Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 Constellation Energy Nuclear Generation Group June 11, 2008 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
REFERENCE:
Document Control Desk Calvert Cliffs Nuclear Power Plant Unit No. 1; Docket No. 50-317 Inservice Inspection Report (a)
American Society of Mechanical Engineers, Boiler & Pressure Vessel Code,Section XI, Article IWA-6000 Pursuant to Reference (a), please find enclosed the Inservice Inspection Report for the Calvert Cliffs Nuclear Power Plant Unit 1. This inspection fulfilled the intentions and requirements stated in our commitment to comply with the American Society of Mechanical Engineers, Boiler & Pressure Vessel Code,Section XI, Inservice Inspection Requirements.
Should you have questions regarding this matter, please contact Mr. Jay S. Gaines at (410) 495-5219.
Very truly yours, Mark D. Flaherty Manager - Engineering Services MDF/RDW/bjd
Enclosure:
(1) 2008 Owner's Activity Report for RFO-18 Service Examinations cc:
Mr. Craig Lowry (Without Enclosure)
D. V. Pickett, NRC S. J. Collins, NRC Resident Inspector, NRC S. Gray, DNR AN7
ENCLOSURE (1) 2008 OWNER'S ACTIVITY REPORT FOR RFO-18 INSERVICE EXAMINATIONS Calvert Cliffs Nuclear Power Plant, Inc.
June 11, 2008
Constellation Energy 750 East Pratt Street Baltimore, Maryland 21202 THIRD INSERVICE INSPECTION INTERVAL THIRD INSERVICE INSPECTION PERIOD 2008 OWNER'S ACTIVITY REPORT FOR RFO-18 INSERVICE EXAMINATIONS Prepared For Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 Commercial Service Date:
May 8,1975 NRC Docket Number:
50-317 Document Number:
CCNPP1-OAR-003-018 Revision Number:
00 Date:
May 6, 2008 Prepared by
\\94 OL Roy E. H II - Principal Engineer Analyst Corporate Engineering Programs Reviewed by:
xri 721 cZ,
,Zd/.
Ed ard L. Anderson - Principal Engineer Analyst Corp r e Engineering Programs Approved by:
/l--4y 210**? 2 p*00 Carl L.FYriant -2.eneral Iypervisor orate Engineeriifg Progr5ms Approvedrby:
C.a&
aRnois Bernie C. Rudell - Genera).Fervisor Site Engineering Progra~ris
Calvert Cliffs Nuclear Power Plant, Unit I CCNPPl-OAR-003-18 THIRD INSERVICE INSPECTION INTERVAL Rev.
00 Nuc_-._
2008 OWNER'S ACTIVITY REPORT Calvert Cliffs FOR Date: May 20, 2008 Nucpear Power'Plant INSERVICE EXAMINATIONS Page i -2 of i-9 TABLE OF CONTENTS T a b le o f C o n te n ts.....................................................................................................................................................
i-2 R e c o rd o f R e v is io n................................................
i-3 A b s tra c t..............................................................
i-4 Form OAR-1 Owner's Activity Report for Inservice Inspection Plan (Includes RI-ISI)............................................ i-6 Form OAR-1 Owner's Activity Report for Containment Inservice Inspection Plan.................................................
i-7 Table 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED S E R V IC E....................................................................................................................................................
i-8 Table 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE........ i-9
Calvert Cliffs Nuclear Power Plant, Unit I CCNPPl-OAR-003-18 C
THIRD INSERVICE INSPECTION INTERVAL Rev.
00 Ni.6w 2008 OWNER'S ACTIVITY REPORT Calvert Cliffs FOR Date: May 20, 2008 N*i-ear Power Plant INSERVICE EXAMINATIONS Page i-3of i-9 A"riff efoyGv 00 May 20, 2008 Entire Document Initial issue of Owner's Activity Report for ASME Section XI Inservice Inspection, Risk-Informed Inspection and Containment Inservice Examinations in accordance with the requirements of ASME Code Case N-532-4.
Calvert Cliffs Nuclear Power Plant, Unit I CCNPPl-OAR-003-18
- C ~steiaton THIRD INSERVICE INSPECTIONINTERVAL Rev.
00
'UiC*
"__"2008 OWNER'S ACTIVITY REPORT INSERVICE :FOR Date: May 20, 2008 N~ar P;,:.*:Pag*INSERVICE EXAMINATIONS N..clea, EXAMINATIONS Page i -4 of i -9 ABSTRACT This Owner's Activity Report summarizes the results of the Calvert Cliffs Nuclear Power Plant (CCNPP), Unit 1, American Society of Mechanical Engineers (ASME) Section Xl Inservice Inspection, Risk-Informed Inspection and Containment Inservice Examinations performed during Refueling Outage Eighteen (RFO-18); the Second outage of the Third Inservice Inspection Period that started on July 1, 2006 and is scheduled to end on June 30, 2009. ISI examinations and repair/replacements for RFO-18 were performed from February 22, 2008 through March 12, 2008.
