous fundamental assumptions, including regulatory requirements, project contingencies, low-level radioactive waste disposal practices, high-level radioactive waste management options, and site restoration requirements. The decommissioning scenarios assume continued operation of the plants spent fuel pool for a minimum of five and one-half years following the cessation of operations for continued cooling of the assemblies.
For the DECON and SAFSTOR scenarios, the ISFSI is expanded to accommodate the spent fuel, once sufficiently cooled, until such time that the DOE can complete the transfer of the assemblies to its repository. The spent fuel remains in the storage pool in the Delayed-DECON alternative.
The cost projected to promptly decommission (DECON) Braidwood is estimated to be $1,363.1 million. The majority of this cost (approximately 71.2%) is associated with the physical decontamination and dismantling of the nuclear units so that the licenses can be terminated. Another 17.5% is associated with the management, interim storage, and eventual transfer of the spent fuel. The remaining 11.3% is for the demolition of the designated structures and limited restoration of the site.
The primary cost contributors, identified in Tables 6.1 through 6.3, are either labor-related or associated with the management and disposition of the radioactive waste.
Program management is the largest single contributor to the overall cost. The magnitude of the expense is a function of both the size of the organization required to manage the decommissioning, as well as the duration of the program. It is assumed, for purposes of this analysis, that Exelon will oversee the decommissioning program, using a DOC to manage the decommissioning labor force and the associated subcontractors. The size and composition of the management organization varies with the decommissioning phase and associated site activities.
However, once the operating license is terminated, the staff is substantially reduced for the conventional demolition and restoration of the site, and the long-term care of the spent fuel (for the DECON alternative).
As described in this report, the spent fuel pool will remain operational for a minimum of five and one-half years following the cessation of operations. The pool
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 6, Page 2 of 6 TLG Services, Inc.
will be isolated and an independent spent fuel island created. This will allow decommissioning operations to proceed in and around the pool areas. Over the five and one-half year period, the spent fuel will be packaged into transportable steel canisters for future loading into a DOE-provided transport cask (DECON and SAFSTOR alternatives). The canisters will be stored in concrete overpacks at the ISFSI until the DOE is able to receive them. Dry storage of the fuel under a separate license provides additional flexibility in the event the DOE is not able to meet the current timetable for completing the transfer of assemblies to an off-site facility and minimizes the associated caretaking expenses.
The cost for waste disposal includes only those costs associated with the controlled disposition of the low-level radioactive waste generated from decontamination and dismantling activities, including plant equipment and components, structural material, filters, resins and dry-active waste. As described in Section 5, disposal of the majority of the radioactive material is at EnergySolutions facility in Clive, Utah or some alternative facility. Highly activated components, requiring additional isolation from the environment, are packaged for geologic disposal. Disposal of these components is based upon a cost equivalent for spent fuel.
A significant portion of the metallic waste is designated for additional processing and treatment at an off-site facility. Processing reduces the volume of material requiring controlled disposal through such techniques and processes as survey and sorting, decontamination, and volume reduction. The material that cannot be unconditionally released is packaged for controlled disposal at one of the currently operating facilities. The cost identified in the summary table for processing is all-inclusive, incorporating the ultimate disposition of the material.
Removal costs reflect the labor-intensive nature of the decommissioning process, as well as the management controls required to ensure a safe and successful program.
Decontamination and packaging costs also have a large labor component that is based upon prevailing union wages. Non-radiological demolition is a natural extension of the decommissioning process.
The methods employed in decontamination and dismantling are generally destructive and indiscriminate in inflicting collateral damage.
With a
work force mobilized to support decommissioning operations, non-radiological demolition can be an integrated activity and a logical expansion of the work being performed in the process of terminating the operating license. Prompt demolition reduces future liabilities and can be more cost effective than deferral, due to the deterioration of the facilities (and therefore the working conditions) with time.
The reported cost for transport includes the tariffs and surcharges associated with moving large components and/or overweight shielded casks overland, as well as the
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 6, Page 3 of 6 TLG Services, Inc.
general expense, e.g., labor and fuel, of transporting material to the destinations identified in this report. For purposes of this analysis, material is primarily moved overland by truck.
Decontamination is used to reduce the plants radiation fields and minimize worker exposure. Slightly contaminated material or material located within a contaminated area is sent to an off-site processing center, i.e., this analysis does not assume that contaminated plant components and equipment can be decontaminated for uncontrolled release in-situ. Centralized processing centers have proven to be a more economical means of handling the large volumes of material produced in the dismantling of a nuclear unit.
License termination survey costs are associated with the labor intensive and complex activity of verifying that contamination has been removed from the site to the levels specified by the regulating agency. This process involves a systematic survey of all remaining plant surface areas and surrounding environs, sampling, isotopic analysis, and documentation of the findings. The status of any plant components and materials not removed in the decommissioning process will also require confirmation and will add to the expense of surveying the facilities alone.
The remaining costs include allocations for heavy equipment and temporary services, as well as for other expenses such as regulatory fees and the premiums for nuclear insurance. While site operating costs are greatly reduced following the final cessation of plant operations, certain administrative functions do need to be maintained either at a basic functional or regulatory level.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 6, Page 4 of 6 TLG Services, Inc.
TABLE 6.1
SUMMARY
OF DECOMMISSIONING COST ELEMENTS DECON (thousands of 2009 dollars)
Cost Element Total Percentage Decontamination 36,446 2.7 Removal 249,366 18.3 Packaging 29,993 2.2 Transportation 20,786 1.5 Waste Disposal 119,684 8.8 Off-site Waste Processing 8,110 0.6 Program Management [1]
591,251 43.4 Spent Fuel Pool Isolation 11,143 0.8 Spent Fuel Management [2]
164,291 12.1 Insurance and Regulatory Fees 23,532 1.7 Energy 17,702 1.3 Characterization and Licensing Surveys 33,288 2.4 Property Taxes 39,113 2.9 Miscellaneous Equipment 12,921 0.9 Site O&M 5,508 0.4 Total [3]
1,363,134 100.0 Cost Element Total Percentage NRC License Termination 971,127 71.2 Spent Fuel Management 238,232 17.5 Site Restoration 153,775 11.3 Total [3]
100.0
[1]
Includes security and engineering costs
[2] Excludes program management costs (staffing) but includes costs for spent fuel loading/transfer/spent fuel pool O&M and EP fees
[3] Columns may not add due to rounding
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 6, Page 5 of 6 TLG Services, Inc.
TABLE 6.2
SUMMARY
OF DECOMMISSIONING COST ELEMENTS DELAYED DECON (thousands of 2009 dollars)
Cost Element Total Percentage Decontamination 31,501 2.3 Removal 244,860 18.1 Packaging 22,717 1.7 Transportation 17,812 1.3 Waste Disposal 81,123 6.0 Off-site Waste Processing 9,465 0.7 Program Management [1]
700,709 51.8 Spent Fuel Pool Isolation 11,143 0.8 Spent Fuel Management [2]
54,256 4.0 Insurance and Regulatory Fees 34,954 2.6 Energy 29,619 2.2 Characterization and Licensing Surveys 36,228 2.7 Property Taxes 49,101 3.6 Miscellaneous Equipment 21,642 1.6 Site O&M 8,115 0.6 Total [3]
1,353,245 100.0 Cost Element Total Percentage NRC License Termination 935,745 69.1 Spent Fuel Management 260,353 19.2 Site Restoration 157,147 11.6 Total [3]
100.0
[1]
Includes security and engineering costs
[2] Excludes program management costs (staffing) but includes costs for spent fuel loading/transfer/spent fuel pool O&M and EP fees
[3] Columns may not add due to rounding
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 6, Page 6 of 6 TLG Services, Inc.
TABLE 6.3
SUMMARY
OF DECOMMISSIONING COST ELEMENTS SAFSTOR (thousands of 2009 dollars)
Cost Element Total Percentage Decontamination 31,130 1.9 Removal 252,829 15.4 Packaging 22,556 1.4 Transportation 17,205 1.0 Waste Disposal 77,849 4.7 Off-site Waste Processing 9,589 0.6 Program Management [1]
781,887 47.5 Spent Fuel Pool Isolation 11,143 0.7 Spent Fuel Management [2]
160,933 9.8 Insurance and Regulatory Fees 69,055 4.2 Energy 36,464 2.2 Characterization and Licensing Surveys 36,228 2.2 Property Taxes 86,125 5.2 Miscellaneous Equipment 34,732 2.1 Site O&M 17,793 1.1 Total [3]
1,645,519 100.0 Cost Element Total Percentage NRC License Termination 1,253,252 76.2 Spent Fuel Management 235,093 14.3 Site Restoration 157,173 9.6 Total [3]
100.0
[1]
Includes security and engineering costs
[2] Excludes program management costs (staffing) but includes costs for spent fuel loading/transfer/spent fuel pool O&M and EP fees
[3] Columns may not add due to rounding
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 7, Page 1 of 3 TLG Services, Inc.
- 7. REFERENCES
- 1.
Decommissioning Cost Analysis for the Braidwood Nuclear Power Station, Document No. E16-1455-013, Rev. 0, TLG Services, Inc., January 2005
- 2.
U.S. Code of Federal Regulations, Title 10, Parts 30, 40, 50, 51, 70 and 72, "General Requirements for Decommissioning Nuclear Facilities," Nuclear Regulatory Commission, Federal Register Volume 53, Number 123 (p 24018 et seq.), June 27, 1988
- 3.
U.S. Nuclear Regulatory Commission, Regulatory Guide 1.159, "Assuring the Availability of Funds for Decommissioning Nuclear Reactors," October 2003
- 4.
U.S. Code of Federal Regulations, Title 10, Part 20, Subpart E, Radiological Criteria for License Termination
- 5.
U.S. Code of Federal Regulations, Title 10, Parts 20 and 50, Entombment Options for Power Reactors, Advanced Notice of Proposed Rulemaking, Federal Register Volume 66, Number 200, October 16, 2001
- 6.
U.S. Code of Federal Regulations, Title 10, Parts 2, 50 and 51, "Decommissioning of Nuclear Power Reactors,"
Nuclear Regulatory Commission, Federal Register Volume 61 (p 39278 et seq.), July 29, 1996
- 7.
Nuclear Waste Policy Act of 1982 and Amendments, U.S. Department of Energys Office of Civilian Radioactive Management, 1982
- 8.
Settlement: Exelon and the U.S. Department of Justice, in close consultation with the DOE, under which the government will reimburse Exelon for costs associated with storage of spent fuel at the company's nuclear stations pending DOE fulfilling its contractual obligation to accept commercial spent nuclear fuel. Additional amounts reimbursed annually for future costs. August 5, 2004
- 9.
U.S. Code of Federal Regulations, Title 10, Part 50, Domestic Licensing of Production and Utilization Facilities, Subpart 54 (bb), Conditions of Licenses
- 10.
Low-Level Radioactive Waste Policy, Public Law 96-573, 1980
- 11.
Low-Level Radioactive Waste Policy Amendments Act of 1985, Public Law 99-240, January 15, 1986
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 7, Page 2 of 3 TLG Services, Inc.
- 7. REFERENCES (continued)
- 12.
U.S. Code of Federal Regulations, Title 10, Part 20, Subpart E, Radiological Criteria for License Termination, Federal Register, Volume 62, Number 139 (p 39058 et seq.), July 21, 1997
- 13.
Establishment of Cleanup Levels for CERCLA Sites with Radioactive Contamination, EPA Memorandum OSWER No. 9200.4-18, August 22, 1997
- 14.
U.S. Code of Federal Regulations, Title 40, Part 141.16, Maximum contaminant levels for beta particle and photon radioactivity from man-made radionuclides in community water systems
- 15.
Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites, OSWER 9295.8-06a, October 9, 2002
- 16.
Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM),
NUREG-1575, Rev. 1, EPA 402-R-97-016, Rev. 1, August 2000
- 17.
T.S. LaGuardia et al., "Guidelines for Producing Commercial Nuclear Power Plant Decommissioning Cost Estimates," AIF/NESP-036, May 1986
- 18.
W.J. Manion and T.S. LaGuardia, "Decommissioning Handbook," U.S.
Department of Energy, DOE/EV/10128-1, November 1980
- 19.
"Building Construction Cost Data 2009," Robert Snow Means Company, Inc.,
Kingston, Massachusetts
- 20.
Project and Cost Engineers Handbook, Second Edition, p. 239, American Association of Cost Engineers, Marcel Dekker, Inc., New York, New York, 1984
- 21.
DOE/RW-0351, Civilian Radioactive Waste Management System Waste Acceptance System Requirements Document, Revision 5, May 31, 2007
- 22.
Civilian Radioactive Waste Management System Requirements Document, DOE/RW-0406, Revision 8, September 2007
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Section 7, Page 3 of 3 TLG Services, Inc.
- 7. REFERENCES (continued)
- 23.
"Strategy for Management and Disposal of Greater-Than-Class C Low-Level Radioactive Waste, Federal Register Volume 60, Number 48 (p 13424 et seq.),
March 1995
- 24.
U.S. Department of Transportation, Title 49 of the Code of Federal Regulations, "Transportation," Parts 173 through 178, 2009
- 25.
Tri-State Motor Transit Company, published tariffs, Interstate Commerce Commission (ICC), Docket No. MC-427719 Rules Tariff, March 2004, Radioactive Materials Tariff, January 2008
- 26.
J.C. Evans et al., "Long-Lived Activation Products in Reactor Materials" NUREG/CR-3474, Pacific Northwest Laboratory for the Nuclear Regulatory Commission. August 1984
- 27.
R.I. Smith, G.J. Konzek, W.E. Kennedy, Jr., "Technology, Safety and Costs of Decommissioning a Reference Pressurized Water Reactor Power Station,"
NUREG/CR-0130 and addenda, Pacific Northwest Laboratory for the Nuclear Regulatory Commission. June 1978
- 28.
H.D. Oak, et al., "Technology, Safety and Costs of Decommissioning a Reference Boiling Water Reactor Power Station," NUREG/CR-0672 and addenda, Pacific Northwest Laboratory for the Nuclear Regulatory Commission. June 1980
- 29.
Financial Protection Requirements for Permanently Shutdown Nuclear Power Reactors, 10 CFR Parts 50 and 140, Federal Register Notice, Vol. 62, No. 210, October 30, 1997
- 30.
"Microsoft Project 2003," Microsoft Corporation, Redmond, WA, 2003
- 31.
Atomic Energy Act of 1954, (68 Stat. 919)
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix A, Page 1 of 4 TLG Services, Inc.
APPENDIX A UNIT COST FACTOR DEVELOPMENT
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix A, Page 2 of 4 TLG Services, Inc.
APPENDIX A UNIT COST FACTOR DEVELOPMENT Example:
Unit Factor for Removal of Contaminated Heat Exchanger < 3,000 lbs.
- 1.
SCOPE Heat exchangers weighing < 3,000 lbs. will be removed in one piece using a crane or small hoist. They will be disconnected from the inlet and outlet piping. The heat exchanger will be sent to the waste processing area.
- 2.
CALCULATIONS Activity Critical Act Activity Duration Duration ID Description (minutes)
(minutes)*
a Remove insulation 60 (b) b Mount pipe cutters 60 60 c
Install contamination controls 20 (b) d Disconnect inlet and outlet lines 60 60 e
Cap openings 20 (d) f Rig for removal 30 30 g
Unbolt from mounts 30 30 h
Remove contamination controls 15 15 i
Remove, wrap, send to waste processing area 60 60 Totals (Activity/Critical) 355 255 Duration adjustment(s):
+ Respiratory protection adjustment (50% of critical duration) 128
+ Radiation/ALARA adjustment (37% of critical duration) 95 Adjusted work duration 478
+ Protective clothing adjustment (30% of adjusted duration) 143 Productive work duration 621
+ Work break adjustment (8.33 % of productive duration) 52 Total work duration (minutes) 673
- Total duration = 11.217 hr ***
- Alpha designators indicate activities that can be performed in parallel
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix A, Page 3 of 4 TLG Services, Inc.
APPENDIX A (Continued)
- 3.
LABOR REQUIRED Duration Rate Crew Number (Hours)
($/hr)
Cost Laborers 3.00 11.217 56.57 1,903.64 Craftsmen 2.00 11.217 68.04 1,526.41 Foreman 1.00 11.217 70.74 793.49 General Foreman 0.25 11.217 72.83 204.23 Fire Watch 0.05 11.217 56.57 31.73 Health Physics Technician 1.00 11.217 51.42 576.78 Total labor cost
$5,036.28
- 4.
EQUIPMENT & CONSUMABLES COSTS Equipment Costs none Consumables/Materials Costs
Blotting paper 50 @ $0.53/sq ft {1}
$26.50
Plastic sheets/bags 50 @ $0.39/sq ft {2}
$19.50
Gas torch consumables 1 @ $9.25 x 1 /hr {3}
$9.25 Subtotal cost of equipment and materials
$55.25 Overhead & profit on equipment and materials @ 16.25 %
$8.98 Total costs, equipment & material
$64.23 TOTAL COST:
Removal of contaminated heat exchanger <3000 pounds:
$5,100.51 Total labor cost:
$5,036.28 Total equipment/material costs:
$64.23 Total craft labor man-hours required per unit:
81.88
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix A, Page 4 of 4 TLG Services, Inc.
- 5.
NOTES AND REFERENCES
Work difficulty factors were developed in conjunction with the Atomic Industrial Forums (now NEI) program to standardize nuclear decommissioning cost estimates and are delineated in Volume 1, Chapter 5 of the Guidelines for Producing Commercial Nuclear Power Plant Decommissioning Cost Estimates," AIF/NESP-036, May 1986.
References for equipment & consumables costs:
- 1. www.mcmaster.com online catalog - Spill Control (7193T88)
- 2. R.S. Means (2009) 01 56 13.60-0200, page 20
- 3. R.S. Means (2009) 01 54 33.40-6360, page 658
Material and consumable costs were adjusted using the regional indices for Joliet, Illinois.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix B, Page 1 of 7 TLG Services, Inc.
APPENDIX B UNIT COST FACTOR LISTING (DECON: Power Block Structures Only)
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix B, Page 2 of 7 APPENDIX B UNIT COST FACTOR LISTING (Power Block Structures Only)
Unit Cost Factor Cost/Unit TLG Services, Inc.
Removal of clean instrument and sampling tubing, $/linear foot 0.60 Removal of clean pipe 0.25 to 2 inches diameter, $/linear foot 6.49 Removal of clean pipe >2 to 4 inches diameter, $/linear foot 9.15 Removal of clean pipe >4 to 8 inches diameter, $/linear foot 17.60 Removal of clean pipe >8 to 14 inches diameter, $/linear foot 34.29 Removal of clean pipe >14 to 20 inches diameter, $/linear foot 44.45 Removal of clean pipe >20 to 36 inches diameter, $/linear foot 65.44 Removal of clean pipe >36 inches diameter, $/linear foot 77.81 Removal of clean valve >2 to 4 inches 116.71 Removal of clean valve >4 to 8 inches 175.97 Removal of clean valve >8 to 14 inches 342.95 Removal of clean valve >14 to 20 inches 444.51 Removal of clean valve >20 to 36 inches 654.36 Removal of clean valve >36 inches 778.06 Removal of clean pipe hanger for small bore piping 38.03 Removal of clean pipe hanger for large bore piping 141.22 Removal of clean pump, <300 pound 293.97 Removal of clean pump, 300-1000 pound 812.82 Removal of clean pump, 1000-10,000 pound 3,239.37 Removal of clean pump, >10,000 pound 6,255.04 Removal of clean pump motor, 300-1000 pound 342.74 Removal of clean pump motor, 1000-10,000 pound 1,350.30 Removal of clean pump motor, >10,000 pound 3,038.18 Removal of clean heat exchanger <3000 pound 1,733.40 Removal of clean heat exchanger >3000 pound 4,349.84 Removal of clean feedwater heater/deaerator 12,304.95 Removal of clean moisture separator/reheater 25,353.69 Removal of clean tank, <300 gallons 378.49 Removal of clean tank, 300-3000 gallon 1,198.86 Removal of clean tank, >3000 gallons, $/square foot surface area 9.93
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix B, Page 3 of 7 APPENDIX B UNIT COST FACTOR LISTING (Power Block Structures Only)
Unit Cost Factor Cost/Unit TLG Services, Inc.
Removal of clean electrical equipment, <300 pound 161.79 Removal of clean electrical equipment, 300-1000 pound 558.02 Removal of clean electrical equipment, 1000-10,000 pound 1,116.03 Removal of clean electrical equipment, >10,000 pound 2,637.70 Removal of clean electrical transformer < 30 tons 1,831.86 Removal of clean electrical transformer > 30 tons 5,275.41 Removal of clean standby diesel generator, <100 kW 1,871.07 Removal of clean standby diesel generator, 100 kW to 1 MW 4,176.37 Removal of clean standby diesel generator, >1 MW 8,645.93 Removal of clean electrical cable tray, $/linear foot 15.03 Removal of clean electrical conduit, $/linear foot 6.56 Removal of clean mechanical equipment, <300 pound 161.79 Removal of clean mechanical equipment, 300-1000 pound 558.02 Removal of clean mechanical equipment, 1000-10,000 pound 1,116.03 Removal of clean mechanical equipment, >10,000 pound 2,637.70 Removal of clean HVAC equipment, <300 pound 195.64 Removal of clean HVAC equipment, 300-1000 pound 670.50 Removal of clean HVAC equipment, 1000-10,000 pound 1,336.30 Removal of clean HVAC equipment, >10,000 pound 2,637.70 Removal of clean HVAC ductwork, $/pound 0.64 Removal of contaminated instrument and sampling tubing, $/linear foot 1.79 Removal of contaminated pipe 0.25 to 2 inches diameter, $/linear foot 25.05 Removal of contaminated pipe >2 to 4 inches diameter, $/linear foot 43.25 Removal of contaminated pipe >4 to 8 inches diameter, $/linear foot 67.65 Removal of contaminated pipe >8 to 14 inches diameter, $/linear foot 134.17 Removal of contaminated pipe >14 to 20 inches diameter, $/linear foot 161.27 Removal of contaminated pipe >20 to 36 inches diameter, $/linear foot 223.60 Removal of contaminated pipe >36 inches diameter, $/linear foot 264.52 Removal of contaminated valve >2 to 4 inches 514.31 Removal of contaminated valve >4 to 8 inches 620.02
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix B, Page 4 of 7 APPENDIX B UNIT COST FACTOR LISTING (Power Block Structures Only)
Unit Cost Factor Cost/Unit TLG Services, Inc.
Removal of contaminated valve >8 to 14 inches 1,288.21 Removal of contaminated valve >14 to 20 inches 1,637.58 Removal of contaminated valve >20 to 36 inches 2,182.56 Removal of contaminated valve >36 inches 2,591.72 Removal of contaminated pipe hanger for small bore piping 167.42 Removal of contaminated pipe hanger for large bore piping 567.05 Removal of contaminated pump, <300 pound 1,102.83 Removal of contaminated pump, 300-1000 pound 2,555.62 Removal of contaminated pump, 1000-10,000 pound 8,473.28 Removal of contaminated pump, >10,000 pound 20,635.56 Removal of contaminated pump motor, 300-1000 pound 1,084.65 Removal of contaminated pump motor, 1000-10,000 pound 3,445.94 Removal of contaminated pump motor, >10,000 pound 7,736.54 Removal of contaminated heat exchanger <3000 pound 5,100.51 Removal of contaminated heat exchanger >3000 pound 14,761.50 Removal of contaminated tank, <300 gallons 1,833.73 Removal of contaminated tank, >300 gallons, $/square foot 35.89 Removal of contaminated electrical equipment, <300 pound 861.12 Removal of contaminated electrical equipment, 300-1000 pound 2,092.89 Removal of contaminated electrical equipment, 1000-10,000 pound 4,030.84 Removal of contaminated electrical equipment, >10,000 pound 7,888.71 Removal of contaminated electrical cable tray, $/linear foot 41.50 Removal of contaminated electrical conduit, $/linear foot 20.07 Removal of contaminated mechanical equipment, <300 pound 958.09 Removal of contaminated mechanical equipment, 300-1000 pound 2,311.70 Removal of contaminated mechanical equipment, 1000-10,000 pound 4,444.97 Removal of contaminated mechanical equipment, >10,000 pound 7,888.71 Removal of contaminated HVAC equipment, <300 pound 958.09 Removal of contaminated HVAC equipment, 300-1000 pound 2,311.70 Removal of contaminated HVAC equipment, 1000-10,000 pound 4,444.97
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix B, Page 5 of 7 APPENDIX B UNIT COST FACTOR LISTING (Power Block Structures Only)
Unit Cost Factor Cost/Unit TLG Services, Inc.
Removal of contaminated HVAC equipment, >10,000 pound 7,888.71 Removal of contaminated HVAC ductwork, $/pound 2.43 Removal/plasma arc cut of contaminated thin metal components, $/linear in.
4.63 Additional decontamination of surface by washing, $/square foot 9.64 Additional decontamination of surfaces by hydrolasing, $/square foot 40.20 Decontamination rig hook up and flush, $/ 250 foot length 8,085.83 Chemical flush of components/systems, $/gallon 15.40 Removal of clean standard reinforced concrete, $/cubic yard 153.19 Removal of grade slab concrete, $/cubic yard 210.32 Removal of clean concrete floors, $/cubic yard 394.86 Removal of sections of clean concrete floors, $/cubic yard 1,200.05 Removal of clean heavily rein concrete w/#9 rebar, $/cubic yard 255.64 Removal of contaminated heavily rein concrete w/#9 rebar, $/cubic yard 2,389.41 Removal of clean heavily rein concrete w/#18 rebar, $/cubic yard 323.12 Removal of contaminated heavily rein concrete w/#18 rebar, $/cubic yard 3,160.92 Removal heavily rein concrete w/#18 rebar & steel embedments, $/cubic yard 507.10 Removal of below-grade suspended floors, $/cubic yard 394.86 Removal of clean monolithic concrete structures, $/cubic yard 1,017.13 Removal of contaminated monolithic concrete structures, $/cubic yard 2,380.99 Removal of clean foundation concrete, $/cubic yard 796.36 Removal of contaminated foundation concrete, $/cubic yard 2,217.60 Explosive demolition of bulk concrete, $/cubic yard 33.98 Removal of clean hollow masonry block wall, $/cubic yard 113.13 Removal of contaminated hollow masonry block wall, $/cubic yard 364.98 Removal of clean solid masonry block wall, $/cubic yard 113.13 Removal of contaminated solid masonry block wall, $/cubic yard 364.98 Backfill of below-grade voids, $/cubic yard 22.74 Removal of subterranean tunnels/voids, $/linear foot 129.34 Placement of concrete for below-grade voids, $/cubic yard 133.82 Excavation of clean material, $/cubic yard 3.06
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix B, Page 6 of 7 APPENDIX B UNIT COST FACTOR LISTING (Power Block Structures Only)
Unit Cost Factor Cost/Unit TLG Services, Inc.
Excavation of contaminated material, $/cubic yard 43.32 Removal of clean concrete rubble (tipping fee included), $/cubic yard 23.70 Removal of contaminated concrete rubble, $/cubic yard 27.61 Removal of building by volume, $/cubic foot 0.33 Removal of clean building metal siding, $/square foot 1.40 Removal of contaminated building metal siding, $/square foot 4.66 Removal of standard asphalt roofing, $/square foot 2.83 Removal of transite panels, $/square foot 2.47 Scarifying contaminated concrete surfaces (drill & spall), $/square foot 13.99 Scabbling contaminated concrete floors, $/square foot 8.87 Scabbling contaminated concrete walls, $/square foot 23.71 Scabbling contaminated ceilings, $/square foot 81.62 Scabbling structural steel, $/square foot 7.19 Removal of clean overhead crane/monorail < 10 ton capacity 770.65 Removal of contaminated overhead crane/monorail < 10 ton capacity 2,106.37 Removal of clean overhead crane/monorail >10-50 ton capacity 1,849.57 Removal of contaminated overhead crane/monorail >10-50 ton capacity 5,054.42 Removal of polar crane > 50 ton capacity 7,687.60 Removal of gantry crane > 50 ton capacity 32,971.33 Removal of structural steel, $/pound 0.24 Removal of clean steel floor grating, $/square foot 5.28 Removal of contaminated steel floor grating, $/square foot 15.02 Removal of clean free standing steel liner, $/square foot 14.89 Removal of contaminated free standing steel liner, $/square foot 42.06 Removal of clean concrete-anchored steel liner, $/square foot 7.44 Removal of contaminated concrete-anchored steel liner, $/square foot 48.98 Placement of scaffolding in clean areas, $/square foot 17.93 Placement of scaffolding in contaminated areas, $/square foot 29.87 Landscaping with topsoil, $/acre 19,589.25 Cost of CPC B-88 LSA box & preparation for use 2,085.23
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix B, Page 7 of 7 APPENDIX B UNIT COST FACTOR LISTING (Power Block Structures Only)
Unit Cost Factor Cost/Unit TLG Services, Inc.
Cost of CPC B-25 LSA box & preparation for use 1,727.86 Cost of CPC B-12V 12 gauge LSA box & preparation for use 1,561.80 Cost of CPC B-144 LSA box & preparation for use 8,998.74 Cost of LSA drum & preparation for use 192.04 Cost of cask liner for CNSI 14 195 cask 276.93 Cost of cask liner for CNSI 8 120A cask (resins) 7,721.08 Cost of cask liner for CNSI 8 120A cask (filters) 8,203.11 Decontamination of surfaces with vacuuming, $/square foot 0.89
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix C, Page 1 of 22 TLG Services, Inc.
APPENDIX C DETAILED COST ANALYSIS DECON Page Braidwood Nuclear Power Station, Unit 1...................................................................C-2 Braidwood Nuclear Power Station, Unit 2................................................................C-12
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 2 of 22 Table C-1 Braidwood Nuclear Power Station, Unit 1 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:29:52 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 1a - Shutdown through Transition Period 1a Direct Decommissioning Activities 1a.1.1 Prepare preliminary decommissioning cost 153 23 176 176 1,300 1a.1.2 Notification of Cessation of Operations a
1a.1.3 Remove fuel & source material n/a 1a.1.4 Notification of Permanent Defueling a
1a.1.5 Deactivate plant systems & process waste a
1a.1.6 Prepare and submit PSDAR 236 35 271 271 2,000 1a.1.7 Review plant dwgs & specs.
543 81 624 624 4,600 1a.1.8 Perform detailed rad survey a
1a.1.9 Estimate by-product inventory 118 18 136 136 1,000 1a.1.10 End product description 118 18 136 136 1,000 1a.1.11 Detailed by-product inventory 153 23 176 176 1,300 1a.1.12 Define major work sequence 885 133 1,018 1,018 7,500 1a.1.13 Perform SER and EA 366 55 421 421 3,100 1a.1.14 Perform Site-Specific Cost Study 590 89 679 679 5,000 1a.1.15 Prepare/submit License Termination Plan 483 73 556 556 4,096 1a.1.16 Receive NRC approval of termination plan a
Activity Specifications 1a.1.17.1 Plant & temporary facilities 581 87 668 601 67 4,920 1a.1.17.2 Plant systems 492 74 565 509 57 4,167 1a.1.17.3 NSSS Decontamination Flush 59 9
68 68 500 1a.1.17.4 Reactor internals 838 126 964 964 7,100 1a.1.17.5 Reactor vessel 767 115 882 882 6,500 1a.1.17.6 Biological shield 59 9
68 68 500 1a.1.17.7 Steam generators 368 55 423 423 3,120 1a.1.17.8 Reinforced concrete 189 28 217 109 109 1,600 1a.1.17.9 Main Turbine 47 7
54 54 400 1a.1.17.10 Main Condensers 47 7
54 54 400 1a.1.17.11 Plant structures & buildings 368 55 423 212 212 3,120 1a.1.17.12 Waste management 543 81 624 624 4,600 1a.1.17.13 Facility & site closeout 106 16 122 61 61 900 1a.1.17 Total 4,464 670 5,134 4,520 613 37,827 Planning & Site Preparations 1a.1.18 Prepare dismantling sequence 283 42 326 326 2,400 1a.1.19 Plant prep. & temp. svces 2,800 420 3,220 3,220 1a.1.20 Design water clean-up system 165 25 190 190 1,400 1a.1.21 Rigging/Cont. Cntrl Envlps/tooling/etc.
2,200 330 2,530 2,530 1a.1.22 Procure casks/liners & containers 145 22 167 167 1,230 1a.1 Subtotal Period 1a Activity Costs 13,704 2,056 15,759 15,146 613 73,753 Period 1a Additional Costs 1a.2.1 ISFSI Expansion 9,900 1,485 11,385 11,385 1a.2 Subtotal Period 1a Additional Costs 9,900 1,485 11,385 11,385 Period 1a Collateral Costs 1a.3.1 Spent Fuel Capital and Transfer 9,000 1,350 10,350 10,350 1a.3 Subtotal Period 1a Collateral Costs 9,000 1,350 10,350 10,350 Period 1a Period-Dependent Costs 1a.4.1 Insurance 751 75 826 826 1a.4.2 Property taxes 1a.4.3 Health physics supplies 421 105 527 527 1a.4.4 Heavy equipment rental 421 63 484 484 1a.4.5 Disposal of DAW generated 2
1 34 9
45 45 610 12,190 3
TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 3 of 22 Table C-1 Braidwood Nuclear Power Station, Unit 1 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:29:52 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 1a Period-Dependent Costs (continued) 1a.4.6 Plant energy budget 1,319 198 1,517 1,517 1a.4.7 NRC Fees 706 71 776 776 1a.4.8 Emergency Planning Fees 315 32 347 347 1a.4.9 Site O&M Costs 125 19 144 144 1a.4.10 Spent Fuel Pool O&M 381 57 438 438 1a.4.11 ISFSI Operating Costs 44 7
51 51 1a.4.12 Security Staff Cost 466 70 536 536 12,264 1a.4.13 Utility Staff Cost 31,082 4,662 35,745 35,745 423,400 1a.4 Subtotal Period 1a Period-Dependent Costs 842 2
1 34 35,189 5,367 41,434 40,599 836 610 12,190 3
435,664 1a.0 TOTAL PERIOD 1a COST 842 2
1 34 67,792 10,257 78,928 55,744 22,571 613 610 12,190 3
509,417 PERIOD 1b - Decommissioning Preparations Period 1b Direct Decommissioning Activities Detailed Work Procedures 1b.1.1.1 Plant systems 559 84 642 578 64 4,733 1b.1.1.2 NSSS Decontamination Flush 118 18 136 136 1,000 1b.1.1.3 Reactor internals 295 44 339 339 2,500 1b.1.1.4 Remaining buildings 159 24 183 46 137 1,350 1b.1.1.5 CRD cooling assembly 118 18 136 136 1,000 1b.1.1.6 CRD housings & ICI tubes 118 18 136 136 1,000 1b.1.1.7 Incore instrumentation 118 18 136 136 1,000 1b.1.1.8 Reactor vessel 428 64 493 493 3,630 1b.1.1.9 Facility closeout 142 21 163 81 81 1,200 1b.1.1.10 Missile shields 53 8
61 61 450 1b.1.1.11 Biological shield 142 21 163 163 1,200 1b.1.1.12 Steam generators 543 81 624 624 4,600 1b.1.1.13 Reinforced concrete 118 18 136 68 68 1,000 1b.1.1.14 Main Turbine 184 28 212 212 1,560 1b.1.1.15 Main Condensers 184 28 212 212 1,560 1b.1.1.16 Auxiliary building 322 48 370 333 37 2,730 1b.1.1.17 Reactor building 322 48 370 333 37 2,730 1b.1.1 Total 3,923 588 4,511 3,663 848 33,243 1b.1.2 Decon primary loop 623 311 934 934 1,067 1b.1 Subtotal Period 1b Activity Costs 623 3,923 900 5,445 4,597 848 1,067 33,243 Period 1b Additional Costs 1b.2.1 Site Characterization 6,341 1,902 8,243 8,243 30,500 10,852 1b.2 Subtotal Period 1b Additional Costs 6,341 1,902 8,243 8,243 30,500 10,852 Period 1b Collateral Costs 1b.3.1 Decon equipment 811 122 932 932 1b.3.2 DOC staff relocation expenses 1,130 169 1,299 1,299 1b.3.3 Process liquid waste 57 81 377 3,379 938 4,832 4,832 375 889 121,195 246 1b.3.4 Small tool allowance 2
0 2
2 1b.3.5 Pipe cutting equipment 1,100 165 1,265 1,265 1b.3.6 Decon rig 1,400 210 1,610 1,610 1b.3.7 Spent Fuel Capital and Transfer 4,000 600 4,600 4,600 1b.3 Subtotal Period 1b Collateral Costs 2,268 1,102 81 377 3,379 5,130 2,204 14,541 9,941 4,600 375 889 121,195 246 Period 1b Period-Dependent Costs 1b.4.1 Decon supplies 25 6
31 31 1b.4.2 Insurance 376 38 414 414 1b.4.3 Property taxes 3,240 324 3,564 3,564 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 4 of 22 Table C-1 Braidwood Nuclear Power Station, Unit 1 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:29:52 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 1b Period-Dependent Costs (continued) 1b.4.4 Health physics supplies 237 59 297 297 1b.4.5 Heavy equipment rental 211 32 242 242 1b.4.6 Disposal of DAW generated 1
0 20 5
27 27 358 7,159 2
1b.4.7 Plant energy budget 1,323 198 1,521 1,521 1b.4.8 NRC Fees 354 35 389 389 1b.4.9 Emergency Planning Fees 158 16 174 174 1b.4.10 Site O&M Costs 63 9
72 72 1b.4.11 Spent Fuel Pool O&M 191 29 220 220 1b.4.12 ISFSI Operating Costs 22 3
25 25 1b.4.13 Security Staff Cost 234 35 269 269 6,149 1b.4.14 DOC Staff Cost 5,217 783 5,999 5,999 63,789 1b.4.15 Utility Staff Cost 15,652 2,348 17,999 17,999 213,326 1b.4 Subtotal Period 1b Period-Dependent Costs 25 448 1
0 20 26,829 3,920 31,243 30,824 419 358 7,159 2
283,263 1b.0 TOTAL PERIOD 1b COST 2,915 1,550 82 377 3,399 42,222 8,926 59,472 53,605 5,019 848 733 889 128,354 31,815 327,358 PERIOD 1 TOTALS 2,915 2,392 84 378 3,433 110,015 19,184 138,401 109,350 27,590 1,462 1,342 889 140,544 31,818 836,775 PERIOD 2a - Large Component Removal Period 2a Direct Decommissioning Activities Nuclear Steam Supply System Removal 2a.1.1.1 Reactor Coolant Piping 212 177 33 39 341 245 1,048 1,048 1,728 208,992 6,092 2a.1.1.2 Pressurizer Relief Tank 36 32 6
8 60 43 184 184 329 36,553 1,072 2a.1.1.3 Reactor Coolant Pumps & Motors 115 118 96 180 1,272 442 2,224 2,224 4,796 780,540 4,291 100 2a.1.1.4 Pressurizer 54 68 399 96 412 201 1,230 1,230 3,033 252,826 2,482 938 2a.1.1.5 Steam Generators 433 4,168 3,062 2,577 667 4,349 3,138 18,394 18,394 45,513 17,817 4,035,428 23,233 2,125 2a.1.1.6 Retired Steam Generator Units 1,535 2,673 580 3,416 1,495 9,700 9,700 39,289 14,064 3,041,432 10,800 1,500 2a.1.1.7 CRDMs/ICIs/Service Structure Removal 101 80 176 42 59 109 568 568 2,843 50,181 2,843 2a.1.1.8 Reactor Vessel Internals 140 2,193 4,483 893 8,058 233 7,122 23,121 23,121 1,377 903 459 326,029 26,933 1,209 2a.1.1.9 Reactor Vessel 106 4,162 1,501 691 7,844 233 7,679 22,216 22,216 6,606 2,254 978,589 26,933 1,209 2a.1.1 Totals 1,197 10,998 11,292 7,197 1,247 25,811 466 20,475 78,684 78,684 84,802 52,594 3,156 459 9,710,570 104,680 7,082 Removal of Major Equipment 2a.1.2 Main Turbine/Generator 650 388 38 203 284 309 1,872 1,872 5,088 2,833 686,663 10,223 2a.1.3 Main Condensers 1,312 170 59 143 211 428 2,324 2,324 6,756 1,992 482,702 20,428 Cascading Costs from Clean Building Demolition 2a.1.4.1 Reactor 1,171 176 1,346 1,346 12,130 2a.1.4.2 Auxiliary Building 644 97 741 741 6,782 2a.1.4.3 Refueling Water Storage Tank 114 17 131 131 1,299 2a.1.4.4 Steam Generator Storage Facility 48 7
55 55 507 2a.1.4 Totals 1,977 297 2,273 2,273 20,718 Disposal of Plant Systems 2a.1.5.1 Auxiliary Feedwater 78 12 89 89 1,244 2a.1.5.2 Auxiliary Steam 70 10 80 80 1,126 2a.1.5.3 Auxiliary Steam RCA 134 6
5 9
21 41 215 215 448 197 35,862 1,946 2a.1.5.4 Boric Acid Processing 501 546 52 39 57 182 452 1,830 1,830 2,981 2,231 275,609 15,951 2a.1.5.5 CO2 & H2 26 4
30 30 419 2a.1.5.6 CO2 & H2 RCA 38 1
1 1
5 11 59 59 67 50 7,168 575 2a.1.5.7 Chemical Feed 57 9
66 66 934 2a.1.5.8 Chilled Water 71 11 82 82 1,142 2a.1.5.9 Circulating Water 318 48 365 365 5,174 2a.1.5.10 Condensate 377 56 433 433 6,023 2a.1.5.11 Condensate Booster 339 51 390 390 5,428 2a.1.5.12 Condensate Cleanup 66 10 76 76 1,060 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 5 of 22 Table C-1 Braidwood Nuclear Power Station, Unit 1 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:29:52 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Disposal of Plant Systems (continued) 2a.1.5.13 Containment Spray 256 17 18 49 57 90 487 487 2,566 543 152,670 3,755 2a.1.5.14 Diesel Fuel Oil 102 15 117 117 1,615 2a.1.5.15 Essential Service Water 236 35 271 271 3,837 2a.1.5.16 Extraction Steam 189 28 217 217 3,089 2a.1.5.17 Feedwater 316 47 363 363 5,142 2a.1.5.18 Feedwater Drains 758 114 872 872 12,366 2a.1.5.19 Gland Steam 57 9
65 65 932 2a.1.5.20 Gland Water 50 7
57 57 828 2a.1.5.21 Main Steam 322 48 371 371 5,216 2a.1.5.22 Main Steam RCA 51 4
4 9
16 19 102 102 468 148 32,263 745 2a.1.5.23 Nitrogen 3
0 0
1 0
1 5
5 49 2
2,118 49 2a.1.5.24 Non-Essential Service Water 178 27 204 204 2,916 2a.1.5.25 Non-Essential Service Water RCA 93 8
8 17 30 36 192 192 897 287 62,152 1,308 2a.1.5.26 Off Gas 622 28 29 71 101 198 1,048 1,048 3,698 953 235,620 9,534 2a.1.5.27 Process Radiation Monitoring 45 1
1 1
2 12 62 62 75 19 4,792 748 2a.1.5.28 Process Sampling 133 2
3 9
8 37 193 193 466 76 25,755 2,166 2a.1.5.29 Screen Wash 50 7
57 57 821 2a.1.5.30 Station Air 31 5
35 35 498 2a.1.5.31 Station Heating 109 16 126 126 1,771 2a.1.5.32 Switchgear Heat Removal 9
1 10 10 139 2a.1.5.33 Turbine Bldg Equip Drains 1
0 1
1 17 2a.1.5.34 Turbine Generator 57 9
65 65 901 2a.1.5.35 Turbine Oil 87 13 100 100 1,399 2a.1.5.36 Waste Oil Sumps 30 4
34 34 483 2a.1.5 Totals 501 5,903 119 108 224 423 1,495 8,773 4,193 4,580 11,715 4,504 834,009 101,293 2a.1.6 Scaffolding in support of decommissioning 1,103 6
1 6
2 278 1,397 1,397 306 19 15,459 18,871 2a.1 Subtotal Period 2a Activity Costs 1,698 21,944 11,975 7,403 1,823 26,731 466 23,282 95,323 90,743 4,580 108,666 61,942 3,156 459 11,729,400 276,213 7,082 Period 2a Collateral Costs 2a.3.1 Process liquid waste 206 98 440 449 291 1,484 1,484 1,518 96,825 296 2a.3.2 Small tool allowance 271 41 312 281 31 2a.3.3 Spent Fuel Capital and Transfer 13,000 1,950 14,950 14,950 2a.3 Subtotal Period 2a Collateral Costs 206 271 98 440 449 13,000 2,282 16,746 1,765 14,950 31 1,518 96,825 296 Period 2a Period-Dependent Costs 2a.4.1 Decon supplies 73 18 91 91 2a.4.2 Insurance 494 49 544 544 2a.4.3 Property taxes 6,445 644 7,089 6,380 709 2a.4.4 Health physics supplies 1,714 428 2,142 2,142 2a.4.5 Heavy equipment rental 2,610 392 3,002 3,002 2a.4.6 Disposal of DAW generated 11 4
210 54 280 280 3,770 75,402 17 2a.4.7 Plant energy budget 1,844 277 2,120 2,120 2a.4.8 NRC Fees 968 97 1,065 1,065 2a.4.9 Emergency Planning Fees 147 15 162 162 2a.4.10 Site O&M Costs 184 28 211 211 2a.4.11 Spent Fuel Pool O&M 561 84 645 645 2a.4.12 ISFSI Operating Costs 65 10 74 74 2a.4.13 Security Staff Cost 642 96 738 738 16,877 2a.4.14 DOC Staff Cost 18,869 2,830 21,699 21,699 233,211 2a.4.15 Utility Staff Cost 32,405 4,861 37,265 37,265 434,203 2a.4 Subtotal Period 2a Period-Dependent Costs 73 4,324 11 4
210 62,622 9,883 77,128 75,538 881 709 3,770 75,402 17 684,291 2a.0 TOTAL PERIOD 2a COST 1,977 26,539 12,084 7,848 1,823 27,391 76,088 35,447 189,197 168,045 15,831 5,320 108,666 67,230 3,156 459 11,901,630 276,526 691,373 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 6 of 22 Table C-1 Braidwood Nuclear Power Station, Unit 1 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:29:52 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 2b - Site Decontamination Disposal of Plant Systems 2b.1.2.1 Chemical & Volume Control 895 1,208 73 52 17 302 843 3,389 3,389 868 2,895 291,539 31,015 2b.1.2.2 Chilled Water RCA 311 21 23 64 72 111 603 603 3,376 680 198,114 4,761 2b.1.2.3 Component Cooling RCA 661 43 44 110 152 231 1,241 1,241 5,759 1,439 362,801 9,740 2b.1.2.4 Electrical 3,047 457 3,504 3,504 48,490 2b.1.2.5 Electrical - Contaminated 1,249 14 24 122 18 340 1,767 1,767 6,385 170 274,560 19,147 2b.1.2.6 Electrical - RCA 1,881 39 64 318 47 543 2,892 2,892 16,677 444 717,088 29,114 2b.1.2.7 Emergency Diesel Generator 129 19 148 148 2,066 2b.1.2.8 Essential Service Water RCA 297 21 25 72 74 109 599 599 3,797 699 216,933 4,447 2b.1.2.9 Fire Protection 122 18 141 141 1,984 2b.1.2.10 Fire Protection RCA 180 8
6 10 29 55 288 288 500 274 44,875 2,593 2b.1.2.11 HVAC-Auxiliary Building 540 11 18 91 15 156 832 832 4,772 143 206,582 8,219 2b.1.2.12 HVAC-Diesel Generator Room 43 6
50 50 682 2b.1.2.13 HVAC-Miscellaneous 42 6
48 48 656 2b.1.2.14 HVAC-Primary Containment 654 23 39 194 29 208 1,145 1,145 10,145 270 436,230 9,906 2b.1.2.15 HVAC-Turbine Building 187 28 215 215 3,177 2b.1.2.16 Instrument Air Supply 46 7
53 53 760 2b.1.2.17 Instrument Air Supply RCA 73 4
3 2
15 23 120 120 86 143 16,339 1,082 2b.1.2.18 Miscellaneous Drains 43 2
2 3
7 13 70 70 176 69 13,320 655 2b.1.2.19 Primary Containment Purge 304 23 27 87 70 113 624 624 4,544 664 244,109 4,845 2b.1.2.20 Primary Water 65 2
1 2
7 19 97 97 90 69 9,849 1,024 2b.1.2.21 Radioactive Waste Disposal 471 997 63 47 53 231 564 2,427 2,427 2,795 2,520 309,487 22,364 2b.1.2.22 Reactor Building Equipment Drains 89 107 8
6 2
34 81 326 326 82 330 32,558 2,742 2b.1.2.23 Reactor Building Floor Drains 20 50 3
2 1
11 26 112 112 76 102 12,182 1,034 2b.1.2.24 Reactor Coolant 187 10 7
2 40 59 304 304 101 378 38,001 2,806 2b.1.2.25 Residual Heat Removal 150 211 16 15 17 76 153 637 637 867 716 99,415 4,227 2b.1.2.26 Safety Injection 958 65 61 128 236 333 1,781 1,781 6,698 2,507 472,191 15,122 2b.1.2.27 Station Air RCA 36 2
1 1
7 11 58 58 39 69 7,800 525 2b.1.2.28 Station Heating RCA 120 7
7 15 25 40 214 214 789 238 53,393 1,772 2b.1.2.29 Waste Oil Sumps RCA 7
1 0
0 2
2 13 13 13 20 2,298 93 2b.1.2 Totals 1,624 13,753 459 473 1,310 1,501 4,577 23,698 19,539 4,159 68,636 14,839 4,059,664 235,048 2b.1.3 Scaffolding in support of decommissioning 1,654 9
2 10 3
417 2,095 2,095 458 29 23,188 28,306 Decontamination of Site Buildings 2b.1.4.1 Reactor 2,160 1,635 200 210 134 786 1,757 6,883 6,883 7,022 9,990 1,229,600 57,951 2b.1.4.2 Auxiliary Building 217 135 10 11 17 23 154 567 567 866 426 76,806 5,404 2b.1.4.3 Refueling Water Storage Tank 396 470 5
6 22 9
322 1,231 1,231 1,146 142 60,369 13,578 2b.1.4.4 Steam Generator Storage Facility 63 0
0 0
0 0
32 95 95 1
0 40 993 2b.1.4 Totals 2,836 2,241 215 227 172 819 2,265 8,776 8,776 9,034 10,558 1,366,815 77,926 2b.1 Subtotal Period 2b Activity Costs 4,460 17,648 684 703 1,492 2,323 7,259 34,569 30,411 4,159 78,129 25,425 5,449,667 341,281 Period 2b Additional Costs 2b.2.1 License Termination Survey Planning 940 282 1,222 1,222 6,240 2b.2 Subtotal Period 2b Additional Costs 940 282 1,222 1,222 6,240 Period 2b Collateral Costs 2b.3.1 Process liquid waste 207 157 717 923 458 2,462 2,462 2,437 198,975 475 2b.3.2 Small tool allowance 350 53 403 403 2b.3.3 Decommissioning Equipment Disposition 123 34 127 40 46 369 369 6,000 373 303,507 88 2b.3.4 Spent Fuel Capital and Transfer 21,000 3,150 24,150 24,150 2b.3 Subtotal Period 2b Collateral Costs 207 350 279 751 127 963 21,000 3,706 27,384 3,234 24,150 6,000 2,811 502,482 563 Period 2b Period-Dependent Costs 2b.4.1 Decon supplies 725 181 907 907 2b.4.2 Insurance 850 85 935 935 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 7 of 22 Table C-1 Braidwood Nuclear Power Station, Unit 1 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:29:52 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 2b Period-Dependent Costs (continued) 2b.4.3 Property taxes 1,264 126 1,390 1,390 2b.4.4 Health physics supplies 2,318 579 2,897 2,897 2b.4.5 Heavy equipment rental 4,450 668 5,118 5,118 2b.4.6 Disposal of DAW generated 15 5
276 71 367 367 4,949 98,975 23 2b.4.7 Plant energy budget 2,502 375 2,877 2,877 2b.4.8 NRC Fees 1,664 166 1,831 1,831 2b.4.9 Emergency Planning Fees 253 25 278 278 2b.4.10 Site O&M Costs 316 47 363 363 2b.4.11 Spent Fuel Pool O&M 964 145 1,109 1,109 2b.4.12 Liquid Radwaste Processing Equipment/Services 484 73 557 557 2b.4.13 ISFSI Operating Costs 111 17 128 128 2b.4.14 Security Staff Cost 1,103 165 1,269 1,269 29,009 2b.4.15 DOC Staff Cost 22,006 3,301 25,307 25,307 284,811 2b.4.16 Utility Staff Cost 37,787 5,668 43,455 43,455 530,066 2b.4 Subtotal Period 2b Period-Dependent Costs 725 6,768 15 5
276 69,303 11,694 88,786 87,272 1,514 4,949 98,975 23 843,886 2b.0 TOTAL PERIOD 2b COST 5,393 24,766 978 1,459 1,619 3,562 91,243 22,941 151,961 122,138 25,664 4,159 84,129 33,184 6,051,124 341,867 850,126 PERIOD 2d - Delay before License Termination Period 2d Period-Dependent Costs 2d.4.1 Insurance 627 63 690 690 2d.4.2 Property taxes 932 93 1,025 1,025 2d.4.3 Health physics supplies 142 35 177 177 2d.4.4 Disposal of DAW generated 1
0 10 3
14 14 186 3,720 1
2d.4.5 Plant energy budget 2d.4.6 NRC Fees 340 34 374 374 2d.4.7 Emergency Planning Fees 186 19 205 205 2d.4.8 Site O&M Costs 233 35 268 268 2d.4.9 ISFSI Operating Costs 82 12 94 94 2d.4.10 Security Staff Cost 444 67 510 510 11,674 2d.4.11 Utility Staff Cost 1,917 288 2,205 2,205 27,240 2d.4 Subtotal Period 2d Period-Dependent Costs 142 1
0 10 4,762 648 5,563 5,264 299 186 3,720 1
38,914 2d.0 TOTAL PERIOD 2d COST 142 1
0 10 4,762 648 5,563 5,264 299 186 3,720 1
38,914 PERIOD 2e - License Termination Period 2e Direct Decommissioning Activities 2e.1.1 ORISE confirmatory survey 151 45 197 197 2e.1.2 Terminate license a
2e.1 Subtotal Period 2e Activity Costs 151 45 197 197 Period 2e Additional Costs 2e.2.1 License Termination Survey 6,204 1,861 8,065 8,065 97,350 3,120 2e.2 Subtotal Period 2e Additional Costs 6,204 1,861 8,065 8,065 97,350 3,120 Period 2e Collateral Costs 2e.3.1 DOC staff relocation expenses 1,130 169 1,299 1,299 2e.3 Subtotal Period 2e Collateral Costs 1,130 169 1,299 1,299 Period 2e Period-Dependent Costs 2e.4.1 Insurance 229 23 252 252 2e.4.2 Property taxes 376 38 414 414 2e.4.3 Health physics supplies 629 157 786 786 2e.4.4 Disposal of DAW generated 1
0 19 5
25 25 337 6,734 2
2e.4.5 Plant energy budget 199 30 229 229 2e.4.6 NRC Fees 532 53 585 585 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 8 of 22 Table C-1 Braidwood Nuclear Power Station, Unit 1 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:29:52 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 2e Period-Dependent Costs (continued) 2e.4.7 Emergency Planning Fees 75 8
83 83 2e.4.8 Site O&M Costs 94 14 108 108 2e.4.9 ISFSI Operating Costs 33 5
38 38 2e.4.10 Security Staff Cost 1,192 179 1,371 1,371 27,893 2e.4.11 DOC Staff Cost 3,801 570 4,371 4,371 46,750 2e.4.12 Utility Staff Cost 4,795 719 5,514 5,514 60,107 2e.4 Subtotal Period 2e Period-Dependent Costs 629 1
0 19 11,326 1,800 13,776 13,655 121 337 6,734 2
134,750 2e.0 TOTAL PERIOD 2e COST 629 1
0 19 18,811 3,876 23,337 23,216 121 337 6,734 97,352 137,870 PERIOD 2 TOTALS 7,370 52,076 13,063 9,308 3,442 30,982 190,904 62,912 370,058 318,663 41,916 9,479 192,795 100,937 3,156 459 17,963,210 715,746 1,718,283 PERIOD 3b - Site Restoration Period 3b Direct Decommissioning Activities Demolition of Remaining Site Buildings 3b.1.1.1 Reactor 6,763 1,014 7,778 7,778 69,546 3b.1.1.2 Auxiliary Building 5,798 870 6,667 6,667 61,037 3b.1.1.3 Refueling Water Storage Tank 1,028 154 1,182 1,182 11,692 3b.1.1.4 Steam Generator Storage Facility 429 64 493 493 4,559 3b.1.1.5 Turbine Building 5,769 865 6,634 6,634 70,342 3b.1.1.6 Turbine Pedestal 1,352 203 1,555 1,555 12,628 3b.1.1 Totals 21,138 3,171 24,309 24,309 229,805 Site Closeout Activities 3b.1.2 Grade & landscape site 716 107 823 823 1,942 3b.1.3 Final report to NRC 184 28 212 212 1,560 3b.1 Subtotal Period 3b Activity Costs 21,854 184 3,306 25,343 212 25,132 231,747 1,560 Period 3b Additional Costs 3b.2.1 Concrete Crushing 603 3
91 697 697 2,798 3b.2 Subtotal Period 3b Additional Costs 603 3
91 697 697 2,798 Period 3b Collateral Costs 3b.3.1 Small tool allowance 256 38 294 294 3b.3 Subtotal Period 3b Collateral Costs 256 38 294 294 Period 3b Period-Dependent Costs 3b.4.1 Insurance 754 75 829 829 3b.4.2 Property taxes 1,239 124 1,363 1,363 3b.4.3 Heavy equipment rental 6,239 936 7,174 7,174 3b.4.4 Plant energy budget 327 49 376 75 301 3b.4.5 NRC ISFSI Fees 244 24 268 268 3b.4.6 Emergency Planning Fees 248 25 273 273 3b.4.7 ISFSI Operating Costs 109 16 125 125 3b.4.8 Site O&M Cost 310 46 356 356 3b.4.9 Security Staff Cost 3,751 563 4,313 (0) 3,537 776 87,294 3b.4.10 DOC Staff Cost 11,650 1,748 13,398 13,398 137,043 3b.4.11 Utility Staff Cost 7,035 1,055 8,090 (0) 1,537 6,553 87,294 3b.4 Subtotal Period 3b Period-Dependent Costs 6,239 25,665 4,661 36,565 (0) 8,007 28,558 311,630 3b.0 TOTAL PERIOD 3b COST 28,952 25,852 8,096 62,900 212 8,007 54,682 234,545 313,190 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 9 of 22 Table C-1 Braidwood Nuclear Power Station, Unit 1 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:29:52 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 3c - Fuel Storage Operations/Shipping Period 3c Direct Decommissioning Activities Period 3c Collateral Costs 3c.3.1 Spent Fuel Capital and Transfer 7,500 1,125 8,625 8,625 3c.3 Subtotal Period 3c Collateral Costs 7,500 1,125 8,625 8,625 Period 3c Period-Dependent Costs 3c.4.1 Insurance 2,619 262 2,881 2,881 3c.4.2 Property taxes 4,307 431 4,737 4,737 3c.4.3 Plant energy budget 3c.4.4 NRC ISFSI Fees 1,269 127 1,396 1,396 3c.4.5 Emergency Planning Fees 861 86 947 947 3c.4.6 Site O&M Costs 1,077 161 1,238 1,238 3c.4.7 ISFSI Operating Costs 379 57 436 436 3c.4.8 Security Staff Cost 10,731 1,610 12,341 12,341 242,691 3c.4.9 Utility Staff Cost 4,656 698 5,354 5,354 60,763 3c.4 Subtotal Period 3c Period-Dependent Costs 25,900 3,432 29,332 29,332 303,454 3c.0 TOTAL PERIOD 3c COST 33,400 4,557 37,957 37,957 303,454 PERIOD 3d - GTCC shipping Period 3d Direct Decommissioning Activities Nuclear Steam Supply System Removal 3d.1.1.1 Vessel & Internals GTCC Disposal 375 11,837 1,813 14,025 14,025 505 104,146 3d.1.1 Totals 375 11,837 1,813 14,025 14,025 505 104,146 3d.1 Subtotal Period 3d Activity Costs 375 11,837 1,813 14,025 14,025 505 104,146 Period 3d Period-Dependent Costs 3d.4.1 Insurance 12 1
13 13 3d.4.2 Property taxes 19 2
21 21 3d.4.3 Plant energy budget 3d.4.4 NRC ISFSI Fees 7
1 8
8 3d.4.5 Emergency Planning Fees 4
0 4
4 3d.4.6 Site O&M Costs 5
1 6
6 3d.4.7 ISFSI Operating Costs 2
0 2
2 3d.4.8 Security Staff Cost 48 7
55 55 1,080 3d.4.9 Utility Staff Cost 21 3
24 24 270 3d.4 Subtotal Period 3d Period-Dependent Costs 117 15 132 132 1,350 3d.0 TOTAL PERIOD 3d COST 375 11,837 117 1,829 14,158 14,025 132 505 104,146 1,350 PERIOD 3e - ISFSI Decontamination Period 3e Direct Decommissioning Activities Period 3e Additional Costs 3e.2.1 ISFSI License Termination 41 1
24 90 719 143 1,017 1,017 1,703 142,573 2,775 1,280 3e.2 Subtotal Period 3e Additional Costs 41 1
24 90 719 143 1,017 1,017 1,703 142,573 2,775 1,280 Period 3e Collateral Costs 3e.3.1 Small tool allowance 1
0 1
1 3e.3 Subtotal Period 3e Collateral Costs 1
0 1
1 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 10 of 22 Table C-1 Braidwood Nuclear Power Station, Unit 1 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:29:52 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 3e Period-Dependent Costs 3e.4.1 Insurance 99 10 109 109 3e.4.2 Property taxes 163 16 179 179 3e.4.3 Heavy equipment rental 222 33 256 256 3e.4.4 Plant energy budget 3e.4.5 Site O&M Costs 41 6
47 47 3e.4.6 Security Staff Cost 109 16 125 125 2,468 3e.4.7 Utility Staff Cost 147 22 169 169 1,870 3e.4 Subtotal Period 3e Period-Dependent Costs 222 559 104 885 885 4,338 3e.0 TOTAL PERIOD 3e COST 264 1
24 90 1,278 247 1,903 1,903 1,703 142,573 2,775 5,618 PERIOD 3f - ISFSI Site Restoration Period 3f Direct Decommissioning Activities Period 3f Additional Costs 3f.2.1 ISFSI Demolition and Site Restoration 1,303 24 199 1,527 1,527 16,256 80 3f.2 Subtotal Period 3f Additional Costs 1,303 24 199 1,527 1,527 16,256 80 Period 3f Collateral Costs 3f.3.1 Small tool allowance 18 3
20 20 3f.3 Subtotal Period 3f Collateral Costs 18 3
20 20 Period 3f Period-Dependent Costs 3f.4.1 Insurance 3f.4.2 Property taxes 86 9
95 95 3f.4.3 Heavy equipment rental 91 14 105 105 3f.4.4 Plant energy budget 3f.4.5 Site O&M Costs 22 3
25 25 3f.4.6 Security Staff Cost 58 9
66 66 1,307 3f.4.7 Utility Staff Cost 64 10 73 73 810 3f.4 Subtotal Period 3f Period-Dependent Costs 91 229 44 364 364 2,117 3f.0 TOTAL PERIOD 3f COST 1,412 253 245 1,910 1,910 16,256 2,197 PERIOD 3 TOTALS 30,627 376 24 11,927 60,900 14,975 118,828 14,237 49,909 54,682 1,703 505 246,719 253,576 625,810 TOTAL COST TO DECOMMISSION 10,285 85,095 13,523 9,709 3,442 46,342 361,819 97,071 627,287 442,250 119,415 65,622 192,795 103,983 4,045 459 505 18,350,470 1,001,139 3,180,868 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 11 of 22 Table C-1 Braidwood Nuclear Power Station, Unit 1 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:29:52 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours TOTAL COST TO DECOMMISSION WITH 18.31% CONTINGENCY:
$627,287 thousands of 2009 dollars TOTAL NRC LICENSE TERMINATION COST IS 70.5% OR:
$442,250 thousands of 2009 dollars SPENT FUEL MANAGEMENT COST IS 19.04% OR:
$119,415 thousands of 2009 dollars NON-NUCLEAR DEMOLITION COST IS 10.46% OR:
$65,622 thousands of 2009 dollars TOTAL LOW-LEVEL RADIOACTIVE WASTE VOLUME BURIED (EXCLUDING GTCC):
108,487 cubic feet TOTAL GREATER THAN CLASS C RADWASTE VOLUME GENERATED:
505 cubic feet TOTAL SCRAP METAL REMOVED:
57,807 tons TOTAL CRAFT LABOR REQUIREMENTS:
1,001,139 man-hours End Notes:
n/a - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
0 - indicates that this value is less than 0.5 but is non-zero.
a cell containing " - " indicates a zero value TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 12 of 22 Table C-2 Braidwood Nuclear Power Station, Unit 2 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:30:10 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 1a - Shutdown through Transition Period 1a Direct Decommissioning Activities 1a.1.1 Prepare preliminary decommissioning cost 66 10 76 76 556 1a.1.2 Notification of Cessation of Operations a
1a.1.3 Remove fuel & source material n/a 1a.1.4 Notification of Permanent Defueling a
1a.1.5 Deactivate plant systems & process waste a
1a.1.6 Prepare and submit PSDAR 101 15 116 116 856 1a.1.7 Review plant dwgs & specs.
232 35 267 267 1,969 1a.1.8 Perform detailed rad survey a
1a.1.9 Estimate by-product inventory 51 8
58 58 428 1a.1.10 End product description 51 8
58 58 428 1a.1.11 Detailed by-product inventory 66 10 76 76 556 1a.1.12 Define major work sequence 379 57 436 436 3,210 1a.1.13 Perform SER and EA 157 23 180 180 1,327 1a.1.14 Perform Site-Specific Cost Study 253 38 290 290 2,140 1a.1.15 Prepare/submit License Termination Plan 207 31 238 238 1,753 1a.1.16 Receive NRC approval of termination plan a
Activity Specifications 1a.1.17.1 Plant & temporary facilities 249 37 286 257 29 2,106 1a.1.17.2 Plant systems 210 32 242 218 24 1,783 1a.1.17.3 NSSS Decontamination Flush 25 4
29 29 214 1a.1.17.4 Reactor internals 359 54 412 412 3,039 1a.1.17.5 Reactor vessel 328 49 378 378 2,782 1a.1.17.6 Biological shield 25 4
29 29 214 1a.1.17.7 Steam generators 158 24 181 181 1,335 1a.1.17.8 Reinforced concrete 81 12 93 46 46 685 1a.1.17.9 Main Turbine 20 3
23 23 171 1a.1.17.10 Main Condensers 20 3
23 23 171 1a.1.17.11 Plant structures & buildings 158 24 181 91 91 1,335 1a.1.17.12 Waste management 232 35 267 267 1,969 1a.1.17.13 Facility & site closeout 45 7
52 26 26 385 1a.1.17 Total 1,911 287 2,197 1,935 262 16,190 Planning & Site Preparations 1a.1.18 Prepare dismantling sequence 121 18 139 139 1,027 1a.1.19 Plant prep. & temp. svces 2,800 420 3,220 3,220 1a.1.20 Design water clean-up system 71 11 81 81 599 1a.1.21 Rigging/Cont. Cntrl Envlps/tooling/etc.
2,200 330 2,530 2,530 1a.1.22 Procure casks/liners & containers 62 9
71 71 526 1a.1 Subtotal Period 1a Activity Costs 8,725 1,309 10,034 9,771 262 31,566 Period 1a Additional Costs 1a.2.1 ISFSI Expansion 9,900 1,485 11,385 11,385 1a.2 Subtotal Period 1a Additional Costs 9,900 1,485 11,385 11,385 Period 1a Collateral Costs 1a.3.1 Spent Fuel Capital and Transfer 8,000 1,200 9,200 9,200 1a.3 Subtotal Period 1a Collateral Costs 8,000 1,200 9,200 9,200 Period 1a Period-Dependent Costs 1a.4.1 Insurance 751 75 826 826 1a.4.2 Property taxes 1a.4.3 Health physics supplies 396 99 496 496 1a.4.4 Heavy equipment rental 421 63 484 484 1a.4.5 Disposal of DAW generated 2
1 32 8
42 42 565 11,299 3
TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 13 of 22 Table C-2 Braidwood Nuclear Power Station, Unit 2 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:30:10 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 1a Period-Dependent Costs (continued) 1a.4.6 Plant energy budget 1,319 198 1,517 1,517 1a.4.7 NRC Fees 471 47 518 518 1a.4.8 Emergency Planning Fees 315 32 347 347 1a.4.9 Site O&M Costs 125 19 144 144 1a.4.10 Spent Fuel Pool O&M 381 57 438 438 1a.4.11 ISFSI Operating Costs 44 7
51 51 1a.4.12 Security Staff Cost 6,337 950 7,287 7,287 157,471 1a.4.13 Utility Staff Cost 24,828 3,724 28,552 28,552 346,229 1a.4 Subtotal Period 1a Period-Dependent Costs 817 2
1 32 34,571 5,279 40,700 39,865 836 565 11,299 3
503,700 1a.0 TOTAL PERIOD 1a COST 817 2
1 32 61,196 9,273 71,319 49,636 21,421 262 565 11,299 3
535,266 PERIOD 1b - Decommissioning Preparations Period 1b Direct Decommissioning Activities Detailed Work Procedures 1b.1.1.1 Plant systems 239 36 275 247 27 2,026 1b.1.1.2 NSSS Decontamination Flush 51 8
58 58 428 1b.1.1.3 Reactor internals 126 19 145 145 1,070 1b.1.1.4 Remaining buildings 68 10 78 20 59 578 1b.1.1.5 CRD cooling assembly 51 8
58 58 428 1b.1.1.6 CRD housings & ICI tubes 51 8
58 58 428 1b.1.1.7 Incore instrumentation 51 8
58 58 428 1b.1.1.8 Reactor vessel 183 28 211 211 1,554 1b.1.1.9 Facility closeout 61 9
70 35 35 514 1b.1.1.10 Missile shields 23 3
26 26 193 1b.1.1.11 Biological shield 61 9
70 70 514 1b.1.1.12 Steam generators 232 35 267 267 1,969 1b.1.1.13 Reinforced concrete 51 8
58 29 29 428 1b.1.1.14 Main Turbine 79 12 91 91 668 1b.1.1.15 Main Condensers 79 12 91 91 668 1b.1.1.16 Auxiliary building 138 21 159 143 16 1,168 1b.1.1.17 Reactor building 138 21 159 143 16 1,168 1b.1.1 Total 1,679 252 1,931 1,568 363 14,228 1b.1.2 Decon primary loop 574 287 861 861 1,067 1b.1 Subtotal Period 1b Activity Costs 574 1,679 539 2,792 2,429 363 1,067 14,228 Period 1b Additional Costs 1b.2.1 Site Characterization 2,657 797 3,454 3,454 12,779 4,547 1b.2.2 Spent Fuel Pool Isolation 9,690 1,453 11,143 11,143 1b.2 Subtotal Period 1b Additional Costs 12,346 2,250 14,597 14,597 12,779 4,547 Period 1b Collateral Costs 1b.3.1 Decon equipment 811 122 932 932 1b.3.2 DOC staff relocation expenses 1,130 169 1,299 1,299 1b.3.3 Process liquid waste 56 76 350 3,070 856 4,408 4,408 371 806 111,694 229 1b.3.4 Small tool allowance 2
0 2
2 1b.3.5 Pipe cutting equipment 1,100 165 1,265 1,265 1b.3.6 Decon rig 1,400 210 1,610 1,610 1b.3.7 Spent Fuel Capital and Transfer 4,000 600 4,600 4,600 1b.3 Subtotal Period 1b Collateral Costs 2,267 1,102 76 350 3,070 5,130 2,122 14,117 9,517 4,600 371 806 111,694 229 Period 1b Period-Dependent Costs 1b.4.1 Decon supplies 25 6
31 31 1b.4.2 Insurance 376 38 414 414 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 14 of 22 Table C-2 Braidwood Nuclear Power Station, Unit 2 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:30:10 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 1b Period-Dependent Costs (continued) 1b.4.3 Property taxes 3,240 324 3,564 3,564 1b.4.4 Health physics supplies 219 55 274 274 1b.4.5 Heavy equipment rental 211 32 242 242 1b.4.6 Disposal of DAW generated 1
0 18 5
24 24 325 6,507 1
1b.4.7 Plant energy budget 1,323 198 1,521 1,521 1b.4.8 NRC Fees 236 24 260 260 1b.4.9 Emergency Planning Fees 158 16 174 174 1b.4.10 Site O&M Costs 63 9
72 72 1b.4.11 Spent Fuel Pool O&M 191 29 220 220 1b.4.12 ISFSI Operating Costs 22 3
25 25 1b.4.13 Security Staff Cost 3,177 477 3,654 3,654 78,951 1b.4.14 DOC Staff Cost 3,689 553 4,242 4,242 47,057 1b.4.15 Utility Staff Cost 12,448 1,867 14,315 14,315 173,589 1b.4 Subtotal Period 1b Period-Dependent Costs 25 430 1
0 18 24,923 3,635 29,032 28,614 419 325 6,507 1
299,597 1b.0 TOTAL PERIOD 1b COST 2,866 1,532 77 351 3,088 44,078 8,547 60,539 55,157 5,019 363 697 806 118,201 14,077 318,372 PERIOD 1 TOTALS 2,866 2,349 78 351 3,120 105,274 17,820 131,858 104,793 26,440 626 1,262 806 129,500 14,079 853,638 PERIOD 2a - Large Component Removal Period 2a Direct Decommissioning Activities Nuclear Steam Supply System Removal 2a.1.1.1 Reactor Coolant Piping 212 177 33 39 341 245 1,048 1,048 1,728 208,992 6,092 2a.1.1.2 Pressurizer Relief Tank 36 32 6
8 60 43 184 184 329 36,553 1,072 2a.1.1.3 Reactor Coolant Pumps & Motors 115 118 96 180 1,272 442 2,224 2,224 4,796 780,540 4,291 100 2a.1.1.4 Pressurizer 54 68 399 96 412 201 1,230 1,230 3,033 252,826 2,482 938 2a.1.1.5 Steam Generators 433 4,168 2,266 2,428 580 3,416 2,790 16,080 16,080 39,289 14,436 3,278,518 23,233 2,125 2a.1.1.6 CRDMs/ICIs/Service Structure Removal 101 80 176 42 59 109 568 568 2,843 50,181 2,843 2a.1.1.7 Reactor Vessel Internals 140 2,193 4,483 893 8,060 233 7,123 23,125 23,125 1,377 903 459 326,029 26,933 1,209 2a.1.1.8 Reactor Vessel 106 4,162 1,501 691 7,847 233 7,681 22,220 22,220 6,606 2,254 978,589 26,933 1,209 2a.1.1 Totals 1,197 10,998 8,960 4,376 580 21,467 466 18,634 66,678 66,678 39,289 35,149 3,156 459 5,912,228 93,880 5,582 Removal of Major Equipment 2a.1.2 Main Turbine/Generator 650 388 38 203 284 309 1,872 1,872 5,088 2,833 686,663 10,223 2a.1.3 Main Condensers 1,312 170 59 143 211 428 2,324 2,324 6,756 1,992 482,702 20,428 Cascading Costs from Clean Building Demolition 2a.1.4.1 Reactor 1,171 176 1,346 1,346 12,130 2a.1.4.2 Auxiliary Building 655 98 754 754 6,896 2a.1.4.3 Radwaste/Service Building 429 64 494 494 5,059 2a.1.4.4 Refueling Water Storage Tank 114 17 131 131 1,299 2a.1.4.5 Fuel Handling Building 337 51 388 388 3,690 2a.1.4 Totals 2,707 406 3,113 3,113 29,074 Disposal of Plant Systems 2a.1.5.1 Auxiliary Feedwater 71 11 82 82 1,143 2a.1.5.2 Auxiliary Steam 130 20 150 150 2,107 2a.1.5.3 Auxiliary Steam RCA 357 16 15 33 59 113 594 594 1,717 562 120,095 5,268 2a.1.5.4 Boric Acid Processing 466 511 36 27 20 145 408 1,612 1,612 1,071 1,516 166,316 14,426 2a.1.5.5 CO2 & H2 18 3
20 20 289 2a.1.5.6 CO2 & H2 RCA 34 2
2 3
6 11 58 58 170 61 12,266 482 2a.1.5.7 Chemical Feed 165 25 190 190 2,663 2a.1.5.8 Chemical Feed at Intake 23 3
26 26 364 2a.1.5.9 Chilled Water 91 14 104 104 1,454 2a.1.5.10 Circulating Water 542 81 624 624 8,814 2a.1.5.11 Condensate 333 50 383 383 5,317 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 15 of 22 Table C-2 Braidwood Nuclear Power Station, Unit 2 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:30:10 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Disposal of Plant Systems (continued) 2a.1.5.12 Condensate Booster 332 50 382 382 5,314 2a.1.5.13 Condensate Cleanup 182 27 209 209 3,000 2a.1.5.14 Containment Spray 251 17 18 49 56 88 478 478 2,569 527 151,430 3,698 2a.1.5.15 Diesel Fuel Oil 180 27 207 207 2,848 2a.1.5.16 Essential Service Water 311 47 358 358 5,049 2a.1.5.17 Extraction Steam 223 33 256 256 3,637 2a.1.5.18 Feedwater 303 45 348 348 4,925 2a.1.5.19 Feedwater Drains 719 108 827 827 11,719 2a.1.5.20 Gland Steam 38 6
43 43 616 2a.1.5.21 Gland Water 28 4
32 32 458 2a.1.5.22 Main Steam 308 46 354 354 4,979 2a.1.5.23 Main Steam RCA 84 4
5 13 17 28 152 152 670 162 41,728 1,256 2a.1.5.24 Make-up Demineralizer 155 23 179 179 2,595 2a.1.5.25 Nitrogen 1
0 1
1 18 2a.1.5.26 Non-Essential Service Water 361 54 416 416 5,903 2a.1.5.27 Non-Essential Service Water RCA 179 19 20 50 70 74 411 411 2,611 658 165,090 2,562 2a.1.5.28 Off Gas 734 35 38 96 128 239 1,271 1,271 5,026 1,212 312,797 11,268 2a.1.5.29 Potable Water 5
1 6
6 75 2a.1.5.30 Process Radiation Monitoring 72 1
1 1
3 19 98 98 75 33 5,961 1,214 2a.1.5.31 Process Sampling 160 3
3 9
9 44 229 229 466 89 26,924 2,632 2a.1.5.32 Screen Wash 45 7
52 52 740 2a.1.5.33 Station Air 43 6
50 50 705 2a.1.5.34 Station Heating 147 22 169 169 2,391 2a.1.5.35 Steam Humidification 7
1 8
8 115 2a.1.5.36 Switchgear Heat Removal 33 5
38 38 519 2a.1.5.37 Turbine Bldg Equip Drains 76 11 88 88 1,235 2a.1.5.38 Turbine Bldg Floor Drains 131 20 150 150 2,117 2a.1.5.39 Turbine Oil 83 12 96 96 1,359 2a.1.5.40 Turbine-Generator Auxilaries 56 8
64 64 884 2a.1.5.41 Waste Oil Sumps 32 5
37 37 517 2a.1.5.42 Well Water 79 12 90 90 1,247 2a.1.5 Totals 466 7,631 133 128 274 494 1,813 10,940 4,903 6,037 14,375 4,820 1,002,607 127,918 2a.1.6 Scaffolding in support of decommissioning 1,627 10 2
10 3
410 2,062 2,062 473 29 23,936 27,854 2a.1 Subtotal Period 2a Activity Costs 1,663 24,926 9,661 4,603 1,211 22,459 466 22,000 86,989 80,951 6,037 65,980 44,823 3,156 459 8,108,137 309,377 5,582 Period 2a Collateral Costs 2a.3.1 Process liquid waste 146 77 347 379 227 1,175 1,175 1,192 81,594 232 2a.3.2 Small tool allowance 316 47 363 327 36 2a.3.3 Spent Fuel Capital and Transfer 12,000 1,800 13,800 13,800 2a.3 Subtotal Period 2a Collateral Costs 146 316 77 347 379 12,000 2,075 15,339 1,502 13,800 36 1,192 81,594 232 Period 2a Period-Dependent Costs 2a.4.1 Decon supplies 73 18 91 91 2a.4.2 Insurance 494 49 544 544 2a.4.3 Property taxes 6,445 644 7,089 6,380 709 2a.4.4 Health physics supplies 1,842 460 2,302 2,302 2a.4.5 Heavy equipment rental 2,610 392 3,002 3,002 2a.4.6 Disposal of DAW generated 11 4
210 54 280 280 3,771 75,415 17 2a.4.7 Plant energy budget 1,844 277 2,120 2,120 2a.4.8 NRC Fees 663 66 729 729 2a.4.9 Emergency Planning Fees 147 15 162 162 2a.4.10 Site O&M Costs 184 28 211 211 2a.4.11 Spent Fuel Pool O&M 561 84 645 645 2a.4.12 ISFSI Operating Costs 65 10 74 74 2a.4.13 Security Staff Cost 7,893 1,184 9,077 9,077 194,087 2a.4.14 DOC Staff Cost 18,869 2,830 21,699 21,699 233,211 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 16 of 22 Table C-2 Braidwood Nuclear Power Station, Unit 2 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:30:10 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 2a Period-Dependent Costs (continued) 2a.4.15 Utility Staff Cost 32,045 4,807 36,852 36,852 431,073 2a.4 Subtotal Period 2a Period-Dependent Costs 73 4,452 11 4
210 69,209 10,918 84,878 83,288 881 709 3,771 75,415 17 858,371 2a.0 TOTAL PERIOD 2a COST 1,882 29,694 9,749 4,954 1,211 23,048 81,674 34,993 187,205 165,742 14,681 6,783 65,980 49,786 3,156 459 8,265,146 309,627 863,953 PERIOD 2b - Site Decontamination Period 2b Direct Decommissioning Activities Disposal of Plant Systems 2b.1.1.1 Chemical & Volume Control 834 1,155 69 50 17 291 795 3,212 3,212 909 2,787 283,146 29,248 2b.1.1.2 Chilled Water RCA 647 48 43 71 191 232 1,233 1,233 3,736 1,808 313,840 9,257 2b.1.1.3 Component Cooling 687 45 47 121 160 242 1,302 1,302 6,342 1,513 393,115 10,143 2b.1.1.4 Electrical 4,168 625 4,793 4,793 66,259 2b.1.1.5 Electrical - Contaminated 1,896 20 35 172 25 514 2,663 2,663 9,033 240 388,394 28,801 2b.1.1.6 Electrical - RCA 2,460 48 78 389 57 704 3,737 3,737 20,387 542 876,577 37,570 2b.1.1.7 Emergency Diesel Generator 95 14 109 109 1,514 2b.1.1.8 Essential Service Water RCA 333 39 45 129 140 148 835 835 6,764 1,325 393,573 5,007 2b.1.1.9 Fire Protection 307 46 353 353 4,983 2b.1.1.10 Fire Protection RCA 521 36 36 76 137 185 990 990 3,961 1,298 277,242 7,443 2b.1.1.11 HVAC-Auxiliary Building 588 12 20 102 15 170 909 909 5,365 141 230,495 9,018 2b.1.1.12 HVAC-Control Room HVAC 8
1 9
9 127 2b.1.1.13 HVAC-Diesel Generator Room 43 6
50 50 686 2b.1.1.14 HVAC-Laboratory 20 3
23 23 315 2b.1.1.15 HVAC-Machine Shop 18 3
21 21 297 2b.1.1.16 HVAC-Primary Containment 654 23 39 194 29 208 1,145 1,145 10,145 270 436,230 9,906 2b.1.1.17 HVAC-Pumphouse 17 3
20 20 275 2b.1.1.18 HVAC-Radwaste 336 7
12 60 9
98 522 522 3,160 84 135,891 5,013 2b.1.1.19 HVAC-Turbine Building 186 28 214 214 3,158 2b.1.1.20 Instrument Air Supply 72 11 83 83 1,197 2b.1.1.21 Instrument Air Supply RCA 240 9
7 8
32 71 368 368 437 306 45,151 3,581 2b.1.1.22 Miscellaneous Drains 81 3
3 7
13 25 133 133 377 121 26,209 1,242 2b.1.1.23 Primary Containment Purge 321 23 27 85 73 118 647 647 4,466 687 242,950 5,082 2b.1.1.24 Primary Water 887 59 55 144 181 303 1,629 1,629 7,569 2,154 460,483 14,115 2b.1.1.25 Radioactive Waste Disposal 2,661 2,967 215 160 110 873 2,353 9,339 9,339 5,771 9,024 973,971 83,600 2b.1.1.26 Reactor Bldg Equipment Drains 109 116 10 8
3 47 98 392 392 170 446 46,524 2,908 2b.1.1.27 Reactor Building Floor Drains 19 44 2
2 1
10 24 103 103 75 92 11,255 942 2b.1.1.28 Reactor Coolant 177 9
6 2
37 56 288 288 104 351 35,666 2,678 2b.1.1.29 Residual Heat Removal 139 204 16 15 16 74 145 608 608 849 696 96,886 3,992 2b.1.1.30 Safety Injection 931 63 59 126 228 324 1,730 1,730 6,576 2,428 460,194 14,716 2b.1.1.31 Station Air RCA 56 3
2 1
12 18 93 93 69 115 13,089 822 2b.1.1.32 Station Heating RCA 244 15 14 26 56 83 437 437 1,372 529 103,157 3,574 2b.1.1.33 Waste Oil Sumps RCA 25 1
1 1
4 8
40 40 78 38 6,630 363 2b.1.1.34 Waste Water Treatment 89 13 102 102 1,464 2b.1.1 Totals 3,763 20,595 777 764 1,865 2,693 7,673 38,131 32,354 5,777 97,714 26,996 6,250,668 369,294 2b.1.2 Scaffolding in support of decommissioning 2,034 12 3
13 4
513 2,578 2,578 591 37 29,920 34,817 Decontamination of Site Buildings 2b.1.3.1 Reactor 2,160 1,635 200 210 134 786 1,757 6,883 6,883 7,022 9,990 1,229,600 57,951 2b.1.3.2 Auxiliary Building 256 165 13 15 17 33 184 683 683 866 613 95,479 6,417 2b.1.3.3 Radwaste/Service Building 168 76 11 12 6
29 114 416 416 322 540 66,188 3,700 2b.1.3.4 Refueling Water Storage Tank 396 470 5
6 22 9
322 1,231 1,231 1,146 142 60,369 13,578 2b.1.3 Totals 2,980 2,346 230 243 179 858 2,377 9,213 9,213 9,355 11,284 1,451,636 81,646 2b.1 Subtotal Period 2b Activity Costs 6,743 24,975 1,019 1,010 2,056 3,555 10,563 49,921 44,145 5,777 107,661 38,317 7,732,224 485,757 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 17 of 22 Table C-2 Braidwood Nuclear Power Station, Unit 2 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:30:10 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 2b Collateral Costs 2b.3.1 Process liquid waste 294 248 1,139 1,519 722 3,923 3,923 3,861 327,363 753 2b.3.2 Small tool allowance 498 75 573 573 2b.3.3 Spent Fuel Capital and Transfer 22,000 3,300 25,300 25,300 2b.3 Subtotal Period 2b Collateral Costs 294 498 248 1,139 1,519 22,000 4,097 29,796 4,496 25,300 3,861 327,363 753 Period 2b Period-Dependent Costs 2b.4.1 Decon supplies 777 194 971 971 2b.4.2 Insurance 850 85 935 935 2b.4.3 Property taxes 1,264 126 1,390 1,390 2b.4.4 Health physics supplies 2,974 744 3,718 3,718 2b.4.5 Heavy equipment rental 4,450 668 5,118 5,118 2b.4.6 Disposal of DAW generated 19 7
363 94 482 482 6,497 129,939 30 2b.4.7 Plant energy budget 2,502 375 2,877 2,877 2b.4.8 NRC Fees 1,547 155 1,702 1,702 2b.4.9 Emergency Planning Fees 253 25 278 278 2b.4.10 Site O&M Costs 316 47 363 363 2b.4.11 Spent Fuel Pool O&M 1,733 260 1,992 1,992 2b.4.12 Liquid Radwaste Processing Equipment/Services 484 73 557 557 2b.4.13 ISFSI Operating Costs 111 17 128 128 2b.4.14 Security Staff Cost 13,567 2,035 15,602 15,602 333,599 2b.4.15 DOC Staff Cost 31,199 4,680 35,879 35,879 385,023 2b.4.16 Utility Staff Cost 53,549 8,032 61,581 61,581 714,666 2b.4 Subtotal Period 2b Period-Dependent Costs 777 7,424 19 7
363 107,374 17,609 133,573 131,175 2,398 6,497 129,939 30 1,433,287 2b.0 TOTAL PERIOD 2b COST 7,813 32,898 1,287 2,157 2,056 5,436 129,374 32,270 213,290 179,815 27,698 5,777 107,661 48,675 8,189,525 486,540 1,433,287 PERIOD 2c - Decontamination Following Wet Fuel Storage Period 2c Direct Decommissioning Activities 2c.1.1 Remove spent fuel racks 1,208 118 313 95 590 827 3,151 3,151 5,572 499,920 2,174 Disposal of Plant Systems 2c.1.2.1 Fuel Handling Bldg Equip Drains 177 11 9
14 38 58 307 307 738 397 62,254 2,688 2c.1.2.2 Fuel Handling Bldg Equip Drains (Unit 1) 32 1
1 1
5 10 49 49 37 49 5,918 475 2c.1.2.3 Fuel Handling Bldg Floor Drains 181 11 8
10 41 59 312 312 524 409 56,293 2,736 2c.1.2.4 Fuel Handling Bldg Floor Drains (Unit 1) 126 7
5 9
24 40 212 212 465 245 39,201 1,954 2c.1.2.5 Fuel Pool Cooling & Cleanup 241 15 14 16 67 83 435 435 830 635 90,354 3,663 2c.1.2.6 Fuel Pool Cooling & Cleanup (Unit 1) 223 14 13 15 61 77 403 403 805 578 84,182 3,417 2c.1.2.7 HVAC-Miscellaneous 110 17 127 127 1,769 2c.1.2.8 Tritium ALPS 106 403 15 20 90 26 178 838 838 4,691 293 212,816 8,043 2c.1.2 Totals 106 1,493 75 70 154 262 522 2,682 2,556 127 8,091 2,607 551,018 24,744 Decontamination of Site Buildings 2c.1.3.1 Fuel Handling Building 1,130 1,306 21 24 59 43 917 3,501 3,501 3,097 736 198,355 38,107 2c.1.3 Totals 1,130 1,306 21 24 59 43 917 3,501 3,501 3,097 736 198,355 38,107 2c.1.4 Scaffolding in support of decommissioning 407 2
1 3
1 103 516 516 118 7
5,984 6,963 2c.1 Subtotal Period 2c Activity Costs 2,444 3,324 411 190 216 897 2,368 9,850 9,723 127 11,307 8,922 1,255,277 71,989 Period 2c Additional Costs 2c.2.1 License Termination Survey Planning 940 282 1,222 1,222 6,240 2c.2 Subtotal Period 2c Additional Costs 940 282 1,222 1,222 6,240 Period 2c Collateral Costs 2c.3.1 Process liquid waste 188 83 374 360 249 1,254 1,254 1,294 77,612 252 2c.3.2 Small tool allowance 94 14 108 108 2c.3.3 Decommissioning Equipment Disposition 123 34 127 40 46 369 369 6,000 373 303,507 88 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 18 of 22 Table C-2 Braidwood Nuclear Power Station, Unit 2 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:30:10 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours 2c.3 Subtotal Period 2c Collateral Costs 188 94 206 407 127 400 309 1,731 1,731 6,000 1,667 381,119 340 Period 2c Period-Dependent Costs 2c.4.1 Decon supplies 159 40 199 199 2c.4.2 Insurance 234 23 257 257 2c.4.3 Property taxes 348 35 382 382 2c.4.4 Health physics supplies 549 137 686 686 2c.4.5 Heavy equipment rental 1,225 184 1,408 1,408 2c.4.6 Disposal of DAW generated 5
2 91 23 120 120 1,622 32,443 7
2c.4.7 Plant energy budget 367 55 422 422 2c.4.8 NRC Fees 328 33 361 361 2c.4.9 Emergency Planning Fees 70 7
76 76 2c.4.10 Site O&M Costs 87 13 100 100 2c.4.11 Liquid Radwaste Processing Equipment/Services 267 40 307 307 2c.4.12 ISFSI Operating Costs 31 5
35 35 2c.4.13 Security Staff Cost 2,078 312 2,389 2,389 48,260 2c.4.14 DOC Staff Cost 5,932 890 6,821 6,821 72,571 2c.4.15 Utility Staff Cost 10,842 1,626 12,468 12,468 138,611 2c.4 Subtotal Period 2c Period-Dependent Costs 159 1,773 5
2 91 20,582 3,422 26,033 25,921 112 1,622 32,443 7
259,443 2c.0 TOTAL PERIOD 2c COST 2,792 5,192 621 599 343 1,387 21,522 6,382 38,836 38,598 112 127 17,307 12,211 1,668,839 72,336 265,683 PERIOD 2e - License Termination Period 2e Direct Decommissioning Activities 2e.1.1 ORISE confirmatory survey 151 45 197 197 2e.1.2 Terminate license a
2e.1 Subtotal Period 2e Activity Costs 151 45 197 197 Period 2e Additional Costs 2e.2.1 License Termination Survey 8,222 2,467 10,688 10,688 131,983 3,120 2e.2 Subtotal Period 2e Additional Costs 8,222 2,467 10,688 10,688 131,983 3,120 Period 2e Collateral Costs 2e.3.1 DOC staff relocation expenses 1,130 169 1,299 1,299 2e.3 Subtotal Period 2e Collateral Costs 1,130 169 1,299 1,299 Period 2e Period-Dependent Costs 2e.4.1 Insurance 229 23 252 252 2e.4.2 Property taxes 376 38 414 414 2e.4.3 Health physics supplies 764 191 955 955 2e.4.4 Disposal of DAW generated 1
0 19 5
25 25 337 6,734 2
2e.4.5 Plant energy budget 199 30 229 229 2e.4.6 NRC Fees 355 35 390 390 2e.4.7 Emergency Planning Fees 75 8
83 83 2e.4.8 Site O&M Costs 94 14 108 108 2e.4.9 ISFSI Operating Costs 33 5
38 38 2e.4.10 Security Staff Cost 1,192 179 1,371 1,371 27,893 2e.4.11 DOC Staff Cost 3,801 570 4,371 4,371 46,750 2e.4.12 Utility Staff Cost 4,795 719 5,514 5,514 60,107 2e.4 Subtotal Period 2e Period-Dependent Costs 764 1
0 19 11,149 1,817 13,750 13,629 121 337 6,734 2
134,750 2e.0 TOTAL PERIOD 2e COST 764 1
0 19 20,652 4,498 25,935 25,814 121 337 6,734 131,985 137,870 PERIOD 2 TOTALS 12,487 68,548 11,658 7,710 3,610 29,890 253,222 78,142 465,266 409,969 42,612 12,686 190,948 111,009 3,156 459 18,130,240 1,000,488 2,700,793 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 19 of 22 Table C-2 Braidwood Nuclear Power Station, Unit 2 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:30:10 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 3b - Site Restoration Period 3b Direct Decommissioning Activities Demolition of Remaining Site Buildings 3b.1.1.1 Reactor 6,763 1,014 7,778 7,778 69,546 3b.1.1.2 Aux Feedwater-Steam Tunnel/Penetr. Area 689 103 792 792 5,186 3b.1.1.3 Auxiliary Building 5,899 885 6,784 6,784 62,063 3b.1.1.4 Blowdown Outfall Structure 29 4
33 33 295 3b.1.1.5 Bottled Gas Storage 26 4
30 30 340 3b.1.1.6 Circulating Water Discharge 233 35 268 268 2,887 3b.1.1.7 Gatehouse and Extension 333 50 382 382 4,193 3b.1.1.8 Instrument Maintenance Building 94 14 109 109 1,190 3b.1.1.9 Lake Screen House 1,494 224 1,718 1,718 15,283 3b.1.1.10 Make-up Demineralizer Area 647 97 744 744 8,158 3b.1.1.11 Miscellaneous Warehouses 1,991 299 2,290 2,290 26,794 3b.1.1.12 Miscellaneous Yard Structures 1,254 188 1,442 1,442 14,693 3b.1.1.13 Radwaste/Service Building 3,927 589 4,516 4,516 45,685 3b.1.1.14 Receiving Building 183 27 210 210 2,292 3b.1.1.15 Refueling Water Storage Tank 1,028 154 1,182 1,182 11,692 3b.1.1.16 River Screen House 616 92 708 708 6,844 3b.1.1.17 Security Modifications 959 144 1,103 1,103 6,939 3b.1.1.18 Sewage Treatment Plant 106 16 122 122 1,326 3b.1.1.19 Tech Support Center & Cond Cleanup Bldg 499 75 574 574 6,095 3b.1.1.20 Turbine Building 5,769 865 6,634 6,634 70,342 3b.1.1.21 Turbine Pedestal 1,352 203 1,555 1,555 12,628 3b.1.1.22 Waste Treatment Building 103 15 118 118 1,265 3b.1.1.23 Fuel Handling Building 3,039 456 3,495 3,495 33,245 3b.1.1 Totals 37,032 5,555 42,587 42,587 408,981 Site Closeout Activities 3b.1.2 Remove Rubble 237 35 272 272 1,367 3b.1.3 Grade & landscape site 716 107 823 823 1,942 3b.1.4 Final report to NRC 79 12 91 91 668 3b.1 Subtotal Period 3b Activity Costs 37,984 79 5,709 43,772 91 43,681 412,290 668 Period 3b Additional Costs 3b.2.1 Concrete Crushing 1,020 5
154 1,179 1,179 4,730 3b.2.2 Cofferdam Construction and Teardown 778 117 894 894 7,391 3b.2 Subtotal Period 3b Additional Costs 1,798 5
270 2,074 2,074 12,121 Period 3b Collateral Costs 3b.3.1 Small tool allowance 459 69 528 528 3b.3 Subtotal Period 3b Collateral Costs 459 69 528 528 Period 3b Period-Dependent Costs 3b.4.1 Insurance 754 75 829 829 3b.4.2 Property taxes 1,239 124 1,363 1,363 3b.4.3 Heavy equipment rental 6,239 936 7,174 7,174 3b.4.4 Plant energy budget 327 49 376 75 301 3b.4.5 NRC ISFSI Fees 244 24 268 268 3b.4.6 Emergency Planning Fees 248 25 273 273 3b.4.7 ISFSI Operating Costs 109 16 125 125 3b.4.8 Site O&M Cost 310 46 356 356 3b.4.9 Security Staff Cost 3,751 563 4,313 (0) 3,537 776 87,294 3b.4.10 DOC Staff Cost 11,650 1,748 13,398 13,398 137,043 3b.4.11 Utility Staff Cost 7,035 1,055 8,090 (0) 1,537 6,553 87,294 3b.4 Subtotal Period 3b Period-Dependent Costs 6,239 25,665 4,661 36,565 (0) 8,007 28,558 311,630 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 20 of 22 Table C-2 Braidwood Nuclear Power Station, Unit 2 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:30:10 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours 3b.0 TOTAL PERIOD 3b COST 46,479 25,749 10,710 82,939 91 8,007 74,841 424,411 312,298 PERIOD 3c - Fuel Storage Operations/Shipping Period 3c Direct Decommissioning Activities Period 3c Collateral Costs 3c.3.1 Spent Fuel Capital and Transfer 7,375 1,106 8,481 8,481 3c.3 Subtotal Period 3c Collateral Costs 7,375 1,106 8,481 8,481 Period 3c Period-Dependent Costs 3c.4.1 Insurance 2,619 262 2,881 2,881 3c.4.2 Property taxes 4,307 431 4,737 4,737 3c.4.3 Plant energy budget 3c.4.4 NRC ISFSI Fees 1,269 127 1,396 1,396 3c.4.5 Emergency Planning Fees 861 86 947 947 3c.4.6 Site O&M Costs 1,077 161 1,238 1,238 3c.4.7 ISFSI Operating Costs 379 57 436 436 3c.4.8 Security Staff Cost 10,731 1,610 12,341 12,341 242,691 3c.4.9 Utility Staff Cost 4,656 698 5,354 5,354 60,763 3c.4 Subtotal Period 3c Period-Dependent Costs 25,900 3,432 29,332 29,332 303,454 3c.0 TOTAL PERIOD 3c COST 33,275 4,538 37,813 37,813 303,454 PERIOD 3d - GTCC shipping Period 3d Direct Decommissioning Activities Nuclear Steam Supply System Removal 3d.1.1.1 Vessel & Internals GTCC Disposal 375 11,837 1,813 14,025 14,025 505 104,146 3d.1.1 Totals 375 11,837 1,813 14,025 14,025 505 104,146 3d.1 Subtotal Period 3d Activity Costs 375 11,837 1,813 14,025 14,025 505 104,146 Period 3d Period-Dependent Costs 3d.4.1 Insurance 12 1
13 13 3d.4.2 Property taxes 19 2
21 21 3d.4.3 Plant energy budget 3d.4.4 NRC ISFSI Fees 7
1 8
8 3d.4.5 Emergency Planning Fees 4
0 4
4 3d.4.6 Site O&M Costs 5
1 6
6 3d.4.7 ISFSI Operating Costs 2
0 2
2 3d.4.8 Security Staff Cost 48 7
55 55 1,080 3d.4.9 Utility Staff Cost 21 3
24 24 270 3d.4 Subtotal Period 3d Period-Dependent Costs 117 15 132 132 1,350 3d.0 TOTAL PERIOD 3d COST 375 11,837 117 1,829 14,158 14,025 132 505 104,146 1,350 PERIOD 3e - ISFSI Decontamination Period 3e Direct Decommissioning Activities Period 3e Additional Costs 3e.2.1 ISFSI License Termination 41 1
24 90 719 143 1,017 1,017 1,703 142,573 2,775 1,280 3e.2 Subtotal Period 3e Additional Costs 41 1
24 90 719 143 1,017 1,017 1,703 142,573 2,775 1,280 Period 3e Collateral Costs 3e.3.1 Small tool allowance 1
0 1
1 3e.3 Subtotal Period 3e Collateral Costs 1
0 1
1 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 21 of 22 Table C-2 Braidwood Nuclear Power Station, Unit 2 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:30:10 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 3e Period-Dependent Costs 3e.4.1 Insurance 99 10 109 109 3e.4.2 Property taxes 163 16 179 179 3e.4.3 Heavy equipment rental 222 33 256 256 3e.4.4 Plant energy budget 3e.4.5 Site O&M Costs 41 6
47 47 3e.4.6 Security Staff Cost 109 16 125 125 2,468 3e.4.7 Utility Staff Cost 147 22 169 169 1,870 3e.4 Subtotal Period 3e Period-Dependent Costs 222 559 104 885 885 4,338 3e.0 TOTAL PERIOD 3e COST 264 1
24 90 1,278 247 1,903 1,903 1,703 142,573 2,775 5,618 PERIOD 3f - ISFSI Site Restoration Period 3f Direct Decommissioning Activities Period 3f Additional Costs 3f.2.1 ISFSI Demolition and Site Restoration 1,303 24 199 1,527 1,527 16,256 80 3f.2 Subtotal Period 3f Additional Costs 1,303 24 199 1,527 1,527 16,256 80 Period 3f Collateral Costs 3f.3.1 Small tool allowance 18 3
20 20 3f.3 Subtotal Period 3f Collateral Costs 18 3
20 20 Period 3f Period-Dependent Costs 3f.4.1 Insurance 3f.4.2 Property taxes 86 9
95 95 3f.4.3 Heavy equipment rental 91 14 105 105 3f.4.4 Plant energy budget 3f.4.5 Site O&M Costs 22 3
25 25 3f.4.6 Security Staff Cost 58 9
66 66 1,307 3f.4.7 Utility Staff Cost 64 10 73 73 810 3f.4 Subtotal Period 3f Period-Dependent Costs 91 229 44 364 364 2,117 3f.0 TOTAL PERIOD 3f COST 1,412 253 245 1,910 1,910 16,256 2,197 PERIOD 3 TOTALS 48,155 376 24 11,927 60,672 17,570 138,723 14,116 49,766 74,841 1,703 505 246,719 443,442 624,918 TOTAL COST TO DECOMMISSION 15,353 119,051 12,112 8,085 3,610 44,937 419,168 113,532 735,847 528,878 118,817 88,152 190,948 113,974 3,962 459 505 18,506,460 1,458,009 4,179,349 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix C, Page 22 of 22 Table C-2 Braidwood Nuclear Power Station, Unit 2 DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Tue, Oct 13, 2009 at 15:30:10 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours TOTAL COST TO DECOMMISSION WITH 18.24% CONTINGENCY:
$735,847 thousands of 2009 dollars TOTAL NRC LICENSE TERMINATION COST IS 71.87% OR:
$528,878 thousands of 2009 dollars SPENT FUEL MANAGEMENT COST IS 16.15% OR:
$118,817 thousands of 2009 dollars NON-NUCLEAR DEMOLITION COST IS 11.98% OR:
$88,152 thousands of 2009 dollars TOTAL LOW-LEVEL RADIOACTIVE WASTE VOLUME BURIED (EXCLUDING GTCC):
118,395 cubic feet TOTAL GREATER THAN CLASS C RADWASTE VOLUME GENERATED:
505 cubic feet TOTAL SCRAP METAL REMOVED:
76,913 tons TOTAL CRAFT LABOR REQUIREMENTS:
1,458,009 man-hours End Notes:
n/a - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
0 - indicates that this value is less than 0.5 but is non-zero.
a cell containing " - " indicates a zero value TLG Services, Inc.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix D, Page 1 of 24 TLG Services, Inc.
APPENDIX D DETAILED COST ANALYSIS DELAYED DECON Page Braidwood Nuclear Power Station, Unit 1...................................................................D-2 Braidwood Nuclear Power Station, Unit 2................................................................D-13
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 2 of 24 Table D-1 Braidwood Nuclear Power Station, Unit 1 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:55:49 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 1a - Shutdown through Transition Period 1a Direct Decommissioning Activities 1a.1.1 SAFSTOR site characterization survey 398 119 517 517 1a.1.2 Prepare preliminary decommissioning cost 153 23 176 176 1,300 1a.1.3 Notification of Cessation of Operations a
1a.1.4 Remove fuel & source material n/a 1a.1.5 Notification of Permanent Defueling a
1a.1.6 Deactivate plant systems & process waste a
1a.1.7 Prepare and submit PSDAR 236 35 271 271 2,000 1a.1.8 Review plant dwgs & specs.
153 23 176 176 1,300 1a.1.9 Perform detailed rad survey a
1a.1.10 Estimate by-product inventory 118 18 136 136 1,000 1a.1.11 End product description 118 18 136 136 1,000 1a.1.12 Detailed by-product inventory 177 27 204 204 1,500 1a.1.13 Define major work sequence 118 18 136 136 1,000 1a.1.14 Perform SER and EA 366 55 421 421 3,100 1a.1.15 Perform Site-Specific Cost Study 590 89 679 679 5,000 Activity Specifications 1a.1.16.1 Prepare plant and facilities for SAFSTOR 581 87 668 668 4,920 1a.1.16.2 Plant systems 492 74 565 565 4,167 1a.1.16.3 Plant structures and buildings 368 55 423 423 3,120 1a.1.16.4 Waste management 236 35 271 271 2,000 1a.1.16.5 Facility and site dormancy 236 35 271 271 2,000 1a.1.16 Total 1,913 287 2,199 2,199 16,207 Detailed Work Procedures 1a.1.17.1 Plant systems 140 21 161 161 1,183 1a.1.17.2 Facility closeout & dormancy 142 21 163 163 1,200 1a.1.17 Total 281 42 323 323 2,383 1a.1.18 Procure vacuum drying system 12 2
14 14 100 1a.1.19 Drain/de-energize non-cont. systems a
1a.1.20 Drain & dry NSSS a
1a.1.21 Drain/de-energize contaminated systems a
1a.1.22 Decon/secure contaminated systems a
1a.1 Subtotal Period 1a Activity Costs 4,633 755 5,388 5,388 35,890 Period 1a Period-Dependent Costs 1a.4.1 Insurance 751 75 826 826 1a.4.2 Property taxes 1a.4.3 Health physics supplies 421 105 527 527 1a.4.4 Heavy equipment rental 421 63 484 484 1a.4.5 Disposal of DAW generated 2
1 34 9
45 45 610 12,190 3
1a.4.6 Plant energy budget 1,319 198 1,517 1,517 1a.4.7 NRC Fees 706 71 776 776 1a.4.8 Emergency Planning Fees 315 32 347 347 1a.4.9 Site O&M Costs 125 19 144 144 1a.4.10 Spent Fuel Pool O&M 381 57 438 438 1a.4.11 ISFSI Operating Costs 44 7
51 51 1a.4.12 Security Staff Cost 466 70 536 536 12,264 1a.4.13 Utility Staff Cost 31,082 4,662 35,745 35,745 423,400 1a.4 Subtotal Period 1a Period-Dependent Costs 842 2
1 34 35,189 5,367 41,434 40,599 836 610 12,190 3
435,664 1a.0 TOTAL PERIOD 1a COST 842 2
1 34 39,822 6,122 46,822 45,986 836 610 12,190 3
471,554 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 3 of 24 Table D-1 Braidwood Nuclear Power Station, Unit 1 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:55:49 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 1b - SAFSTOR Limited DECON Activities Period 1b Direct Decommissioning Activities Decontamination of Site Buildings 1b.1.1.1 Reactor 2,135 1,067 3,202 3,202 33,093 1b.1.1.2 Auxiliary Building 211 106 317 317 3,289 1b.1.1.3 Refueling Water Storage Tank 351 176 527 527 5,322 1b.1.1.4 Steam Generator Storage Facility 57 29 86 86 887 1b.1.1 Totals 2,754 1,377 4,131 4,131 42,591 1b.1 Subtotal Period 1b Activity Costs 2,754 1,377 4,131 4,131 42,591 Period 1b Collateral Costs 1b.3.1 Decon equipment 811 122 932 932 1b.3.2 Process liquid waste 185 81 364 351 243 1,223 1,223 1,259 75,560 246 1b.3.3 Small tool allowance 45 7
51 51 1b.3 Subtotal Period 1b Collateral Costs 996 45 81 364 351 371 2,207 2,207 1,259 75,560 246 Period 1b Period-Dependent Costs 1b.4.1 Decon supplies 588 147 735 735 1b.4.2 Insurance 187 19 206 206 1b.4.3 Property taxes 1,612 161 1,773 1,773 1b.4.4 Health physics supplies 270 68 338 338 1b.4.5 Heavy equipment rental 105 16 121 121 1b.4.6 Disposal of DAW generated 2
1 29 8
39 39 526 10,515 2
1b.4.7 Plant energy budget 329 49 378 378 1b.4.8 NRC Fees 176 18 194 194 1b.4.9 Emergency Planning Fees 79 8
86 86 1b.4.10 Site O&M Costs 31 5
36 36 1b.4.11 Spent Fuel Pool O&M 95 14 109 109 1b.4.12 ISFSI Operating Costs 11 2
13 13 1b.4.13 Security Staff Cost 116 17 134 134 3,058 1b.4.14 Utility Staff Cost 7,252 1,088 8,340 8,340 99,429 1b.4 Subtotal Period 1b Period-Dependent Costs 588 375 2
1 29 9,889 1,619 12,502 12,294 208 526 10,515 2
102,487 1b.0 TOTAL PERIOD 1b COST 4,338 420 83 364 380 9,889 3,367 18,840 18,632 208 1,785 86,076 42,839 102,487 PERIOD 1c - Preparations for SAFSTOR Dormancy Period 1c Direct Decommissioning Activities 1c.1.1 Prepare support equipment for storage 457 69 525 525 3,000 1c.1.2 Install containment pressure equal. lines 48 7
55 55 700 1c.1.3 Interim survey prior to dormancy 733 220 953 953 13,416 1c.1.4 Secure building accesses a
1c.1.5 Prepare & submit interim report 69 10 79 79 583 1c.1 Subtotal Period 1c Activity Costs 504 802 306 1,612 1,612 17,116 583 Period 1c Collateral Costs 1c.3.1 Process liquid waste 150 66 296 285 197 995 995 1,024 61,469 200 1c.3.2 Small tool allowance 4
1 5
5 1c.3 Subtotal Period 1c Collateral Costs 150 4
66 296 285 198 1,000 1,000 1,024 61,469 200 Period 1c Period-Dependent Costs 1c.4.1 Insurance 187 19 206 206 1c.4.2 Property taxes 1,612 161 1,773 1,773 1c.4.3 Health physics supplies 143 36 179 179 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 4 of 24 Table D-1 Braidwood Nuclear Power Station, Unit 1 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:55:49 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 1c Period-Dependent Costs (continued) 1c.4.4 Heavy equipment rental 105 16 121 121 1c.4.5 Disposal of DAW generated 0
0 6
1 7
7 99 1,976 0
1c.4.6 Plant energy budget 329 49 378 378 1c.4.7 NRC Fees 176 18 194 194 1c.4.8 Emergency Planning Fees 79 8
86 86 1c.4.9 Site O&M Costs 31 5
36 36 1c.4.10 Spent Fuel Pool O&M 95 14 109 109 1c.4.11 ISFSI Operating Costs 11 2
13 13 1c.4.12 Security Staff Cost 116 17 134 134 3,058 1c.4.13 Utility Staff Cost 1,073 161 1,234 1,234 13,520 1c.4 Subtotal Period 1c Period-Dependent Costs 248 0
0 6
3,709 507 4,470 4,261 208 99 1,976 0
16,578 1c.0 TOTAL PERIOD 1c COST 150 757 66 296 291 4,511 1,011 7,082 6,873 208 1,123 63,445 17,316 17,161 PERIOD 1 TOTALS 4,489 2,018 151 661 705 54,222 10,499 72,744 71,491 1,252 3,518 161,711 60,157 591,202 PERIOD 2a - SAFSTOR Dormancy with Wet Spent Fuel Storage Period 2a Direct Decommissioning Activities 2a.1.1 Quarterly Inspection a
2a.1.2 Semi-annual environmental survey a
2a.1.3 Prepare reports a
2a.1.4 Bituminous roof replacement 63 9
73 73 2a.1.5 Maintenance supplies 1,850 463 2,313 2,313 2a.1 Subtotal Period 2a Activity Costs 1,913 472 2,385 2,385 Period 2a Collateral Costs 2a.3.1 Spent Fuel Capital and Transfer 11,750 1,763 13,513 13,513 2a.3 Subtotal Period 2a Collateral Costs 11,750 1,763 13,513 13,513 Period 2a Period-Dependent Costs 2a.4.1 Insurance 4,945 495 5,440 5,440 2a.4.2 Property taxes 13,084 1,308 14,392 14,392 2a.4.3 Health physics supplies 1,192 298 1,490 1,490 2a.4.4 Disposal of DAW generated 17 6
314 81 418 418 5,629 112,581 26 2a.4.5 Plant energy budget 3,883 582 4,465 4,465 2a.4.6 NRC Fees 2,966 297 3,262 3,262 2a.4.7 Emergency Planning Fees 1,471 147 1,618 1,618 2a.4.8 Site O&M Costs 1,838 276 2,114 2,114 2a.4.9 Spent Fuel Pool O&M 5,610 842 6,452 6,452 2a.4.10 ISFSI Operating Costs 647 97 744 744 2a.4.11 Security Staff Cost 30,970 4,646 35,616 35,616 752,387 2a.4.12 Utility Staff Cost 34,687 5,203 39,890 39,890 445,109 2a.4 Subtotal Period 2a Period-Dependent Costs 1,192 17 6
314 100,101 14,271 115,901 5,170 110,731 5,629 112,581 26 1,197,496 2a.0 TOTAL PERIOD 2a COST 1,192 17 6
314 113,764 16,505 131,798 7,555 124,243 5,629 112,581 26 1,197,496 PERIOD 2b - SAFSTOR Dormancy with Dry Spent Fuel Storage Period 2b Direct Decommissioning Activities 2b.1.1 Quarterly Inspection a
2b.1.2 Semi-annual environmental survey a
2b.1.3 Prepare reports a
2b.1.4 Bituminous roof replacement 13 2
15 15 2b.1.5 Maintenance supplies 377 94 472 472 2b.1 Subtotal Period 2b Activity Costs 390 96 487 487 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 5 of 24 Table D-1 Braidwood Nuclear Power Station, Unit 1 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:55:49 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 2b Collateral Costs 2b.3.1 Spent Fuel Capital and Transfer 1,625 244 1,869 1,869 2b.3 Subtotal Period 2b Collateral Costs 1,625 244 1,869 1,869 Period 2b Period-Dependent Costs 2b.4.1 Insurance 913 91 1,004 1,004 2b.4.2 Property taxes 1,500 150 1,650 1,650 2b.4.3 Health physics supplies 226 57 283 283 2b.4.4 Disposal of DAW generated 3
1 62 16 83 83 1,118 22,366 5
2b.4.5 Plant energy budget 396 59 455 455 2b.4.6 NRC Fees 605 61 666 666 2b.4.7 Emergency Planning Fees 300 30 330 330 2b.4.8 Site O&M Costs 375 56 431 431 2b.4.9 ISFSI Operating Costs 132 20 152 152 2b.4.10 Security Staff Cost 1,489 223 1,713 1,713 30,500 2b.4.11 Utility Staff Cost 2,686 403 3,089 3,089 38,579 2b.4 Subtotal Period 2b Period-Dependent Costs 226 3
1 62 8,397 1,166 9,856 1,032 8,825 1,118 22,366 5
69,079 2b.0 TOTAL PERIOD 2b COST 226 3
1 62 10,412 1,506 12,212 1,518 10,693 1,118 22,366 5
69,079 PERIOD 2 TOTALS 1,418 20 7
377 124,176 18,012 144,010 9,074 134,936 6,747 134,947 31 1,266,575 PERIOD 3a - Reactivate Site Following SAFSTOR Dormancy Period 3a Direct Decommissioning Activities 3a.1.1 Prepare preliminary decommissioning cost 153 23 176 176 1,300 3a.1.2 Review plant dwgs & specs.
543 81 624 624 4,600 3a.1.3 Perform detailed rad survey a
3a.1.4 End product description 118 18 136 136 1,000 3a.1.5 Detailed by-product inventory 153 23 176 176 1,300 3a.1.6 Define major work sequence 885 133 1,018 1,018 7,500 3a.1.7 Perform SER and EA 366 55 421 421 3,100 3a.1.8 Perform Site-Specific Cost Study 590 89 679 679 5,000 3a.1.9 Prepare/submit License Termination Plan 483 73 556 556 4,096 3a.1.10 Receive NRC approval of termination plan a
Activity Specifications 3a.1.11.1 Re-activate plant & temporary facilities 870 130 1,000 900 100 7,370 3a.1.11.2 Plant systems 492 74 565 509 57 4,167 3a.1.11.3 Reactor internals 838 126 964 964 7,100 3a.1.11.4 Reactor vessel 767 115 882 882 6,500 3a.1.11.5 Biological shield 59 9
68 68 500 3a.1.11.6 Steam generators 368 55 423 423 3,120 3a.1.11.7 Reinforced concrete 189 28 217 109 109 1,600 3a.1.11.8 Main Turbine 47 7
54 54 400 3a.1.11.9 Main Condensers 47 7
54 54 400 3a.1.11.10 Plant structures & buildings 368 55 423 212 212 3,120 3a.1.11.11 Waste management 543 81 624 624 4,600 3a.1.11.12 Facility & site closeout 106 16 122 61 61 900 3a.1.11 Total 4,694 704 5,398 4,752 646 39,777 Planning & Site Preparations 3a.1.12 Prepare dismantling sequence 283 42 326 326 2,400 3a.1.13 Plant prep. & temp. svces 2,800 420 3,220 3,220 3a.1.14 Design water clean-up system 165 25 190 190 1,400 3a.1.15 Rigging/Cont. Cntrl Envlps/tooling/etc.
2,200 330 2,530 2,530 3a.1.16 Procure casks/liners & containers 145 22 167 167 1,230 3a.1 Subtotal Period 3a Activity Costs 13,580 2,037 15,617 14,970 646 72,703 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 6 of 24 Table D-1 Braidwood Nuclear Power Station, Unit 1 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:55:49 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 3a Period-Dependent Costs 3a.4.1 Insurance 304 30 334 334 3a.4.2 Property taxes 500 50 550 550 3a.4.3 Health physics supplies 369 92 461 461 3a.4.4 Heavy equipment rental 421 63 484 484 3a.4.5 Disposal of DAW generated 2
1 29 7
38 38 516 10,311 2
3a.4.6 Plant energy budget 1,319 198 1,517 1,517 3a.4.7 NRC Fees 249 25 274 274 3a.4.8 Site O&M Costs 125 19 144 144 3a.4.9 Security Staff Cost 2,986 448 3,434 3,434 69,350 3a.4.10 Utility Staff Cost 19,481 2,922 22,403 22,403 260,714 3a.4 Subtotal Period 3a Period-Dependent Costs 789 2
1 29 24,964 3,855 29,639 29,639 516 10,311 2
330,064 3a.0 TOTAL PERIOD 3a COST 789 2
1 29 38,543 5,892 45,255 44,609 646 516 10,311 2
402,767 PERIOD 3b - Decommissioning Preparations Period 3b Direct Decommissioning Activities Detailed Work Procedures 3b.1.1.1 Plant systems 559 84 642 578 64 4,733 3b.1.1.2 Reactor internals 295 44 339 339 2,500 3b.1.1.3 Remaining buildings 159 24 183 46 137 1,350 3b.1.1.4 CRD cooling assembly 118 18 136 136 1,000 3b.1.1.5 CRD housings & ICI tubes 118 18 136 136 1,000 3b.1.1.6 Incore instrumentation 118 18 136 136 1,000 3b.1.1.7 Reactor vessel 428 64 493 493 3,630 3b.1.1.8 Facility closeout 142 21 163 81 81 1,200 3b.1.1.9 Missile shields 53 8
61 61 450 3b.1.1.10 Biological shield 142 21 163 163 1,200 3b.1.1.11 Steam generators 543 81 624 624 4,600 3b.1.1.12 Reinforced concrete 118 18 136 68 68 1,000 3b.1.1.13 Main Turbine 184 28 212 212 1,560 3b.1.1.14 Main Condensers 184 28 212 212 1,560 3b.1.1.15 Auxiliary building 322 48 370 333 37 2,730 3b.1.1.16 Reactor building 322 48 370 333 37 2,730 3b.1.1 Total 3,805 571 4,376 3,527 848 32,243 3b.1 Subtotal Period 3b Activity Costs 3,805 571 4,376 3,527 848 32,243 Period 3b Additional Costs 3b.2.1 Site Characterization 6,341 1,902 8,243 8,243 30,500 10,852 3b.2 Subtotal Period 3b Additional Costs 6,341 1,902 8,243 8,243 30,500 10,852 Period 3b Collateral Costs 3b.3.1 Decon equipment 811 122 932 932 3b.3.2 DOC staff relocation expenses 1,130 169 1,299 1,299 3b.3.3 Pipe cutting equipment 1,100 165 1,265 1,265 3b.3 Subtotal Period 3b Collateral Costs 811 1,100 1,130 456 3,497 3,497 Period 3b Period-Dependent Costs 3b.4.1 Decon supplies 25 6
31 31 3b.4.2 Insurance 168 17 185 185 3b.4.3 Property taxes 251 25 276 276 3b.4.4 Health physics supplies 204 51 255 255 3b.4.5 Heavy equipment rental 211 32 242 242 3b.4.6 Disposal of DAW generated 1
0 16 4
22 22 292 5,846 1
3b.4.7 Plant energy budget 661 99 761 761 3b.4.8 NRC Fees 125 12 137 137 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 7 of 24 Table D-1 Braidwood Nuclear Power Station, Unit 1 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:55:49 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 3b Period-Dependent Costs (continued) 3b.4.9 Site O&M Costs 63 9
72 72 3b.4.10 Security Staff Cost 1,497 225 1,722 1,722 34,770 3b.4.11 DOC Staff Cost 4,781 717 5,498 5,498 58,560 3b.4.12 Utility Staff Cost 9,767 1,465 11,232 11,232 130,714 3b.4 Subtotal Period 3b Period-Dependent Costs 25 415 1
0 16 17,313 2,663 20,433 20,433 292 5,846 1
224,044 3b.0 TOTAL PERIOD 3b COST 836 1,515 1
0 16 28,589 5,592 36,548 35,700 848 292 5,846 30,501 267,139 PERIOD 3 TOTALS 836 2,304 2
1 45 67,132 11,483 81,804 80,309 1,495 808 16,157 30,504 669,906 PERIOD 4a - Large Component Removal Period 4a Direct Decommissioning Activities Nuclear Steam Supply System Removal 4a.1.1.1 Reactor Coolant Piping 46 160 33 29 341 156 765 765 1,728 208,992 3,290 4a.1.1.2 Pressurizer Relief Tank 8
29 6
6 60 28 136 136 329 36,553 596 4a.1.1.3 Reactor Coolant Pumps & Motors 28 105 57 168 1,272 389 2,018 2,018 4,796 780,540 2,726 80 4a.1.1.4 Pressurizer 12 68 347 94 412 175 1,108 1,108 3,033 252,826 1,527 750 4a.1.1.5 Steam Generators 94 4,168 2,158 2,533 667 4,349 2,872 16,841 16,841 45,513 17,359 3,811,289 20,508 1,500 4a.1.1.6 Retired Steam Generator Units 1,486 2,673 580 3,416 1,491 9,646 9,646 39,289 14,064 3,041,432 10,800 1,500 4a.1.1.7 CRDMs/ICIs/Service Structure Removal 22 80 176 31 59 68 436 436 2,843 50,181 1,648 4a.1.1.8 Reactor Vessel Internals 77 2,017 3,471 566 4,811 206 4,997 16,144 16,144 1,710 876 459 325,944 23,400 1,068 4a.1.1.9 Vessel & Internals GTCC Disposal 11,837 1,776 13,613 13,613 505 104,146 4a.1.1.10 Reactor Vessel 90 3,987 1,302 670 3,071 206 5,094 14,418 14,418 6,672 2,254 979,179 23,400 1,068 4a.1.1 Totals 376 10,613 9,037 6,769 1,247 29,628 411 17,044 75,124 75,124 84,802 52,534 3,130 459 505 9,591,082 87,895 5,966 Removal of Major Equipment 4a.1.2 Main Turbine/Generator 574 262 32 214 207 1,288 1,288 5,355 455,213 9,016 4a.1.3 Main Condensers 1,176 136 27 150 334 1,823 1,823 7,111 320,000 18,250 Cascading Costs from Clean Building Demolition 4a.1.4.1 Reactor 1,171 176 1,346 1,346 12,130 4a.1.4.2 Auxiliary Building 644 97 741 741 6,782 4a.1.4.3 Refueling Water Storage Tank 114 17 131 131 1,299 4a.1.4.4 Steam Generator Storage Facility 48 7
55 55 507 4a.1.4 Totals 1,977 297 2,273 2,273 20,718 Disposal of Plant Systems 4a.1.5.1 Auxiliary Feedwater 78 12 89 89 1,244 4a.1.5.2 Auxiliary Steam 70 10 80 80 1,126 4a.1.5.3 Auxiliary Steam RCA 134 2
3 16 36 190 190 835 33,900 1,935 4a.1.5.4 Boric Acid Processing 492 33 31 86 99 169 912 912 4,531 1,193 268,274 7,890 4a.1.5.5 CO2 & H2 26 4
30 30 419 4a.1.5.6 CO2 & H2 RCA 38 0
1 3
10 52 52 164 6,658 572 4a.1.5.7 Chemical Feed 57 9
66 66 934 4a.1.5.8 Chilled Water 71 11 82 82 1,142 4a.1.5.9 Circulating Water 318 48 365 365 5,174 4a.1.5.10 Condensate 377 56 433 433 6,023 4a.1.5.11 Condensate Booster 339 51 390 390 5,428 4a.1.5.12 Condensate Cleanup 66 10 76 76 1,060 4a.1.5.13 Containment Spray 256 7
12 69 77 421 421 3,629 147,367 3,729 4a.1.5.14 Diesel Fuel Oil 102 15 117 117 1,615 4a.1.5.15 Essential Service Water 236 35 271 271 3,837 4a.1.5.16 Extraction Steam 189 28 217 217 3,089 4a.1.5.17 Feedwater 316 47 363 363 5,142 4a.1.5.18 Feedwater Drains 758 114 872 872 12,366 4a.1.5.19 Gland Steam 57 9
65 65 932 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 8 of 24 Table D-1 Braidwood Nuclear Power Station, Unit 1 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:55:49 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Disposal of Plant Systems (continued) 4a.1.5.20 Gland Water 50 7
57 57 828 4a.1.5.21 Main Steam 322 48 371 371 5,216 4a.1.5.22 Main Steam RCA 51 1
3 15 15 85 85 760 30,853 739 4a.1.5.23 Nitrogen 3
0 0
1 1
5 5
52 2,102 49 4a.1.5.24 Non-Essential Service Water 178 27 204 204 2,916 4a.1.5.25 Non-Essential Service Water RCA 93 3
5 28 29 158 158 1,462 59,354 1,295 4a.1.5.26 Off Gas 563 10 19 106 160 858 858 5,572 226,266 8,494 4a.1.5.27 Process Radiation Monitoring 40 0
0 2
11 54 54 113 4,587 666 4a.1.5.28 Process Sampling 119 1
2 12 32 166 166 616 25,019 1,927 4a.1.5.29 Screen Wash 50 7
57 57 821 4a.1.5.30 Station Air 31 5
35 35 498 4a.1.5.31 Station Heating 109 16 126 126 1,771 4a.1.5.32 Switchgear Heat Removal 9
1 10 10 139 4a.1.5.33 Turbine Bldg Equip Drains 1
0 1
1 17 4a.1.5.34 Turbine Generator 57 9
65 65 901 4a.1.5.35 Turbine Oil 87 13 100 100 1,399 4a.1.5.36 Waste Oil Sumps 30 4
34 34 483 4a.1.5 Totals 5,772 57 76 338 99 1,137 7,480 2,900 4,580 17,732 1,193 804,381 91,814 4a.1.6 Scaffolding in support of decommissioning 1,060 6
1 6
2 267 1,343 1,343 306 19 15,459 18,101 4a.1 Subtotal Period 4a Activity Costs 376 21,171 9,499 6,904 1,956 29,729 411 19,286 89,332 84,752 4,580 115,307 53,747 3,130 459 505 11,186,130 245,794 5,966 Period 4a Collateral Costs 4a.3.1 Process liquid waste 75 34 152 147 100 508 508 528 31,673 103 4a.3.2 Small tool allowance 236 35 271 244 27 4a.3 Subtotal Period 4a Collateral Costs 75 236 34 152 147 136 779 752 27 528 31,673 103 Period 4a Period-Dependent Costs 4a.4.1 Decon supplies 65 16 82 82 4a.4.2 Insurance 445 44 489 489 4a.4.3 Property taxes 661 66 727 655 73 4a.4.4 Health physics supplies 1,505 376 1,881 1,881 4a.4.5 Heavy equipment rental 2,348 352 2,700 2,700 4a.4.6 Disposal of DAW generated 9
3 173 45 230 230 3,103 62,068 14 4a.4.7 Plant energy budget 1,658 249 1,907 1,907 4a.4.8 NRC Fees 871 87 958 958 4a.4.9 Site O&M Costs 165 25 190 190 4a.4.10 Liquid Radwaste Processing Equipment/Services 507 76 583 583 4a.4.11 Security Staff Cost 2,628 394 3,022 3,022 61,244 4a.4.12 DOC Staff Cost 15,016 2,252 17,268 17,268 188,508 4a.4.13 Utility Staff Cost 24,422 3,663 28,086 28,086 332,359 4a.4 Subtotal Period 4a Period-Dependent Costs 65 3,853 9
3 173 46,373 7,647 58,124 58,051 73 3,103 62,068 14 582,112 4a.0 TOTAL PERIOD 4a COST 516 25,259 9,542 7,060 1,956 30,049 46,785 27,068 148,235 143,555 4,680 115,307 57,378 3,130 459 505 11,279,880 245,911 588,078 PERIOD 4b - Site Decontamination Disposal of Plant Systems 4b.1.2.1 Chemical & Volume Control 1,095 64 47 33 255 356 1,851 1,851 1,744 2,431 287,102 16,313 4b.1.2.2 Chilled Water RCA 311 9
16 90 95 520 520 4,716 191,536 4,732 4b.1.2.3 Component Cooling RCA 661 16 29 164 196 1,066 1,066 8,589 348,801 9,675 4b.1.2.4 Electrical 3,047 457 3,504 3,504 48,490 4b.1.2.5 Electrical - Contaminated 1,128 12 23 128 306 1,597 1,597 6,722 272,965 17,115 4b.1.2.6 Electrical - RCA 1,881 32 59 335 532 2,839 2,839 17,555 712,922 29,098 4b.1.2.7 Emergency Diesel Generator 129 19 148 148 2,066 4b.1.2.8 Essential Service Water RCA 297 10 17 99 93 515 515 5,177 210,230 4,418 4b.1.2.9 Fire Protection 122 18 141 141 1,984 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 9 of 24 Table D-1 Braidwood Nuclear Power Station, Unit 1 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:55:49 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Disposal of Plant Systems (continued) 4b.1.2.10 Fire Protection RCA 180 2
3 20 49 254 254 1,037 42,116 2,577 4b.1.2.11 HVAC-Auxiliary Building 486 9
17 96 139 747 747 5,054 205,243 7,162 4b.1.2.12 HVAC-Diesel Generator Room 43 6
50 50 682 4b.1.2.13 HVAC-Miscellaneous 42 6
48 48 656 4b.1.2.14 HVAC-Primary Containment 588 19 36 204 185 1,032 1,032 10,679 433,695 8,624 4b.1.2.15 HVAC-Turbine Building 187 28 215 215 3,177 4b.1.2.16 Instrument Air Supply 46 7
53 53 760 4b.1.2.17 Instrument Air Supply RCA 73 1
1 7
20 102 102 366 14,869 1,073 4b.1.2.18 Miscellaneous Drains 38 1
1 6
11 57 57 312 12,666 584 4b.1.2.19 Primary Containment Purge 274 10 20 112 89 504 504 5,850 237,590 4,312 4b.1.2.20 Primary Water 59 1
1 3
4 17 86 86 143 42 9,560 915 4b.1.2.21 Radioactive Waste Disposal 899 46 39 81 154 286 1,504 1,504 4,235 1,622 302,491 14,169 4b.1.2.22 Reactor Building Equipment Drains 97 7
5 3
29 33 175 175 183 277 32,048 1,435 4b.1.2.23 Reactor Building Floor Drains 45 2
2 2
8 14 73 73 130 74 11,914 678 4b.1.2.24 Reactor Coolant 169 9
6 4
34 53 276 276 208 324 37,451 2,506 4b.1.2.25 Residual Heat Removal 190 11 12 28 44 66 351 351 1,453 418 96,526 2,924 4b.1.2.26 Safety Injection 865 38 48 175 103 279 1,509 1,509 9,181 1,028 460,142 13,528 4b.1.2.27 Station Air RCA 36 0
1 3
9 49 49 175 7,089 521 4b.1.2.28 Station Heating RCA 120 2
4 24 34 184 184 1,256 51,005 1,759 4b.1.2.29 Waste Oil Sumps RCA 7
0 0
1 2
10 10 52 2,098 92 4b.1.2 Totals 13,115 301 388 1,619 632 3,406 19,461 15,302 4,159 84,817 6,216 3,980,059 202,024 4b.1.3 Scaffolding in support of decommissioning 1,589 9
2 10 3
401 2,014 2,014 458 29 23,188 27,151 Decontamination of Site Buildings 4b.1.4.1 Reactor 1,937 1,369 182 196 134 604 1,529 5,951 5,951 7,022 8,897 1,144,512 50,361 4b.1.4.2 Auxiliary Building 194 103 6
7 17 13 130 470 470 866 229 57,065 4,554 4b.1.4.3 Refueling Water Storage Tank 352 408 4
5 22 6
284 1,081 1,081 1,146 87 54,852 11,906 4b.1.4.4 Steam Generator Storage Facility 57 0
0 0
0 0
29 86 86 1
0 40 888 4b.1.4 Totals 2,540 1,880 192 208 172 623 1,972 7,588 7,588 9,034 9,212 1,256,470 67,709 4b.1 Subtotal Period 4b Activity Costs 2,540 16,585 502 598 1,801 1,258 5,779 29,063 24,904 4,159 94,309 15,457 5,259,717 296,885 Period 4b Additional Costs 4b.2.1 License Termination Survey Planning 940 282 1,222 1,222 6,240 4b.2.2 ISFSI License Termination 36 0
24 89 618 127 894 894 1,688 142,260 1,473 1,280 4b.2 Subtotal Period 4b Additional Costs 36 0
24 89 1,558 410 2,116 1,222 894 1,688 142,260 1,473 7,520 Period 4b Collateral Costs 4b.3.1 Process liquid waste 90 41 185 179 122 617 617 641 38,474 125 4b.3.2 Small tool allowance 306 46 352 352 4b.3.3 Decommissioning Equipment Disposition 123 34 127 40 46 369 369 6,000 373 303,507 88 4b.3 Subtotal Period 4b Collateral Costs 90 306 164 219 127 218 214 1,337 1,337 6,000 1,015 341,981 213 Period 4b Period-Dependent Costs 4b.4.1 Decon supplies 686 171 857 857 4b.4.2 Insurance 745 74 819 819 4b.4.3 Property taxes 1,107 111 1,218 1,218 4b.4.4 Health physics supplies 1,992 498 2,490 2,490 4b.4.5 Heavy equipment rental 3,900 585 4,486 4,486 4b.4.6 Disposal of DAW generated 13 5
241 62 321 321 4,321 86,419 20 4b.4.7 Plant energy budget 2,193 329 2,522 2,522 4b.4.8 NRC Fees 1,459 146 1,605 1,605 4b.4.9 Site O&M Costs 277 42 318 318 4b.4.10 Liquid Radwaste Processing Equipment/Services 849 127 976 976 4b.4.11 Security Staff Cost 967 145 1,112 1,112 25,426 4b.4.12 DOC Staff Cost 16,431 2,465 18,895 18,895 217,274 4b.4.13 Utility Staff Cost 27,621 4,143 31,764 31,764 388,320 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 10 of 24 Table D-1 Braidwood Nuclear Power Station, Unit 1 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:55:49 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours 4b.4 Subtotal Period 4b Period-Dependent Costs 686 5,893 13 5
241 51,648 8,898 67,384 67,384 4,321 86,419 20 631,020 4b.0 TOTAL PERIOD 4b COST 3,316 22,820 679 845 1,928 1,806 53,206 15,301 99,900 94,847 894 4,159 100,309 22,480 5,830,376 298,591 638,540 PERIOD 4d - Delay before License Termination Period 4d Period-Dependent Costs 4d.4.1 Insurance 4d.4.2 Property taxes 668 67 735 735 4d.4.3 Health physics supplies 102 25 127 127 4d.4.4 Disposal of DAW generated 0
0 7
2 10 10 133 2,665 1
4d.4.5 Plant energy budget 4d.4.6 NRC Fees 244 24 268 268 4d.4.7 Site O&M Costs 167 25 192 192 4d.4.8 Utility Staff Cost 1,374 206 1,580 1,580 19,520 4d.4 Subtotal Period 4d Period-Dependent Costs 102 0
0 7
2,453 350 2,912 2,912 133 2,665 1
19,520 4d.0 TOTAL PERIOD 4d COST 102 0
0 7
2,453 350 2,912 2,912 133 2,665 1
19,520 PERIOD 4e - License Termination Period 4e Direct Decommissioning Activities 4e.1.1 ORISE confirmatory survey 151 45 197 197 4e.1.2 Terminate license a
4e.1 Subtotal Period 4e Activity Costs 151 45 197 197 Period 4e Additional Costs 4e.2.1 License Termination Survey 6,204 1,861 8,065 8,065 97,350 3,120 4e.2 Subtotal Period 4e Additional Costs 6,204 1,861 8,065 8,065 97,350 3,120 Period 4e Collateral Costs 4e.3.1 DOC staff relocation expenses 1,130 169 1,299 1,299 4e.3 Subtotal Period 4e Collateral Costs 1,130 169 1,299 1,299 Period 4e Period-Dependent Costs 4e.4.1 Insurance 4e.4.2 Property taxes 376 38 414 414 4e.4.3 Health physics supplies 628 157 785 785 4e.4.4 Disposal of DAW generated 1
0 19 5
25 25 335 6,698 2
4e.4.5 Plant energy budget 199 30 229 229 4e.4.6 NRC Fees 532 53 585 585 4e.4.7 Site O&M Costs 94 14 108 108 4e.4.8 Security Staff Cost 527 79 606 606 11,786 4e.4.9 DOC Staff Cost 3,801 570 4,371 4,371 46,750 4e.4.10 Utility Staff Cost 4,551 683 5,234 5,234 56,964 4e.4 Subtotal Period 4e Period-Dependent Costs 628 1
0 19 10,079 1,628 12,356 12,356 335 6,698 2
115,500 4e.0 TOTAL PERIOD 4e COST 628 1
0 19 17,564 3,704 21,917 21,917 335 6,698 97,352 118,620 PERIOD 4 TOTALS 3,832 48,808 10,222 7,906 3,884 31,881 120,008 46,423 272,963 263,230 894 8,839 215,616 80,326 3,130 459 505 17,119,610 641,854 1,364,758 PERIOD 5b - Site Restoration Period 5b Direct Decommissioning Activities Demolition of Remaining Site Buildings 5b.1.1.1 Reactor 6,763 1,014 7,778 7,778 69,546 5b.1.1.2 Auxiliary Building 5,798 870 6,667 6,667 61,037 5b.1.1.3 Refueling Water Storage Tank 1,028 154 1,182 1,182 11,692 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 11 of 24 Table D-1 Braidwood Nuclear Power Station, Unit 1 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:55:49 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Demolition of Remaining Site Buildings (continued) 5b.1.1.4 Steam Generator Storage Facility 429 64 493 493 4,559 5b.1.1.5 Turbine Building 5,769 865 6,634 6,634 70,342 5b.1.1.6 Turbine Pedestal 1,352 203 1,555 1,555 12,628 5b.1.1 Totals 21,138 3,171 24,309 24,309 229,805 Site Closeout Activities 5b.1.2 Grade & landscape site 716 107 823 823 1,942 5b.1.3 Final report to NRC 184 28 212 212 1,560 5b.1 Subtotal Period 5b Activity Costs 21,854 184 3,306 25,343 212 25,132 231,747 1,560 Period 5b Additional Costs 5b.2.1 Concrete Crushing 603 3
91 697 697 2,798 5b.2.2 ISFSI Demolition and Site Restoration 516 24 81 622 622 5,235 80 5b.2 Subtotal Period 5b Additional Costs 1,120 27 172 1,319 622 697 8,033 80 Period 5b Collateral Costs 5b.3.1 Small tool allowance 262 39 301 301 5b.3 Subtotal Period 5b Collateral Costs 262 39 301 301 Period 5b Period-Dependent Costs 5b.4.1 Insurance 5b.4.2 Property taxes 1,239 124 1,363 1,363 5b.4.3 Heavy equipment rental 6,239 936 7,174 7,174 5b.4.4 Plant energy budget 327 49 376 376 5b.4.5 Site O&M Cost 310 46 356 356 5b.4.6 Security Staff Cost 1,561 234 1,795 1,795 34,287 5b.4.7 DOC Staff Cost 11,650 1,748 13,398 13,398 137,043 5b.4.8 Utility Staff Cost 5,559 834 6,392 6,392 67,229 5b.4 Subtotal Period 5b Period-Dependent Costs 6,239 20,645 3,971 30,855 30,855 238,558 5b.0 TOTAL PERIOD 5b COST 29,474 20,857 7,488 57,818 212 622 56,985 239,780 240,198 PERIOD 5 TOTALS 29,474 20,857 7,488 57,818 212 622 56,985 239,780 240,198 TOTAL COST TO DECOMMISSION 9,156 84,022 10,395 8,575 3,884 33,008 386,394 93,904 629,338 424,316 137,704 67,318 215,616 91,399 3,130 459 505 17,432,430 972,325 4,132,638 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 12 of 24 Table D-1 Braidwood Nuclear Power Station, Unit 1 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:55:49 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours TOTAL COST TO DECOMMISSION WITH 17.54% CONTINGENCY:
$629,338 thousands of 2009 dollars TOTAL NRC LICENSE TERMINATION COST IS 67.42% OR:
$424,316 thousands of 2009 dollars SPENT FUEL MANAGEMENT COST IS 21.88% OR:
$137,704 thousands of 2009 dollars NON-NUCLEAR DEMOLITION COST IS 10.7% OR:
$67,318 thousands of 2009 dollars TOTAL LOW-LEVEL RADIOACTIVE WASTE VOLUME BURIED (EXCLUDING GTCC):
94,988 cubic feet TOTAL GREATER THAN CLASS C RADWASTE VOLUME GENERATED:
505 cubic feet TOTAL SCRAP METAL REMOVED:
57,871 tons TOTAL CRAFT LABOR REQUIREMENTS:
972,325 man-hours End Notes:
n/a - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
0 - indicates that this value is less than 0.5 but is non-zero.
a cell containing " - " indicates a zero value TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 13 of 24 Table D-2 Braidwood Nuclear Power Station, Unit 2 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:05 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 1a - Shutdown through Transition Period 1a Direct Decommissioning Activities 1a.1.1 SAFSTOR site characterization survey 398 119 517 517 1a.1.2 Prepare preliminary decommissioning cost 66 10 76 76 556 1a.1.3 Notification of Cessation of Operations a
1a.1.4 Remove fuel & source material n/a 1a.1.5 Notification of Permanent Defueling a
1a.1.6 Deactivate plant systems & process waste a
1a.1.7 Prepare and submit PSDAR 101 15 116 116 856 1a.1.8 Review plant dwgs & specs.
66 10 76 76 556 1a.1.9 Perform detailed rad survey a
1a.1.10 Estimate by-product inventory 51 8
58 58 428 1a.1.11 End product description 51 8
58 58 428 1a.1.12 Detailed by-product inventory 76 11 87 87 642 1a.1.13 Define major work sequence 51 8
58 58 428 1a.1.14 Perform SER and EA 157 23 180 180 1,327 1a.1.15 Perform Site-Specific Cost Study 253 38 290 290 2,140 Activity Specifications 1a.1.16.1 Prepare plant and facilities for SAFSTOR 249 37 286 286 2,106 1a.1.16.2 Plant systems 210 32 242 242 1,783 1a.1.16.3 Plant structures and buildings 158 24 181 181 1,335 1a.1.16.4 Waste management 101 15 116 116 856 1a.1.16.5 Facility and site dormancy 101 15 116 116 856 1a.1.16 Total 819 123 941 941 6,936 Detailed Work Procedures 1a.1.17.1 Plant systems 60 9
69 69 506 1a.1.17.2 Facility closeout & dormancy 61 9
70 70 514 1a.1.17 Total 120 18 138 138 1,020 1a.1.18 Procure vacuum drying system 5
1 6
6 43 1a.1.19 Drain/de-energize non-cont. systems a
1a.1.20 Drain & dry NSSS a
1a.1.21 Drain/de-energize contaminated systems a
1a.1.22 Decon/secure contaminated systems a
1a.1 Subtotal Period 1a Activity Costs 2,211 391 2,602 2,602 15,361 Period 1a Period-Dependent Costs 1a.4.1 Insurance 751 75 826 826 1a.4.2 Property taxes 1a.4.3 Health physics supplies 421 105 527 527 1a.4.4 Heavy equipment rental 421 63 484 484 1a.4.5 Disposal of DAW generated 2
1 34 9
45 45 610 12,190 3
1a.4.6 Plant energy budget 1,319 198 1,517 1,517 1a.4.7 NRC Fees 471 47 518 518 1a.4.8 Emergency Planning Fees 315 32 347 347 1a.4.9 Site O&M Costs 125 19 144 144 1a.4.10 Spent Fuel Pool O&M 381 57 438 438 1a.4.11 ISFSI Operating Costs 44 7
51 51 1a.4.12 Security Staff Cost 6,337 950 7,287 7,287 157,471 1a.4.13 Utility Staff Cost 31,082 4,662 35,745 35,745 423,400 1a.4 Subtotal Period 1a Period-Dependent Costs 842 2
1 34 40,825 6,224 47,927 47,092 836 610 12,190 3
580,871 1a.0 TOTAL PERIOD 1a COST 842 2
1 34 43,035 6,615 50,529 49,693 836 610 12,190 3
596,232 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 14 of 24 Table D-2 Braidwood Nuclear Power Station, Unit 2 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:05 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 1b - SAFSTOR Limited DECON Activities Period 1b Direct Decommissioning Activities Decontamination of Site Buildings 1b.1.1.1 Reactor 2,135 1,067 3,202 3,202 33,093 1b.1.1.2 Auxiliary Building 246 123 369 369 3,829 1b.1.1.3 Radwaste/Service Building 160 80 240 240 2,506 1b.1.1.4 Refueling Water Storage Tank 351 176 527 527 5,322 1b.1.1.5 Fuel Handling Building 1,003 502 1,505 1,505 15,238 1b.1.1 Totals 3,895 1,947 5,842 5,842 59,989 1b.1 Subtotal Period 1b Activity Costs 3,895 1,947 5,842 5,842 59,989 Period 1b Collateral Costs 1b.3.1 Decon equipment 811 122 932 932 1b.3.2 Process liquid waste 205 90 404 389 269 1,357 1,357 1,398 83,852 272 1b.3.3 Small tool allowance 64 10 73 73 1b.3 Subtotal Period 1b Collateral Costs 1,016 64 90 404 389 401 2,363 2,363 1,398 83,852 272 Period 1b Period-Dependent Costs 1b.4.1 Decon supplies 746 187 933 933 1b.4.2 Insurance 187 19 206 206 1b.4.3 Property taxes 1,612 161 1,773 1,773 1b.4.4 Health physics supplies 340 85 425 425 1b.4.5 Heavy equipment rental 105 16 121 121 1b.4.6 Disposal of DAW generated 2
1 33 8
43 43 585 11,699 3
1b.4.7 Plant energy budget 329 49 378 378 1b.4.8 NRC Fees 117 12 129 129 1b.4.9 Emergency Planning Fees 79 8
86 86 1b.4.10 Site O&M Costs 31 5
36 36 1b.4.11 Spent Fuel Pool O&M 95 14 109 109 1b.4.12 ISFSI Operating Costs 11 2
13 13 1b.4.13 Security Staff Cost 1,580 237 1,817 1,817 39,260 1b.4.14 Utility Staff Cost 7,749 1,162 8,912 8,912 105,560 1b.4 Subtotal Period 1b Period-Dependent Costs 746 445 2
1 33 11,790 1,965 14,982 14,773 208 585 11,699 3
144,820 1b.0 TOTAL PERIOD 1b COST 5,657 509 92 404 422 11,790 4,313 23,186 22,978 208 1,983 95,552 60,264 144,820 PERIOD 1c - Preparations for SAFSTOR Dormancy Period 1c Direct Decommissioning Activities 1c.1.1 Prepare support equipment for storage 457 69 525 525 3,000 1c.1.2 Install containment pressure equal. lines 48 7
55 55 700 1c.1.3 Interim survey prior to dormancy 733 220 953 953 13,416 1c.1.4 Secure building accesses a
1c.1.5 Prepare & submit interim report 29 4
34 34 250 1c.1 Subtotal Period 1c Activity Costs 504 762 300 1,567 1,567 17,116 250 Period 1c Additional Costs 1c.2.1 Spent Fuel Pool Isolation 9,690 1,453 11,143 11,143 1c.2 Subtotal Period 1c Additional Costs 9,690 1,453 11,143 11,143 Period 1c Collateral Costs 1c.3.1 Process liquid waste 251 110 494 476 330 1,661 1,661 1,710 102,618 333 1c.3.2 Small tool allowance 4
1 5
5 1c.3 Subtotal Period 1c Collateral Costs 251 4
110 494 476 330 1,666 1,666 1,710 102,618 333 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 15 of 24 Table D-2 Braidwood Nuclear Power Station, Unit 2 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:05 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 1c Period-Dependent Costs 1c.4.1 Insurance 187 19 206 206 1c.4.2 Property taxes 1,612 161 1,773 1,773 1c.4.3 Health physics supplies 144 36 179 179 1c.4.4 Heavy equipment rental 105 16 121 121 1c.4.5 Disposal of DAW generated 0
0 6
1 7
7 99 1,976 0
1c.4.6 Plant energy budget 329 49 378 378 1c.4.7 NRC Fees 117 12 129 129 1c.4.8 Emergency Planning Fees 79 8
86 86 1c.4.9 Site O&M Costs 31 5
36 36 1c.4.10 Spent Fuel Pool O&M 95 14 109 109 1c.4.11 ISFSI Operating Costs 11 2
13 13 1c.4.12 Security Staff Cost 1,580 237 1,817 1,817 39,260 1c.4.13 Utility Staff Cost 1,073 161 1,234 1,234 13,520 1c.4 Subtotal Period 1c Period-Dependent Costs 248 0
0 6
5,114 720 6,089 5,881 208 99 1,976 0
52,780 1c.0 TOTAL PERIOD 1c COST 251 757 110 494 482 15,566 2,804 20,465 20,257 208 1,809 104,595 17,450 53,030 PERIOD 1 TOTALS 5,908 2,108 204 899 937 70,392 13,732 94,180 92,928 1,252 4,401 212,337 77,716 794,082 PERIOD 2a - SAFSTOR Dormancy with Wet Spent Fuel Storage Period 2a Direct Decommissioning Activities 2a.1.1 Quarterly Inspection a
2a.1.2 Semi-annual environmental survey a
2a.1.3 Prepare reports a
2a.1.4 Bituminous roof replacement 931 140 1,071 1,071 2a.1.5 Maintenance supplies 1,944 486 2,430 2,430 2a.1 Subtotal Period 2a Activity Costs 2,876 626 3,501 3,501 Period 2a Collateral Costs 2a.3.1 Spent Fuel Capital and Transfer 11,500 1,725 13,225 13,225 2a.3 Subtotal Period 2a Collateral Costs 11,500 1,725 13,225 13,225 Period 2a Period-Dependent Costs 2a.4.1 Insurance 5,197 520 5,717 5,007 710 2a.4.2 Property taxes 13,459 1,346 14,805 8,502 6,303 2a.4.3 Health physics supplies 1,271 318 1,589 1,589 2a.4.4 Disposal of DAW generated 18 7
332 86 442 442 5,950 118,994 27 2a.4.5 Plant energy budget 4,081 612 4,693 2,346 2,346 2a.4.6 NRC Fees 2,765 276 3,041 3,041 2a.4.7 Emergency Planning Fees 1,546 155 1,700 1,700 2a.4.8 Site O&M Costs 1,932 290 2,222 2,222 2a.4.9 Spent Fuel Pool O&M 6,826 1,024 7,850 7,850 2a.4.10 ISFSI Operating Costs 680 102 782 782 2a.4.11 Security Staff Cost 39,751 5,963 45,714 45,714 965,627 2a.4.12 Utility Staff Cost 40,979 6,147 47,125 9,694 37,432 525,885 2a.4 Subtotal Period 2a Period-Dependent Costs 1,271 18 7
332 117,215 16,838 135,680 32,844 102,836 5,950 118,994 27 1,491,512 2a.0 TOTAL PERIOD 2a COST 1,271 18 7
332 131,591 19,188 152,406 36,345 116,061 5,950 118,994 27 1,491,512 PERIOD 2b - SAFSTOR Dormancy with Dry Spent Fuel Storage Period 2b Direct Decommissioning Activities 2b.1.1 Quarterly Inspection a
2b.1.2 Semi-annual environmental survey a
2b.1.3 Prepare reports a
2b.1.4 Bituminous roof replacement 65 10 75 75 2b.1.5 Maintenance supplies 136 34 170 170 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 16 of 24 Table D-2 Braidwood Nuclear Power Station, Unit 2 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:05 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours 2b.1 Subtotal Period 2b Activity Costs 201 44 245 245 Period 2b Collateral Costs 2b.3.1 Spent Fuel Capital and Transfer 1,625 244 1,869 1,869 2b.3 Subtotal Period 2b Collateral Costs 1,625 244 1,869 1,869 Period 2b Period-Dependent Costs 2b.4.1 Insurance 329 33 362 350 11 2b.4.2 Property taxes 541 54 595 595 2b.4.3 Health physics supplies 84 21 105 105 2b.4.4 Disposal of DAW generated 1
0 23 6
30 30 408 8,161 2
2b.4.5 Plant energy budget 143 21 164 164 2b.4.6 NRC Fees 193 19 213 213 2b.4.7 Emergency Planning Fees 108 11 119 119 2b.4.8 Site O&M Costs 135 20 155 155 2b.4.9 ISFSI Operating Costs 48 7
55 55 2b.4.10 Security Staff Cost 486 73 558 558 10,992 2b.4.11 Utility Staff Cost 1,640 246 1,886 678 1,207 22,571 2b.4 Subtotal Period 2b Period-Dependent Costs 84 1
0 23 3,622 512 4,242 2,291 1,951 408 8,161 2
33,564 2b.0 TOTAL PERIOD 2b COST 84 1
0 23 5,448 799 6,356 2,536 3,820 408 8,161 2
33,564 PERIOD 2c - SAFSTOR Dormancy without Spent Fuel Storage Period 2c Direct Decommissioning Activities 2c.1.1 Quarterly Inspection a
2c.1.2 Semi-annual environmental survey a
2c.1.3 Prepare reports a
2c.1.4 Bituminous roof replacement 52 8
59 59 2c.1.5 Maintenance supplies 108 27 135 135 2c.1 Subtotal Period 2c Activity Costs 159 35 194 194 Period 2c Period-Dependent Costs 2c.4.1 Insurance 252 25 278 278 2c.4.2 Property taxes 428 43 471 471 2c.4.3 Health physics supplies 63 16 79 79 2c.4.4 Disposal of DAW generated 1
0 18 5
24 24 317 6,343 1
2c.4.5 Plant energy budget 113 17 130 130 2c.4.6 NRC Fees 146 15 161 161 2c.4.7 Site O&M Costs 107 16 123 123 2c.4.8 Utility Staff Cost 467 70 537 537 7,154 2c.4 Subtotal Period 2c Period-Dependent Costs 63 1
0 18 1,515 206 1,803 1,803 317 6,343 1
7,154 2c.0 TOTAL PERIOD 2c COST 63 1
0 18 1,674 241 1,997 1,997 317 6,343 1
7,154 PERIOD 2 TOTALS 1,419 20 7
372 138,713 20,228 160,760 40,879 119,881 6,675 133,497 31 1,532,230 PERIOD 3a - Reactivate Site Following SAFSTOR Dormancy Period 3a Direct Decommissioning Activities 3a.1.1 Prepare preliminary decommissioning cost 66 10 76 76 556 3a.1.2 Review plant dwgs & specs.
232 35 267 267 1,969 3a.1.3 Perform detailed rad survey a
3a.1.4 End product description 51 8
58 58 428 3a.1.5 Detailed by-product inventory 66 10 76 76 556 3a.1.6 Define major work sequence 379 57 436 436 3,210 3a.1.7 Perform SER and EA 157 23 180 180 1,327 3a.1.8 Perform Site-Specific Cost Study 253 38 290 290 2,140 3a.1.9 Prepare/submit License Termination Plan 207 31 238 238 1,753 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 17 of 24 Table D-2 Braidwood Nuclear Power Station, Unit 2 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:05 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours 3a.1.10 Receive NRC approval of termination plan a
Activity Specifications 3a.1.11.1 Re-activate plant & temporary facilities 372 56 428 385 43 3,154 3a.1.11.2 Plant systems 210 32 242 218 24 1,783 3a.1.11.3 Reactor internals 359 54 412 412 3,039 3a.1.11.4 Reactor vessel 328 49 378 378 2,782 3a.1.11.5 Biological shield 25 4
29 29 214 3a.1.11.6 Steam generators 158 24 181 181 1,335 3a.1.11.7 Reinforced concrete 81 12 93 46 46 685 3a.1.11.8 Main Turbine 20 3
23 23 171 3a.1.11.9 Main Condensers 20 3
23 23 171 3a.1.11.10 Plant structures & buildings 158 24 181 91 91 1,335 3a.1.11.11 Waste management 232 35 267 267 1,969 3a.1.11.12 Facility & site closeout 45 7
52 26 26 385 3a.1.11 Total 2,009 301 2,310 2,034 277 17,024 Planning & Site Preparations 3a.1.12 Prepare dismantling sequence 121 18 139 139 1,027 3a.1.13 Plant prep. & temp. svces 2,800 420 3,220 3,220 3a.1.14 Design water clean-up system 71 11 81 81 599 3a.1.15 Rigging/Cont. Cntrl Envlps/tooling/etc.
2,200 330 2,530 2,530 3a.1.16 Procure casks/liners & containers 62 9
71 71 526 3a.1 Subtotal Period 3a Activity Costs 8,672 1,301 9,973 9,696 277 31,117 Period 3a Period-Dependent Costs 3a.4.1 Insurance 304 30 334 334 3a.4.2 Property taxes 500 50 550 550 3a.4.3 Health physics supplies 349 87 437 437 3a.4.4 Heavy equipment rental 421 63 484 484 3a.4.5 Disposal of DAW generated 1
1 27 7
36 36 481 9,613 2
3a.4.6 Plant energy budget 1,319 198 1,517 1,517 3a.4.7 NRC Fees 214 21 236 236 3a.4.8 Site O&M Costs 125 19 144 144 3a.4.9 Security Staff Cost 238 36 274 274 6,257 3a.4.10 Utility Staff Cost 14,259 2,139 16,398 16,398 200,229 3a.4 Subtotal Period 3a Period-Dependent Costs 770 1
1 27 16,959 2,650 20,408 20,408 481 9,613 2
206,486 3a.0 TOTAL PERIOD 3a COST 770 1
1 27 25,631 3,951 30,381 30,105 277 481 9,613 2
237,603 PERIOD 3b - Decommissioning Preparations Period 3b Direct Decommissioning Activities Detailed Work Procedures 3b.1.1.1 Plant systems 239 36 275 247 27 2,026 3b.1.1.2 Reactor internals 126 19 145 145 1,070 3b.1.1.3 Remaining buildings 68 10 78 20 59 578 3b.1.1.4 CRD cooling assembly 51 8
58 58 428 3b.1.1.5 CRD housings & ICI tubes 51 8
58 58 428 3b.1.1.6 Incore instrumentation 51 8
58 58 428 3b.1.1.7 Reactor vessel 183 28 211 211 1,554 3b.1.1.8 Facility closeout 61 9
70 35 35 514 3b.1.1.9 Missile shields 23 3
26 26 193 3b.1.1.10 Biological shield 61 9
70 70 514 3b.1.1.11 Steam generators 232 35 267 267 1,969 3b.1.1.12 Reinforced concrete 51 8
58 29 29 428 3b.1.1.13 Main Turbine 79 12 91 91 668 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 18 of 24 Table D-2 Braidwood Nuclear Power Station, Unit 2 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:05 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Detailed Work Procedures (continued) 3b.1.1.14 Main Condensers 79 12 91 91 668 3b.1.1.15 Auxiliary building 138 21 159 143 16 1,168 3b.1.1.16 Reactor building 138 21 159 143 16 1,168 3b.1.1 Total 1,629 244 1,873 1,510 363 13,800 3b.1 Subtotal Period 3b Activity Costs 1,629 244 1,873 1,510 363 13,800 Period 3b Additional Costs 3b.2.1 Site Characterization 2,657 797 3,454 3,454 12,779 4,547 3b.2 Subtotal Period 3b Additional Costs 2,657 797 3,454 3,454 12,779 4,547 Period 3b Collateral Costs 3b.3.1 Decon equipment 811 122 932 932 3b.3.2 DOC staff relocation expenses 1,130 169 1,299 1,299 3b.3.3 Pipe cutting equipment 1,100 165 1,265 1,265 3b.3 Subtotal Period 3b Collateral Costs 811 1,100 1,130 456 3,497 3,497 Period 3b Period-Dependent Costs 3b.4.1 Decon supplies 25 6
31 31 3b.4.2 Insurance 168 17 185 185 3b.4.3 Property taxes 251 25 276 276 3b.4.4 Health physics supplies 189 47 236 236 3b.4.5 Heavy equipment rental 211 32 242 242 3b.4.6 Disposal of DAW generated 1
0 15 4
20 20 266 5,315 1
3b.4.7 Plant energy budget 661 99 761 761 3b.4.8 NRC Fees 107 11 118 118 3b.4.9 Site O&M Costs 63 9
72 72 3b.4.10 Security Staff Cost 119 18 137 137 3,137 3b.4.11 DOC Staff Cost 3,296 494 3,790 3,790 42,874 3b.4.12 Utility Staff Cost 7,149 1,072 8,222 8,222 100,389 3b.4 Subtotal Period 3b Period-Dependent Costs 25 400 1
0 15 11,815 1,835 14,090 14,090 266 5,315 1
146,400 3b.0 TOTAL PERIOD 3b COST 836 1,500 1
0 15 17,230 3,332 22,913 22,550 363 266 5,315 12,780 164,747 PERIOD 3 TOTALS 836 2,270 2
1 42 42,861 7,283 53,295 52,655 640 746 14,927 12,782 402,349 PERIOD 4a - Large Component Removal Period 4a Direct Decommissioning Activities Nuclear Steam Supply System Removal 4a.1.1.1 Reactor Coolant Piping 46 160 33 29 341 156 765 765 1,728 208,992 3,290 4a.1.1.2 Pressurizer Relief Tank 8
29 6
6 60 28 136 136 329 36,553 596 4a.1.1.3 Reactor Coolant Pumps & Motors 28 105 57 168 1,272 389 2,018 2,018 4,796 780,540 2,726 80 4a.1.1.4 Pressurizer 12 68 347 94 412 175 1,108 1,108 3,033 252,826 1,527 750 4a.1.1.5 Steam Generators 94 4,168 1,486 2,392 580 3,416 2,537 14,674 14,674 39,289 14,436 3,096,232 20,508 1,500 4a.1.1.6 CRDMs/ICIs/Service Structure Removal 22 80 176 31 59 68 436 436 2,843 50,181 1,648 4a.1.1.7 Reactor Vessel Internals 77 2,017 3,471 566 4,827 206 5,005 16,170 16,170 1,710 876 459 325,944 23,400 1,068 4a.1.1.8 Vessel & Internals GTCC Disposal 11,837 1,776 13,613 13,613 505 104,146 4a.1.1.9 Reactor Vessel 90 3,987 1,302 670 3,077 206 5,097 14,427 14,427 6,672 2,254 979,179 23,400 1,068 4a.1.1 Totals 376 10,613 6,879 3,955 580 25,302 411 15,230 63,346 63,346 39,289 35,547 3,130 459 505 5,834,593 77,095 4,466 Removal of Major Equipment 4a.1.2 Main Turbine/Generator 574 262 32 214 207 1,288 1,288 5,355 455,213 9,016 4a.1.3 Main Condensers 1,176 136 27 150 334 1,823 1,823 7,111 320,000 18,250 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 19 of 24 Table D-2 Braidwood Nuclear Power Station, Unit 2 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:05 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Cascading Costs from Clean Building Demolition 4a.1.4.1 Reactor 1,171 176 1,346 1,346 12,130 4a.1.4.2 Auxiliary Building 655 98 754 754 6,896 4a.1.4.3 Radwaste/Service Building 429 64 494 494 5,059 4a.1.4.4 Refueling Water Storage Tank 114 17 131 131 1,299 4a.1.4.5 Fuel Handling Building 337 51 388 388 3,690 4a.1.4 Totals 2,707 406 3,113 3,113 29,074 Disposal of Plant Systems 4a.1.5.1 Auxiliary Feedwater 71 11 82 82 1,143 4a.1.5.2 Auxiliary Steam 130 20 150 150 2,107 4a.1.5.3 Auxiliary Steam RCA 357 5
9 54 99 525 525 2,822 114,583 5,241 4a.1.5.4 Boric Acid Processing 463 28 23 34 106 154 808 808 1,794 1,076 162,827 6,970 4a.1.5.5 CO2 & H2 18 3
20 20 289 4a.1.5.6 CO2 & H2 RCA 34 1
1 5
9 50 50 287 11,664 478 4a.1.5.7 Chemical Feed 165 25 190 190 2,663 4a.1.5.8 Chemical Feed at Intake 23 3
26 26 364 4a.1.5.9 Chilled Water 91 14 104 104 1,454 4a.1.5.10 Circulating Water 542 81 624 624 8,814 4a.1.5.11 Condensate 333 50 383 383 5,317 4a.1.5.12 Condensate Booster 332 50 382 382 5,314 4a.1.5.13 Condensate Cleanup 182 27 209 209 3,000 4a.1.5.14 Containment Spray 251 7
12 69 76 414 414 3,602 146,289 3,673 4a.1.5.15 Diesel Fuel Oil 180 27 207 207 2,848 4a.1.5.16 Essential Service Water 311 47 358 358 5,049 4a.1.5.17 Extraction Steam 223 33 256 256 3,637 4a.1.5.18 Feedwater 303 45 348 348 4,925 4a.1.5.19 Feedwater Drains 719 108 827 827 11,719 4a.1.5.20 Gland Steam 38 6
43 43 616 4a.1.5.21 Gland Water 28 4
32 32 458 4a.1.5.22 Main Steam 308 46 354 354 4,979 4a.1.5.23 Main Steam RCA 84 2
3 19 24 132 132 990 40,190 1,250 4a.1.5.24 Make-up Demineralizer 155 23 179 179 2,595 4a.1.5.25 Nitrogen 1
0 1
1 18 4a.1.5.26 Non-Essential Service Water 361 54 416 416 5,903 4a.1.5.27 Non-Essential Service Water RCA 179 7
13 75 59 332 332 3,909 158,755 2,535 4a.1.5.28 Off Gas 665 13 25 141 192 1,037 1,037 7,411 300,945 10,038 4a.1.5.29 Potable Water 5
1 6
6 75 4a.1.5.30 Process Radiation Monitoring 64 0
0 3
17 84 84 138 5,613 1,086 4a.1.5.31 Process Sampling 143 1
2 12 38 196 196 641 26,045 2,347 4a.1.5.32 Screen Wash 45 7
52 52 740 4a.1.5.33 Station Air 43 6
50 50 705 4a.1.5.34 Station Heating 147 22 169 169 2,391 4a.1.5.35 Steam Humidification 7
1 8
8 115 4a.1.5.36 Switchgear Heat Removal 33 5
38 38 519 4a.1.5.37 Turbine Bldg Equip Drains 76 11 88 88 1,235 4a.1.5.38 Turbine Bldg Floor Drains 131 20 150 150 2,117 4a.1.5.39 Turbine Oil 83 12 96 96 1,359 4a.1.5.40 Turbine-Generator Auxilaries 56 8
64 64 884 4a.1.5.41 Waste Oil Sumps 32 5
37 37 517 4a.1.5.42 Well Water 79 12 90 90 1,247 4a.1.5 Totals 7,489 64 90 412 106 1,455 9,616 3,579 6,037 21,594 1,076 966,911 118,732 4a.1.6 Scaffolding in support of decommissioning 1,560 10 2
10 3
394 1,979 1,979 473 29 23,936 26,661 4a.1 Subtotal Period 4a Activity Costs 376 24,118 7,351 4,106 1,367 25,411 411 18,026 81,165 75,128 6,037 73,823 36,653 3,130 459 505 7,600,654 278,829 4,466 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 20 of 24 Table D-2 Braidwood Nuclear Power Station, Unit 2 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:05 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 4a Collateral Costs 4a.3.1 Process liquid waste 76 35 156 151 103 521 521 541 32,439 105 4a.3.2 Small tool allowance 281 42 323 291 32 4a.3 Subtotal Period 4a Collateral Costs 76 281 35 156 151 145 843 811 32 541 32,439 105 Period 4a Period-Dependent Costs 4a.4.1 Decon supplies 65 16 81 81 4a.4.2 Insurance 442 44 486 486 4a.4.3 Property taxes 657 66 723 651 72 4a.4.4 Health physics supplies 1,630 408 2,038 2,038 4a.4.5 Heavy equipment rental 2,333 350 2,683 2,683 4a.4.6 Disposal of DAW generated 9
3 176 45 234 234 3,149 62,985 14 4a.4.7 Plant energy budget 1,648 247 1,895 1,895 4a.4.8 NRC Fees 593 59 652 652 4a.4.9 Site O&M Costs 164 25 189 189 4a.4.10 Liquid Radwaste Processing Equipment/Services 504 76 579 579 4a.4.11 Security Staff Cost 2,604 391 2,995 2,995 60,699 4a.4.12 DOC Staff Cost 14,921 2,238 17,159 17,159 187,310 4a.4.13 Utility Staff Cost 24,263 3,639 27,902 27,902 330,240 4a.4 Subtotal Period 4a Period-Dependent Costs 65 3,964 9
3 176 45,796 7,604 57,617 57,545 72 3,149 62,985 14 578,249 4a.0 TOTAL PERIOD 4a COST 518 28,362 7,395 4,265 1,367 25,737 46,207 25,775 139,626 133,484 6,142 73,823 40,343 3,130 459 505 7,696,078 278,949 582,715 PERIOD 4b - Site Decontamination Period 4b Direct Decommissioning Activities 4b.1.1 Remove spent fuel racks 1,093 118 313 95 590 769 2,978 2,978 5,572 499,920 2,174 Disposal of Plant Systems 4b.1.2.1 Chemical & Volume Control 1,046 60 45 34 243 340 1,769 1,769 1,783 2,322 278,742 15,645 4b.1.2.2 Chilled Water RCA 647 13 25 139 188 1,012 1,012 7,293 296,176 9,173 4b.1.2.3 Component Cooling 687 17 31 178 205 1,118 1,118 9,319 378,439 10,075 4b.1.2.4 Electrical 4,168 625 4,793 4,793 66,259 4b.1.2.5 Electrical - Contaminated 1,716 17 32 181 463 2,409 2,409 9,508 386,137 25,754 4b.1.2.6 Electrical - RCA 2,460 39 72 410 691 3,673 3,673 21,460 871,483 37,551 4b.1.2.7 Emergency Diesel Generator 95 14 109 109 1,514 4b.1.2.8 Essential Service Water RCA 333 17 32 179 117 677 677 9,380 380,930 4,955 4b.1.2.9 Fire Protection 307 46 353 353 4,983 4b.1.2.10 Fire Protection RCA 521 12 22 124 153 832 832 6,516 264,606 7,384 4b.1.2.11 Fuel Handling Bldg Equip Drains 161 7
7 20 23 51 268 268 1,027 221 60,829 2,404 4b.1.2.12 Fuel Handling Bldg Equip Drains (Unit 1) 29 1
1 1
4 8
44 44 67 34 5,758 424 4b.1.2.13 Fuel Handling Bldg Floor Drains 164 7
7 16 25 51 270 270 830 238 54,723 2,441 4b.1.2.14 Fuel Handling Bldg Floor Drains (Unit 1) 114 4
4 13 11 34 181 181 703 109 37,980 1,740 4b.1.2.15 Fuel Pool Cooling & Cleanup 218 11 11 24 43 72 380 380 1,275 406 88,160 3,272 4b.1.2.16 Fuel Pool Cooling & Cleanup (Unit 1) 202 10 10 23 38 66 350 350 1,226 361 82,110 3,050 4b.1.2.17 HVAC-Auxiliary Building 529 10 19 108 152 818 818 5,643 229,172 7,876 4b.1.2.18 HVAC-Control Room HVAC 8
1 9
9 127 4b.1.2.19 HVAC-Diesel Generator Room 43 6
50 50 686 4b.1.2.20 HVAC-Laboratory 20 3
23 23 315 4b.1.2.21 HVAC-Machine Shop 18 3
21 21 297 4b.1.2.22 HVAC-Miscellaneous 110 17 127 127 1,769 4b.1.2.23 HVAC-Primary Containment 588 19 36 204 185 1,032 1,032 10,679 433,695 8,624 4b.1.2.24 HVAC-Pumphouse 17 3
20 20 275 4b.1.2.25 HVAC-Radwaste 303 6
11 63 87 471 471 3,327 135,102 4,323 4b.1.2.26 HVAC-Turbine Building 186 28 214 214 3,158 4b.1.2.27 Instrument Air Supply 72 11 83 83 1,197 4b.1.2.28 Instrument Air Supply RCA 240 2
3 20 64 329 329 1,035 42,036 3,563 4b.1.2.29 Miscellaneous Drains 73 1
2 12 20 108 108 617 25,043 1,104 4b.1.2.30 Primary Containment Purge 289 10 20 111 93 523 523 5,816 236,197 4,524 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 21 of 24 Table D-2 Braidwood Nuclear Power Station, Unit 2 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:05 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Disposal of Plant Systems (continued) 4b.1.2.31 Primary Water 801 32 43 187 61 253 1,377 1,377 9,803 667 449,848 12,651 4b.1.2.32 Radioactive Waste Disposal 2,694 170 139 187 658 904 4,752 4,752 9,780 6,604 954,524 40,174 4b.1.2.33 Reactor Bldg Equipment Drains 106 8
7 7
37 39 203 203 356 350 45,614 1,581 4b.1.2.34 Reactor Building Floor Drains 40 2
2 2
7 12 65 65 125 66 11,009 597 4b.1.2.35 Reactor Coolant 161 8
6 4
32 50 260 260 206 299 35,137 2,391 4b.1.2.36 Residual Heat Removal 184 11 12 27 43 64 340 340 1,421 405 94,061 2,834 4b.1.2.37 Safety Injection 841 37 46 172 98 271 1,465 1,465 9,001 979 448,431 13,165 4b.1.2.38 Station Air RCA 56 1
1 6
15 78 78 293 11,919 815 4b.1.2.39 Station Heating RCA 244 4
8 46 70 373 373 2,412 97,961 3,548 4b.1.2.40 Tritium ALPS 364 9
17 99 109 599 599 5,181 210,418 5,732 4b.1.2.41 Waste Oil Sumps RCA 25 0
1 3
7 36 36 154 6,246 361 4b.1.2.42 Waste Water Treatment 89 13 102 102 1,464 4b.1.2 Totals 20,969 549 672 2,600 1,321 5,605 31,717 25,813 5,903 136,237 13,061 6,652,483 319,776 4b.1.3 Scaffolding in support of decommissioning 2,340 15 3
15 5
590 2,968 2,968 710 44 35,904 39,992 Decontamination of Site Buildings 4b.1.4.1 Reactor 1,937 1,369 182 196 134 604 1,529 5,951 5,951 7,022 8,897 1,144,512 50,361 4b.1.4.2 Auxiliary Building 227 116 8
9 17 18 151 545 545 866 322 66,370 5,240 4b.1.4.3 Radwaste/Service Building 149 46 6
7 6
15 92 320 320 322 278 40,039 2,959 4b.1.4.4 Refueling Water Storage Tank 352 408 4
5 22 6
284 1,081 1,081 1,146 87 54,852 11,906 4b.1.4.5 Fuel Handling Building 1,009 1,121 14 17 59 26 804 3,051 3,051 3,097 411 165,831 33,340 4b.1.4 Totals 3,673 3,060 214 234 238 669 2,861 10,948 10,948 12,452 9,994 1,471,605 103,806 4b.1 Subtotal Period 4b Activity Costs 4,766 26,487 1,091 1,005 2,853 2,585 9,825 48,611 42,708 5,903 149,399 28,671 8,659,912 465,748 Period 4b Additional Costs 4b.2.1 License Termination Survey Planning 940 282 1,222 1,222 6,240 4b.2.2 ISFSI License Termination 36 0
24 89 618 127 894 894 1,688 142,260 1,473 1,280 4b.2 Subtotal Period 4b Additional Costs 36 0
24 89 1,558 410 2,116 1,222 894 1,688 142,260 1,473 7,520 Period 4b Collateral Costs 4b.3.1 Process liquid waste 218 100 449 433 295 1,495 1,495 1,555 93,278 303 4b.3.2 Small tool allowance 497 74 571 571 4b.3.3 Decommissioning Equipment Disposition 123 34 127 40 46 369 369 6,000 373 303,507 88 4b.3 Subtotal Period 4b Collateral Costs 218 497 223 483 127 472 415 2,435 2,435 6,000 1,928 396,785 391 Period 4b Period-Dependent Costs 4b.4.1 Decon supplies 868 217 1,085 1,085 4b.4.2 Insurance 909 91 999 999 4b.4.3 Property taxes 1,351 135 1,486 1,486 4b.4.4 Health physics supplies 2,932 733 3,665 3,665 4b.4.5 Heavy equipment rental 4,759 714 5,472 5,472 4b.4.6 Disposal of DAW generated 20 7
374 97 498 498 6,704 134,081 31 4b.4.7 Plant energy budget 2,675 401 3,076 3,076 4b.4.8 NRC Fees 1,219 122 1,340 1,340 4b.4.9 Site O&M Costs 338 51 388 388 4b.4.10 Liquid Radwaste Processing Equipment/Services 1,036 155 1,191 1,191 4b.4.11 Security Staff Cost 7,645 1,147 8,792 8,792 176,250 4b.4.12 DOC Staff Cost 30,407 4,561 34,967 34,967 377,880 4b.4.13 Utility Staff Cost 50,045 7,507 57,552 57,552 665,520 4b.4 Subtotal Period 4b Period-Dependent Costs 868 7,691 20 7
374 95,624 15,930 120,513 120,513 6,704 134,081 31 1,219,650 4b.0 TOTAL PERIOD 4b COST 5,852 34,711 1,333 1,518 2,980 3,520 97,181 26,580 173,676 166,878 894 5,903 155,399 38,991 9,333,038 467,643 1,227,170 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 22 of 24 Table D-2 Braidwood Nuclear Power Station, Unit 2 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:05 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 4e - License Termination Period 4e Direct Decommissioning Activities 4e.1.1 ORISE confirmatory survey 151 45 197 197 4e.1.2 Terminate license a
4e.1 Subtotal Period 4e Activity Costs 151 45 197 197 Period 4e Additional Costs 4e.2.1 License Termination Survey 8,222 2,467 10,688 10,688 131,983 3,120 4e.2 Subtotal Period 4e Additional Costs 8,222 2,467 10,688 10,688 131,983 3,120 Period 4e Collateral Costs 4e.3.1 DOC staff relocation expenses 1,130 169 1,299 1,299 4e.3 Subtotal Period 4e Collateral Costs 1,130 169 1,299 1,299 Period 4e Period-Dependent Costs 4e.4.1 Insurance 4e.4.2 Property taxes 376 38 414 414 4e.4.3 Health physics supplies 763 191 954 954 4e.4.4 Disposal of DAW generated 1
0 19 5
25 25 335 6,698 2
4e.4.5 Plant energy budget 199 30 229 229 4e.4.6 NRC Fees 355 35 390 390 4e.4.7 Site O&M Costs 94 14 108 108 4e.4.8 Security Staff Cost 527 79 606 606 11,786 4e.4.9 DOC Staff Cost 3,801 570 4,371 4,371 46,750 4e.4.10 Utility Staff Cost 4,551 683 5,234 5,234 56,964 4e.4 Subtotal Period 4e Period-Dependent Costs 763 1
0 19 9,902 1,644 12,330 12,330 335 6,698 2
115,500 4e.0 TOTAL PERIOD 4e COST 763 1
0 19 19,406 4,326 24,515 24,515 335 6,698 131,985 118,620 PERIOD 4 TOTALS 6,369 63,836 8,729 5,784 4,347 29,276 162,794 56,681 337,816 324,877 894 12,045 229,222 79,669 3,130 459 505 17,035,810 878,577 1,928,505 PERIOD 5b - Site Restoration Period 5b Direct Decommissioning Activities Demolition of Remaining Site Buildings 5b.1.1.1 Reactor 6,763 1,014 7,778 7,778 69,546 5b.1.1.2 Aux Feedwater-Steam Tunnel/Penetr. Area 689 103 792 792 5,186 5b.1.1.3 Auxiliary Building 5,899 885 6,784 6,784 62,063 5b.1.1.4 Blowdown Outfall Structure 29 4
33 33 295 5b.1.1.5 Bottled Gas Storage 26 4
30 30 340 5b.1.1.6 Circulating Water Discharge 233 35 268 268 2,887 5b.1.1.7 Gatehouse and Extension 333 50 382 382 4,193 5b.1.1.8 Instrument Maintenance Building 94 14 109 109 1,190 5b.1.1.9 Lake Screen House 1,494 224 1,718 1,718 15,283 5b.1.1.10 Make-up Demineralizer Area 647 97 744 744 8,158 5b.1.1.11 Miscellaneous Warehouses 1,991 299 2,290 2,290 26,794 5b.1.1.12 Miscellaneous Yard Structures 1,254 188 1,442 1,442 14,693 5b.1.1.13 Radwaste/Service Building 3,927 589 4,516 4,516 45,685 5b.1.1.14 Receiving Building 183 27 210 210 2,292 5b.1.1.15 Refueling Water Storage Tank 1,028 154 1,182 1,182 11,692 5b.1.1.16 River Screen House 616 92 708 708 6,844 5b.1.1.17 Security Modifications 959 144 1,103 1,103 6,939 5b.1.1.18 Sewage Treatment Plant 106 16 122 122 1,326 5b.1.1.19 Tech Support Center & Cond Cleanup Bldg 499 75 574 574 6,095 5b.1.1.20 Turbine Building 5,769 865 6,634 6,634 70,342 5b.1.1.21 Turbine Pedestal 1,352 203 1,555 1,555 12,628 5b.1.1.22 Waste Treatment Building 103 15 118 118 1,265 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 23 of 24 Table D-2 Braidwood Nuclear Power Station, Unit 2 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:05 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Demolition of Remaining Site Buildings (continued) 5b.1.1.23 Fuel Handling Building 3,039 456 3,495 3,495 33,245 5b.1.1 Totals 37,032 5,555 42,587 42,587 408,981 Site Closeout Activities 5b.1.2 Remove Rubble 237 35 272 272 1,367 5b.1.3 Grade & landscape site 716 107 823 823 1,942 5b.1.4 Final report to NRC 79 12 91 91 668 5b.1 Subtotal Period 5b Activity Costs 37,984 79 5,709 43,772 91 43,681 412,290 668 Period 5b Additional Costs 5b.2.1 ISFSI Demolition and Site Restoration 516 24 81 622 622 5,235 80 5b.2.2 Cofferdam Construction and Teardown 778 117 894 894 7,391 5b.2.3 Concrete Crushing 1,020 5
154 1,179 1,179 4,730 5b.2 Subtotal Period 5b Additional Costs 2,314 29 352 2,695 622 2,074 17,356 80 Period 5b Collateral Costs 5b.3.1 Small tool allowance 465 70 534 534 5b.3 Subtotal Period 5b Collateral Costs 465 70 534 534 Period 5b Period-Dependent Costs 5b.4.1 Insurance 5b.4.2 Property taxes 1,239 124 1,363 1,363 5b.4.3 Heavy equipment rental 6,239 936 7,174 7,174 5b.4.4 Plant energy budget 327 49 376 376 5b.4.5 Site O&M Cost 310 46 356 356 5b.4.6 Security Staff Cost 1,561 234 1,795 1,795 34,287 5b.4.7 DOC Staff Cost 11,650 1,748 13,398 13,398 137,043 5b.4.8 Utility Staff Cost 5,559 834 6,392 6,392 67,229 5b.4 Subtotal Period 5b Period-Dependent Costs 6,239 20,645 3,971 30,855 30,855 238,558 5b.0 TOTAL PERIOD 5b COST 47,001 20,753 10,101 77,856 91 622 77,144 429,646 239,306 PERIOD 5 TOTALS 47,001 20,753 10,101 77,856 91 622 77,144 429,646 239,306 TOTAL COST TO DECOMMISSION 13,113 116,635 8,955 6,691 4,347 30,627 435,514 108,026 723,907 511,430 122,649 89,829 229,222 91,491 3,130 459 505 17,396,570 1,398,752 4,896,472 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix D, Page 24 of 24 Table D-2 Braidwood Nuclear Power Station, Unit 2 Delayed DECON Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:05 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours TOTAL COST TO DECOMMISSION WITH 17.54% CONTINGENCY:
$723,907 thousands of 2009 dollars TOTAL NRC LICENSE TERMINATION COST IS 70.65% OR:
$511,430 thousands of 2009 dollars SPENT FUEL MANAGEMENT COST IS 16.94% OR:
$122,649 thousands of 2009 dollars NON-NUCLEAR DEMOLITION COST IS 12.41% OR:
$89,829 thousands of 2009 dollars TOTAL LOW-LEVEL RADIOACTIVE WASTE VOLUME BURIED (EXCLUDING GTCC):
95,080 cubic feet TOTAL GREATER THAN CLASS C RADWASTE VOLUME GENERATED:
505 cubic feet TOTAL SCRAP METAL REMOVED:
76,977 tons TOTAL CRAFT LABOR REQUIREMENTS:
1,398,752 man-hours End Notes:
n/a - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
0 - indicates that this value is less than 0.5 but is non-zero.
a cell containing " - " indicates a zero value TLG Services, Inc.
Braidwood Nuclear Power Station Document E16-1555-014, Rev. 0 Decommissioning Cost Analysis Appendix E, Page 1 of 24 TLG Services, Inc.
APPENDIX E DETAILED COST ANALYSIS SAFSTOR Page Braidwood Nuclear Power Station, Unit 1...................................................................E-2 Braidwood Nuclear Power Station, Unit 2................................................................E-13
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 2 of 24 Table E-1 Braidwood Nuclear Power Station, Unit 1 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:26 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 1a - Shutdown through Transition Period 1a Direct Decommissioning Activities 1a.1.1 SAFSTOR site characterization survey 398 119 517 517 1a.1.2 Prepare preliminary decommissioning cost 153 23 176 176 1,300 1a.1.3 Notification of Cessation of Operations a
1a.1.4 Remove fuel & source material n/a 1a.1.5 Notification of Permanent Defueling a
1a.1.6 Deactivate plant systems & process waste a
1a.1.7 Prepare and submit PSDAR 236 35 271 271 2,000 1a.1.8 Review plant dwgs & specs.
153 23 176 176 1,300 1a.1.9 Perform detailed rad survey a
1a.1.10 Estimate by-product inventory 118 18 136 136 1,000 1a.1.11 End product description 118 18 136 136 1,000 1a.1.12 Detailed by-product inventory 177 27 204 204 1,500 1a.1.13 Define major work sequence 118 18 136 136 1,000 1a.1.14 Perform SER and EA 366 55 421 421 3,100 1a.1.15 Perform Site-Specific Cost Study 590 89 679 679 5,000 Activity Specifications 1a.1.16.1 Prepare plant and facilities for SAFSTOR 581 87 668 668 4,920 1a.1.16.2 Plant systems 492 74 565 565 4,167 1a.1.16.3 Plant structures and buildings 368 55 423 423 3,120 1a.1.16.4 Waste management 236 35 271 271 2,000 1a.1.16.5 Facility and site dormancy 236 35 271 271 2,000 1a.1.16 Total 1,913 287 2,199 2,199 16,207 Detailed Work Procedures 1a.1.17.1 Plant systems 140 21 161 161 1,183 1a.1.17.2 Facility closeout & dormancy 142 21 163 163 1,200 1a.1.17 Total 281 42 323 323 2,383 1a.1.18 Procure vacuum drying system 12 2
14 14 100 1a.1.19 Drain/de-energize non-cont. systems a
1a.1.20 Drain & dry NSSS a
1a.1.21 Drain/de-energize contaminated systems a
1a.1.22 Decon/secure contaminated systems a
1a.1 Subtotal Period 1a Activity Costs 4,633 755 5,388 5,388 35,890 Period 1a Additional Costs 1a.2.1 ISFSI Expansion 9,900 1,485 11,385 11,385 1a.2 Subtotal Period 1a Additional Costs 9,900 1,485 11,385 11,385 Period 1a Collateral Costs 1a.3.1 Spent Fuel Capital and Transfer 9,000 1,350 10,350 10,350 1a.3 Subtotal Period 1a Collateral Costs 9,000 1,350 10,350 10,350 Period 1a Period-Dependent Costs 1a.4.1 Insurance 751 75 826 826 1a.4.2 Property taxes 1a.4.3 Health physics supplies 421 105 527 527 1a.4.4 Heavy equipment rental 421 63 484 484 1a.4.5 Disposal of DAW generated 2
1 34 9
45 45 610 12,190 3
1a.4.6 Plant energy budget 1,319 198 1,517 1,517 1a.4.7 NRC Fees 706 71 776 776 1a.4.8 Emergency Planning Fees 315 32 347 347 1a.4.9 Site O&M Costs 125 19 144 144 1a.4.10 Spent Fuel Pool O&M 381 57 438 438 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 3 of 24 Table E-1 Braidwood Nuclear Power Station, Unit 1 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:26 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 1a Period-Dependent Costs (continued) 1a.4.11 ISFSI Operating Costs 44 7
51 51 1a.4.12 Security Staff Cost 466 70 536 536 12,264 1a.4.13 Utility Staff Cost 31,082 4,662 35,745 35,745 423,400 1a.4 Subtotal Period 1a Period-Dependent Costs 842 2
1 34 35,189 5,367 41,434 40,599 836 610 12,190 3
435,664 1a.0 TOTAL PERIOD 1a COST 842 2
1 34 58,722 8,957 68,557 45,986 22,571 610 12,190 3
471,554 PERIOD 1b - SAFSTOR Limited DECON Activities Period 1b Direct Decommissioning Activities Decontamination of Site Buildings 1b.1.1.1 Reactor 2,135 1,067 3,202 3,202 33,093 1b.1.1.2 Auxiliary Building 211 106 317 317 3,289 1b.1.1.3 Refueling Water Storage Tank 351 176 527 527 5,322 1b.1.1.4 Steam Generator Storage Facility 57 29 86 86 887 1b.1.1 Totals 2,754 1,377 4,131 4,131 42,591 1b.1 Subtotal Period 1b Activity Costs 2,754 1,377 4,131 4,131 42,591 Period 1b Collateral Costs 1b.3.1 Decon equipment 811 122 932 932 1b.3.2 Process liquid waste 185 81 364 351 243 1,223 1,223 1,259 75,560 246 1b.3.3 Small tool allowance 45 7
51 51 1b.3.4 Spent Fuel Capital and Transfer 2,000 300 2,300 2,300 1b.3 Subtotal Period 1b Collateral Costs 996 45 81 364 351 2,000 671 4,507 2,207 2,300 1,259 75,560 246 Period 1b Period-Dependent Costs 1b.4.1 Decon supplies 588 147 735 735 1b.4.2 Insurance 187 19 206 206 1b.4.3 Property taxes 1,612 161 1,773 1,773 1b.4.4 Health physics supplies 270 68 338 338 1b.4.5 Heavy equipment rental 105 16 121 121 1b.4.6 Disposal of DAW generated 2
1 29 8
39 39 526 10,515 2
1b.4.7 Plant energy budget 329 49 378 378 1b.4.8 NRC Fees 176 18 194 194 1b.4.9 Emergency Planning Fees 79 8
86 86 1b.4.10 Site O&M Costs 31 5
36 36 1b.4.11 Spent Fuel Pool O&M 95 14 109 109 1b.4.12 ISFSI Operating Costs 11 2
13 13 1b.4.13 Security Staff Cost 116 17 134 134 3,058 1b.4.14 Utility Staff Cost 7,252 1,088 8,340 8,340 99,429 1b.4 Subtotal Period 1b Period-Dependent Costs 588 375 2
1 29 9,889 1,619 12,502 12,294 208 526 10,515 2
102,487 1b.0 TOTAL PERIOD 1b COST 4,338 420 83 364 380 11,889 3,667 21,140 18,632 2,508 1,785 86,076 42,839 102,487 PERIOD 1c - Preparations for SAFSTOR Dormancy Period 1c Direct Decommissioning Activities 1c.1.1 Prepare support equipment for storage 457 69 525 525 3,000 1c.1.2 Install containment pressure equal. lines 48 7
55 55 700 1c.1.3 Interim survey prior to dormancy 733 220 953 953 13,416 1c.1.4 Secure building accesses a
1c.1.5 Prepare & submit interim report 69 10 79 79 583 1c.1 Subtotal Period 1c Activity Costs 504 802 306 1,612 1,612 17,116 583 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 4 of 24 Table E-1 Braidwood Nuclear Power Station, Unit 1 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:26 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 1c Collateral Costs 1c.3.1 Process liquid waste 150 66 296 285 197 995 995 1,024 61,469 200 1c.3.2 Small tool allowance 4
1 5
5 1c.3.3 Spent Fuel Capital and Transfer 2,000 300 2,300 2,300 1c.3 Subtotal Period 1c Collateral Costs 150 4
66 296 285 2,000 498 3,300 1,000 2,300 1,024 61,469 200 Period 1c Period-Dependent Costs 1c.4.1 Insurance 187 19 206 206 1c.4.2 Property taxes 1,612 161 1,773 1,773 1c.4.3 Health physics supplies 143 36 179 179 1c.4.4 Heavy equipment rental 105 16 121 121 1c.4.5 Disposal of DAW generated 0
0 6
1 7
7 99 1,976 0
1c.4.6 Plant energy budget 329 49 378 378 1c.4.7 NRC Fees 176 18 194 194 1c.4.8 Emergency Planning Fees 79 8
86 86 1c.4.9 Site O&M Costs 31 5
36 36 1c.4.10 Spent Fuel Pool O&M 95 14 109 109 1c.4.11 ISFSI Operating Costs 11 2
13 13 1c.4.12 Security Staff Cost 116 17 134 134 3,058 1c.4.13 Utility Staff Cost 1,073 161 1,234 1,234 13,520 1c.4 Subtotal Period 1c Period-Dependent Costs 248 0
0 6
3,709 507 4,470 4,261 208 99 1,976 0
16,578 1c.0 TOTAL PERIOD 1c COST 150 757 66 296 291 6,511 1,311 9,382 6,873 2,508 1,123 63,445 17,316 17,161 PERIOD 1 TOTALS 4,489 2,018 151 661 705 77,122 13,934 99,079 71,491 27,587 3,518 161,711 60,157 591,202 PERIOD 2a - SAFSTOR Dormancy with Wet Spent Fuel Storage Period 2a Direct Decommissioning Activities 2a.1.1 Quarterly Inspection a
2a.1.2 Semi-annual environmental survey a
2a.1.3 Prepare reports a
2a.1.4 Bituminous roof replacement 17 3
20 20 2a.1.5 Maintenance supplies 503 126 629 629 2a.1 Subtotal Period 2a Activity Costs 520 128 649 649 Period 2a Collateral Costs 2a.3.1 Spent Fuel Capital and Transfer 34,000 5,100 39,100 39,100 2a.3 Subtotal Period 2a Collateral Costs 34,000 5,100 39,100 39,100 Period 2a Period-Dependent Costs 2a.4.1 Insurance 1,345 134 1,479 1,296 184 2a.4.2 Property taxes 7,726 773 8,499 2,200 6,299 2a.4.3 Health physics supplies 324 81 405 405 2a.4.4 Disposal of DAW generated 5
2 85 22 114 114 1,531 30,618 7
2a.4.5 Plant energy budget 1,056 158 1,214 607 607 2a.4.6 NRC Fees 807 81 887 887 2a.4.7 Emergency Planning Fees 400 40 440 440 2a.4.8 Site O&M Costs 500 75 575 575 2a.4.9 Spent Fuel Pool O&M 1,526 229 1,755 1,755 2a.4.10 ISFSI Operating Costs 176 26 202 202 2a.4.11 Security Staff Cost 6,476 971 7,447 3,541 3,907 157,287 2a.4.12 Utility Staff Cost 9,434 1,415 10,849 4,321 6,527 121,054 2a.4 Subtotal Period 2a Period-Dependent Costs 324 5
2 85 29,445 4,006 33,867 13,946 19,921 1,531 30,618 7
278,341 2a.0 TOTAL PERIOD 2a COST 324 5
2 85 63,965 9,234 73,615 14,595 59,021 1,531 30,618 7
278,341 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 5 of 24 Table E-1 Braidwood Nuclear Power Station, Unit 1 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:26 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 2b - SAFSTOR Dormancy with Dry Spent Fuel Storage Period 2b Direct Decommissioning Activities 2b.1.1 Quarterly Inspection a
2b.1.2 Semi-annual environmental survey a
2b.1.3 Prepare reports a
2b.1.4 Bituminous roof replacement 59 9
68 68 2b.1.5 Maintenance supplies 1,724 431 2,155 2,155 2b.1 Subtotal Period 2b Activity Costs 1,783 440 2,223 2,223 Period 2b Collateral Costs 2b.3.1 Spent Fuel Capital and Transfer 7,500 1,125 8,625 8,625 2b.3 Subtotal Period 2b Collateral Costs 7,500 1,125 8,625 8,625 Period 2b Period-Dependent Costs 2b.4.1 Insurance 4,169 417 4,586 4,441 145 2b.4.2 Property taxes 6,854 685 7,540 7,540 2b.4.3 Health physics supplies 1,065 266 1,331 1,331 2b.4.4 Disposal of DAW generated 15 6
288 74 383 383 5,164 103,276 24 2b.4.5 Plant energy budget 1,809 271 2,081 2,081 2b.4.6 NRC Fees 2,764 276 3,041 3,041 2b.4.7 Emergency Planning Fees 1,371 137 1,508 1,508 2b.4.8 Site O&M Costs 1,714 257 1,971 1,971 2b.4.9 ISFSI Operating Costs 603 90 693 693 2b.4.10 Security Staff Cost 15,623 2,343 17,966 12,134 5,832 353,351 2b.4.11 Utility Staff Cost 19,652 2,948 22,600 14,810 7,791 271,522 2b.4 Subtotal Period 2b Period-Dependent Costs 1,065 15 6
288 54,560 7,767 63,700 47,731 15,969 5,164 103,276 24 624,874 2b.0 TOTAL PERIOD 2b COST 1,065 15 6
288 63,843 9,332 74,548 49,954 24,594 5,164 103,276 24 624,874 PERIOD 2c - SAFSTOR Dormancy without Spent Fuel Storage Period 2c Direct Decommissioning Activities 2c.1.1 Quarterly Inspection a
2c.1.2 Semi-annual environmental survey a
2c.1.3 Prepare reports a
2c.1.4 Bituminous roof replacement 145 22 167 167 2c.1.5 Maintenance supplies 4,246 1,061 5,307 5,307 2c.1 Subtotal Period 2c Activity Costs 4,391 1,083 5,474 5,474 Period 2c Period-Dependent Costs 2c.4.1 Insurance 9,940 994 10,934 10,934 2c.4.2 Property taxes 16,877 1,688 18,564 18,564 2c.4.3 Health physics supplies 2,551 638 3,189 3,189 2c.4.4 Disposal of DAW generated 37 14 702 181 935 935 12,588 251,751 58 2c.4.5 Plant energy budget 4,455 668 5,124 5,124 2c.4.6 NRC Fees 6,163 616 6,779 6,779 2c.4.7 Site O&M Costs 4,219 633 4,852 4,852 2c.4.8 Security Staff Cost 25,980 3,897 29,877 29,877 528,343 2c.4.9 Utility Staff Cost 31,708 4,756 36,464 36,464 449,444 2c.4 Subtotal Period 2c Period-Dependent Costs 2,551 37 14 702 99,341 14,071 116,717 116,717 12,588 251,751 58 977,786 2c.0 TOTAL PERIOD 2c COST 2,551 37 14 702 103,732 15,154 122,190 122,190 12,588 251,751 58 977,786 PERIOD 2 TOTALS 3,940 57 21 1,076 231,540 33,720 270,354 186,739 83,614 19,282 385,645 88 1,881,001 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 6 of 24 Table E-1 Braidwood Nuclear Power Station, Unit 1 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:26 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 3a - Reactivate Site Following SAFSTOR Dormancy Period 3a Direct Decommissioning Activities 3a.1.1 Prepare preliminary decommissioning cost 153 23 176 176 1,300 3a.1.2 Review plant dwgs & specs.
543 81 624 624 4,600 3a.1.3 Perform detailed rad survey a
3a.1.4 End product description 118 18 136 136 1,000 3a.1.5 Detailed by-product inventory 153 23 176 176 1,300 3a.1.6 Define major work sequence 885 133 1,018 1,018 7,500 3a.1.7 Perform SER and EA 366 55 421 421 3,100 3a.1.8 Perform Site-Specific Cost Study 590 89 679 679 5,000 3a.1.9 Prepare/submit License Termination Plan 483 73 556 556 4,096 3a.1.10 Receive NRC approval of termination plan a
Activity Specifications 3a.1.11.1 Re-activate plant & temporary facilities 870 130 1,000 900 100 7,370 3a.1.11.2 Plant systems 492 74 565 509 57 4,167 3a.1.11.3 Reactor internals 838 126 964 964 7,100 3a.1.11.4 Reactor vessel 767 115 882 882 6,500 3a.1.11.5 Biological shield 59 9
68 68 500 3a.1.11.6 Steam generators 368 55 423 423 3,120 3a.1.11.7 Reinforced concrete 189 28 217 109 109 1,600 3a.1.11.8 Main Turbine 47 7
54 54 400 3a.1.11.9 Main Condensers 47 7
54 54 400 3a.1.11.10 Plant structures & buildings 368 55 423 212 212 3,120 3a.1.11.11 Waste management 543 81 624 624 4,600 3a.1.11.12 Facility & site closeout 106 16 122 61 61 900 3a.1.11 Total 4,694 704 5,398 4,752 646 39,777 Planning & Site Preparations 3a.1.12 Prepare dismantling sequence 283 42 326 326 2,400 3a.1.13 Plant prep. & temp. svces 2,800 420 3,220 3,220 3a.1.14 Design water clean-up system 165 25 190 190 1,400 3a.1.15 Rigging/Cont. Cntrl Envlps/tooling/etc.
