Text

Dulce Energy December 22,2008 u.s.

Nuclear Regulatory Commission -

Region II Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85

Atlanta, Georgia 30303 DAVE BAXTER Vice President Oconee Nuclear Station Duke Energy Corporation ONOl VP/7800 Rochester Highway Seneca, SC 29672 864-885-4460 864-885-4208 fax dabaxter@dukeenergy.com ATTENTION:

Dr.

Luis Reyes, Regional Administrator

SUBJECT:

Oconee Nuclear Station Units 1, 2 and 3 Docket Nos:

50-269, 270 and 287 NRC Inspection Report 05000269/2008010, 05000270/2008010, and 05000287/2008010; Preliminary Greater Than Green Finding Duke Energy Carolinas, LLC (Duke) received the subject Choice Letter dated November 21, 2008.

The Choice Letter provides the option of either responding to the potential finding in writing or at a Regulatory Conference.

This letter is to inform you of the decision to present the Duke perspectives at a Regulatory Conference.

The Choice Letter indicated that the Regulatory Conference should be held within 30 days of receipt of the letter.

Due to the complex nature of this specific finding, completion of the Oconee Unit 2 refueling outage involying key resources needed to support the conference, and pending

holidays, Duke hereby requests an extension beyond 30 days and proposes that the conference be scheduled for the week of January 19, 2009.

Based on discussions with Jim

Moorman, Thursday, January 22,
2009, has been selected as a mutually acceptable date.

This additional time is needed to thoroughly evaluate the Nuclear Regulatory Commission (NRC) assumptions and inputs described in the Phase 3 Risk Assessment contained in the subject Choice Letter.

Duke intends to provide NRC with www.duke-energy.com

Nuclear Regulatory Commission December 22, 2008 Page 2 the results of the evaluation one week prior to the date of the conference.

If you have any questions or comments regarding this request, please contact Graham Davenport of the Regulatory Compliance Group at 864-885-3044.

Sincerely, Dav

Baxter, Site Vice President Oconee Nuclear Station

Nuclear Regulatory Commission December 22, 2008 Page 3 cc:

Mr.

L.D.

Wert, Jr.,

Director Division of Reactor Projects, Region II U. S. Nuclear Regulatory Commissi*on -

Region II Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85

Atlanta, Georgia 30303 Mr.

J.

H.

Moorman, Chief Branch 1 DRP u.S.

Nuclear Regulatory Commission -

Region II Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85

Atlanta, Georgia 30303 Mr.

J.

F.

Stang, Senior Project Manager U.S.

Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 H 4A Washington, D.C.

20555 Mr.

G.

A.

Hutto Senior Resident Inspector Oconee Nuclear Station