As an alternate to the requirements of the ASME, Boiler and Pressure Vessel Code (B&PVC), Section Xl, Article IWA-6000, CCNPP is implementing ASME Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1". Regulatory Guide 1.147, Revision 15, approved ASME Code Case N-532-4 for use. This Report complies with the requirements of Code Case N-532-4.
OWNER'S ACTIVITY REPORTS - FORM OAR-1 Owner's Activity Reports Form OAR-I's were prepared and certified upon completion of the CCNPP Unit 1, 2008 refueling outage (RFO-1 8) examination activity in accordance with the following inspection plans and schedules:
Inservice Inspection Program Plan(s) for the Third and successive Inspection Intervals for CCNPP Units 1 and 2 Long Term Plan for CCNPP, Unit 1 CCNP-002-004, Calvert Cliffs Nuclear Power Plant Risk-Informed Inservice Inspection Application to Class 1 and 2 Piping Final Report ISI Program Plan ASME Xl, IWE/IWL First Inspection Interval In addition to the Owner's Activity Report, Form OAR-i, the following Tables are also included:
- a.
TABLE 1, ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE provides a listing of item(s) with flaws or relevant conditions that exceeded the acceptance criteria of ASME XI Division 1 and required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, and evaluation description.
- b.
TABLE 2, ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE identifies those items containing flaws or relevant conditions that exceeded the ASME Section XI Division 1 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair/replacement may not have resulted from an examination or test required by Section Xl, and provides such information as code class, item description, description of work, date completed and the repair replacement plan number.
Calvert Cliffs Nuclear Power Plant, Unit I CCNPPl-OAR-003-18 cw*ns~at~on THIRD INSERVICE INSPECTION INTERVAL Rev.
00 N
r.2008 OWNER'S ACTIVITY REPORT
" *eii lffs
.FOR Date: May 20, 2008 NU
- cIaT Po.e'a Plant INSERVICE EXAMINATIONS Page i - 5of i-9 In accordance with ASME Section XI, IWB-2412 (a), IWC-2412, IWD-2412 and IWE-2412(a), IWF-2410 and with the exception of the examinations that may be deferred until the end of the inspection interval as specified in Table IWB-2500-1, IWC-2500-1, IWD-2500-1, IWE-2500-1, and IWF-2500-1 including those examinations which CCNPP has requested and received approval in the form of relief request, the required examinations in each examination category have been completed for the Third In-service Inspection Period in accordance with Tables IWB-2412-1, IWC-2412-1, IWD-2412-1, IWE-2412-1 and IWF-2410-2.
Calvert Cliffs Nuclear Power Plant, Unit I CCNPPI-OAR-003-18 lCznsteEIation THIRD INSERVICE INSPECTION INTERVAL Rev.
O0
- NW.ea 2008 OWNER'S ACTIVITY REPORT Ia vert Cliffs FOR Date: May 20, 2008 Nuc1ea0r.Power Plant INSERVICE EXAMINATIONS Page i-6of i-9 caevaro Env Grwfr FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASMECode Case N-532-4 Report Number CCNPP1-OAR-003-18 Owner Constellation Energy, 750 Pratt Street, Baltimore, Maryland 21202 (Name and Address of Owner)
Plant Calvert Cliffs Nuclear Power Plant, 1650 Calvert Cliffs Parkway, Lusby, Maryland 20657 (Name and Address of Plant)
Plant Unit 1
Commercial Service Date May 5. 1975 Refueling Outage Number RFO-18 Current Inspection Interval Third Inservice Inspection Interval -
July 1, 1999 to June 30, 2009 (1st, 2nd, 3rd, 4th, Other)
Current Inspection Period Third Inservice Inspection Period -
July 1. 2006 to June 30, 2009 (1st, 2nd, 3rd)
Edition and Addenda of Section Xl applicable to the Inspection Plan 1998 Edition, No Addenda Date and Revision of Inspection Plan Revision 03, Change 1, Dated May 16, 2008 Edition and Addenda of ASME Section Xl applicable to Repairs and Replacements, if different than the Inspection PlarW/A CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owne's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations and corrective measures represented by this report conform to the requirements of Section Xl.
Certificate of Authorization No.
N/A Expiration Date N/A 7
(If applicable)
Signed 44VE_"
, tý2Wý4 Date
-/z3) 2.
zO3o (Carl L. Friant, General Supervisor-Corporate Engineering Programs)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Maryland and employed by Hartford Steam Boiler (HSBCT) of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, during the period February 22, 2008 to March 14. 2008
, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this IEort in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measires described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this insoection.
, /
Calvert Cliffs Nuclear Power Plant, Unit I CCNPPI-OAR-003-18
_otei*b THIRD INSERVICE INSPECTION INTERVAL
-Rev.
00 NU
.2008 OWNER'S ACTIVITY REPORT CHIt
.FOR Date; May 20, 2008 tINSERVICE EXAMINATIONS Page i-7of i-9 FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N532-4 Report Number CCNPP1-OAR-003-18 Owner Constellation Nuclear Generation, 750 Pratt Street, Baltimore, Maryland 21202 (Name and Address of Owner)
Plant Calvert Cliffs Nuclear Power Plant, 1650 Calvert Cliffs Parkway, Lusby, Maryland 20657 (Name and Address of Plant),
Plant Unit 1
Commercial Service Date May 5, 1975 Refueling Outage Number RFO-18 Current Inspection Interval First Containment Inspection Interval -
July 1. 1999 to June 30, 2009 (1st; 2nd, 3rd, 4th, Other)
Current Inspection Period Third Inservice Inspection Period - July 1, 2006 to June 30, 2009 (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the Inspection Plan 1992 Edition. 1992 Addenda Date and Revision of Inspection Plan Revision 02, Dated December 27, 2001 Edition and Addenda of ASME Section Xl applicable to Repairs and Replacements, if different than the Inspection PlarN/A CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owne's Activity Report are correct, and that the examinations, tests, repairseplacements, evaluations and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization No.
N/A Expiration Date N/A A-I* "*
(If applicable)
Signed r-( L.iG uv DateCopocat
- Eni, 2006/
(Carl L. Friant, Generar S~upervisor -Corporate Engineering Programs)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boileand Pressure Vessel Inspectors and the State or Province of Maryland and employed by Hartford Steam Boiler (HSBCT) of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, during tb period February 24, 2007 to April 2. 2007 and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described in this report. Furthermore, neither the Inspector nchis employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
i/d J-qZV*
-'. d Commissions NB12990, Maryland-1200,,A, N, I Inspector's Ygnature National Board, State, Province, and Endorsements Date al1'/,*fZV Zi
'.9;'
Calvert Cliffs Nuclear Power Plant, Unit I CCNPPl-OAR-003-18
- ons
- etlaation THIRD INSERVICE INSPECTION INTERVAL Rev.
00
,Nur 2008 OWNER'S ACTIVITY REPORT Cvert Cliffs FOR Date: May 20, 2008 Nuclear PowerPlant INSERVICE EXAMINATIONS
,*,*,*,'.=,*
Page i - 8of i-9 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE As required by the provisions of the ASME Code Case N532-4 Examination Category and Item Number Item Description Evaluation Description None I
Calvert Cliffs Nuclear Power Plant, Unit I CCNPP1-OAR-003-18 STHIRD INSERVICE INSPECTION INTERVAL Rev.
00 S.
.2008 OWNER'S ACTIVITY REPORT C lve Clifs FOR Date: May 20, 2008 Nuc ea* Power Piant INSERVICE EXAMINATIONS
,*,,.*,*:,*.Page i-9of i-9 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE As equired by the provisions ofthe ASME Code Case N-532-4 Code Description of Date Class Item Description Work Completed Repair/Replacement Plan Number 1
1 PZVRC1 1 Installation of a May 2, 2008 20.08-1-010 (MOl1200800084)
- 11 Pressurizer Heater Mechanical Nozzle Nozzle Sleeve C-2 Seal Assembly 1
Snubber 1-52-42A Replace clevis April 1, 2008 2008-1-016 (M01200800945) brackets to snubbers 1-52-42 and 1-52-42A.
Snubber 1-52-42A had a broken bracket at connection to steel beam.
2 1'CC7-1001 Repair cracked May 2, 2008 2006-1-038 (M01200606415) weld upstream of 1HVCVC-168. #11 charging pump has a leak upstream of the discharge drain valve 1-CVC-168 where the drain pipe is welded to the discharge'pipe.
2 1-CC7-1003 Repair broken weld April 29, 2008 2006-1-039 (M01200606404) on pipe hanger.
3 1CKVSW-103 Replace valve May 2, 2008 2007-1-035 (MO1200703275)
SNi 1325 with SN11329 3
CKVSW - SN1 1325 (Not Repair valve February 27, 2007-1-037 (MO1200703393) in service)
SN11325 2008 3
1CKVSW-103 Replace valve April 1, 2008 2007-1-038 (MO1200703478)
SN11329 with SN11325 3
CKVSW - SN11329 (Not Repair valve February 15, 2008-1-004 (M00200702920) in-service)
SN11329 2008 3
1CKVSW-107 Replace valve May 5, 2008*
2008-1-006 (MO1200704804)
SN11326 with SN11329 3
CKVSW-SNt1326 (Not Repair valve May 8, 2008 2008-1-002 (M00200702921) in-service)
SN11326 3
1CKVSW-111 Replace valve May 1; 2008 2008-1-005 (MO1200703354)
- "SN11328 with SN11326