Issue date: 02/12/2008
From: Jack Cushing
NRC/NRR/ADRO/DORL/LPLIII-1
To: Mccarthy J
Florida Power & Light Energy Point Beach
Cushing, Jack /NRR/DORL/LPL3-1, 415-1424
References
TAC MD7231
Download: ML080370062 (4)


Text

February 12, 2008 Mr. James McCarthy Site Vice President FPL EnergyPoint Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE STEAM GENERATOR TUBE INSERVICE INSPECTION REPORTS FOR REFUELING OUTAGE 30 (TAC NO. MD7231)

Dear Mr. McCarthy:

By letter dated October 25, 2007, Agencywide Documents Access and Management System (ADAMS) ADAMS Accession No. ML072990108, FPL Energy Point Beach, LLC, the licensee, submitted, in accordance with the plants technical specifications, steam generator inspection report for Point Beach Nuclear, Unit 1 for their spring 2007 (U1R30) outage.

The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided and determined that additional information is required in order to complete the evaluation.

The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on February 7, 2008, it was agreed that you would provide a response by March 14, 2008.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC=s goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-3154.

Sincerely,

/RA/

Jack Cushing, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-266

Enclosure:

Request for Additional Information cc w/encl: See next page

ML072990108, FPL Energy Point Beach, LLC, the licensee, submitted, in accordance with the plants technical specifications, steam generator inspection report for Point Beach Nuclear, Unit 1 for their spring 2007 (U1R30) outage.

The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided and determined that additional information is required in order to complete the evaluation.

The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on February 7, 2008, it was agreed that you would provide a response by March 14, 2008.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC=s goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-3154.

Sincerely,

/RA/

Jack Cushing, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-266

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION:

PUBLIC LPL3-1 R/F RidsNrrDorlLpl3-1 RidsNRRPMJCushing RidsNrrLATHarris RidsAcrsAcnw&mMailCenter RidsOgcRp RidsRgn3MailCenter RidsNrrDorlDpr RidsNrrLABTully, ADAMS Accession Number: ML080370062 OFFICE LPL3-1/PM LPL3-1/LA LPL3-1/LA LPL3-1/(A)BC NAME JCushing BTully THarris PMilano DATE 2/7/08 2/8/08 2/8/08 2/12/08

Point Beach Nuclear Plant, Units 1 and 2 cc:

Licensing Manager FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Mr. J. A. Stall Senior Vice President and Chief Nuclear Officer FPL Group P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Antonio Fernandez Senior Attorney FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Mano Nazar Senior Vice President and Nuclear Chief Operating Officer FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. R. S. Kundalkar Vice President Nuclear Technical Services FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 J. Kitsembel Electric Division Public Service Commission of Wisconsin P. O. Box 7854 Madison, WI 53707-7854 Mr. M. S. Ross Managing Attorney FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 December 2007

Enclosure REQUEST FOR ADDITIONAL INFORMATION POINT BEACH NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-266 By letter dated October 25, 2007, Agencywide Documents Access and Management Systems (ADAMS) ADAMS Accession No. (ML072990108), FPL Energy Point Beach, LLC, the licensee, in accordance with the plants technical specifications, submitted a steam generator (SG) inspection report for Point Beach Nuclear, Unit 1 for their spring 2007 (U1R30) outage.

In order for the staff to complete its review, the following additional information is requested.

1. At the time the first SG tube inspections were performed in your replacement SGs (presumably during refueling outage 12), how many effective full power months had the SGs operated? In addition, for the last several outages (e.g., since refueling outage 26),

please provide the cumulative effective full power months the SGs operated.

2. For the +PointTM examinations that started slightly above the top of the tubesheet, please discuss the basis for selecting the height from which the exams started/terminated (i.e.,

why were some tubes examined to 8 inches above the top of the tubesheet while others were only examined to 3 or 6 inches above the top of the tubesheet).

3. It was indicated that all dents and dings at tube supports and in the U-bends were inspected with a +PointTM coil. Please discuss the reporting threshold for dents and dings at these locations (e.g., 2-volts).
4. Please discuss whether the very small fine wire observed in SG B was removed from the SG. If not, discuss the basis for acceptance of leaving the wire in the SG.
5. It was indicated that visual inspections were performed at various locations on the secondary side of the SG. Please discuss the scope and results of any other secondary side inspections performed during refueling outage 30 (2007).