Inspection / Activity Plan Page 1 of 2 03/04/2009 07:17:08 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site McGuire ISFSI
- ISFSI ROUTING LOADING 2
1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 01/01/2009 03/30/2009 TFPI 805
- TRIENNIEL FIRE PROTECTION INSPECTION 7
1, 2 IP Fire Protection [Triennial]
7111105T 03/09/2009 03/13/2009 1, 2 IP Fire Protection [Triennial]
7111105T 03/23/2009 03/27/2009 EB3HS
- HEAT SINK 1
1, 2 IP Heat Sink Performance 7111107T 04/20/2009 04/24/2009 OL EXAM
- INITIAL EXAM PREP 7
1 MCGUIRE/MAY 2009 EXAM AT POWER FACILITIES V23306 04/20/2009 04/24/2009 EB1-CDBI
- COMPONENT DESIGN BASES INSPECTION 9
1, 2 IP Component Design Bases Inspection 7111121 05/04/2009 05/08/2009 1, 2 IP Component Design Bases Inspection 7111121 05/18/2009 05/22/2009 1, 2 IP Component Design Bases Inspection 7111121 06/01/2009 06/05/2009 1, 2 IP Component Design Bases Inspection 7111121 06/15/2009 06/19/2009 OL EXAM
- INITIAL EXAM - WEEK 1 7
1 MCGUIRE/MAY 2009 EXAM AT POWER FACILITIES V23306 05/11/2009 05/15/2009 OL EXAM
- INITIAL EXAM - WEEK 2 7
1 MCGUIRE/MAY 2009 EXAM AT POWER FACILITIES V23306 05/18/2009 05/22/2009 PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE INS 4
1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/27/2009 07/31/2009 1, 2 IP Access Control to Radiologically Significant Areas 7112101 07/27/2009 07/31/2009 1, 2 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 07/27/2009 07/31/2009 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 07/27/2009 07/31/2009 1, 2 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 07/27/2009 07/31/2009 1, 2 IP Performance Indicator Verification 71151 07/27/2009 07/31/2009 PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 3
1, 2 IP Exercise Evaluation 7111401 08/17/2009 08/21/2009 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 08/17/2009 08/21/2009 1, 2 IP Performance Indicator Verification 71151 08/17/2009 08/21/2009 EB3ISI
- UNIT 2 INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 09/14/2009 09/18/2009 EB3TI172
2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 09/14/2009 09/18/2009 EB3SGISI
- U2 STEAM GENERATOR ISI 1
2 IP Inservice Inspection Activities - PWR 7111108P 09/21/2009 09/25/2009 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 03/04/2009 07:17:08 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site McGuire PSB1-RP
- RP GROUNDWATER PROTECTION 1
1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 02/22/2010 02/26/2010 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK 1 2
1, 2 IP Access Control to Radiologically Significant Areas 7112101 03/29/2010 04/02/2010 1, 2 IP ALARA - Required 7112102-7112102R 03/29/2010 04/02/2010 1, 2 IP Radioactive Material Processing and Transportation 7112202 03/29/2010 04/02/2010 1, 2 IP Performance Indicator Verification 71151 03/29/2010 04/02/2010 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK 2 2
1, 2 IP Access Control to Radiologically Significant Areas 7112101 04/12/2010 04/16/2010 1
IP ALARA - Required 7112102-7112102R 04/12/2010 04/16/2010 1, 2 IP Radioactive Material Processing and Transportation 7112202 04/12/2010 04/16/2010 1, 2 IP Performance Indicator Verification 71151 04/12/2010 04/16/2010 OL RQ
- REQUAL INSPECTION 2
1, 2 IP Licensed Operator Requalification Program 7111111B 06/07/2010 06/11/2010 This report does not include INPO and OUTAGE activities.