August 8, 2007
Kevin T. Walsh, Vice President
of Operations
Waterford 3
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-3093
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF NRC
INITIAL OPERATOR LICENSING EXAMINATION 05000385/2007302
Dear Mr. Walsh:
In a telephone conversation on August 1, 2007, between Messrs. Keith Vines, Senior
Operations Instructor, and Tom Stetka, NRC Chief Examiner, arrangements were made for the
administration of licensing written retake examinations at the Waterford Steam Electric Station
on November 8, 2007.
As agreed during the telephone conversation, your staff will prepare the examination based on
the guidelines in Revision 9 of NUREG-1021, Operator Licensing Examination Standards for
Power Reactors. The NRCs regional office will discuss with your staff any changes that might
be necessary before the examination is administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outline by August 29, 2007. The written examination and supporting reference materials
identified in Attachment 2 to ES-201 will be due by September 28, 2007. Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations, an authorized representative of the
facility licensee shall approve the outline and written examination before they are submitted to
the NRC for review and approval. The examination shall be complete and ready-to-use. Any
delay in receiving the required examination and reference materials, or the submittal of
inadequate or incomplete materials, may cause the examination to be rescheduled.
In order to conduct the requested written examination, it will be necessary for your staff to
provide adequate space and accommodations, and to administer the examination in
accordance with ES-402.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be
in effect while the written examination is being administered.
Waterford 3
-2-
To permit timely NRC review and evaluation, your staff should submit the preliminary reactor
operator license application (Office of Management and Budget (OMB) approval
number 3150-0090), the medical certification (OMB approval number 3150-0024), and waiver
requests (OMB approval number 3150-0090) at least 30 days before the first examination date.
If the application is not received at least 30 days before the examination date, a postponement
may be necessary. A signed application certifying that all training has been completed should
be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for
this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including
the time for reviewing instructions, gathering and maintaining the data needed, writing the
examination, and completing and reviewing the collection of information. Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to
the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202,
(3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to,
an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter
and its enclosures will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of the NRCs
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/adams/index.html.
Thank you for your cooperation in this matter. Mr. Vines has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Tom Stetka at 817-860-8247, or
myself at 817-860-8159.
Sincerely,
/RA/
Anthony T. Gody, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-382
License: NPF-38
Waterford 3
-3-
cc:
Mr. Jeff Forbes
Senior Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Ms. Kimberly S. Cook, Director
Nuclear Safety Assurance
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
Mr. Joe Kowalewski
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
Manager, Licensing
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-3093
Chairman
Louisiana Public Service Commission
P.O. Box 91154
Baton Rouge, LA 70825-1697
Richard Penrod, Senior Environmental
Scientist, State Liaison Officer
Office of Environmental Services
Northwestern State University
Russsell Hall, Room 201
Natchitoches, LA 71497
Parish President Council
St. Charles Parish
P.O. Box 302
Hahnville, LA 70057
Waterford 3
-4-
Mr. John McCann
Director, Nuclear Safety & Licensing
Entergy, Operations, Inc.
440 Hamilton Avenue
White Plains, NY 10601
Louisiana Department of Environmental
Quality Radiological Emergency Planning
and Response Division
P.O. Box 4312
Baton Rouge, LA 70821-4312
Louisiana Department of Environmental
Quality
Office of Environmental Compliance
P.O. Box 4312
Baton Rouge, LA 70821-4312
Lisa R. Hammond, Chief
Technological Hazards Branch
National Preparedness Division
FEMA Region VI
800 N. Loop 288
Denton, TX 76209
-5-
Waterford 3
-5-
Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (RJC1)
DRS Deputy Director (WBJ)
Senior Resident Inspector (GFL1)
Branch Chief, DRP/E (JAC)
Senior Project Engineer, DRP/E (GDR)
Team Leader, DRP/TSS (CJP)
RITS Coordinator (MSH3)
SUNSI Review Completed: yes __ADAMS: : Yes
G No Initials: _TFS_____
- Publicly Available G Non-Publicly Available G Sensitive
- Non-Sensitive
DOCUMENT: C:\\FileNet\\ML072210747.wpd
SOE:OB
C:OB
TFStetka
ATGody
/RA/
/RA/
08/ 9 /07
08/9/07
T=Telephone E=E-mail F=Fax