Technical Specifications, Changes to Sections TS 5.5.9, Steam Generator Program and TS 5.6.10
ML080950256
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/09/2008
From:
NRC/NRR/ADRO/DORL/LPLII-1
To:
Lingam, Siva NRR/DORL 415-1564
Shared Package
ML080950232 List:
References
TAC MD7450, TAC MD7451
Download: ML080950256 (14)


Text

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.150 'and the Environmental Protection Plan contained in Appendix B, both of which-are attached hereto, are hereby incorporated into this license. Southern Nuclear shall-operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3). Southern Nuclear Operating Company shall be capable of establishing containment hydrogen monitoring within 90 minutes of initiating safety injection following a loss of coolant accident.

(4)

DELETED (5)

DELETED (6)

DELETED

.(7)

DELETED (8)

DELETED (9)

DELETED (10) Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a)

Fire fighting response strategy with the following elements:

1.

Pre-defined coordinated fire response strategy and guidance

2.

Assessment of mutual aid fire fighting assets

3.

Designated staging areas for equipment and materials 4..

Command and control

5.

Training of response personnel (b)

Operations to mitigate fuel damage considering the following:

1.

Protection and use of personnel assets

2.

Communications

3.

Minimizing fire spread

4.

Procedures for implementing integrated fire response strategy

5.

Identification of readily-available pre-staged equipment

6.

Training on integrated fire response strategy

7.

Spent fuel pool mitigation measures (c)

Actions to minimize release to include consideration of:

1.

Water spray scrubbing

2.

Dose to onsite responders Amendment No. 150 C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below.'

(1)

Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 3625.6 megawatts thermal (100 percent power) in accordance with the conditions specified herein.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.130 and the Environmental Protection Plan contained in Appendix B, both OT which are attached hereto, are hereby incorporated into this license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental, Protection Plan.

The Surveillance Requirements (SRs) contained in the Appendix A Technical Specifications and listed below are not required to be performed immediately upon implementation of Amendment No. 74. The SRs listed below shall be successfully demonstrated prior to the time and condition specified below for each:

a)

DELETED b)

DELETED c)

SR 3.8.1.20 shall be successfully demonstrated at the first regularly scheduled performance after implementation of this license amendment.

(3)

Southern Nuclear Operating Company shall be capable of establishing containment hydrogen monitoring within 90 minutes of initiating safety injection' following a loss of coolant accident.

(4)

Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a)

Fire fighting response strategy with the following elements:

1.

Pre-defined coordinated fire response strategy and guidance

2.

Assessment of mutual aid fire fighting assets

3.

Designated staging areas. for equipment and materials

4.

Command and control

5.

Training of response personnel Amendment No. 130

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Proqram (continued)

2. Accident induced leakage performance criterion: The primary to secondary accident induced leakage rate for any design basis accident, other than a SG tube rupture., shall not exceed the leakage rate assumed in the accident analysis in terms of total leakage rate for all SGs and leakage rate for an individual SG. Leakage is not to exceed 1 gpm per SG.
3. The operational LEAKAGE performance criterion is specified in LCO 3.4.13, "RCS Operational LEAKAGE."
c.

Provisions for SG tube repair criteria. Tubes found by inservice inspection to contain flaws with a depth equal to or exceeding 40% of the nominal tube wall thickness shall be plugged.

The following alternate tube repair criteria shall be applied as an alternative to the 40% depth based criteria:

1. For Unit 2 during Refueling Outage 11 and the subsequent operating cycle, degradation found in the portion of the tube below 17 inches from the top of the hot leg tubesheet does not require plugging.

For Unit 2 during Refueling Outage 11 and the subsequent operating cycle, degradation identified in the portion of the tube from the top of

.the hot leg tubesheet to 17 inches below the top of the tubesheet shall be plugged upon detection.

2. For Unit 1 during Refueling Outage 13 and the subsequent operating cycle, and for Unit 2 during Refueling Outage 12 and the subsequent operating cycle, degradation identified in the portion of the tube below

.17 inches from the top of the hot leg tubesheet does not require plugging.

For Unit 1 during Refueling Outage 13 and the subsequent operating cycle, and for Unit 2 during Refueling Outage 12 and the subsequent operating cycle, degradation identified in the portion of the tube from the top of the hot leg tubesheet to 17 inches below the top of the hot leg tubesheet shall be plugged upon detection.

3. For Unit 1 during Refueling Outage 14 and the subsequent operating cycle, tubes with flaws having a circumferential component less than or equal to 203 degrees found in the portion of the tube below 17 inches from the top of the tubesheet and above 1 inch from the bottom of the tubesheet do not require plugging. Tubes with flaws having a (continued)

Vogtle Units 1 and 2 5.5-8 Amendment No.150 (Unit 1)

Amendment No.130 (Unit 2)

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Program (continued) circumferential component greater than-203 degrees found in the portion of the tube below 17 inches from the top of the tubesheet and above 1 inch from the bottom of the tubesheet shall be removed from service.

Tubes with service-induced flaws located within the region from the top of the tubesheet to 17 inches below the top of the" tubesheet shall be removed from service. Tubes with service-induced axial cracks found in the portion of-the tube below 17 inches from the top of the tubesheet do not require plugging.

When more than one flaw with circumferential components is found in the portion of the tube below 17 inches from the top of the tubesheet and above 1 inch from the bottom of the tubesheet with the total of the circumferential components greater than 203 degrees and an axial separation distance of less than 1 inch, then the tube shall be removed from service. When the circumferential components of each of the flaws are added, it is acceptable to count the overlapped portions only once in the total of circumferential components.

When one or more flaws with circumferential components are found in the portion of the tube within 1 inch from the bottom of the tubesheet, and the total of the circumferential components found in the tube exceeds 94 degrees, then the tube shall be removed from service.

When one or more flaws with circumferential components are found in the portion of the tube within 1 inch from the bottom of the tubesheet, and within 1 inch axial separation distance of a flaw above 1 inch from the bottom of the tubesheet, and the total of the circumferential components found in the tube exceeds 94 degrees, then the tube shall be removed from service. When the circumferential components of each of the flaws are added, it is acceptable to count the overlapped portions only once in the total of circumferential components.

d.

Provisions for SG tube inspections. Periodic SG tube inspections shall be performed. The number and portions of the tubes inspected and methods of inspection shall be performed with the objedtive of detecting flaws of any type (e.g., volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube, from the tube-to-tubesheet weld at

, the tube inlet to the tube-to-tubesheet weld at the tube outlet, and that may satisfy the applicable tube repair criteria. For Unit 2 during Refueling Outage 11 and the subsequent operating cycle, the portion of the tube below 17 inches from the top of the hot leg tubesheet is excluded. For Unit 1 during RefuelingOutage 13 and the subsequent operating cycle, (continued)

Vogtle Units 1 and 2 5.5-9 Amendment No.150 (Unit 1)

Amendment No.130 (Unit 2)

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Pro-gram (continued) and for Unit 2 during Refueling Outage 12 and the subsequent operating cycle, the portion of the tube below 17 inches from the top of the hot leg tubesheet is excluded. The tube-to-tubesheet weld is not part of the tube.

In addition to meeting the requirements of d.1, d.2, and d.3 below, the inspection scope, inspection methods, and inspection intervals shall be such as to ensure that SG tube integrity is maintained until the next SG inspection. An assessment of degradation shall be performed to determine the type and location of flaws to which the tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations.

1. Inspect 100% of the tubes in each SG during the first refueling outage following SG replacement.
2. Inspect 100% of the tubes at sequential periods of 120, 90, and, thereafter, 60 effective full power months. The firstsequential period shall be considered to begin after the first inservice inspection of the SGs. In addition, inspect 50% of the tubes by the refueling outage nearest the midpoint of the period and the remaining 50% by the refueling outage nearest the end of the period. No SG shall operate for more than 48 effective full power months or two refueling outages (whichever is less) without being inspected.
3.

If crack indications are found in any SG tube, then the next inspection for each SG for the degradation mechanism that caused the crack indication shall not exceed 24 effective full power months or one refueling outage (whichever is less). If definitive information, such as from examination of a pulled tube, diagnostic nondestructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack.

e.

Provisions for monitoring operational primary to secondary. LEAKAGE.

5.5.10 Secondary Water Chemistry Program This program provides controls for monitoring secondary water chemistry to inhibit SG tube degradation. The program shall include:

a.

Identification of a sampling schedule for the critical variables and control points for these variables; (continued)

Vogtle Units 1 and 2 5.5-10 Amendment No. 150 (Unit 1)

Amendment No. 130 (Unit 2)

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.10 Secondary Water Chemistry Program (continued)

b.

Identification of the procedures used to measure the values ofthe critical variables;

c.

Identification of process sampling points;

d.

Procedures for the recording and management of data;

e.

Procedures defining corrective actions for all off control point chemistry conditions; and

f.

A procedure identifying the authority responsible for the interpretation of the data and'the sequence and timing of administrative events, which is required to initiate corrective action.

Ventilation Filter Testing Pro-gram (VFTP)

A program shall be established to implement the following required testing of Engineered Safety Feature (ESF) filter ventilation systems at the frequencies specified in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1980:

a.

Demonstrate for each of the ESF systems that an inplace test of the high efficiency particulate air (HEPA) filters shows a penetration and system bypass < 0.05% when tested in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1980 at the system flow rate specified below

+/- 10%.

5.5.11 ESF Ventilation System Control Room Emergency Filtration System (CREFS)

Piping Penetration Area Filtration and Exhaust (PPAFES)

Flow Rate 19,000 CFM 15,500 CFM

b.

Demonstrate for each of the ESF systems that an inplace test of the charcoal adsorber shows a penetration and system bypass - 0.05% when tested in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1980 at the system flow rate specified below +/- 10%.

(continued)

Vogtle Units 1 and 2 5.5-11 Amendment No.150 (Unit 1)

Amendment No.130 (Unit 2)

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.11 Ventilation Filter Testing Program (VFTP) (continued)

ESF Ventilation System Flow Rate CREFS 19,000 CFM PPAFES 15,500 CFM

c.

Demonstrate for each of the ESF systems that a laboratory test of a sample of the charcoal adsorber, when obtained as describedin Regulatory Guide 1.52, Revision 2, shows the methyl iodide penetration less than or equal to the value specified below when tested in accordance with ASTM D3803-1989 at'a temperature of 30 0C and greater than or equal to the relative humidity specified below.

ESF Ventilation System Penetration RH CREFS

.2%

70%

PPAFES 10%

.95%

d.

Demonstrate for each of the ESF systems that the pressure drop across the combined HEPA filters, the charcoal adsorbers, and CREFS cooling coils is less than the value specified below when tested in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1989 at the system flow rate specified below +/- 10%.

ESF Ventilation System Delta. P Flow Rate CREFS 7.1 in.

19,000 CFM water gauge PPAFES.

6 in.

15,500 CFM water gauge

e.

Demonstrate that the heaters for the CREFS dissipate _> 95 kW when corrected to 460 V when tested in accordance with ASME N510-1989.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the VFTPtest frequencies.

