OFFICIAL USE ONLY - SECURITY RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION November 16, 2007 Mr. Richard L. Anderson Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
SITE SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES DRAFT TEMPORARY INSTRUCTION INSPECTION
Dear Mr. Anderson:
In a telephone conversation on November 6, 2007, Mr. R. Harter, Operations Support Manager, and Mr. N. Valos, Senior Operations Engineer, made arrangements for the NRC to inspect the site specific implementation of B.5.b Phase 2 and 3 mitigating strategies at the Duane Arnold Energy Center. The inspection is planned for the week of December 10, 2007.
In order for the NRC to adequately prepare for this inspection, please furnish the documents listed in Enclosure 2 to the NRC by the week of November 26, 2007. Additionally, to facilitate the efficient conduct for this inspection, please have available on site at the beginning of the inspection the arrangements and documents listed in Enclosure 3. Mr. R. Harter has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.
EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)
Exemption number: (b)(5)
Nuclear Regulatory Commission review required before public release.
Nicholas A. Valos, RIII, DRS, OB Name and organization of person making determination.
Date of determination: 11/02/07 Enclosures Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION OFFICIAL USE ONLY - SECURITY RELATED INFORMATION R. Anderson The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.
In order for your DAEC staff to understand the scope and level of detail that will be reviewed, we are providing a draft copy of the Temporary Inspection (TI) procedure that will be used to perform this inspection. This procedure, TI-2525/171, Verification of Site Specific Implementation of B.5.B Phase 2 & 3 Mitigating Strategies, Rev. A, attached as Enclosure 1, contains Sensitive Unclassified Non-Safeguards Information.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Nicholas Valos at 630-829-9761, or me at 630-829-9707.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 Nonpublic
Enclosures:
- 1.
Temporary Inspection 2515/171
- 2.
Documentation Requested Prior to the Inspection
- 3.
Arrangements/Documents Requested to Be Available Onsite during the Inspection Week DISTRIBUTION See next page Enclosures Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION OFFICIAL USE ONLY - SECURITY RELATED INFORMATION R. Anderson The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.
20503-0001.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.
In order for your DAEC staff to understand the scope and level of detail that will be reviewed, we are providing a draft copy of the Temporary Inspection (TI) procedure that will be used to perform this inspection. This procedure, TI-2525/171, Verification of Site Specific Implementation of B.5.B Phase 2 & 3 Mitigating Strategies, Rev. A, attached as Enclosure 1, contains Sensitive Unclassified Non-Safeguards Information.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Nicholas Valos at 630-829-9761, or me at 630-829-9707.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 Nonpublic
Enclosures:
- 1.
Temporary Inspection 2515/171
- 2.
Documentation Requested Prior to the Inspection
- 3.
Arrangements/Documents Requested to Be Available Onsite during the Inspection Week DISTRIBUTION See next page DOCUMENT NAME: G:\\DRS\\Work in Progress\\DUA 11__07 DRS OL OUO.doc To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII HQ RIII NAME NValos:co KRiemer TReis HPeterson for HPeterson DATE 11/14/07 11/15/07 11/16/07 11/16/07 DOCUMENTATION REQUESTED PRIOR TO THE INSPECTION Enclosures Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION OFFICIAL USE ONLY - SECURITY RELATED INFORMATION Letter to Richard L. Anderson from Hironori Peterson dated November 16, 2007.
SUBJECT:
SITE SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES DRAFT TEMPORARY INSTRUCTION INSPECTION cc w/o encls:
J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs D. Blair, Manager, Plant Operations D. McGhee, State Liaison Officer Enclosures Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION OFFICIAL USE ONLY - SECURITY RELATED INFORMATION Letter to Richard L. Anderson from Hironori Peterson dated November 16, 2007.
SUBJECT:
SITE SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES DRAFT TEMPORARY INSTRUCTION INSPECTION cc w/o encls:
J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs D. Blair, Manager, Plant Operations D. McGhee, State Liaison Officer DISTRIBUTION w/o encls:
TEB DWS RidsNrrDirsIrib MAS KGO JKH3 RJO CAA1 DRPIII DRSIII PLB1 TXN Enclosures Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.