Report 22, Inspection/Activity Plan 09/01/2009 - 12/31/2010
ML092440525
Person / Time
Site: Brunswick, 07200006  Duke Energy icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
Shared Package
ML092440514 List:
References
Download: ML092440525 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2009 07:53:39 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Brunswick SIT

- FINAL SIGNIFICANCE DETERMINATION LETTER 2

1, 2 IP Special Inspection 93812 06/29/2009 09/30/2009 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1, 2 IP Alert and Notification System Testing 7111402 11/16/2009 11/20/2009 1, 2 IP Emergency Response Organization Augmentation Testing 7111403 11/16/2009 11/20/2009 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 11/16/2009 11/20/2009 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 11/16/2009 11/20/2009 1, 2 IP Performance Indicator Verification 71151 11/16/2009 11/20/2009 PSB1-RP

- RP GROUNDWATER PROTECTION 1

1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 01/25/2010 01/29/2010 PSB1-RP

- RP PUBLIC RADIATION PROTECTION 3

1, 2 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 02/08/2010 02/12/2010 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 02/08/2010 02/12/2010 1, 2 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 02/08/2010 02/12/2010 1, 2 IP Performance Indicator Verification 71151 02/08/2010 02/12/2010 PSB1-RP

- RP ACCESS CONTROLS 1

1, 2 IP Access Control to Radiologically Significant Areas 7112101 02/22/2010 02/26/2010 EB3ISI

- EB3 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - BWR 7111108G 03/01/2010 03/05/2010 OL EXAM

- INITIAL EXAM PREP 7

1 BRUNSWICK/APRIL 2010 EXAM AT POWER FACILITIES V23322 03/15/2010 03/19/2010 OL EXAM

- INITIAL EXAM - WEEK 1 7

1 BRUNSWICK/APRIL 2010 EXAM AT POWER FACILITIES V23322 04/05/2010 04/09/2010 OL EXAM

- INITIAL EXAM - WEEK 2 6

1 BRUNSWICK/APRIL 2010 EXAM AT POWER FACILITIES V23322 04/12/2010 04/16/2010 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2 IP Exercise Evaluation 7111401 06/21/2010 06/25/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/21/2010 06/25/2010 1, 2 IP Performance Indicator Verification 71151 06/21/2010 06/25/2010 INSP.

- COMPONENT DESIGN BASIS INSP. (TRIENIAL) 5 1, 2 IP Component Design Bases Inspection 7111121 09/20/2010 09/24/2010 1, 2 IP Component Design Bases Inspection 7111121 10/04/2010 10/08/2010 1, 2 IP Component Design Bases Inspection 7111121 10/18/2010 10/22/2010 1, 2 IP Component Design Bases Inspection 7111121 11/01/2010 11/05/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2009 07:53:39 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Brunswick OL RQ

- REQUAL INSPECTION 2

1, 2 IP Licensed Operator Requalification Program 7111111B 10/18/2010 10/22/2010 OL EXAM

- INITIAL EXAM PREP 3

1 BRUNSWICK/DECEMBER 2010 EXAM AT POWER FACILITIES V23342 11/15/2010 11/19/2010 OL EXAM

- INITIAL EXAM WEEK 1 3

1 BRUNSWICK/DECEMBER 2010 EXAM AT POWER FACILITIES V23342 12/06/2010 12/10/2010 OL EXAM

- INITIAL EXAM WEEK 2 3

1 BRUNSWICK/DECEMBER 2010 EXAM AT POWER FACILITIES V23342 12/13/2010 12/17/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.