ML073240520

From kanterella
Jump to navigation Jump to search

Notice of Meeting with Duke Power Company, Oconee Units 1, 2, & 3, to Discuss Upcoming License Amendment Request for Digital Upgrade to Oconee Reactor Protective System and Engineered Safeguards Protective System
ML073240520
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/26/2007
From: Olshan L
NRC/NRR/ADRO/DORL/LPLII-1
To: Marinos E
NRC/NRR/ADRO/DORL/LPLII-1
Olshan L N, NRR/DORL, 415-1419
References
TAC MD2471, TAC MD2472, TAC MD2473
Download: ML073240520 (5)


Text

November 26, 2007 MEMORANDUM TO: Evangelos C. Marinos, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Leonard N. Olshan, Project Manager /RA/

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH DUKE POWER COMPANY LLC (DUKE), OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)

(TAC NOS. MD2471, MD2472, and MD2473)

DATE & TIME:

Wednesday, December 12, 2007 10:30 a.m. - 12 noon LOCATION:

U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11555 Rockville Pike, Room O-3B2 Rockville, Maryland PURPOSE:

To discuss the upcoming license amendment request for a digital upgrade to the Oconee reactor protective system and engineered safeguards protective system.

CATEGORY 1:

  • This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

MEETING CONTACTS:

Leonard N. Olshan, NRR John F. Stang, NRR 301-415-1419 301-415-1345 lno@nrc.gov jfs2@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002

E. Marinos PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)

NRC DUKE T. McGinty, NRR G. Davenport P. Hiland, NRR R. Gill E. Marinos, NRR B. Shingleton W. Kemper, NRR E. Burchfield I. Ahmed, NRR M. Bailey G. Singh, NRR B. Thomas L. Olshan, NRR Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

Agenda cc w/encl: See next page

E. Marinos PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)

NRC DUKE T. McGinty, NRR G. Davenport P. Hiland, NRR R. Gill E. Marinos, NRR B. Shingleton W. Kemper, NRR E. Burchfield I. Ahmed, NRR M. Bailey G. Singh, NRR B. Thomas L. Olshan, NRR Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

Agenda cc w/encl: See next page Distribution:

PUBLIC P.Hiland, NRR LPL2-1 R/F W. Kemper, NRR RidsNrrAdro I. Ahmed, NRR RidsOgcMailCenter G. Singh, NRR RidsNrrDorl (TMcGinty)

Receptionist (OWFN and TWFN) (hardcopy)

RidsNrrDorlLpl2-1(EMarinos)

RidsRgn2MailCenter (JMoorman)

RidsNrrPMLOlshan (hard copy)

RidsAcrsAcnwMailCenter RidsNrrLAMOBrien (hard copy)

RidsOpaMail T. Liu, NRR S. Campbell, EDO, Rgn II K. Clark, OPA Rgn II PMNS Accession Number: ML073240520 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME LOlshan:nc MOBrien EMarinos DATE 11/26/07 11/26/07 11/26/07 OFFICIAL RECORD COPY

Enclosure FORTHCOMING MEETING ON DECEMBER 12, 2007, WITH DUKE POWER COMPANY LLC, TO DISCUSS OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, UPCOMING LICENSE AMENDMENT REQUEST (LAR) FOR DIGITAL UPGRADE TO REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS)

AGENDA 10:30 a.m. - 10:35 a.m.

LAR format and content overview 10:35 a.m. - 10:45 a.m.

LAR status 10:45 a.m. - 10:50 a.m.

Technical document status 10:50 a.m. - 11:00 a.m.

Alternate approach to technical document docketing 11:00 a.m. - 11:15 a.m.

Conformance to Interim Staff Guidance 11:15 a.m. - 11:30 a.m.

Proposed process for requests for additional information 11:30 a.m. - 11:40 a.m.

Post-submittal review management 11:40 a.m. - 11:50 a.m.

Post-submittal licensing communications plan 11:50 a.m. - 11:55 a.m.

Coordination of review 11:55 a.m. - 12 noon Factory acceptance test update 12 noon Adjourn

Oconee Nuclear Station, Units 1, 2, and 3 cc:

Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672 Ms. Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.

Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.

Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Mr. Leonard G. Green Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.

Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.

Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.

Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Charles Brinkman Director, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Ms. Kathryn B. Nolan Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202