Correction Letter the Recirculation Spray System Pump Start Signal Issued Amendment
ML081570303
Person / Time
Site: Beaver Valley
Issue date: 07/24/2008
From: Nadiyah Morgan
NRC/NRR/ADRO/DORL/LPLI-1
To: Sena P
FirstEnergy Nuclear Operating Co
Morgan Nadiyah, NRR/Dorl, 415-1016
References
TAC MD4290, TAC MD4291
Download: ML081570303 (5)


Text

July 24, 2008 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 - CORRECTION LETTER RE: THE RECIRCULATION SPRAY SYSTEM PUMP START SIGNAL ISSUED AMENDMENT (TAC NOS. MD4290 AND MD4291)

Dear Mr. Sena:

On October 5, 2007, the Nuclear Regulatory Commission (NRC) issued Amendment No. 280 to Facility Operating License No. DPR-66 for Beaver Valley Power Station, Unit No. 1 (BVPS-1).

On March 11, 200, the NRC issued Amendment No. 164 to Facility Operating License No. NPF-73 for Beaver Valley Power Station, Unit No. 2 (BVPS-2). The amendments addressed Generic Safety Issue 191, Assessment of Debris Accumulation on PWR [Pressurized-Water Reactor]

Sump Performance, by implementing technical specification changes that reflect the use of a new recirculation spray system pump start signal due to a modification to the containment sump screens, and replaced the use of the LOCTIC code with the Modular Accident Analysis Program-Design Basis Accident (MAAP-DBA) code to calculate containment pressure, temperature, and condensation rates for input to the SWNAUA code, which ultimately changes the aerosol removal coefficients used in dose consequence analysis.

Per your request, the NRC staff has agreed to issue corrected safety evaluations (SEs) to address certain administrative errors, as well as, insert applicable information for BVPS-2 from your supplemental response to Generic Letter 2004-02, by letter dated February 29, 2008. The enclosed corrected SEs do not influence or change the NRC staffs previous position concluded in the SEs.

If there are any questions or concerns regarding this issue, please contact me at 301-415-1016.

Sincerely,

/RA/

Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

1. BVPS-1 Corrected SE
2. BVPS-2 Corrected SE cc w/encl: See next page

OFFICE LPLI-1/PM LPLI-1/LA EMCB/BC LPLI-1/BC NAME NMorgan SLittle KManoly MKowal DATE 6/26/08 6/25/08 7/17/08 7/24/08

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Ohio EPA-DERR ATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, Ohio 44308 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364

Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:

Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 Ms. Carol OClaire Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin-Granville Road Columbus, OH 43235-2206 Mr. Dan Hill Chief, Radiological Health Program West Virginia Department of Health and Human Resources Capitol & Washington Streets 1 Davis Square Suite 200 Charleston, WV 25305-0360