OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Nov 14, 2008 18:38 PAPER NUMBER:
ACTION OFFICE:
LTR-05-0052 SECY LOGGING DATE: 01/31/2005 AUTHOR:
AFFILIATION:
ADDRESSEE:
SUBJECT:
ACTION:
DISTRIBUTION:
LETTER DATE:
ACKNOWLEDGED SPECIAL HANDLING:
Joe Colvin NEI Nils Diaz Request for briefing with the Commission to discuss industry mitigation strategy studies at Plant Hatch etc; Appropriate RF 01/28/2005 No NOTES:
Proposed meeting.. February 24, 2005 FILE LOCATION:
ADAMS DATE DUE:
DATE SIGNED:
S&~C<I70 -
NUCLEAR ENERGY INSTITUTE Joe F. Colvin PRESIDENT AND CHIEF EXECUTIVE OFFICER January 28, 2005 The Honorable Nils J. Diaz Chairman U.S. Nuclear Regulatory Commission Mail Stop 0-16 C1 Washington, DC 20555-0001
Dear Chairman Diaz:
We appreciate our recent discussions on the industry mitigation strategy studies.
We have engaged the NRC senior staff and will continue to do so as we move forward.
As we discussed, the industry is completing the pilot study at Plant Hatch and will initiate the pilot studies for Catawba, Palo Verde and Clinton, as scheduled. These four facilities will r.o-vide insights that are representative of a large majority of the plants.
Given the schedule for completing the above mentioned activities, we look forward to meeting with the Commission the week of February 21 to discuss the results of the Plant Hatch studyai-d-thle p6liifi-iary results0from the other three pilots. The purpose of the meeting would be to update you on the actual results from the pilot studies and engage in a discussion of insights and policy issues resulting from the studies. Due to the sensitive nature of the discussions, industry attendance would be limited to Skip Bowman, Mike Wallace and a select few industry and NEI executives. Based upon the availability of our participants, we would propose February 24 as a preferred day for the meeting.
s 9
The Honorable Nils J. Diaz January 28, 2004 Page 2 Please let me know as soon as possible if this is an acceptable date for a Commission meeting.
Sincerely, Joe F. Colvin c: The Honorable Edward McGaffigan Jr., Commissioner, NRC The Honorable Jeffrey S. Merrifield, Commissioner, NRC The Honorable Peter B. Lyons, Commissioner, NRC The Honorable Gregory B. Jaczko, Commissioner, NRC Luis Reyes, Executive Director for Operations, NRC William F. Kane, Deputy Executive Director of Homeland Security and Preparedness, NRC
- 1. CHAIRMAN - Industry Mitigation Studies i-age 1 1 From:
"COLVIN, Joe" <jfc@nei.org>
To:
<chairman @nrc.gov>, <exm @ nrc.gov>, <jmer@ nrc.gov>, <pbl @nrc.gov>,
<gbj@ nrc.gov>, <Iarl @ nrc.gov>, <wfk@nrc.gov>
Date:
Fri, Jan 28, 2005 2:45 PM
Subject:
Industry Mitigation Studies This electronic message transmission contains information from the Nuclear Energy Institute, Inc. The information is intended solely for the use of the addressee and its use by any other person is not authorized. If you are not the intended recipient, you have received this communication in error, and any review, use, disclosure, copying or distribution of the contents of this communication is strictly prohibited.
If you have received this electronic transmission in error, please notify the sender immediately by telephone or by electronic mail and permanently delete the original message.
CC:
"GRP. President's Staff" <GRP.President'sStaff@nei.org>, "GRP. President's Staff AA's" <G R P. President'sStaffAA's @ nei.org>
NUCLEAR ENERGY INSTITUTE Joe F. Colvin PRESIDENT AND CHIEF EXECUTIVE OFFICER January 28, 2005 The Honorable Nils J. Diaz, Chairman U.S. Nuclear Regulatory Commission Mail Stop 0-16 C1 Washington, DC 20555-0001
Dear Chairman Diaz:
We appreciate our recent discussions on the industry mitigation strategy studies.
We have engaged the NRC senior staff and will continue to do so as we move forward.
As we discussed, the industry is completing the pilot study at Plant Hatch and will initiate the pilot studies for Catawba, Palo Verde and Clinton, as scheduled. These four facilities will provide insights that are representative of a large majority of the plants.
Given the schedule for completing the above mentioned activities, we look forward to meeting with the Commission the week of February 21 to discuss the results of the Plant Hatch study and the preliminary results from the other three pilots. The purpose of the meeting would be to update you on the actual results from the pilot studies and engage in a discussion of insights and policy issues resulting from the studies. Due to the sensitive nature of the discussions, industry attendance would be limited to Skip Bowman, Mike Wallace and a select few industry and NEI
-executives. Based upon the availability of our participants, we would propose February 24 as a preferred day for the meeting.
The Honorable Nils J. Diaz January 28, 2004 Page 2 Please let me know as soon as possible if this is an acceptable date for a Commission meeting.
Sincerely, Joe F. Colvin c: The Honorable Edward McGaffigan Jr., Commissioner, NRC The Honorable Jeffrey S. Merrifield, Commissioner, NRC The Honorable Peter B. Lyons, Commissioner, NRC The Honorable Gregory B. Jaczko, Commissioner, NRC Luis Reyes, Executive Director for Operations, NRC William F. Kane, Deputy Executive Director of Homeland Security and Preparedness, NRC
i a-6ri~pVO6O' i.M Pg Mail Envelope Properties (41FA9640.6F8 : 20: 14072)
Subject:
Creation Date:
From:
Created By:
Industry Mitigation Studies Fri, Jan 28, 2005 2:46 PM "COLVIN, Joe" <jfc@nei.org>
jfc@nei.org Recipients nrc.gov owf5_po.OWFNDO WFK (William Kane)
LARI (Luis Reyes)
JMER (Jeffrey Merrifield)
EXM (Edward McGaffigan)
CHAIRMAN nrc.gov TWGWPO0 I.HQGWDO01 PBL (Peter Lyons) nrc.gov OWGWPOO2.HQGWDOO1 GBJ (Gregory Jaczko) nei.org GRP.President'sStaffAA's CC (GRP. Presiden GRP.President'sStaff CC (GRP. President's Post Office owf5_po.OWFNDO TWGWPO01.HQGWDOO1 OWGWPO02.HQGWDO01 Files Size MESSAGE 611 TEXT.htm 1093 01-28-05_NRCjIndustry Mitigation Studies.pdf Mime.822 69003 Route nrc.gov nrc.gov nrc.gov nei.org Date & Time Friday, January 28, 2005 2:46 PM 47163 Options Expiration Date:
Priority:
Reply Requested:
None Standard No
v~terp\\GWOOOO TM?
Pa e2 Return Notification:
Concealed
Subject:
Security:
None No Standar-d