Inspection / Activity Plan Page 1 of 2 09/01/2009 07:59:17 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson ISFSI
- ISFSI OPERATIONAL INSPECTION 2
2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/01/2009 10/15/2009 OL EXAM
- INITIAL EXAM - WEEK 1 4
2 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23310 09/07/2009 09/11/2009 EB1-MODS
- MODIFICATIONS-10CFR50.59 4
2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 09/14/2009 09/18/2009 2
IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 09/28/2009 10/02/2009 OL EXAM
- INTIAL EXAM - WEEK2 3
2 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23310 09/21/2009 09/25/2009 PSB1-RP
- RP ACCESS CONTROLS 1
2 IP Access Control to Radiologically Significant Areas 7112101 11/16/2009 11/20/2009 LI
- POST APPROVAL LR INSPECTION 6
2 IP Post-Approval Site Inspection for License Renewal 71003 02/08/2010 02/12/2010 LI
- POST APPROVAL LR CONT INSPECTION 4
2 IP Post-Approval Site Inspection for License Renewal 71003 02/22/2010 02/26/2010 TFPI 805
- TRIENNIAL FIRE PROTECTION 5
2 IP Fire Protection [Triennial]
7111105T 03/15/2010 03/19/2010 2
IP Fire Protection [Triennial]
7111105T 03/29/2010 04/02/2010 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK1 4
2 IP Access Control to Radiologically Significant Areas 7112101 04/19/2010 04/23/2010 2
IP ALARA - Required 7112102-7112102R 04/19/2010 04/23/2010 2
IP Radioactive Material Processing and Transportation 7112202 04/19/2010 04/23/2010 2
IP Performance Indicator Verification 71151 04/19/2010 04/23/2010 EB3ISI
- UNIT 2 INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 04/26/2010 04/30/2010 EB3TI172
2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 04/26/2010 04/30/2010 EB3SGISI
- SGISI 1
2 IP Inservice Inspection Activities - PWR 7111108P 05/03/2010 05/07/2010 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK 2 3
2 IP Access Control to Radiologically Significant Areas 7112101 05/10/2010 05/14/2010 2
IP ALARA - Required 7112102-7112102R 05/10/2010 05/14/2010 2
IP Radioactive Material Processing and Transportation 7112202 05/10/2010 05/14/2010 2
IP Performance Indicator Verification 71151 05/10/2010 05/14/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 09/01/2009 07:59:17 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
2 IP Alert and Notification System Testing 7111402 05/24/2010 05/28/2010 2
IP Emergency Response Organization Augmentation Testing 7111403 05/24/2010 05/28/2010 2
IP Emergency Action Level and Emergency Plan Changes 7111404 05/24/2010 05/28/2010 2
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/24/2010 05/28/2010 2
IP Performance Indicator Verification 71151 05/24/2010 05/28/2010 PSB1-RP
- RP GROUND WATER PROTECTION 1
2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/31/2010 06/04/2010 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 5
2 IP Identification and Resolution of Problems 71152B 07/12/2010 07/16/2010 2
IP Identification and Resolution of Problems 71152B 07/26/2010 07/30/2010 EB1
- COMPONENT DESIGN BASES INSPECTION 7
2 IP Component Design Bases Inspection 7111121 08/16/2010 08/20/2010 2
IP Component Design Bases Inspection 7111121 08/30/2010 09/03/2010 2
IP Component Design Bases Inspection 7111121 09/13/2010 09/17/2010 2
IP Component Design Bases Inspection 7111121 09/27/2010 10/01/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.