ML072960596

From kanterella
Jump to navigation Jump to search
Encl to 10/22/2007 T. Gatlin Ltr Quality Assurance Program Approval for Radioactive Material Packages No. 0479, Revision 7
ML072960596
Person / Time
Site: Summer, 07100479  South Carolina Electric & Gas Company icon.png
Issue date: 10/22/2007
From: David Pstrak
NRC/NMSS/SFST
To:
South Carolina Electric & Gas Co
Shared Package
ML072960591 List:
References
Download: ML072960596 (1)


Text

NRC FORM 311 (10-2006) 10 CFR 71 U.S. NUCLEAR REGULATORY COMMISSION QUALITY ASSURANCE PROGRAM APPROVAL FOR RADIOACTIVE MATERIAL PACKAGES

1. APPROVAL NUMBER 0479 REVISION NUMBER 7

Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974, as amended, and Title 10, Code of Federal Regulations, Chapter 1, Part 71, and in reliance on statements and representations heretofore made in Item 5 by the organization named in Item 2, the Quality Assurance Program identified in Item 5 is hereby approved. This approval is issued to satisfy the requirements of Section 71.101 of 10 CFR Part 71. This approval is subject to all applicable rules, regulations, and orders of the Nuclear Regulatory Commission now or hereafter in effect and to any conditions specified below.

2. NAME
3. EXPIRATION DATE South Carolina Electric and Gas Company - Virgil C. Summer Nuclear Station August 31, 2017 STREET ADDRESS P O Box 88
4. DOCKET NUMBER CITY STATE ZIP CODE 71-0479 Jenkinsville SC 29065
5. QUALITY ASSURANCE PROGRAM APPLICATION DATE(S)

June 5, 1992, June 30, 1997, July 24, 2002, and August 28, 2007

6. CONDITIONS 0B1. Activities conducted with regard to transportation packagings under applicable criteria of Appendix B to 10 CFR Part 50 authorized by this approval: procurement, maintenance, repair, and use. All other activities (i.e., design, fabrication, assembly, testing, and modification) shall be satisfied by obtaining certifications from packaging suppliers that these activities were conducted in accordance with an NRC-approved Quality Assurance Program. It shall remain the responsibility of the Quality Assurance Program holder that all transportation activities meet the requirements of 10 CFR 71.101.
2. Records shall be maintained in accordance with the provisions of 10 CFR Part 71. Specifically:
a. Records of each shipment of licensed material shall be maintained for 3 years after that shipment

[10 CFR 71.91(a)].

b. Records providing evidence of packaging quality shall be maintained for 3 years after the life of the packaging [10 CFR 71.91(d)].
c. Records describing activities affecting packaging quality shall be maintained for 3 years after this Quality Assurance Program Approval is terminated [10 CFR 71.135].
3. Planned and periodic audits of all aspects of the Quality Assurance Program shall be conducted in accordance with written procedures or checklists, by appropriately trained personnel not having direct responsibility in the areas being audited, in accordance with 10 CFR 71.137.

FOR THE U.S. NUCLEAR REGULATORY COMMISSION SIGNATURE DATE DAVID W. PSTRAK, CHIEF RULES, INSPECTIONS, AND OPERATIONS BRANCH DIVISION OF SPENT FUEL STORAGE AND TRANSPORTATION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS NRC FORM 311 (10-2006)

PRINTED ON RECYCLED PAPER