5.5.12 Explosive Gas and Storage Tank Radioactivity Monitoring Program This program provides controls for potentially explosive gas-mixtu-res contained in the Gaseous Waste Processing System, the quantity of radioactivity contained in each Gas Decay Tank, and the quantity of radioactivity contained in (continued)

Vogtle Units I and 2 5.5-12 Amendment No. 150 (Unit 1)

Amendment No. 130 (Unit 2)

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.12 Explosive Gas and Storage Tank Radioactivity Monitoring Program (continued):

unprotected outdoor liquid storage tanks. The gaseous radioactivity quantities

.shall be determined following the methodology in Branch Technical Position (BTP) ETSB 11-5, "Postulated Radioactive Release due toWaste Gas System Leak or Failure." The liquid radwaste quantities shall be limited to 10 curies per outdoor tank in accordance with Standard Review Plan, Section 15.7.3, "Postulated Radioactive Release due to Tank Failures."

The program shall include:

a.

The limits for concentrations of hydrogen and oxygen in the Gaseous Waste Processing System and a surveillance program to ensure the limits are maintained. Such limits shall be appropriate to the system's design criteria (i.e., whether or not the system is designed to withstand a hydrogen explosion);

b.

A surveillance program to ensure that the quantity of radioactivity contained in each gas decay tank is less than the amount that would result in a wholebody exposure of ; 0.5 rem to any individual in an unrestricted area, in the event of an uncontrolled release of the tanks' contents; and

c.

A surveillance program to ensure that the quantity of radioactivity contained in all outdoor liquid radwaste tanks that are not surrounded by liners, dikes, or walls, capable of holding the tanks' contents and that do not have tank overflows and surrounding area drains connected to the Liquid Radwaste Treatment System is limited to < 10 curies per tank, excluding tritium and dissolved or entrained noble gases. This surveillance program provides assurance that in the event of an uncontrolled release of the tank's contents, the resulting concentrations would be less than the limits of 10 CFR 20, Appendix B,.Table 2, Column 2, at the nearest potable water supply and the nearest surface water supply: in an unrestricted area.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Explosive Gas and Storage Tank Radioactivity Monitoring Program surveillance frequencies.

5.5.13 Diesel Fuel Oil Testing Program A diesel fuel oil testing program to implement required testing of both new fuel oil and stored fuel oil shall be established. The program shall include sampling and testing requirements, and acceptance criteria, all in accordance with applicable ASTM Standards. The purpose of the program is to establish the following:

a.

Acceptability of new fuel oil for use prior to addition to storage tanks by.

determining that the fuel oil has:

(continued)

Vogtle Units I and 2 5.5-13 Amendment No. 150 (Unit 1)

Amendment No. 130 (Unit 2)

Programs and Manuals 5.5

.5.5 Programs and Manuals 5.5.13 Diesel Fuel Oil Testing Program (continued)

1.

an API gravity or an absolute specific gravity within.limits, or an API gravity or specific gravity within limits when compared to the supplier's certificate;

2.

a flash point within limits for ASTM 2D fuel oil, and, if gravity was not determined lby comparison with supplier's certification, a kinematic viscosity within limits for ASTM 2D fuel oil; and

3.

a clear and bright appearance with proper color.

b.

Other properties for ASTM 2D fuel oil are within limits within 30 days following sampling and addition to storage tanks; and

c.

Total particulate concentration of the fuel oil is < 10 mg/I when tested every 31 days.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Diesel Fuel Oil Testing Program surveillance frequencies.

5.5.14 Technical Specifications.(TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.

a.

Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews

b.

Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:

1.

a change in the TS incorporated in the license; or

2.

a change to the updated FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.

d.

The Bases Control Program shall contain provisions to ensure that the Bases are maintainedconsistent with the FSAR.

e.

Proposed changes that meet the criteria of (b) above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71(e).

(continued)

Vogtle Units 1 and 2 5.5-14 Amendment No. 150 (Unit 1)

Amendment No. 130 (Unit 2)

Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.15 Safety Function Determination Progqram (SFDP)

This program ensures loss of safety function is detected and appropriate actions taken. Upon entry into LCO 3.0.6, an evaluation shall be made to determine if loss of safety function exists. Additionally, other appropriate actions may be taken as a result of the support system inoperability and corresponding exception to entering supported system Condition and Required Actions. This program implements the requirements of LCO 3.0.6. The SFDP shall contain the following:

a.

Provisions for cross train checks to ensure a loss of the capability to perform the safety function assumed in the accident analysis does not go undetected;

b.

Provisions for ensuring the plant is maintained in a safe condition if a loss of function condition exists;

c.

Provisions to ensure that an inoperable supported system's Completion Time is not inappropriately extended as a result of multiple support system inoperabilities; and

d.

Other appropriate limitations and remedial or compensatory actions.

A loss of safety function exists when, assuming no concurrent single failure, a safety function assumed in the accident analysis cannot be performed. For the purpose of this program, a loss of safety function may exist when a support system is inoperable, and:

a.

A required system redundant to the system(s) supported by the inoperable support system is also inoperable; or

b.

A required system redundant to the system(s) in turn supported by the inoperable supported system is also inoperable; or

c.

A required system redundant to the support system(s) for the supported systems (a) and (b) above is also inoperable.

The SFDP. identifies where a loss of safety function exists. If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO. in which the loss of safetyfunction exists are required to be entered.

(continued)

Vogtle Units I and 2 5.5-15 Amendment No. 150 (Unit 1)

Amendment No. 130 (Unit 2)

Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.16 MS and FW Pipinq Inspection Program This program.shall provide for the inspection of the four Main Steam and Feedwater lines from th6 containment penetration flued head outboard welds, up to the first five-way restraint. The extentof the inservice examinations completed during each inspection interval (ASME Code Section XI) shall provide 100%

volumetric examination of circumferential and longitudinal welds to the extent practical. This augmented inservice inspection is consistent with the requirements of NRC Branch Technical Position MEB 3-1, "Postulated Break and Leakage Locations in Fluid System Piping Outside Containment," November 1975 and Section 6.6 of the FSAR.

5.5.17 Containment Leakage Rate Testinq Pro-qram A program shall be established to implement the leakage rate testing of the containment as required by 10 CFR 50.54(0) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions. This programiishall be in accordance with the guidelines contained in Regulatory Guide 1.163, "Performance-Based Containment Leak-Testing Program," dated September 1995, as modified by the following exceptions:

1.

Leakage rate testing for containment purge valves with resilient seals is performed once per 18 months in accordance with LCO 3.6:3, SR 3.6.3.6 and SR 3.0.2.

2.

Containment personnel air lock door seals will be tested prior to reestablishing containment integrity when the air lock has been used for containment entry. When -containment integrity is required and the air lock has been used for containment entry, door seals will be tested at least once per 30 days during the period that containment entry(ies) is (are) being made.

3.

The visual examination of containment concrete surfaces intended to fulfill the requirements of 10 CFR 50, Appendix J, Option B testing, will be performed in accordance With the requirements of and frequency specified by ASME Section Xl Code, Subsection IWL, except where relief or alternative has been authorized by the NRC. At the discretion of the.

licensee, the containment concrete visual examinations may be.performed during either power operation, e.g., performed concurrently with other containment inspection-related activities such as tendon testing, or during a maintenance/refueling outage.

(continued)

Vogtle Units 1 and 2 5.5'.16 Amendment No. 150 (Unit 1)

Amendment No. 130 (Unit 2)

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.17 Containment Leakage Rate Testing Program (continued)

4.

A one time exception to NEI 94-01, Rev. 0, "Industry Guidelines for Implementing Performance-Based Option of 10 CFR 50, Appendix J":

Section 9.2.3:

The next Type A test, after the March 2002 test for Unit 1 and the March 1995 test for Unit 2, shall be performed within 15 years.

The peak calculated primary containment internal pressure for the design basis loss of coolant accident, Pa, is 37 psig.

The maximum allowable containment leakage rate, La, at Pa, is 0.2% of primary containment air weight per day..

Leakage rate acceptance criteria are:

a.

Containment overall leakage rate acceptance criteria are < 1.0 La. During the first unit startup following testing in accordance with this program, the leakage rate acceptance criteria are' < 0.60 La for the combined Type B and Type C tests, and < 0.75 La for Type A tests;

b.

Air lock testing acceptance criteria are:

.1)

Overall air lock leakage rate is _< 0.05 La when tested at _ P,,

2)

For each door, the leakage rate is < 0.01 La when pressurized to

>Pa.

The provisions of SR 3.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.

The provisions of SR 3.0.3 are applicable to the Containment Leakage Rate Testing Program.

5.5.18 Configuration Risk Management Program The Configuration Risk Management Program (CRMP) provides a proceduralized risk-informed assessment to manage the risk associated with equipment inoperability. The program applies to technical specification structures, systems, or components for which a risk-informed allowed outage time has been granted. The program shall include the following elements:

(continued)

Vogtle Units 1 and 2 5.5-17 Amendment No. 150 (Unit 1)

Amendment No. 130 (Unit 2)

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.18 Configuration Risk Management Program (continued)

a.

Provisions for the control and implementation of a Level 1 at power internal events PRA-informed methodology. The assessment shall be capable of evaluating the applicable plant configuration.

b.

Provisions for performing an assessment prior to entering the LCO Condition for preplanned activities.

c.

Provisions for performing'an assessment after entering the LCO Condition for unplanned entry into the LCO Condition.

d.

Provisions for assessing the need for additional actions after the discovery of additional equipment out of service conditions while in the LCO Condition.

e.

Provisions for considering other applicable risk significant contributors such as Level 2 issues and external events, qualitatively or quantitatively.

Battery Monitoring and Maintenance Program This program provides for restoration and maintenance, based on the recommendations of IEEE Standard 450-1995, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications," of the following:

a.

Actions to restore battery cells with float voltage < 2.13 V, and b

Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the, plates.

5.5.19 Vogtle Units 1 and 2 5.5-18 Amendment No. 150 (Unit 1)

Amendment No. 130 (Unit 2)

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.9 Deleted.

5.6.10 Steam Generator. Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with.the Specification 5.5.9, Steam Generator (SG) Program. The report shall include:

a.

The scope of inspections performed on each SG,

b.

Active degradation mechanisms found,

c.

Nondestructive examination techniques utilized for each degradation mechanism,

d.

Location, orientation (if linear), and measured sizes (if available) of service induced indications,

e.

Number of tubes plugged during the inspection outage for each active degradation mechanism,

f.

Total number and percentage of tubes plugged to date,

g.

The results of condition monitoring, including the results of tube pulls and in-situ testing,

h.

Following completion of a Unit 1 inspection performed in Refueling Outage 14 (and any inspections performed in the subsequent operating cycle), the number of indications and location, size, orientation, whether initiated on primary or secondary side for each service-induced flaw within the thickness of the tubesheet, and the total of the circumferential components and any circumferential overlap below 17 inches from the top of the tubesheet as determined in accordance with TS 5.5.9.c.3;

i.

Following completion of a Unit 1 inspection performed in Refueling Outage 14 (and any inspections performed in the subsequent operating cycle), the primary to secondary LEAKAGE rate observed in each SG (if it is not practical to assign leakage to an individual SG, the entire primary to secondary LEAKAGE should be conservatively assumed to be from one SG) during the cycle preceding the inspection which is the subject of the report; and

j.

Following completion of a Unit 1 inspection performed in Refueling Outage 14 (and any inspections performed in the subsequent operating cycle), the calculated accident leakage rate from the portion of the tube below 17 inches from the top of the tubesheet for the most limiting accident in the most limiting SG.

Vogtle Units 1 and 2 5.6-6 Amendment No. 150 (Unit 1)

Amendment No. 130 (Unit 2)