ML083181218

From kanterella
Jump to navigation Jump to search
Notification of NRC Initial Operator Licensing Retake Examination 05000361-09-301, 05000362-09-301 on 02/02/08
ML083181218
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/12/2008
From: Ryan Lantz
Operations Branch IV
To: Ridenoure R
Southern California Edison Co
References
Download: ML083181218 (5)


See also: IR 05000361/2009301

Text

Mr. Ross T. Ridenoure

Senior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2, UNIT 3,

NOTIFICATION OF NRC INITIAL OPERATOR LICENSING RETAKE

EXAMINATION 05000361/2009301; 05000362/2009301

Dear Mr. Ridenoure:

In a telephone conversation on November 6, 2008, between Messrs. Bill Arbour, Operations

Training Supervisor and Tom McKernon, Chief Examiner, arrangements were made for the

administration of a licensing retake examination at SONGS, Unit 2, Unit 3, during the week of

February 2, 2009.

As agreed during the telephone conversation, your staff will prepare the examination based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examination is

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines and the draft retake examination by January 5, 2009. The examination shall include

supporting reference materials identified in Attachment 3 to ES-201. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outlines, examination, and quality

checklists before they are submitted to the NRC for review and approval. All materials shall be

complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or

safeguards information in your response be contained in a separate enclosure and appropriately

marked. Any delay in receiving the required examination and reference materials, or the

submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested retake examination, it will be necessary for your staff to

provide adequate space and accommodations in accordance with ES-402 and to make the

simulation facility available on the dates noted above. In accordance with ES-302, your staff

should retain the original simulator performance data (e.g., system pressures, temperatures, and

levels) generated during the dynamic operating tests until the examination results are final.

November 12, 2008

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

Southern California Edison Company

- 2 -

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the retake examination is being administered.

To permit timely NRC review and evaluation, your staff should submit the preliminary senior

operator license application (Office of Management and Budget (OMB) approval number 3150-

0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if

any)(OMB approval number 3150-0090) by January 5, 2009. If the application is not received at

least by the above date, a postponement may be necessary. Signed applications certifying that

all training has been completed should be submitted at least 14 days before the first examination

date, no later than January 19, 2009.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, writing the examinations,

and completing and reviewing the collection of information. Send comments regarding this

burden estimate or any other aspect of these information collections, including suggestions for

reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear

Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Martin has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Tom McKernon at 817-860-8153, or myself at

817-860-8159.

Sincerely,

/RA/

Ryan E. Lantz, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-361, 50-362

Licenses: NPF-10, NPF-15

Southern California Edison Company

- 3 -

DISTRIBUTION:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, CA 92101

Gary L. Nolff

Assistant Director-Resources

City of Riverside

3900 Main Street

Riverside, CA 92522

Mark L. Parsons

Deputy City Attorney

City of Riverside

3900 Main Street

Riverside, CA 92522

Dr. David Spath, Chief

Division of Drinking Water and

Environmental Management

California Department of Health Services

850 Marina Parkway, Bldg P, 2nd Floor

Richmond, CA 94804

Michael J. DeMarco

San Onofre Liaison

San Diego Gas & Electric Company

8315 Century Park Ct. CP21G

San Diego, CA 92123-1548

Director, Radiological Health Branch

State Department of Health Services

P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

Mayor

City of San Clemente

100 Avenida Presidio

San Clemente, CA 92672

James D. Boyd, Commissioner

California Energy Commission

1516 Ninth Street (MS 34)

Sacramento, CA 95814

Southern California Edison Company

- 4 -

Douglas K. Porter, Esq.

Southern California Edison Company

2244 Walnut Grove Avenue

Rosemead, CA 91770

Albert R. Hochevar

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92675

A. Edward Scherer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Mr. Steve Hsu

Department of Health Services

Radiologic Health Branch

MS 7610, P.O. Box 997414

Sacramento, CA 95899-7414

Mr. James T. Reilly

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Chief, Radiological Emergency Preparedness Section

National Preparedness Directorate

Technological Hazards Division

Department of Homeland Security

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Southern California Edison Company

- 5 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Greg.Warnick@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov )

Branch Chief, DRP/D (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov )

SO Site Secretary (Heather.Hutchinson@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

SUNSI Review Completed: TOM

ADAMS:

Yes

No Initials: TOM

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

ML083181218

SOE

COB

TOMcKernon

RELantz

/RA/

/RA/

11/7/08

11/12/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax