ML091520419

From kanterella
Jump to navigation Jump to search
ES-301-5, Transient and Event Checklist
ML091520419
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III/DRS/OLB
To:
Entergy Nuclear Palisades
Shared Package
ML082200313 List:
References
Download: ML091520419 (1)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Palisades Date of Exam:

July 2008 Operating Test No.:

1 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 SPARE (#)

T O

T A

L MINIMUM

(*)

CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

R I

U SRO-U RX 0

0 NOR 1

1 1

1 I/C 23458 234 5

2 MAJ 7

7 1

1 TS 248 246 3

2 SRO-U RX 0

0 NOR 1

1 2

1 I/C 2345 234 4

2 MAJ 7

7 1

1 TS 245 246 3

2 RO RX 1

1 1

1 NOR 1

1 1

1 I/C 2568 256 246 345 7

4 MAJ 7

7 7

7 2

2 TS 0

0 Note:

Each SRO-U will perform as SRO in one scenario.

A surrogate will act as BOP or ATC operator as necessary

  1. Spare scenario not included in totals Instructions:
1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must do one scenario, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.