ML092440685

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan 09/01/2009 - 12/31/2010
ML092440685
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
References
Download: ML092440685 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2009 07:46:01 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Browns Ferry TFPI

- TRIENNIAL FIRE PROTECTION INSPECTION 6

1, 2, 3 IP Fire Protection [Triennial]

7111105T 09/21/2009 09/25/2009 1, 2, 3 IP Fire Protection [Triennial]

7111105T 10/05/2009 10/09/2009 ISFSI

- ISFSI OPERATIONAL INSPECTION 2

1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/01/2009 12/31/2009 CDBI-EB1

- COMPONENT DESIGN BASES INSPECTION 8

1, 2, 3 IP Component Design Bases Inspection 7111121 09/28/2009 10/02/2009 1

IP Power Uprate 71004 09/28/2009 11/20/2009 1, 2, 3 IP Component Design Bases Inspection 7111121 10/19/2009 10/23/2009 1, 2, 3 IP Component Design Bases Inspection 7111121 11/02/2009 11/06/2009 1, 2, 3 IP Component Design Bases Inspection 7111121 11/16/2009 11/20/2009 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2, 3 IP Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 2515/175 11/02/2009 11/06/2009 1, 2, 3 IP Exercise Evaluation 7111401 11/02/2009 11/06/2009 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 11/02/2009 11/06/2009 1, 2, 3 IP Performance Indicator Verification 71151 11/02/2009 11/06/2009 EB3ISI

- UNIT 3 INSERVICE INSPECTION 1

3 IP Inservice Inspection Activities - BWR 7111108G 03/08/2010 03/12/2010 PSB1-RP

- RP ACCESS CONTROLS 1

1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 03/22/2010 03/26/2010 1, 2, 3 IP Performance Indicator Verification 71151 03/22/2010 03/26/2010 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1, 2, 3 IP Alert and Notification System Testing 7111402 03/22/2010 03/26/2010 1, 2, 3 IP Emergency Response Organization Augmentation Testing 7111403 03/22/2010 03/26/2010 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 03/22/2010 03/26/2010 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/22/2010 03/26/2010 1, 2, 3 IP Performance Indicator Verification 71151 03/22/2010 03/26/2010 OL EXAM

- INITIAL EXAM PREP 7

1 BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIES V23304 05/17/2010 05/21/2010 PSB1-RP

- RP GROUNDWATER PROTECTION 1

1, 2, 3 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/31/2010 06/04/2010 OL EXAM

- INITIAL EXAM - WEEK 1 7

1 BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIES V23304 06/07/2010 06/11/2010 OL EXAM

- INITIAL EXAM - WEEK 2 7

1 BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIES V23304 06/14/2010 06/18/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2009 07:46:01 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Browns Ferry PSB1-RP

- RP PUBLIC RADIATION PROTECTION 3

1, 2, 3 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 06/14/2010 06/18/2010 1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 06/14/2010 06/18/2010 1, 2, 3 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 06/14/2010 06/18/2010 1, 2, 3 IP Performance Indicator Verification 71151 06/14/2010 06/18/2010 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION IN 5

1, 2, 3 IP Identification and Resolution of Problems 71152B 08/30/2010 09/03/2010 1, 2, 3 IP Identification and Resolution of Problems 71152B 09/20/2010 09/24/2010 EB3ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - BWR 7111108G 11/01/2010 11/05/2010 OL RQ

- REQUAL INSPECTION 2

1, 2 IP Licensed Operator Requalification Program 7111111B 12/06/2010 12/10/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure