ML080980400
| ML080980400 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/07/2008 |
| From: | Hay M NRC/RGN-IV/DRP/RPB-D |
| To: | Edington R Arizona Public Service Co |
| References | |
| CAL-4-07-004 | |
| Download: ML080980400 (6) | |
Text
April 7, 2008 Randall K. Edington, Executive Vice President, Nuclear and Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034
References:
(1) Revised Confirmatory Action Letter CAL-4-2007-004 dated February 15, 2008, from Elmo E. Collins, Region IV, NRC to Randall K. Edington (ADAMS ML080460653)
SUBJECT:
RECEIPT OF ARIZONA PUBLIC SERVICE COMPANY LETTER DATED MARCH 31, 2008, INVOLVING NRC CONFIRMATORY ACTION LETTER (CAL)-4-07-004 LIST OF SPECIFIC TASKS, DUE DATES, MEASURES, AND METRICS
Dear Mr. Edington:
Thank you for your letter dated March 31, 2008, providing a list of the specific tasks, including due dates, associated with the action plans and strategies for each of the twelve key performance areas of CAL-4-2007-004 (Reference 1), as well as a description of the measures and metrics for each PVNGS Site Integrated Improvement Plan Action Plan. We understand that the actions, metrics, and effectiveness reviews described in your response supersede and replace previously submitted plans and commitments on this subject. We further understand that APS will notify the NRC upon satisfactory completion or demonstration of substantial and sustainable improvement in each of the twelve performance areas itemized in the CAL.
As previously discussed in CAL-4-2007-004, the NRC will review and close these items upon demonstrated sufficient progress based on the results of direct inspections, interim effectiveness reviews, performance measures, and metrics.
UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 611 RYAN PLAZA DRIV E, SUITE 400 ARLINGTON, TEXAS 76011-4005
Arizona Public Service Company Should you have any questions regarding our follow-up inspection plans, please contact me at (817) 860-8144.
Sincerely,
/RA/
Michael C. Hay, Chief Project Branch D Division of Reactor Projects Dockets: 50-528 50-529 50-530 Licenses: NPF-41 NPF-51 NPF-74
Arizona Public Service Company cc:
Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040 Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Dwight C. Mims Vice President, Regulatory Affairs and Performance Improvement Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901
Arizona Public Service Company Eric J. Tharp Director of Generation Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255 Los Angeles, CA 90051-5700 John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy, Bldg. D21 San Clemente, CA 92672 Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Karen O' Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix, AZ 85003 Matthew Benac Assistant Vice President Nuclear & Generation Services El Paso Electric Company 340 East Palm Lane, Suite 310 Phoenix, AZ 85004
Arizona Public Service Company Chief, Radiological Emergency Preparedness Section National Preparedness Directorate Technological Hazards Division Department of Homeland Security 1111 Broadway, Suite 1200 Oakland, CA 94607-4052
Arizona Public Service Company Electronic distribution by RIV:
Regional Administrator (EEC)
DRP Director (DDC)
DRS Director (RJC1)
DRS Deputy Director (ACC)
Senior Resident Inspector (GXW2)
Branch Chief, DRP/D (TWP)
Senior Project Engineer, DRP/D (GEW)
Team Leader, DRP/TSS (CJP)
RITS Coordinator (MSH3)
Only inspection reports to the following:
V. Dricks, PAO (VLD)
J. Adams, OEDO RIV Coordinator (JPA)
ROPreports PV Site Secretary (PRC)
SUNSI Review Completed: ______ADAMS: Yes No Initials: ______
Publicly Available Non-Publicly Available Sensitive Non-Sensitive R:\\REACTORS\\PV\\2008\\CALResponse4-070-004ltr.doc ML080980400 RIV:C:DRP/D MCHay(vlh)
/RA/
4/7/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax