Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0807303392008-01-31031 January 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number 2007-09 Project stage: Request ML0804607072008-02-13013 February 2008 Units 1 & 2 and Oconee Independent Spent Fuel Storage Instillation, and William States Lee III Nuclear Station - Organizational Changes, Effective February 17, 2008 Project stage: Request ML0806503202008-03-0505 March 2008 3/18/2008 - Forthcoming Meeting with Duke Power Company LLC, Oconee, Units 1, 2, and 3 to Discuss the January 31, 2008 License Amendment Request for Digital Upgrade to the Reactor Protective System and Engineered Safeguards Protective Syste Project stage: Meeting ML0808400402008-03-18018 March 2008 Duke Handout from 03/18/08 Meeting Project stage: Request ML0808400382008-03-18018 March 2008 Draft NRC Handout from 03/18/2008 Meeting Project stage: Request ML0808400442008-03-20020 March 2008 Corrected NRC Handout from 03/18/2008 Meeting, Draft Project stage: Request ML0808801512008-04-0202 April 2008 Summary of March 18, 2008 Meeting to Discuss the January 31, 2008, License Amendment Request (LAR) for a Digital Upgrade to Oconee Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) Project stage: Meeting ML0809900862008-04-0303 April 2008 Schedule for Providing Information Requested During March 18, 2008, Duke/Nrc Meeting Associated with the License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Meeting ML0809900512008-04-0303 April 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 1 Project stage: Supplement ML0808605472008-04-10010 April 2008 /2/3, Call Summary to Discuss the Availability of Documents Related to the January 31, 2008 License Amendment Request Project stage: Other ML0810705212008-04-24024 April 2008 Acceptance Review of January 31, 2008, License Amendment Request for a Upgrade to the Reactor Protective System and Engineered Safeguards Protective System Project stage: Acceptance Review ML0812601672008-04-29029 April 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 2 Project stage: Supplement ML0812702222008-04-29029 April 2008 Rps/Esps Digital LAR, Oconee Nuclear Station, Non-Proprietary Material Project stage: Request ML0814300032008-05-15015 May 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 3 Project stage: Supplement ML0810601562008-05-27027 May 2008 Areva Np Incorp. Request for Withholding Information from Public Disclosure for Oconee, Units 1,2, & 3 Project stage: Withholding Request Acceptance ML0815501452008-05-28028 May 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 4 Project stage: Supplement ML0815603312008-06-16016 June 2008 Summary of Closed Meeting to Discuss Two Issues Related to the Oconee, Units 1, 2, and 3, January 31, 2008, License Amendment Request (LAR) Project stage: Meeting ML0819001972008-07-23023 July 2008 /2/3, Trip Report for NRC Staff Visit to Discuss Issues Identified in the Acceptance Review Letter Regarding the Digital Upgrade of the Reactor Protective System and Esps (TAC MD7999-MD8001) Project stage: Acceptance Review ML0823306182008-08-28028 August 2008 Nonproprietary Version- Oconee Nuclear Station, Units 1, 2, Request for Additional Information Digital Upgrade of Reactor Protective System and Engineered Safeguards Protective System Project stage: RAI ML0827504992008-09-30030 September 2008 Third Ten Year Inservice Inspection Interval Request for Relief No. 04-ON-009, Revision 1, Request for Additional Information Response Project stage: Request ML0826310132008-10-10010 October 2008 Summary of Meeting to Discuss August 20, 2008, Request for Additional Information Pertaining the Digital Upgrade to the Oconee Reactor Protective System and Engineered Safeguards Protective System (TAC Nos. MD7999, MD80000, and MD8001) Project stage: RAI ML0830804532008-11-12012 November 2008 Trip Report for U.S. Nuclear Commission (NRC) Staffs Oconee Nuclear Station, Units 1, 2, and 3 (Oconee) - Thread Audit at Areva for Digital Upgrade of the Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) Project stage: Other ML0832602582008-11-24024 November 2008 FRN: Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing Project stage: Other ML0832603052008-11-24024 November 2008 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing Project stage: Other ML0906205812009-02-27027 February 2009 Fitness-For- Duty Program Performance Data Reports for July 1, 2008 Through December 31, 2008 Project stage: Request ML0907001202009-03-0606 March 2009 Supplemental Response to Request for Additional Information for License Amendment, Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change No. 2007-09, Supplement 14 Project stage: Supplement ML0906202452009-03-11011 March 2009 Request for Additional Information (RAI) Regarding License Amendment Request (LAR) to Change Technical Specifications as Well as Cyber Security Features Related to Replacement of Current Analog Reactor Project stage: RAI ML0910006592009-04-0303 April 2009 Response to Supplemental Request for Additional Information Associated with Cyber Security Features of Reactor Protective System and Engineered Safeguards Protective System Digital Upgrade Project stage: Supplement ML0917704362009-06-19019 June 2009 Suppl. Request for Additional Information for License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Suppl. 17 Project stage: Request ML0918300102009-07-13013 July 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0923205502009-08-10010 August 2009 Supplemental Request for Additional Information for License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number Project stage: Supplement ML0920801012009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade - Supplement 6 Project stage: Withholding Request Acceptance ML0921706842009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective Systems/ Engineered Safeguards Protective System Digital Upgrade (Tac Nos. MD7999, MD8000, and MD8001) - s Project stage: Withholding Request Acceptance ML0921806152009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000, and 8001) - Suppl Project stage: Withholding Request Acceptance ML0921807362009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000, and MD8001) - Sup Project stage: Withholding Request Acceptance ML0920800742009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0926700632009-10-0909 October 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000 and MD8001 Project stage: Withholding Request Acceptance ML0926701302009-10-0909 October 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0926701022009-10-0909 October 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0929600422009-10-23023 October 2009 Decontrolled Version of Transmittal Letter for Draft Safety Evaluation for Acceptance of the Reactor Protective System and Engineered Safeguard Protective System (Rps/Esps) Digital Upgrades Project stage: Draft Approval ML0924504412009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0924504572009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 16-3), Project stage: Withholding Request Acceptance ML0924504912009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 17), Project stage: Withholding Request Acceptance ML0924505432009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 12), TAC Nos. MD7999, MD8000, and MD8001 Project stage: Withholding Request Acceptance ML0924504122009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 16-1), Project stage: Withholding Request Acceptance ML0924503862009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 15-2), Project stage: Withholding Request Acceptance ML0924502332009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0924503252009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0930704632009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0930707182009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance 2008-05-28
[Table View] |
Text
April 2, 2008 LICENSEE:
DUKE POWER COMPANY LLC (DUKE)
FACILITY:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)
SUBJECT:
SUMMARY
OF MARCH 18, 2008, MEETING TO DISCUSS THE JANUARY 31, 2008, LICENSE AMENDMENT REQUEST (LAR) FOR A DIGITAL UPGRADE TO OCONEE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS. MD7999, MD8000, AND MD8001)
On March 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) met with Duke (the licensee) to discuss the January 31, 2008, LAR for a digital upgrade to the Oconee RPS/ESPS.
Enclosed is a list of the attendees. The handout provided by the licensee during the meeting is available in the Agencywide Documents Access and Management System (ADAMS) under accession number ML080840040. The handout provided by the NRC is available under ADAMS accession number ML080840038. During the meeting, it was discovered that the NRC handout contained several typographical errors. The corrected version of the NRC handout is available under ADAMS accession number ML080840044.
The NRC staff stated that this LAR represents the most extensive use of digital systems on an operating plant in the U.S. and is one of the most significant licensing actions currently under NRC review. The NRC staff stated that the licensee has provided sufficient technical information in both scope and depth to accept the LAR for a detailed technical review.
However, in its handout, the NRC staff identified 6 items that present significant challenges to completing a comprehensive review of the LAR so that the NRC staff can make an independent assessment regarding the acceptability of the LAR in terms of regulatory requirements and the protection of the health and safety of the public.
The NRC staff requested that the licensee provide a schedule by April 1, 2008, for submitting the additional information specified in items 2 through 6 of the NRC handout. The NRC staff stated that no additional information is needed at this time on item 1, but that the NRC staff will be reviewing the defense-in-depth and diversity (D3) analysis in accordance with the Interim Staff Guidance on D3.
The NRC staff stated that, based on timely responses to the information requested in items 2 through 6 and all additional requests for additional information, the safety evaluation of the LAR is scheduled to be completed by June 30, 2009, with the issuance of the amendments probably 1 to 2 months later.
Duke The licensee stated that it intends to implement the digital upgrade to RPS/ESPS on Unit 1 during the refueling outage scheduled to begin in December 2009. In order to accomplish this, the licensee requested that the NRC staff issue the amendments by March 31, 2009. The NRC staff stated, that by March 31, 2009, it would have a good indication as to whether the LAR would be found acceptable or not acceptable, but that it was unlikely that the amendments would be issued by March 31, 2009. Both the NRC staff and the licensee stated that they will re-examine their schedules and have further discussions on these schedules.
/RA/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
List of Attendees cc w/encl: See next page
Duke The licensee stated that it intends to implement the digital upgrade to RPS/ESPS on Unit 1 during the refueling outage scheduled to begin in December 2009. In order to accomplish this, the licensee requested that the NRC staff issue the amendments by March 31, 2009. The NRC staff stated, that by March 31, 2009, it would have a good indication as to whether the LAR would be found acceptable or not acceptable, but that it was unlikely that the amendments would be issued by March 31, 2009. Both the NRC staff and the licensee stated that they will re-examine their schedules and have further discussions on these schedules.
/RA/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
List of Attendees cc w/encl: See next page Distribution:
PUBLIC S.Arndt, NRR LPL2-1 R/F J. Sharkey, NR RidsNrrDorlLpl2-1 (MWong)
P. Loeser, NRR RidsNrrLAMOBrien (hard copy)
RidsNrrPMMChernoff RidsNrrPMLOlshan (hard copy)
S. Bailey, NRR RidsOgcRp M.Cox, EDO, Rgn II RidsAcrsAcnw&mMailCenter RidsRgn2MailCenter (KWeaver)
C. Tucci, NRR W. Kemper, NRR I. Ahmed, NRR RidsNrrDorl (TMcGinty)
P.Hiland, NRR N. Carte, NRR Accession Number: ML080880151 OFFICE NRR/LPL2-1/PM NRR/LP2-1/LA NRR/LPL2-1/BC NAME LOlshan MOBrien MWong DATE 04/02/08 04/02/08 04/02/08 OFFICIAL RECORD COPY
Enclosure MEETING ATTENDEES FROM MARCH 18, 2008, MEETING WITH DUKE POWER COMPANY LLC (DUKE)
TO DISCUSS THE JANUARY 31, 2008, LICENSE AMENDMENT REQUEST FOR A DIGITAL UPGRADE TO THE OCONEE RPS/ESPS NRC DUKE W. Kemper R. Gill I. Ahmed R. Freudenberger M. Wong M. Bailey T. McGinty T. Owusu P. Hiland B. Shingleton L. Olshan G. Davenport N. Carte D. Richardson S. Arndt B. Geddes J. Sharkey P. Loeser M. Chernoff S. Bailey OTHER R. Gardner, AREVA M. Burzynski, AREVA J. Riley, Nuclear Energy Institute G. Clefton, Nuclear Energy Institute J. Weil, McGraw-Hill S. Hanada, Mitsubishi Nuclear Energy Systems D. Raleigh, Scientech
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672 Ms. Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.
Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.
Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Mr. Leonard G. Green Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.
Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.
Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.
Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Charles Brinkman Director, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Ms. Kathryn B. Nolan Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202