Text
From:
David, Marshall Sent:
Friday, July 31, 2009 11:43 AM To:
patrick.simpson@exeloncorp.com Cc:
'ken.nicely@exeloncorp.com'; 'Lisa.Schofield@exeloncorp.com'; Campbell, Stephen; Casto, Greg; Munro, John; Wilson, George; Elliott, Robert; Mahoney, Michael
Subject:
Application Accepted - Byron LAR for Ultimate Heat Sink (ME1669-70)
- Pat, By letter dated June 30, 2009, Exelon Generation Company, LLC (the licensee) submitted a license amendment request for Byron Station, Unit Nos.1 and 2 (ADAMS Accession Number ML091831253). The proposed license amendment requests Nuclear Regulatory Commission (NRC) approval to revise Technical Specification 3.7.9, "Ultimate Heat Sink (UHS)," to add additional essential service water (SX) cooling tower fan requirements as a function of SX pump discharge temperature to reflect results of a revised analysis for the UHS. The purpose of this message is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.
The acceptance review was also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested and follow, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and has concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
In accordance with our process as described in LIC-109, "ACCEPTANCE REVIEW PROCEDURES," I am placing a copy of this email in ADAMS as a publicly-available, official agency record.
Sincerely, Marshall David Senior Project Manager (301) 415-1547 E-mail Properties
Mail Envelope Properties (01BD2A1885C88F45A12CB413DEF03410ABAFAF10B2)
Subject:
Application Accepted - Byron LAR for Ultimate Heat Sink (ME1669-70)
Sent Date: 7/31/2009 11:42:52 AM Received Date: 7/31/2009 11:42:52 AM From: David, Marshall Created By: Marshall.David@nrc.gov Recipients:
patrick.simpson@exeloncorp.com (patrick.simpson@exeloncorp.com)
Tracking Status: None ken.nicely@exeloncorp.com ('ken.nicely@exeloncorp.com')
Tracking Status: None Lisa.Schofield@exeloncorp.com ('Lisa.Schofield@exeloncorp.com')
Tracking Status: None Stephen.Campbell@nrc.gov (Campbell, Stephen)
Tracking Status: None Greg.Casto@nrc.gov (Casto, Greg)
Tracking Status: None John.Munro@nrc.gov (Munro, John)
Tracking Status: None George.Wilson@nrc.gov (Wilson, George)
Tracking Status: None Robert.Elliott@nrc.gov (Elliott, Robert)
Tracking Status: None Michael.Mahoney@nrc.gov (Mahoney, Michael)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 9368 7/31/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: