Inspection / Activity Plan Page 1 of 2 03/04/2009 07:28:58 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson OL RQ
- REQUAL INSPECTION 2
2 IP Licensed Operator Requalification Program 7111111B 03/02/2009 03/06/2009 PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 3
2 IP Exercise Evaluation 7111401 05/18/2009 05/22/2009 2
IP Emergency Action Level and Emergency Plan Changes 7111404 05/18/2009 05/22/2009 2
IP Performance Indicator Verification 71151 05/18/2009 05/22/2009 EB3-HS
- HEAT SINK 3
2 IP Heat Sink Performance 7111107T 06/01/2009 06/05/2009 OL EXAM
- INITIAL EXAM PREP 4
2 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23310 08/17/2009 08/21/2009 ISFSI
- ISFSI OPERATIONAL INSPECTION 2
2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/01/2009 10/15/2009 OL EXAM
- INITIAL EXAM - WEEK 1 4
2 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23310 09/07/2009 09/11/2009 EB1-MODS
- MODIFICATIONS-10CFR50.59 2
2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117 09/14/2009 09/18/2009 2
IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117 09/28/2009 10/02/2009 OL EXAM
- INTIAL EXAM - WEEK2 3
2 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23310 09/21/2009 09/25/2009 PSB1-RP
- RP ACCESS CONTROLS 1
2 IP Access Control to Radiologically Significant Areas 7112101 11/16/2009 11/20/2009 LI
- POST APPROVAL LR INSPECTION 5
2 IP Post-Approval Site Inspection for License Renewal 71003 01/25/2010 01/29/2010 LI
- POST APPROVAL LR INSPECTION 5
2 IP Post-Approval Site Inspection for License Renewal 71003 02/08/2010 02/12/2010 TFPI 805
- TRIENNIAL FIRE PROTECTION 1
2 IP Fire Protection [Triennial]
7111105T 03/15/2010 03/19/2010 2
IP Fire Protection [Triennial]
7111105T 03/29/2010 04/02/2010 LI
- POST APPROVAL LR CONT INSPECTION 2
2 IP Post-Approval Site Inspection for License Renewal 71003 04/19/2010 04/23/2010 EB3ISI
- UNIT 2 INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 04/26/2010 04/30/2010 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK1 2
2 IP Access Control to Radiologically Significant Areas 7112101 04/26/2010 04/30/2010 2
IP ALARA - Required 7112102-7112102R 04/26/2010 04/30/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 03/04/2009 07:28:58 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK1 2
2 IP Radioactive Material Processing and Transportation 7112202 04/26/2010 04/30/2010 2
IP Performance Indicator Verification 71151 04/26/2010 04/30/2010 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK 2 3
2 IP Access Control to Radiologically Significant Areas 7112101 05/10/2010 05/14/2010 2
IP ALARA - Required 7112102-7112102R 05/10/2010 05/14/2010 2
IP Radioactive Material Processing and Transportation 7112202 05/10/2010 05/14/2010 2
IP Performance Indicator Verification 71151 05/10/2010 05/14/2010 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
2 IP Alert and Notification System Testing 7111402 05/24/2010 05/28/2010 2
IP Emergency Response Organization Augmentation Testing 7111403 05/24/2010 05/28/2010 2
IP Emergency Action Level and Emergency Plan Changes 7111404 05/24/2010 05/28/2010 2
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/24/2010 05/28/2010 2
IP Performance Indicator Verification 71151 05/24/2010 05/28/2010 PSB1-RP
- RP GROUND WATER PROTECTION 1
2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/31/2010 06/04/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.