2,200 330 2,530 2,530 3a.1.16 Procure casks/liners & containers 145 22 167 167 1,230 3a.1 Subtotal Period 3a Activity Costs 13,580 2,037 15,617 14,970 646 72,703 Period 3a Period-Dependent Costs 3a.4.1 Insurance 294 29 324 324 3a.4.2 Property taxes 500 50 550 550 3a.4.3 Health physics supplies 368 92 460 460 3a.4.4 Heavy equipment rental 421 63 484 484 3a.4.5 Disposal of DAW generated 2
1 29 7
38 38 514 10,287 2
3a.4.6 Plant energy budget 1,319 198 1,517 1,517 3a.4.7 NRC Fees 249 25 274 274 3a.4.8 Site O&M Costs 125 19 144 144 3a.4.9 Security Staff Cost 2,827 424 3,251 3,251 65,179 3a.4.10 Utility Staff Cost 19,293 2,894 22,187 22,187 258,629 3a.4 Subtotal Period 3a Period-Dependent Costs 789 2
1 29 24,607 3,801 29,228 29,228 514 10,287 2
323,807 3a.0 TOTAL PERIOD 3a COST 789 2
1 29 38,187 5,838 44,845 44,198 646 514 10,287 2
396,510 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 7 of 24 Table E-1 Braidwood Nuclear Power Station, Unit 1 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:26 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 3b - Decommissioning Preparations Period 3b Direct Decommissioning Activities Detailed Work Procedures 3b.1.1.1 Plant systems 559 84 642 578 64 4,733 3b.1.1.2 Reactor internals 295 44 339 339 2,500 3b.1.1.3 Remaining buildings 159 24 183 46 137 1,350 3b.1.1.4 CRD cooling assembly 118 18 136 136 1,000 3b.1.1.5 CRD housings & ICI tubes 118 18 136 136 1,000 3b.1.1.6 Incore instrumentation 118 18 136 136 1,000 3b.1.1.7 Reactor vessel 428 64 493 493 3,630 3b.1.1.8 Facility closeout 142 21 163 81 81 1,200 3b.1.1.9 Missile shields 53 8
61 61 450 3b.1.1.10 Biological shield 142 21 163 163 1,200 3b.1.1.11 Steam generators 543 81 624 624 4,600 3b.1.1.12 Reinforced concrete 118 18 136 68 68 1,000 3b.1.1.13 Main Turbine 184 28 212 212 1,560 3b.1.1.14 Main Condensers 184 28 212 212 1,560 3b.1.1.15 Auxiliary building 322 48 370 333 37 2,730 3b.1.1.16 Reactor building 322 48 370 333 37 2,730 3b.1.1 Total 3,805 571 4,376 3,527 848 32,243 3b.1 Subtotal Period 3b Activity Costs 3,805 571 4,376 3,527 848 32,243 Period 3b Additional Costs 3b.2.1 Site Characterization 6,341 1,902 8,243 8,243 30,500 10,852 3b.2 Subtotal Period 3b Additional Costs 6,341 1,902 8,243 8,243 30,500 10,852 Period 3b Collateral Costs 3b.3.1 Decon equipment 811 122 932 932 3b.3.2 DOC staff relocation expenses 1,130 169 1,299 1,299 3b.3.3 Pipe cutting equipment 1,100 165 1,265 1,265 3b.3 Subtotal Period 3b Collateral Costs 811 1,100 1,130 456 3,497 3,497 Period 3b Period-Dependent Costs 3b.4.1 Decon supplies 25 6
31 31 3b.4.2 Insurance 168 17 185 185 3b.4.3 Property taxes 251 25 276 276 3b.4.4 Health physics supplies 203 51 254 254 3b.4.5 Heavy equipment rental 211 32 242 242 3b.4.6 Disposal of DAW generated 1
0 16 4
22 22 292 5,834 1
3b.4.7 Plant energy budget 661 99 761 761 3b.4.8 NRC Fees 125 12 137 137 3b.4.9 Site O&M Costs 63 9
72 72 3b.4.10 Security Staff Cost 1,417 213 1,630 1,630 32,679 3b.4.11 DOC Staff Cost 4,781 717 5,498 5,498 58,560 3b.4.12 Utility Staff Cost 9,673 1,451 11,124 11,124 129,669 3b.4 Subtotal Period 3b Period-Dependent Costs 25 414 1
0 16 17,139 2,637 20,233 20,233 292 5,834 1
220,907 3b.0 TOTAL PERIOD 3b COST 836 1,514 1
0 16 28,415 5,566 36,348 35,500 848 292 5,834 30,501 264,002 PERIOD 3 TOTALS 836 2,303 2
1 45 66,602 11,404 81,193 79,698 1,495 806 16,121 30,504 660,512 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 8 of 24 Table E-1 Braidwood Nuclear Power Station, Unit 1 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:26 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 4a - Large Component Removal Period 4a Direct Decommissioning Activities Nuclear Steam Supply System Removal 4a.1.1.1 Reactor Coolant Piping 46 160 33 21 45 170 119 594 594 864 864 200,408 3,290 4a.1.1.2 Pressurizer Relief Tank 8
29 6
4 9
30 21 107 107 165 165 36,553 596 4a.1.1.3 Reactor Coolant Pumps & Motors 28 105 57 168 1,272 389 2,018 2,018 4,796 780,540 2,726 80 4a.1.1.4 Pressurizer 12 68 347 94 412 175 1,108 1,108 3,033 252,826 1,527 750 4a.1.1.5 Steam Generators 94 4,168 2,158 2,533 667 4,349 2,872 16,841 16,841 45,513 17,359 3,811,289 20,508 1,500 4a.1.1.6 Retired Steam Generator Units 1,486 2,673 580 3,416 1,491 9,646 9,646 39,289 14,064 3,041,432 10,800 1,500 4a.1.1.7 CRDMs/ICIs/Service Structure Removal 22 80 176 31 59 68 436 436 2,843 50,181 1,648 4a.1.1.8 Reactor Vessel Internals 75 2,001 3,442 525 3,710 203 4,416 14,372 14,372 2,211 376 470 325,254 23,067 1,055 4a.1.1.9 Vessel & Internals GTCC Disposal 11,837 1,776 13,613 13,613 505 104,146 4a.1.1.10 Reactor Vessel 90 3,970 1,283 670 2,976 203 5,029 14,221 14,221 6,672 2,254 979,179 23,067 1,055 4a.1.1 Totals 374 10,580 8,989 6,718 1,301 28,232 406 16,354 72,955 72,955 85,831 52,007 2,629 470 505 9,581,808 87,228 5,939 Removal of Major Equipment 4a.1.2 Main Turbine/Generator 574 262 32 214 207 1,288 1,288 5,355 455,213 9,016 4a.1.3 Main Condensers 1,176 136 27 150 334 1,823 1,823 7,111 320,000 18,250 Cascading Costs from Clean Building Demolition 4a.1.4.1 Reactor 1,171 176 1,346 1,346 12,130 4a.1.4.2 Auxiliary Building 644 97 741 741 6,782 4a.1.4.3 Refueling Water Storage Tank 114 17 131 131 1,299 4a.1.4.4 Steam Generator Storage Facility 48 7
55 55 507 4a.1.4 Totals 1,977 297 2,273 2,273 20,718 Disposal of Plant Systems 4a.1.5.1 Auxiliary Feedwater 78 12 89 89 1,244 4a.1.5.2 Auxiliary Steam 70 10 80 80 1,126 4a.1.5.3 Auxiliary Steam RCA 134 2
3 16 36 190 190 835 33,900 1,935 4a.1.5.4 Boric Acid Processing 492 33 31 86 99 169 912 912 4,531 1,193 268,274 7,890 4a.1.5.5 CO2 & H2 26 4
30 30 419 4a.1.5.6 CO2 & H2 RCA 38 0
1 3
10 52 52 164 6,658 572 4a.1.5.7 Chemical Feed 57 9
66 66 934 4a.1.5.8 Chilled Water 71 11 82 82 1,142 4a.1.5.9 Circulating Water 318 48 365 365 5,174 4a.1.5.10 Condensate 377 56 433 433 6,023 4a.1.5.11 Condensate Booster 339 51 390 390 5,428 4a.1.5.12 Condensate Cleanup 66 10 76 76 1,060 4a.1.5.13 Containment Spray 256 7
12 69 77 421 421 3,629 147,367 3,729 4a.1.5.14 Diesel Fuel Oil 102 15 117 117 1,615 4a.1.5.15 Essential Service Water 236 35 271 271 3,837 4a.1.5.16 Extraction Steam 189 28 217 217 3,089 4a.1.5.17 Feedwater 316 47 363 363 5,142 4a.1.5.18 Feedwater Drains 758 114 872 872 12,366 4a.1.5.19 Gland Steam 57 9
65 65 932 4a.1.5.20 Gland Water 50 7
57 57 828 4a.1.5.21 Main Steam 322 48 371 371 5,216 4a.1.5.22 Main Steam RCA 51 1
3 15 15 85 85 760 30,853 739 4a.1.5.23 Nitrogen 3
0 0
1 1
5 5
52 2,102 49 4a.1.5.24 Non-Essential Service Water 178 27 204 204 2,916 4a.1.5.25 Non-Essential Service Water RCA 93 3
5 28 29 158 158 1,462 59,354 1,295 4a.1.5.26 Off Gas 563 10 19 106 160 858 858 5,572 226,266 8,494 4a.1.5.27 Process Radiation Monitoring 40 0
0 2
11 54 54 113 4,587 666 4a.1.5.28 Process Sampling 119 1
2 12 32 166 166 616 25,019 1,927 4a.1.5.29 Screen Wash 50 7
57 57 821 4a.1.5.30 Station Air 31 5
35 35 498 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 9 of 24 Table E-1 Braidwood Nuclear Power Station, Unit 1 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:26 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Disposal of Plant Systems (continued) 4a.1.5.31 Station Heating 109 16 126 126 1,771 4a.1.5.32 Switchgear Heat Removal 9
1 10 10 139 4a.1.5.33 Turbine Bldg Equip Drains 1
0 1
1 17 4a.1.5.34 Turbine Generator 57 9
65 65 901 4a.1.5.35 Turbine Oil 87 13 100 100 1,399 4a.1.5.36 Waste Oil Sumps 30 4
34 34 483 4a.1.5 Totals 5,772 57 76 338 99 1,137 7,480 2,900 4,580 17,732 1,193 804,381 91,814 4a.1.6 Scaffolding in support of decommissioning 1,060 6
1 6
2 267 1,343 1,343 306 19 15,459 18,101 4a.1 Subtotal Period 4a Activity Costs 374 21,137 9,451 6,854 2,010 28,334 406 18,596 87,163 82,583 4,580 116,335 53,219 2,629 470 505 11,176,860 245,127 5,939 Period 4a Collateral Costs 4a.3.1 Process liquid waste 35 18 80 77 50 260 260 276 16,582 54 4a.3.2 Small tool allowance 235 35 270 243 27 4a.3 Subtotal Period 4a Collateral Costs 35 235 18 80 77 86 530 503 27 276 16,582 54 Period 4a Period-Dependent Costs 4a.4.1 Decon supplies 65 16 81 81 4a.4.2 Insurance 438 44 482 482 4a.4.3 Property taxes 652 65 717 645 72 4a.4.4 Health physics supplies 1,497 374 1,871 1,871 4a.4.5 Heavy equipment rental 2,314 347 2,661 2,661 4a.4.6 Disposal of DAW generated 9
3 172 44 229 229 3,088 61,756 14 4a.4.7 Plant energy budget 1,634 245 1,879 1,879 4a.4.8 NRC Fees 858 86 944 944 4a.4.9 Site O&M Costs 163 24 187 187 4a.4.10 Liquid Radwaste Processing Equipment/Services 500 75 574 574 4a.4.11 Security Staff Cost 2,869 430 3,299 3,299 75,426 4a.4.12 DOC Staff Cost 14,948 2,242 17,191 17,191 186,946 4a.4.13 Utility Staff Cost 24,875 3,731 28,607 28,607 335,158 4a.4 Subtotal Period 4a Period-Dependent Costs 65 3,811 9
3 172 46,937 7,725 58,722 58,650 72 3,088 61,756 14 597,530 4a.0 TOTAL PERIOD 4a COST 474 25,183 9,478 6,937 2,010 28,583 47,343 26,407 146,415 141,736 4,679 116,335 56,583 2,629 470 505 11,255,200 245,195 603,469 PERIOD 4b - Site Decontamination Disposal of Plant Systems 4b.1.2.1 Chemical & Volume Control 1,095 64 47 33 255 356 1,851 1,851 1,744 2,431 287,102 16,313 4b.1.2.2 Chilled Water RCA 311 9
16 90 95 520 520 4,716 191,536 4,732 4b.1.2.3 Component Cooling RCA 661 16 29 164 196 1,066 1,066 8,589 348,801 9,675 4b.1.2.4 Electrical 3,047 457 3,504 3,504 48,490 4b.1.2.5 Electrical - Contaminated 1,128 12 23 128 306 1,597 1,597 6,722 272,965 17,115 4b.1.2.6 Electrical - RCA 1,881 32 59 335 532 2,839 2,839 17,555 712,922 29,098 4b.1.2.7 Emergency Diesel Generator 129 19 148 148 2,066 4b.1.2.8 Essential Service Water RCA 297 10 17 99 93 515 515 5,177 210,230 4,418 4b.1.2.9 Fire Protection 122 18 141 141 1,984 4b.1.2.10 Fire Protection RCA 180 2
3 20 49 254 254 1,037 42,116 2,577 4b.1.2.11 HVAC-Auxiliary Building 486 9
17 96 139 747 747 5,054 205,243 7,162 4b.1.2.12 HVAC-Diesel Generator Room 43 6
50 50 682 4b.1.2.13 HVAC-Miscellaneous 42 6
48 48 656 4b.1.2.14 HVAC-Primary Containment 588 19 36 204 185 1,032 1,032 10,679 433,695 8,624 4b.1.2.15 HVAC-Turbine Building 187 28 215 215 3,177 4b.1.2.16 Instrument Air Supply 46 7
53 53 760 4b.1.2.17 Instrument Air Supply RCA 73 1
1 7
20 102 102 366 14,869 1,073 4b.1.2.18 Miscellaneous Drains 38 1
1 6
11 57 57 312 12,666 584 4b.1.2.19 Primary Containment Purge 274 10 20 112 89 504 504 5,850 237,590 4,312 4b.1.2.20 Primary Water 59 1
1 3
4 17 86 86 143 42 9,560 915 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 10 of 24 Table E-1 Braidwood Nuclear Power Station, Unit 1 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:26 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Disposal of Plant Systems (continued) 4b.1.2.21 Radioactive Waste Disposal 899 46 39 81 154 286 1,504 1,504 4,235 1,622 302,491 14,169 4b.1.2.22 Reactor Building Equipment Drains 97 7
5 3
29 33 175 175 183 277 32,048 1,435 4b.1.2.23 Reactor Building Floor Drains 45 2
2 2
8 14 73 73 130 74 11,914 678 4b.1.2.24 Reactor Coolant 169 9
6 4
34 53 276 276 208 324 37,451 2,506 4b.1.2.25 Residual Heat Removal 190 11 12 28 44 66 351 351 1,453 418 96,526 2,924 4b.1.2.26 Safety Injection 865 38 48 175 103 279 1,509 1,509 9,181 1,028 460,142 13,528 4b.1.2.27 Station Air RCA 36 0
1 3
9 49 49 175 7,089 521 4b.1.2.28 Station Heating RCA 120 2
4 24 34 184 184 1,256 51,005 1,759 4b.1.2.29 Waste Oil Sumps RCA 7
0 0
1 2
10 10 52 2,098 92 4b.1.2 Totals 13,115 301 388 1,619 632 3,406 19,461 15,302 4,159 84,817 6,216 3,980,059 202,024 4b.1.3 Scaffolding in support of decommissioning 1,589 9
2 10 3
401 2,014 2,014 458 29 23,188 27,151 Decontamination of Site Buildings 4b.1.4.1 Reactor 1,937 1,369 176 195 134 455 1,491 5,757 5,757 7,022 8,433 1,122,380 50,350 4b.1.4.2 Auxiliary Building 194 103 6
7 17 13 130 470 470 866 229 57,065 4,554 4b.1.4.3 Refueling Water Storage Tank 352 408 4
5 22 6
284 1,081 1,081 1,146 87 54,852 11,906 4b.1.4.4 Steam Generator Storage Facility 57 0
0 0
0 0
29 86 86 1
0 40 888 4b.1.4 Totals 2,540 1,880 186 208 172 474 1,934 7,393 7,393 9,034 8,749 1,234,338 67,698 4b.1 Subtotal Period 4b Activity Costs 2,540 16,585 496 597 1,801 1,109 5,741 28,868 24,710 4,159 94,309 14,993 5,237,585 296,874 Period 4b Additional Costs 4b.2.1 License Termination Survey Planning 940 282 1,222 1,222 6,240 4b.2.2 ISFSI License Termination 41 1
24 90 719 144 1,018 1,018 1,703 142,573 2,775 1,280 4b.2 Subtotal Period 4b Additional Costs 41 1
24 90 1,659 426 2,240 1,222 1,018 1,703 142,573 2,775 7,520 Period 4b Collateral Costs 4b.3.1 Process liquid waste 42 22 98 94 61 317 317 338 20,267 66 4b.3.2 Small tool allowance 306 46 352 352 4b.3.3 Decommissioning Equipment Disposition 123 34 127 40 46 369 369 6,000 373 303,507 88 4b.3 Subtotal Period 4b Collateral Costs 42 306 144 131 127 134 154 1,038 1,038 6,000 711 323,774 154 Period 4b Period-Dependent Costs 4b.4.1 Decon supplies 686 171 857 857 4b.4.2 Insurance 745 74 819 819 4b.4.3 Property taxes 1,107 111 1,218 1,218 4b.4.4 Health physics supplies 1,997 499 2,496 2,496 4b.4.5 Heavy equipment rental 3,900 585 4,486 4,486 4b.4.6 Disposal of DAW generated 13 5
241 62 321 321 4,321 86,419 20 4b.4.7 Plant energy budget 2,193 329 2,522 2,522 4b.4.8 NRC Fees 1,459 146 1,605 1,605 4b.4.9 Site O&M Costs 277 42 318 318 4b.4.10 Liquid Radwaste Processing Equipment/Services 849 127 976 976 4b.4.11 Security Staff Cost 967 145 1,112 1,112 25,426 4b.4.12 DOC Staff Cost 16,431 2,465 18,895 18,895 217,274 4b.4.13 Utility Staff Cost 27,621 4,143 31,764 31,764 388,320 4b.4 Subtotal Period 4b Period-Dependent Costs 686 5,897 13 5
241 51,648 8,900 67,390 67,390 4,321 86,419 20 631,020 4b.0 TOTAL PERIOD 4b COST 3,268 22,829 653 757 1,928 1,573 53,307 15,220 99,536 94,359 1,018 4,159 100,309 21,728 5,790,351 299,823 638,540 PERIOD 4d - Delay before License Termination Period 4d Period-Dependent Costs 4d.4.1 Insurance 4d.4.2 Property taxes 634 63 697 697 4d.4.3 Health physics supplies 96 24 120 120 4d.4.4 Disposal of DAW generated 0
0 7
2 9
9 126 2,529 1
TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 11 of 24 Table E-1 Braidwood Nuclear Power Station, Unit 1 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:26 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 4d Period-Dependent Costs (continued) 4d.4.5 Plant energy budget 4d.4.6 NRC Fees 231 23 255 255 4d.4.7 Site O&M Costs 158 24 182 182 4d.4.8 Utility Staff Cost 1,303 196 1,499 1,499 18,520 4d.4 Subtotal Period 4d Period-Dependent Costs 96 0
0 7
2,327 332 2,763 2,763 126 2,529 1
18,520 4d.0 TOTAL PERIOD 4d COST 96 0
0 7
2,327 332 2,763 2,763 126 2,529 1
18,520 PERIOD 4e - License Termination Period 4e Direct Decommissioning Activities 4e.1.1 ORISE confirmatory survey 151 45 197 197 4e.1.2 Terminate license a
4e.1 Subtotal Period 4e Activity Costs 151 45 197 197 Period 4e Additional Costs 4e.2.1 License Termination Survey 6,204 1,861 8,065 8,065 97,350 3,120 4e.2 Subtotal Period 4e Additional Costs 6,204 1,861 8,065 8,065 97,350 3,120 Period 4e Collateral Costs 4e.3.1 DOC staff relocation expenses 1,130 169 1,299 1,299 4e.3 Subtotal Period 4e Collateral Costs 1,130 169 1,299 1,299 Period 4e Period-Dependent Costs 4e.4.1 Insurance 4e.4.2 Property taxes 376 38 414 414 4e.4.3 Health physics supplies 628 157 785 785 4e.4.4 Disposal of DAW generated 1
0 19 5
25 25 335 6,698 2
4e.4.5 Plant energy budget 199 30 229 229 4e.4.6 NRC Fees 532 53 585 585 4e.4.7 Site O&M Costs 94 14 108 108 4e.4.8 Security Staff Cost 527 79 606 606 11,786 4e.4.9 DOC Staff Cost 3,801 570 4,371 4,371 46,750 4e.4.10 Utility Staff Cost 4,551 683 5,234 5,234 56,964 4e.4 Subtotal Period 4e Period-Dependent Costs 628 1
0 19 10,079 1,628 12,356 12,356 335 6,698 2
115,500 4e.0 TOTAL PERIOD 4e COST 628 1
0 19 17,564 3,704 21,917 21,917 335 6,698 97,352 118,620 PERIOD 4 TOTALS 3,742 48,736 10,133 7,694 3,938 30,182 120,542 45,663 270,631 260,775 1,018 8,838 216,645 78,773 2,629 470 505 17,054,780 642,370 1,379,149 PERIOD 5b - Site Restoration Period 5b Direct Decommissioning Activities Demolition of Remaining Site Buildings 5b.1.1.1 Reactor 6,763 1,014 7,778 7,778 69,546 5b.1.1.2 Auxiliary Building 5,798 870 6,667 6,667 61,037 5b.1.1.3 Refueling Water Storage Tank 1,028 154 1,182 1,182 11,692 5b.1.1.4 Steam Generator Storage Facility 429 64 493 493 4,559 5b.1.1.5 Turbine Building 5,769 865 6,634 6,634 70,342 5b.1.1.6 Turbine Pedestal 1,352 203 1,555 1,555 12,628 5b.1.1 Totals 21,138 3,171 24,309 24,309 229,805 Site Closeout Activities 5b.1.2 Grade & landscape site 716 107 823 823 1,942 5b.1.3 Final report to NRC 184 28 212 212 1,560 5b.1 Subtotal Period 5b Activity Costs 21,854 184 3,306 25,343 212 25,132 231,747 1,560 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 12 of 24 Table E-1 Braidwood Nuclear Power Station, Unit 1 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:26 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 5b Additional Costs 5b.2.1 ISFSI Demolition and Site Restoration 1,303 24 199 1,527 1,527 16,256 80 5b.2.2 Concrete Crushing 603 3
91 697 697 2,798 5b.2 Subtotal Period 5b Additional Costs 1,907 27 290 2,224 1,527 697 19,053 80 Period 5b Collateral Costs 5b.3.1 Small tool allowance 273 41 315 315 5b.3 Subtotal Period 5b Collateral Costs 273 41 315 315 Period 5b Period-Dependent Costs 5b.4.1 Insurance 5b.4.2 Property taxes 1,239 124 1,363 1,363 5b.4.3 Heavy equipment rental 6,239 936 7,174 7,174 5b.4.4 Plant energy budget 327 49 376 376 5b.4.5 Site O&M Cost 310 46 356 356 5b.4.6 Security Staff Cost 1,561 234 1,795 1,795 34,287 5b.4.7 DOC Staff Cost 11,650 1,748 13,398 13,398 137,043 5b.4.8 Utility Staff Cost 5,559 834 6,392 6,392 67,229 5b.4 Subtotal Period 5b Period-Dependent Costs 6,239 20,645 3,971 30,855 30,855 238,558 5b.0 TOTAL PERIOD 5b COST 30,273 20,857 7,607 58,737 212 1,527 56,998 250,800 240,198 PERIOD 5 TOTALS 30,273 20,857 7,607 58,737 212 1,527 56,998 250,800 240,198 TOTAL COST TO DECOMMISSION 9,066 87,270 10,343 8,377 3,938 32,008 516,662 112,329 779,992 598,915 113,746 67,331 216,645 102,379 2,629 470 505 17,618,250 983,920 4,752,062 TOTAL COST TO DECOMMISSION WITH 16.82% CONTINGENCY:
$779,992 thousands of 2009 dollars TOTAL NRC LICENSE TERMINATION COST IS 76.78% OR:
$598,915 thousands of 2009 dollars SPENT FUEL MANAGEMENT COST IS 14.58% OR:
$113,746 thousands of 2009 dollars NON-NUCLEAR DEMOLITION COST IS 8.63% OR:
$67,331 thousands of 2009 dollars TOTAL LOW-LEVEL RADIOACTIVE WASTE VOLUME BURIED (EXCLUDING GTCC):
105,477 cubic feet TOTAL GREATER THAN CLASS C RADWASTE VOLUME GENERATED:
505 cubic feet TOTAL SCRAP METAL REMOVED:
57,871 tons TOTAL CRAFT LABOR REQUIREMENTS:
983,920 man-hours End Notes:
n/a - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
0 - indicates that this value is less than 0.5 but is non-zero.
a cell containing " - " indicates a zero value TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 13 of 24 Table E-2 Braidwood Nuclear Power Station, Unit 2 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:44 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 1a - Shutdown through Transition Period 1a Direct Decommissioning Activities 1a.1.1 SAFSTOR site characterization survey 398 119 517 517 1a.1.2 Prepare preliminary decommissioning cost 66 10 76 76 556 1a.1.3 Notification of Cessation of Operations a
1a.1.4 Remove fuel & source material n/a 1a.1.5 Notification of Permanent Defueling a
1a.1.6 Deactivate plant systems & process waste a
1a.1.7 Prepare and submit PSDAR 101 15 116 116 856 1a.1.8 Review plant dwgs & specs.
66 10 76 76 556 1a.1.9 Perform detailed rad survey a
1a.1.10 Estimate by-product inventory 51 8
58 58 428 1a.1.11 End product description 51 8
58 58 428 1a.1.12 Detailed by-product inventory 76 11 87 87 642 1a.1.13 Define major work sequence 51 8
58 58 428 1a.1.14 Perform SER and EA 157 23 180 180 1,327 1a.1.15 Perform Site-Specific Cost Study 253 38 290 290 2,140 Activity Specifications 1a.1.16.1 Prepare plant and facilities for SAFSTOR 249 37 286 286 2,106 1a.1.16.2 Plant systems 210 32 242 242 1,783 1a.1.16.3 Plant structures and buildings 158 24 181 181 1,335 1a.1.16.4 Waste management 101 15 116 116 856 1a.1.16.5 Facility and site dormancy 101 15 116 116 856 1a.1.16 Total 819 123 941 941 6,936 Detailed Work Procedures 1a.1.17.1 Plant systems 60 9
69 69 506 1a.1.17.2 Facility closeout & dormancy 61 9
70 70 514 1a.1.17 Total 120 18 138 138 1,020 1a.1.18 Procure vacuum drying system 5
1 6
6 43 1a.1.19 Drain/de-energize non-cont. systems a
1a.1.20 Drain & dry NSSS a
1a.1.21 Drain/de-energize contaminated systems a
1a.1.22 Decon/secure contaminated systems a
1a.1 Subtotal Period 1a Activity Costs 2,211 391 2,602 2,602 15,361 Period 1a Additional Costs 1a.2.1 ISFSI Expansion 9,900 1,485 11,385 11,385 1a.2 Subtotal Period 1a Additional Costs 9,900 1,485 11,385 11,385 Period 1a Collateral Costs 1a.3.1 Spent Fuel Capital and Transfer 8,000 1,200 9,200 9,200 1a.3 Subtotal Period 1a Collateral Costs 8,000 1,200 9,200 9,200 Period 1a Period-Dependent Costs 1a.4.1 Insurance 751 75 826 826 1a.4.2 Property taxes 1a.4.3 Health physics supplies 421 105 527 527 1a.4.4 Heavy equipment rental 421 63 484 484 1a.4.5 Disposal of DAW generated 2
1 34 9
45 45 610 12,190 3
1a.4.6 Plant energy budget 1,319 198 1,517 1,517 1a.4.7 NRC Fees 471 47 518 518 1a.4.8 Emergency Planning Fees 315 32 347 347 1a.4.9 Site O&M Costs 125 19 144 144 1a.4.10 Spent Fuel Pool O&M 381 57 438 438 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 14 of 24 Table E-2 Braidwood Nuclear Power Station, Unit 2 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:44 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 1a Period-Dependent Costs (continued) 1a.4.11 ISFSI Operating Costs 44 7
51 51 1a.4.12 Security Staff Cost 6,337 950 7,287 7,287 157,471 1a.4.13 Utility Staff Cost 31,082 4,662 35,745 35,745 423,400 1a.4 Subtotal Period 1a Period-Dependent Costs 842 2
1 34 40,825 6,224 47,927 47,092 836 610 12,190 3
580,871 1a.0 TOTAL PERIOD 1a COST 842 2
1 34 60,935 9,300 71,114 49,693 21,421 610 12,190 3
596,232 PERIOD 1b - SAFSTOR Limited DECON Activities Period 1b Direct Decommissioning Activities Decontamination of Site Buildings 1b.1.1.1 Reactor 2,135 1,067 3,202 3,202 33,093 1b.1.1.2 Auxiliary Building 246 123 369 369 3,829 1b.1.1.3 Radwaste/Service Building 160 80 240 240 2,506 1b.1.1.4 Refueling Water Storage Tank 351 176 527 527 5,322 1b.1.1.5 Fuel Handling Building 1,003 502 1,505 1,505 15,238 1b.1.1 Totals 3,895 1,947 5,842 5,842 59,989 1b.1 Subtotal Period 1b Activity Costs 3,895 1,947 5,842 5,842 59,989 Period 1b Collateral Costs 1b.3.1 Decon equipment 811 122 932 932 1b.3.2 Process liquid waste 205 90 404 389 269 1,357 1,357 1,398 83,852 272 1b.3.3 Small tool allowance 64 10 73 73 1b.3.4 Spent Fuel Capital and Transfer 2,000 300 2,300 2,300 1b.3 Subtotal Period 1b Collateral Costs 1,016 64 90 404 389 2,000 701 4,663 2,363 2,300 1,398 83,852 272 Period 1b Period-Dependent Costs 1b.4.1 Decon supplies 746 187 933 933 1b.4.2 Insurance 187 19 206 206 1b.4.3 Property taxes 1,612 161 1,773 1,773 1b.4.4 Health physics supplies 340 85 425 425 1b.4.5 Heavy equipment rental 105 16 121 121 1b.4.6 Disposal of DAW generated 2
1 33 8
43 43 585 11,699 3
1b.4.7 Plant energy budget 329 49 378 378 1b.4.8 NRC Fees 117 12 129 129 1b.4.9 Emergency Planning Fees 79 8
86 86 1b.4.10 Site O&M Costs 31 5
36 36 1b.4.11 Spent Fuel Pool O&M 95 14 109 109 1b.4.12 ISFSI Operating Costs 11 2
13 13 1b.4.13 Security Staff Cost 1,580 237 1,817 1,817 39,260 1b.4.14 Utility Staff Cost 7,749 1,162 8,912 8,912 105,560 1b.4 Subtotal Period 1b Period-Dependent Costs 746 445 2
1 33 11,790 1,965 14,982 14,773 208 585 11,699 3
144,820 1b.0 TOTAL PERIOD 1b COST 5,657 509 92 404 422 13,790 4,613 25,486 22,978 2,508 1,983 95,552 60,264 144,820 PERIOD 1c - Preparations for SAFSTOR Dormancy Period 1c Direct Decommissioning Activities 1c.1.1 Prepare support equipment for storage 457 69 525 525 3,000 1c.1.2 Install containment pressure equal. lines 48 7
55 55 700 1c.1.3 Interim survey prior to dormancy 733 220 953 953 13,416 1c.1.4 Secure building accesses a
1c.1.5 Prepare & submit interim report 29 4
34 34 250 1c.1 Subtotal Period 1c Activity Costs 504 762 300 1,567 1,567 17,116 250 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 15 of 24 Table E-2 Braidwood Nuclear Power Station, Unit 2 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:44 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 1c Additional Costs 1c.2.1 Spent Fuel Pool Isolation 9,690 1,453 11,143 11,143 1c.2 Subtotal Period 1c Additional Costs 9,690 1,453 11,143 11,143 Period 1c Collateral Costs 1c.3.1 Process liquid waste 251 110 494 476 330 1,661 1,661 1,710 102,618 333 1c.3.2 Small tool allowance 4
1 5
5 1c.3.3 Spent Fuel Capital and Transfer 2,000 300 2,300 2,300 1c.3 Subtotal Period 1c Collateral Costs 251 4
110 494 476 2,000 630 3,966 1,666 2,300 1,710 102,618 333 Period 1c Period-Dependent Costs 1c.4.1 Insurance 187 19 206 206 1c.4.2 Property taxes 1,612 161 1,773 1,773 1c.4.3 Health physics supplies 145 36 182 182 1c.4.4 Heavy equipment rental 105 16 121 121 1c.4.5 Disposal of DAW generated 0
0 6
1 8
8 102 2,045 0
1c.4.6 Plant energy budget 329 49 378 378 1c.4.7 NRC Fees 117 12 129 129 1c.4.8 Emergency Planning Fees 79 8
86 86 1c.4.9 Site O&M Costs 31 5
36 36 1c.4.10 Spent Fuel Pool O&M 95 14 109 109 1c.4.11 ISFSI Operating Costs 11 2
13 13 1c.4.12 Security Staff Cost 1,580 237 1,817 1,817 39,260 1c.4.13 Utility Staff Cost 1,559 234 1,793 1,793 19,500 1c.4 Subtotal Period 1c Period-Dependent Costs 250 0
0 6
5,600 794 6,650 6,442 208 102 2,045 0
58,760 1c.0 TOTAL PERIOD 1c COST 251 759 110 494 482 18,052 3,178 23,326 20,818 2,508 1,813 104,664 17,450 59,010 PERIOD 1 TOTALS 5,908 2,110 204 899 938 92,778 17,090 119,927 93,489 26,437 4,405 212,406 77,716 800,062 PERIOD 2a - SAFSTOR Dormancy with Wet Spent Fuel Storage Period 2a Direct Decommissioning Activities 2a.1.1 Quarterly Inspection a
2a.1.2 Semi-annual environmental survey a
2a.1.3 Prepare reports a
2a.1.4 Bituminous roof replacement 241 36 277 277 2a.1.5 Maintenance supplies 503 126 629 629 2a.1 Subtotal Period 2a Activity Costs 744 162 906 906 Period 2a Collateral Costs 2a.3.1 Spent Fuel Capital and Transfer 34,000 5,100 39,100 39,100 2a.3 Subtotal Period 2a Collateral Costs 34,000 5,100 39,100 39,100 Period 2a Period-Dependent Costs 2a.4.1 Insurance 1,345 134 1,479 1,296 184 2a.4.2 Property taxes 7,726 773 8,499 2,200 6,299 2a.4.3 Health physics supplies 336 84 419 419 2a.4.4 Disposal of DAW generated 5
2 87 22 115 115 1,551 31,027 7
2a.4.5 Plant energy budget 1,056 158 1,214 607 607 2a.4.6 NRC Fees 715 72 787 787 2a.4.7 Emergency Planning Fees 400 40 440 440 2a.4.8 Site O&M Costs 500 75 575 575 2a.4.9 Spent Fuel Pool O&M 2,294 344 2,639 2,639 2a.4.10 ISFSI Operating Costs 176 26 202 202 2a.4.11 Security Staff Cost 10,406 1,561 11,967 3,462 8,505 287,274 2a.4.12 Utility Staff Cost 12,191 1,829 14,019 4,281 9,738 156,452 2a.4 Subtotal Period 2a Period-Dependent Costs 336 5
2 87 36,809 5,118 42,356 13,743 28,613 1,551 31,027 7
443,727 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 16 of 24 Table E-2 Braidwood Nuclear Power Station, Unit 2 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:44 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours 2a.0 TOTAL PERIOD 2a COST 336 5
2 87 71,553 10,380 82,362 14,649 67,713 1,551 31,027 7
443,727 PERIOD 2b - SAFSTOR Dormancy with Dry Spent Fuel Storage Period 2b Direct Decommissioning Activities 2b.1.1 Quarterly Inspection a
2b.1.2 Semi-annual environmental survey a
2b.1.3 Prepare reports a
2b.1.4 Bituminous roof replacement 755 113 869 869 2b.1.5 Maintenance supplies 1,577 394 1,972 1,972 2b.1 Subtotal Period 2b Activity Costs 2,333 508 2,840 2,840 Period 2b Collateral Costs 2b.3.1 Spent Fuel Capital and Transfer 7,375 1,106 8,481 8,481 2b.3 Subtotal Period 2b Collateral Costs 7,375 1,106 8,481 8,481 Period 2b Period-Dependent Costs 2b.4.1 Insurance 3,813 381 4,195 4,062 133 2b.4.2 Property taxes 6,270 627 6,897 6,897 2b.4.3 Health physics supplies 978 245 1,223 1,223 2b.4.4 Disposal of DAW generated 14 5
264 68 351 351 4,731 94,623 22 2b.4.5 Plant energy budget 1,655 248 1,903 1,903 2b.4.6 NRC Fees 2,243 224 2,467 2,467 2b.4.7 Emergency Planning Fees 1,254 125 1,379 1,379 2b.4.8 Site O&M Costs 1,567 235 1,803 1,803 2b.4.9 ISFSI Operating Costs 551 83 634 634 2b.4.10 Security Staff Cost 14,290 2,144 16,434 10,853 5,581 323,217 2b.4.11 Utility Staff Cost 19,012 2,852 21,863 13,420 8,443 261,714 2b.4 Subtotal Period 2b Period-Dependent Costs 978 14 5
264 50,656 7,232 59,149 42,979 16,170 4,731 94,623 22 584,931 2b.0 TOTAL PERIOD 2b COST 978 14 5
264 60,364 8,846 70,471 45,819 24,652 4,731 94,623 22 584,931 PERIOD 2c - SAFSTOR Dormancy without Spent Fuel Storage Period 2c Direct Decommissioning Activities 2c.1.1 Quarterly Inspection a
2c.1.2 Semi-annual environmental survey a
2c.1.3 Prepare reports a
2c.1.4 Bituminous roof replacement 2,079 312 2,391 2,391 2c.1.5 Maintenance supplies 4,342 1,085 5,427 5,427 2c.1 Subtotal Period 2c Activity Costs 6,421 1,397 7,819 7,819 Period 2c Period-Dependent Costs 2c.4.1 Insurance 10,165 1,017 11,182 11,182 2c.4.2 Property taxes 17,260 1,726 18,986 18,986 2c.4.3 Health physics supplies 2,608 652 3,259 3,259 2c.4.4 Disposal of DAW generated 38 14 718 185 956 956 12,871 257,419 59 2c.4.5 Plant energy budget 4,556 683 5,240 5,240 2c.4.6 NRC Fees 5,892 589 6,482 6,482 2c.4.7 Site O&M Costs 4,315 647 4,962 4,962 2c.4.8 Security Staff Cost 25,980 3,897 29,877 29,877 528,095 2c.4.9 Utility Staff Cost 32,125 4,819 36,944 36,944 455,329 2c.4 Subtotal Period 2c Period-Dependent Costs 2,608 38 14 718 100,294 14,216 117,887 117,887 12,871 257,419 59 983,424 2c.0 TOTAL PERIOD 2c COST 2,608 38 14 718 106,715 15,613 125,706 125,706 12,871 257,419 59 983,424 PERIOD 2 TOTALS 3,921 56 21 1,069 238,632 34,839 278,539 186,174 92,365 19,153 383,069 88 2,012,082 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 17 of 24 Table E-2 Braidwood Nuclear Power Station, Unit 2 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:44 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 3a - Reactivate Site Following SAFSTOR Dormancy Period 3a Direct Decommissioning Activities 3a.1.1 Prepare preliminary decommissioning cost 66 10 76 76 556 3a.1.2 Review plant dwgs & specs.
232 35 267 267 1,969 3a.1.3 Perform detailed rad survey a
3a.1.4 End product description 51 8
58 58 428 3a.1.5 Detailed by-product inventory 66 10 76 76 556 3a.1.6 Define major work sequence 379 57 436 436 3,210 3a.1.7 Perform SER and EA 157 23 180 180 1,327 3a.1.8 Perform Site-Specific Cost Study 253 38 290 290 2,140 3a.1.9 Prepare/submit License Termination Plan 207 31 238 238 1,753 3a.1.10 Receive NRC approval of termination plan a
Activity Specifications 3a.1.11.1 Re-activate plant & temporary facilities 372 56 428 385 43 3,154 3a.1.11.2 Plant systems 210 32 242 218 24 1,783 3a.1.11.3 Reactor internals 359 54 412 412 3,039 3a.1.11.4 Reactor vessel 328 49 378 378 2,782 3a.1.11.5 Biological shield 25 4
29 29 214 3a.1.11.6 Steam generators 158 24 181 181 1,335 3a.1.11.7 Reinforced concrete 81 12 93 46 46 685 3a.1.11.8 Main Turbine 20 3
23 23 171 3a.1.11.9 Main Condensers 20 3
23 23 171 3a.1.11.10 Plant structures & buildings 158 24 181 91 91 1,335 3a.1.11.11 Waste management 232 35 267 267 1,969 3a.1.11.12 Facility & site closeout 45 7
52 26 26 385 3a.1.11 Total 2,009 301 2,310 2,034 277 17,024 Planning & Site Preparations 3a.1.12 Prepare dismantling sequence 121 18 139 139 1,027 3a.1.13 Plant prep. & temp. svces 2,800 420 3,220 3,220 3a.1.14 Design water clean-up system 71 11 81 81 599 3a.1.15 Rigging/Cont. Cntrl Envlps/tooling/etc.
2,200 330 2,530 2,530 3a.1.16 Procure casks/liners & containers 62 9
71 71 526 3a.1 Subtotal Period 3a Activity Costs 8,672 1,301 9,973 9,696 277 31,117 Period 3a Period-Dependent Costs 3a.4.1 Insurance 294 29 324 324 3a.4.2 Property taxes 500 50 550 550 3a.4.3 Health physics supplies 349 87 437 437 3a.4.4 Heavy equipment rental 421 63 484 484 3a.4.5 Disposal of DAW generated 1
1 27 7
36 36 481 9,613 2
3a.4.6 Plant energy budget 1,319 198 1,517 1,517 3a.4.7 NRC Fees 214 21 236 236 3a.4.8 Site O&M Costs 125 19 144 144 3a.4.9 Security Staff Cost 238 36 274 274 6,257 3a.4.10 Utility Staff Cost 14,259 2,139 16,398 16,398 200,229 3a.4 Subtotal Period 3a Period-Dependent Costs 770 1
1 27 16,950 2,649 20,398 20,398 481 9,613 2
206,486 3a.0 TOTAL PERIOD 3a COST 770 1
1 27 25,622 3,950 30,371 30,094 277 481 9,613 2
237,603 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 18 of 24 Table E-2 Braidwood Nuclear Power Station, Unit 2 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:44 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 3b - Decommissioning Preparations Period 3b Direct Decommissioning Activities Detailed Work Procedures 3b.1.1.1 Plant systems 239 36 275 247 27 2,026 3b.1.1.2 Reactor internals 126 19 145 145 1,070 3b.1.1.3 Remaining buildings 68 10 78 20 59 578 3b.1.1.4 CRD cooling assembly 51 8
58 58 428 3b.1.1.5 CRD housings & ICI tubes 51 8
58 58 428 3b.1.1.6 Incore instrumentation 51 8
58 58 428 3b.1.1.7 Reactor vessel 183 28 211 211 1,554 3b.1.1.8 Facility closeout 61 9
70 35 35 514 3b.1.1.9 Missile shields 23 3
26 26 193 3b.1.1.10 Biological shield 61 9
70 70 514 3b.1.1.11 Steam generators 232 35 267 267 1,969 3b.1.1.12 Reinforced concrete 51 8
58 29 29 428 3b.1.1.13 Main Turbine 79 12 91 91 668 3b.1.1.14 Main Condensers 79 12 91 91 668 3b.1.1.15 Auxiliary building 138 21 159 143 16 1,168 3b.1.1.16 Reactor building 138 21 159 143 16 1,168 3b.1.1 Total 1,629 244 1,873 1,510 363 13,800 3b.1 Subtotal Period 3b Activity Costs 1,629 244 1,873 1,510 363 13,800 Period 3b Additional Costs 3b.2.1 Site Characterization 2,657 797 3,454 3,454 12,779 4,547 3b.2 Subtotal Period 3b Additional Costs 2,657 797 3,454 3,454 12,779 4,547 Period 3b Collateral Costs 3b.3.1 Decon equipment 811 122 932 932 3b.3.2 DOC staff relocation expenses 1,130 169 1,299 1,299 3b.3.3 Pipe cutting equipment 1,100 165 1,265 1,265 3b.3 Subtotal Period 3b Collateral Costs 811 1,100 1,130 456 3,497 3,497 Period 3b Period-Dependent Costs 3b.4.1 Decon supplies 25 6
31 31 3b.4.2 Insurance 169 17 186 186 3b.4.3 Property taxes 252 25 277 277 3b.4.4 Health physics supplies 190 48 238 238 3b.4.5 Heavy equipment rental 212 32 244 244 3b.4.6 Disposal of DAW generated 1
0 15 4
20 20 267 5,344 1
3b.4.7 Plant energy budget 665 100 765 765 3b.4.8 NRC Fees 108 11 119 119 3b.4.9 Site O&M Costs 63 9
72 72 3b.4.10 Security Staff Cost 120 18 138 138 3,154 3b.4.11 DOC Staff Cost 3,314 497 3,811 3,811 43,109 3b.4.12 Utility Staff Cost 7,188 1,078 8,267 8,267 100,937 3b.4 Subtotal Period 3b Period-Dependent Costs 25 402 1
0 15 11,879 1,845 14,167 14,167 267 5,344 1
147,200 3b.0 TOTAL PERIOD 3b COST 836 1,502 1
0 15 17,295 3,342 22,990 22,627 363 267 5,344 12,780 165,547 PERIOD 3 TOTALS 836 2,272 2
1 42 42,916 7,292 53,361 52,721 640 748 14,956 12,782 403,149 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 19 of 24 Table E-2 Braidwood Nuclear Power Station, Unit 2 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:44 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours PERIOD 4a - Large Component Removal Period 4a Direct Decommissioning Activities Nuclear Steam Supply System Removal 4a.1.1.1 Reactor Coolant Piping 46 160 33 21 45 170 119 594 594 864 864 200,408 3,290 4a.1.1.2 Pressurizer Relief Tank 8
29 6
4 9
30 21 107 107 165 165 36,553 596 4a.1.1.3 Reactor Coolant Pumps & Motors 28 105 57 168 1,272 389 2,018 2,018 4,796 780,540 2,726 80 4a.1.1.4 Pressurizer 12 68 347 94 412 175 1,108 1,108 3,033 252,826 1,527 750 4a.1.1.5 Steam Generators 94 4,168 1,486 2,392 580 3,416 2,537 14,674 14,674 39,289 14,436 3,096,232 20,508 1,500 4a.1.1.6 CRDMs/ICIs/Service Structure Removal 22 80 176 31 59 68 436 436 2,843 50,181 1,648 4a.1.1.7 Reactor Vessel Internals 75 2,001 3,442 525 3,717 203 4,419 14,383 14,383 2,211 376 470 325,254 23,067 1,055 4a.1.1.8 Vessel & Internals GTCC Disposal 11,837 1,776 13,613 13,613 505 104,146 4a.1.1.9 Reactor Vessel 90 3,970 1,283 670 2,978 203 5,030 14,224 14,224 6,672 2,254 979,179 23,067 1,055 4a.1.1 Totals 374 10,580 6,831 3,905 634 23,892 406 14,534 61,156 61,156 40,318 35,019 2,629 470 505 5,825,319 76,428 4,439 Removal of Major Equipment 4a.1.2 Main Turbine/Generator 574 262 32 214 207 1,288 1,288 5,355 455,213 9,016 4a.1.3 Main Condensers 1,176 136 27 150 334 1,823 1,823 7,111 320,000 18,250 Cascading Costs from Clean Building Demolition 4a.1.4.1 Reactor 1,171 176 1,346 1,346 12,130 4a.1.4.2 Auxiliary Building 655 98 754 754 6,896 4a.1.4.3 Radwaste/Service Building 429 64 494 494 5,059 4a.1.4.4 Refueling Water Storage Tank 114 17 131 131 1,299 4a.1.4.5 Fuel Handling Building 337 51 388 388 3,690 4a.1.4 Totals 2,707 406 3,113 3,113 29,074 Disposal of Plant Systems 4a.1.5.1 Auxiliary Feedwater 71 11 82 82 1,143 4a.1.5.2 Auxiliary Steam 130 20 150 150 2,107 4a.1.5.3 Auxiliary Steam RCA 357 5
9 54 99 525 525 2,822 114,583 5,241 4a.1.5.4 Boric Acid Processing 463 28 23 34 106 154 808 808 1,794 1,076 162,827 6,970 4a.1.5.5 CO2 & H2 18 3
20 20 289 4a.1.5.6 CO2 & H2 RCA 34 1
1 5
9 50 50 287 11,664 478 4a.1.5.7 Chemical Feed 165 25 190 190 2,663 4a.1.5.8 Chemical Feed at Intake 23 3
26 26 364 4a.1.5.9 Chilled Water 91 14 104 104 1,454 4a.1.5.10 Circulating Water 542 81 624 624 8,814 4a.1.5.11 Condensate 333 50 383 383 5,317 4a.1.5.12 Condensate Booster 332 50 382 382 5,314 4a.1.5.13 Condensate Cleanup 182 27 209 209 3,000 4a.1.5.14 Containment Spray 251 7
12 69 76 414 414 3,602 146,289 3,673 4a.1.5.15 Diesel Fuel Oil 180 27 207 207 2,848 4a.1.5.16 Essential Service Water 311 47 358 358 5,049 4a.1.5.17 Extraction Steam 223 33 256 256 3,637 4a.1.5.18 Feedwater 303 45 348 348 4,925 4a.1.5.19 Feedwater Drains 719 108 827 827 11,719 4a.1.5.20 Gland Steam 38 6
43 43 616 4a.1.5.21 Gland Water 28 4
32 32 458 4a.1.5.22 Main Steam 308 46 354 354 4,979 4a.1.5.23 Main Steam RCA 84 2
3 19 24 132 132 990 40,190 1,250 4a.1.5.24 Make-up Demineralizer 155 23 179 179 2,595 4a.1.5.25 Nitrogen 1
0 1
1 18 4a.1.5.26 Non-Essential Service Water 361 54 416 416 5,903 4a.1.5.27 Non-Essential Service Water RCA 179 7
13 75 59 332 332 3,909 158,755 2,535 4a.1.5.28 Off Gas 665 13 25 141 192 1,037 1,037 7,411 300,945 10,038 4a.1.5.29 Potable Water 5
1 6
6 75 4a.1.5.30 Process Radiation Monitoring 64 0
0 3
17 84 84 138 5,613 1,086 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 20 of 24 Table E-2 Braidwood Nuclear Power Station, Unit 2 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:44 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Disposal of Plant Systems (continued) 4a.1.5.31 Process Sampling 143 1
2 12 38 196 196 641 26,045 2,347 4a.1.5.32 Screen Wash 45 7
52 52 740 4a.1.5.33 Station Air 43 6
50 50 705 4a.1.5.34 Station Heating 147 22 169 169 2,391 4a.1.5.35 Steam Humidification 7
1 8
8 115 4a.1.5.36 Switchgear Heat Removal 33 5
38 38 519 4a.1.5.37 Turbine Bldg Equip Drains 76 11 88 88 1,235 4a.1.5.38 Turbine Bldg Floor Drains 131 20 150 150 2,117 4a.1.5.39 Turbine Oil 83 12 96 96 1,359 4a.1.5.40 Turbine-Generator Auxilaries 56 8
64 64 884 4a.1.5.41 Waste Oil Sumps 32 5
37 37 517 4a.1.5.42 Well Water 79 12 90 90 1,247 4a.1.5 Totals 7,489 64 90 412 106 1,455 9,616 3,579 6,037 21,594 1,076 966,911 118,732 4a.1.6 Scaffolding in support of decommissioning 1,560 10 2
10 3
394 1,979 1,979 473 29 23,936 26,661 4a.1 Subtotal Period 4a Activity Costs 374 24,085 7,303 4,055 1,420 24,001 406 17,329 78,975 72,938 6,037 74,851 36,125 2,629 470 505 7,591,379 278,163 4,439 Period 4a Collateral Costs 4a.3.1 Process liquid waste 36 18 82 79 52 266 266 283 16,991 55 4a.3.2 Small tool allowance 280 42 322 290 32 4a.3 Subtotal Period 4a Collateral Costs 36 280 18 82 79 94 589 556 32 283 16,991 55 Period 4a Period-Dependent Costs 4a.4.1 Decon supplies 65 16 81 81 4a.4.2 Insurance 442 44 486 486 4a.4.3 Property taxes 657 66 723 651 72 4a.4.4 Health physics supplies 1,629 407 2,036 2,036 4a.4.5 Heavy equipment rental 2,333 350 2,683 2,683 4a.4.6 Disposal of DAW generated 9
3 175 45 233 233 3,142 62,838 14 4a.4.7 Plant energy budget 1,648 247 1,895 1,895 4a.4.8 NRC Fees 593 59 652 652 4a.4.9 Site O&M Costs 164 25 189 189 4a.4.10 Liquid Radwaste Processing Equipment/Services 504 76 579 579 4a.4.11 Security Staff Cost 2,532 380 2,912 2,912 66,597 4a.4.12 DOC Staff Cost 14,980 2,247 17,227 17,227 187,776 4a.4.13 Utility Staff Cost 24,577 3,687 28,264 28,264 333,202 4a.4 Subtotal Period 4a Period-Dependent Costs 65 3,962 9
3 175 46,097 7,649 57,960 57,888 72 3,142 62,838 14 587,575 4a.0 TOTAL PERIOD 4a COST 475 28,327 7,331 4,140 1,420 24,256 46,503 25,072 137,524 131,382 6,142 74,851 39,550 2,629 470 505 7,671,209 278,232 592,014 PERIOD 4b - Site Decontamination Period 4b Direct Decommissioning Activities 4b.1.1 Remove spent fuel racks 1,093 118 313 95 590 769 2,978 2,978 5,572 499,920 2,174 Disposal of Plant Systems 4b.1.2.1 Chemical & Volume Control 1,046 60 45 34 243 340 1,769 1,769 1,783 2,322 278,742 15,645 4b.1.2.2 Chilled Water RCA 647 13 25 139 188 1,012 1,012 7,293 296,176 9,173 4b.1.2.3 Component Cooling 687 17 31 178 205 1,118 1,118 9,319 378,439 10,075 4b.1.2.4 Electrical 4,168 625 4,793 4,793 66,259 4b.1.2.5 Electrical - Contaminated 1,716 17 32 181 463 2,409 2,409 9,508 386,137 25,754 4b.1.2.6 Electrical - RCA 2,460 39 72 410 691 3,673 3,673 21,460 871,483 37,551 4b.1.2.7 Emergency Diesel Generator 95 14 109 109 1,514 4b.1.2.8 Essential Service Water RCA 333 17 32 179 117 677 677 9,380 380,930 4,955 4b.1.2.9 Fire Protection 307 46 353 353 4,983 4b.1.2.10 Fire Protection RCA 521 12 22 124 153 832 832 6,516 264,606 7,384 4b.1.2.11 Fuel Handling Bldg Equip Drains 161 7
7 20 23 51 268 268 1,027 221 60,829 2,404 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 21 of 24 Table E-2 Braidwood Nuclear Power Station, Unit 2 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:44 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Disposal of Plant Systems (continued) 4b.1.2.12 Fuel Handling Bldg Equip Drains (Unit 1) 29 1
1 1
4 8
44 44 67 34 5,758 424 4b.1.2.13 Fuel Handling Bldg Floor Drains 164 7
7 16 25 51 270 270 830 238 54,723 2,441 4b.1.2.14 Fuel Handling Bldg Floor Drains (Unit 1) 114 4
4 13 11 34 181 181 703 109 37,980 1,740 4b.1.2.15 Fuel Pool Cooling & Cleanup 218 11 11 24 43 72 380 380 1,275 406 88,160 3,272 4b.1.2.16 Fuel Pool Cooling & Cleanup (Unit 1) 202 10 10 23 38 66 350 350 1,226 361 82,110 3,050 4b.1.2.17 HVAC-Auxiliary Building 529 10 19 108 152 818 818 5,643 229,172 7,876 4b.1.2.18 HVAC-Control Room HVAC 8
1 9
9 127 4b.1.2.19 HVAC-Diesel Generator Room 43 6
50 50 686 4b.1.2.20 HVAC-Laboratory 20 3
23 23 315 4b.1.2.21 HVAC-Machine Shop 18 3
21 21 297 4b.1.2.22 HVAC-Miscellaneous 110 17 127 127 1,769 4b.1.2.23 HVAC-Primary Containment 588 19 36 204 185 1,032 1,032 10,679 433,695 8,624 4b.1.2.24 HVAC-Pumphouse 17 3
20 20 275 4b.1.2.25 HVAC-Radwaste 303 6
11 63 87 471 471 3,327 135,102 4,323 4b.1.2.26 HVAC-Turbine Building 186 28 214 214 3,158 4b.1.2.27 Instrument Air Supply 72 11 83 83 1,197 4b.1.2.28 Instrument Air Supply RCA 240 2
3 20 64 329 329 1,035 42,036 3,563 4b.1.2.29 Miscellaneous Drains 73 1
2 12 20 108 108 617 25,043 1,104 4b.1.2.30 Primary Containment Purge 289 10 20 111 93 523 523 5,816 236,197 4,524 4b.1.2.31 Primary Water 801 32 43 187 61 253 1,377 1,377 9,803 667 449,848 12,651 4b.1.2.32 Radioactive Waste Disposal 2,694 170 139 187 658 904 4,752 4,752 9,780 6,604 954,524 40,174 4b.1.2.33 Reactor Bldg Equipment Drains 106 8
7 7
37 39 203 203 356 350 45,614 1,581 4b.1.2.34 Reactor Building Floor Drains 40 2
2 2
7 12 65 65 125 66 11,009 597 4b.1.2.35 Reactor Coolant 161 8
6 4
32 50 260 260 206 299 35,137 2,391 4b.1.2.36 Residual Heat Removal 184 11 12 27 43 64 340 340 1,421 405 94,061 2,834 4b.1.2.37 Safety Injection 841 37 46 172 98 271 1,465 1,465 9,001 979 448,431 13,165 4b.1.2.38 Station Air RCA 56 1
1 6
15 78 78 293 11,919 815 4b.1.2.39 Station Heating RCA 244 4
8 46 70 373 373 2,412 97,961 3,548 4b.1.2.40 Tritium ALPS 364 9
17 99 109 599 599 5,181 210,418 5,732 4b.1.2.41 Waste Oil Sumps RCA 25 0
1 3
7 36 36 154 6,246 361 4b.1.2.42 Waste Water Treatment 89 13 102 102 1,464 4b.1.2 Totals 20,969 549 672 2,600 1,321 5,605 31,717 25,813 5,903 136,237 13,061 6,652,483 319,776 4b.1.3 Scaffolding in support of decommissioning 2,340 15 3
15 5
590 2,968 2,968 710 44 35,904 39,992 Decontamination of Site Buildings 4b.1.4.1 Reactor 1,937 1,369 176 195 134 455 1,491 5,757 5,757 7,022 8,433 1,122,380 50,350 4b.1.4.2 Auxiliary Building 227 116 8
9 17 18 151 545 545 866 322 66,370 5,240 4b.1.4.3 Radwaste/Service Building 149 46 6
7 6
15 92 320 320 322 278 40,039 2,959 4b.1.4.4 Refueling Water Storage Tank 352 408 4
5 22 6
284 1,081 1,081 1,146 87 54,852 11,906 4b.1.4.5 Fuel Handling Building 1,009 1,121 14 17 59 26 804 3,051 3,051 3,097 411 165,831 33,340 4b.1.4 Totals 3,673 3,060 208 233 238 520 2,823 10,754 10,754 12,452 9,531 1,449,473 103,795 4b.1 Subtotal Period 4b Activity Costs 4,766 26,487 1,084 1,004 2,853 2,436 9,787 48,417 42,514 5,903 149,399 28,207 8,637,780 465,737 Period 4b Additional Costs 4b.2.1 License Termination Survey Planning 940 282 1,222 1,222 6,240 4b.2.2 ISFSI License Termination 41 1
24 90 719 144 1,018 1,018 1,703 142,573 2,775 1,280 4b.2 Subtotal Period 4b Additional Costs 41 1
24 90 1,659 426 2,240 1,222 1,018 1,703 142,573 2,775 7,520 Period 4b Collateral Costs 4b.3.1 Process liquid waste 103 53 237 228 149 770 770 820 49,217 160 4b.3.2 Small tool allowance 497 74 571 571 4b.3.3 Decommissioning Equipment Disposition 123 34 127 40 46 369 369 6,000 373 303,507 88 4b.3 Subtotal Period 4b Collateral Costs 103 497 175 271 127 268 270 1,710 1,710 6,000 1,194 352,724 248 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 22 of 24 Table E-2 Braidwood Nuclear Power Station, Unit 2 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:44 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Period 4b Period-Dependent Costs 4b.4.1 Decon supplies 868 217 1,085 1,085 4b.4.2 Insurance 909 91 999 999 4b.4.3 Property taxes 1,351 135 1,486 1,486 4b.4.4 Health physics supplies 2,937 734 3,671 3,671 4b.4.5 Heavy equipment rental 4,759 714 5,472 5,472 4b.4.6 Disposal of DAW generated 20 7
374 97 498 498 6,704 134,081 31 4b.4.7 Plant energy budget 2,675 401 3,076 3,076 4b.4.8 NRC Fees 1,219 122 1,340 1,340 4b.4.9 Site O&M Costs 338 51 388 388 4b.4.10 Liquid Radwaste Processing Equipment/Services 1,036 155 1,191 1,191 4b.4.11 Security Staff Cost 7,645 1,147 8,792 8,792 176,250 4b.4.12 DOC Staff Cost 30,407 4,561 34,967 34,967 377,880 4b.4.13 Utility Staff Cost 50,045 7,507 57,552 57,552 665,520 4b.4 Subtotal Period 4b Period-Dependent Costs 868 7,695 20 7
374 95,624 15,931 120,519 120,519 6,704 134,081 31 1,219,650 4b.0 TOTAL PERIOD 4b COST 5,736 34,720 1,280 1,306 2,980 3,167 97,283 26,414 172,886 165,965 1,018 5,903 155,399 37,808 9,267,158 468,791 1,227,170 PERIOD 4e - License Termination Period 4e Direct Decommissioning Activities 4e.1.1 ORISE confirmatory survey 151 45 197 197 4e.1.2 Terminate license a
4e.1 Subtotal Period 4e Activity Costs 151 45 197 197 Period 4e Additional Costs 4e.2.1 License Termination Survey 8,222 2,467 10,688 10,688 131,983 3,120 4e.2 Subtotal Period 4e Additional Costs 8,222 2,467 10,688 10,688 131,983 3,120 Period 4e Collateral Costs 4e.3.1 DOC staff relocation expenses 1,130 169 1,299 1,299 4e.3 Subtotal Period 4e Collateral Costs 1,130 169 1,299 1,299 Period 4e Period-Dependent Costs 4e.4.1 Insurance 4e.4.2 Property taxes 376 38 414 414 4e.4.3 Health physics supplies 763 191 954 954 4e.4.4 Disposal of DAW generated 1
0 19 5
25 25 335 6,698 2
4e.4.5 Plant energy budget 199 30 229 229 4e.4.6 NRC Fees 355 35 390 390 4e.4.7 Site O&M Costs 94 14 108 108 4e.4.8 Security Staff Cost 527 79 606 606 11,786 4e.4.9 DOC Staff Cost 3,801 570 4,371 4,371 46,750 4e.4.10 Utility Staff Cost 4,551 683 5,234 5,234 56,964 4e.4 Subtotal Period 4e Period-Dependent Costs 763 1
0 19 9,902 1,644 12,330 12,330 335 6,698 2
115,500 4e.0 TOTAL PERIOD 4e COST 763 1
0 19 19,406 4,326 24,515 24,515 335 6,698 131,985 118,620 PERIOD 4 TOTALS 6,211 63,810 8,612 5,446 4,400 27,442 163,192 55,812 334,925 321,862 1,018 12,045 230,250 77,693 2,629 470 505 16,945,060 879,008 1,937,804 PERIOD 5b - Site Restoration Period 5b Direct Decommissioning Activities Demolition of Remaining Site Buildings 5b.1.1.1 Reactor 6,763 1,014 7,778 7,778 69,546 5b.1.1.2 Aux Feedwater-Steam Tunnel/Penetr. Area 689 103 792 792 5,186 5b.1.1.3 Auxiliary Building 5,899 885 6,784 6,784 62,063 5b.1.1.4 Blowdown Outfall Structure 29 4
33 33 295 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 23 of 24 Table E-2 Braidwood Nuclear Power Station, Unit 2 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:44 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours Demolition of Remaining Site Buildings (continued) 5b.1.1.5 Bottled Gas Storage 26 4
30 30 340 5b.1.1.6 Circulating Water Discharge 233 35 268 268 2,887 5b.1.1.7 Gatehouse and Extension 333 50 382 382 4,193 5b.1.1.8 Instrument Maintenance Building 94 14 109 109 1,190 5b.1.1.9 Lake Screen House 1,494 224 1,718 1,718 15,283 5b.1.1.10 Make-up Demineralizer Area 647 97 744 744 8,158 5b.1.1.11 Miscellaneous Warehouses 1,991 299 2,290 2,290 26,794 5b.1.1.12 Miscellaneous Yard Structures 1,254 188 1,442 1,442 14,693 5b.1.1.13 Radwaste/Service Building 3,927 589 4,516 4,516 45,685 5b.1.1.14 Receiving Building 183 27 210 210 2,292 5b.1.1.15 Refueling Water Storage Tank 1,028 154 1,182 1,182 11,692 5b.1.1.16 River Screen House 616 92 708 708 6,844 5b.1.1.17 Security Modifications 959 144 1,103 1,103 6,939 5b.1.1.18 Sewage Treatment Plant 106 16 122 122 1,326 5b.1.1.19 Tech Support Center & Cond Cleanup Bldg 499 75 574 574 6,095 5b.1.1.20 Turbine Building 5,769 865 6,634 6,634 70,342 5b.1.1.21 Turbine Pedestal 1,352 203 1,555 1,555 12,628 5b.1.1.22 Waste Treatment Building 103 15 118 118 1,265 5b.1.1.23 Fuel Handling Building 3,039 456 3,495 3,495 33,245 5b.1.1 Totals 37,032 5,555 42,587 42,587 408,981 Site Closeout Activities 5b.1.2 Remove Rubble 237 35 272 272 1,367 5b.1.3 Grade & landscape site 716 107 823 823 1,942 5b.1.4 Final report to NRC 79 12 91 91 668 5b.1 Subtotal Period 5b Activity Costs 37,984 79 5,709 43,772 91 43,681 412,290 668 Period 5b Additional Costs 5b.2.1 ISFSI Demolition and Site Restoration 1,303 24 199 1,527 1,527 16,256 80 5b.2.2 Cofferdam Construction and Teardown 778 117 894 894 7,391 5b.2.3 Concrete Crushing 1,020 5
154 1,179 1,179 4,730 5b.2 Subtotal Period 5b Additional Costs 3,101 29 470 3,600 1,527 2,074 28,377 80 Period 5b Collateral Costs 5b.3.1 Small tool allowance 477 71 548 548 5b.3 Subtotal Period 5b Collateral Costs 477 71 548 548 Period 5b Period-Dependent Costs 5b.4.1 Insurance 5b.4.2 Property taxes 1,239 124 1,363 1,363 5b.4.3 Heavy equipment rental 6,239 936 7,174 7,174 5b.4.4 Plant energy budget 327 49 376 376 5b.4.5 Site O&M Cost 310 46 356 356 5b.4.6 Security Staff Cost 1,561 234 1,795 1,795 34,287 5b.4.7 DOC Staff Cost 11,650 1,748 13,398 13,398 137,043 5b.4.8 Utility Staff Cost 5,559 834 6,392 6,392 67,229 5b.4 Subtotal Period 5b Period-Dependent Costs 6,239 20,645 3,971 30,855 30,855 238,558 5b.0 TOTAL PERIOD 5b COST 47,800 20,753 10,221 78,775 91 1,527 77,158 440,667 239,306 PERIOD 5 TOTALS 47,800 20,753 10,221 78,775 91 1,527 77,158 440,667 239,306 TOTAL COST TO DECOMMISSION 12,955 119,914 8,874 6,367 4,400 29,490 558,271 125,255 865,527 654,337 121,347 89,843 230,250 101,999 2,629 470 505 17,555,500 1,410,261 5,392,403 TLG Services, Inc.
Braidwood Nuclear Power Station Decommissioning Cost Analysis Document E16-1555-014, Rev. 0 Appendix E, Page 24 of 24 Table E-2 Braidwood Nuclear Power Station, Unit 2 SAFSTOR Decommissioning Cost Estimate (thousands of 2009 dollars)
Costs run: Wed, Oct 14, 2009 at 13:56:44 Off-Site LLRW NRC Spent Fuel Site Processed Burial Volumes Burial /
Utility and Activity DECCER Version 2007.02.18c Decon Removal Packaging Transport Processing Disposal Other Total Total Lic. Term.
Management Restoration Volume Class A Class B Class C GTCC Processed Craft Contractor Index Activity Description Cost Cost Costs Costs Costs Costs Costs Contingency Costs Costs Costs Costs Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt., Lbs.
Manhours Manhours TOTAL COST TO DECOMMISSION WITH 16.92% CONTINGENCY:
$865,527 thousands of 2009 dollars TOTAL NRC LICENSE TERMINATION COST IS 75.6% OR:
$654,337 thousands of 2009 dollars SPENT FUEL MANAGEMENT COST IS 14.02% OR:
$121,347 thousands of 2009 dollars NON-NUCLEAR DEMOLITION COST IS 10.38% OR:
$89,843 thousands of 2009 dollars TOTAL LOW-LEVEL RADIOACTIVE WASTE VOLUME BURIED (EXCLUDING GTCC):
105,098 cubic feet TOTAL GREATER THAN CLASS C RADWASTE VOLUME GENERATED:
505 cubic feet TOTAL SCRAP METAL REMOVED:
76,977 tons TOTAL CRAFT LABOR REQUIREMENTS:
1,410,261 man-hours End Notes:
n/a - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
0 - indicates that this value is less than 0.5 but is non-zero.
a cell containing " - " indicates a zero value TLG Services, Inc.
ATTACHMENT 2 Braidwood Station, Units 1 and 2 Radiological Decommissioning Projected SAFSTOR Cash Flow (dollars, thousands)
Braidwood Unit 1 Braidwood Unit 2 Radiological Decommissioning Cost Radiological DecommOssioning Cost Year (December 31,2009 dollars)
(December 31,2009 dollars) 2026
$9,575
$0 2027
$51,972
$1,906 2028
$1 2,542
$51,575 2029
$3,646
$41,993 2030
$3,646
$3,660 2031
$3,646
$3,660 2032
$3,653
$3,670 2033
$3,642
$3,655 2034
$3,642
$3,652 2035
$3,642
$3,652 2036
$3,652
$3,662 2037
$3,642
$3,652 2038
$3,642
$3,652 2039
$3,642
$3,652 2040
$3,652
$3,662 2041
$3,642
$3,652 2042
$3,642
$3,652 2043
$3,642
$3,652 2044
$3,652
$3,662 2045
$3,641
$3,652 2046
$3,618
$3,639 2047
$3,618
$3,639 2048
$3,628
$3,649 2049
$3,6 18
$3,639 2050
$3,618
$3,639 2051
$3,618
$3,639 2052
$3,628
$3,649 2053
$3,618
$3,639 2054
$3,618
$3,639 2055
$3,618
$3,639 2056
$3,628
$3,649 2057
$3,618
$3,639 2058
$3,618
$3,639 2059
$3,618
$3,639 2060
$3,628
$3,649 2061
$3,618
$3,639 2062
$3,618
$3,639 2063
$3,618
$3,639 2064
$3,628
$3,649
Braidwood Station Units 1 and 2 Radiological Decommissioning Projected SAFSTOR Cash Flow (continued)
(dollars, thousands)
Braidwood Unit 1 Braidwood Unit 2 Radiological Decommissioning Cost Radiological Decommissioning Cost Year (December 31,2009 dollars)
(December 31,2009 dollars) 2065
$3,618
$3,639 2066
$3,618
$3,639 2067
$3,618
$3,639 2068
$3,628
$3,649 2069
$3,618
$3,639 2070
$3,618
$3,639 2071
$3,618
$3,639 2072
$3,628
$3,649 2073
$3,618
$3,639 2074
$3,618
$3,639 2075
$3,618
$3,639 2076
$3,628
$3,649 Total
$598,915