Technical Specifications, Issuance of Amendment Changes to Technical Specifications to Replace Trisodium Phosphate Buffer with Sodium Tetraborate
ML080420216
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/07/2008
From:
NRC/NRR/ADRO/DORL/LPLI-1
To:
Boska J, NRR, 301-415-2901
References
TAC MD7182
Download: ML080420216 (2)


Text

/ instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

ENO pursuant to the Act and 10 CFR Parts 30, 40 and 70.,

Amdt. 42 to receive, possess, and use in amounts as required any 10-17-78 byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5)

ENO pursuant to the Act and 10 CFR Parts 30 and 70, to Amdt. 220 possess, but not separate, such byproduct and special 09-06-01 nuclear materials as may be produced by the operation of the facility.

C. This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level ENO is authorized to operate the facility at steady state Amdt. 241 reactor core power levels not in excess of 3216 10-27-04 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 253, are hereby incorporated in the license. ENO shall operate the facility in accordance with the Technical Specifications.

(3) The following conditions relate to the amendment approving the conversion to Improved Standard Technical Specifications:

1. This amendment authorizes the relocation of certain Technical Specification requirements and detailed information to licensee-controlled documents as described in Table R, "Relocated Technical Specifications from the CTS," and Table LA, "Removed Details and Less Restrictive Administrative Changes to the CTS" attached to the NRC staffs Safety Evaluation enclosed with this amendment. The relocation of requirements and detailed information shall be completed on or before the implementation of this amendment.

Amendment No. 253

Recirculation pH Control System 3.6.7 3.6 CONTAINMENT SYSTEMS 3.6.7 Recirculation pH Control System LCO 3.6.7 APPLICABILITY:

The Recirculation pH Control System shall be OPERABLE.

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Recirculation pH Control A.1 Restore Recirculation pH 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> System inoperable.

Control System to OPERABLE status.

B.

Required Action and B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND B.2 Be in MODE 5.

84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.7.1 Perform a visual inspection of the four sodium 24 months tetraborate storage baskets to verify each of the following:

a.

'Each storage basket is in place and intact; and,

b.

Collectively contain >_ 8096 pounds (160 cubic feet) of sodium tetraborate decahydrate, or equivalent.

INDIAN POINT 2 3.6.7-1 Amendment No. 253