August 23, 2007 Mr. Adrian P. Heymer, Senior Director New Plant Deployment Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING TOPICAL REPORT NEI 07-02, GENERIC FSAR TEMPLATE GUIDANCE FOR MAINTENANCE RULE PROGRAM DESCRIPTION FOR PLANTS LICENSED UNDER 10 CFR PART 52, REVISION 1
Dear Mr. Heymer:
By letter dated February 2, 2007 the Nuclear Energy Institute (NEI) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review, its proposed Generic FSAR Template Guidance for Maintenance Rule Program Description, Revision 0 (ADAMS Accession Number ML070610363). In response to issuance of Regulatory Guide 1.206, Revision 0 of this Technical Report was withdrawn, and by letter dated July 2, 2007, the Nuclear Energy Institute (NEI) submitted the revised Generic FSAR Template Guidance for Maintenance Rule Program Description, Revision 1 (ADAMS Accession Number ML072140499).
The NRC staff performed an acceptance review of NEI 07-02, Revision 1, and found the material presented sufficient to begin our comprehensive review. The staff has also determined that additional information is necessary to complete this review.
On August 2, 2007, an electronic draft copy of the enclosed request for additional information (RAI) was transmitted to NEIs staff and discussed via telephone call. The NRC staff expects to issue its safety evaluation report by October 19, 2007, based on a 30 day response time for NEI on these questions. The staff estimates that this review will require approximately 160 staff hours including project management time. These review schedule milestones and estimated costs were discussed in a telephone call with NEIs staff on July 20, 2007, wherein, it was agreed that NEI would respond to the staffs RAIs in less than 30 days, barring complications.
If you have any questions or comments regarding this matter, I may be reached at (301) 415-0737, or by e-mail, mac6@nrc.gov.
Sincerely,
/RA/
Michael A. Canova, Project Manager EPR Projects Branch Division of New Reactor Licensing Office of New Reactors Project No. 689
Enclosure:
RAI Questions
cc w/encl: See Next page
Mr. Adrian P. Heymer, Senior Director New Plant Deployment Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING TOPICAL REPORT NEI 07-02, GENERIC FSAR TEMPLATE GUIDANCE FOR MAINTENANCE RULE PROGRAM DESCRIPTION FOR PLANTS LICENSED UNDER 10 CFR PART 52, REVISION 1
Dear Mr. Heymer:
By letter dated February 2, 2007 the Nuclear Energy Institute (NEI) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review, its proposed Generic FSAR Template Guidance for Maintenance Rule Program Description, Revision 0 (ADAMS Accession Number ML070610363). In response to issuance of Regulatory Guide 1.206, Revision 0 of this Technical Report was withdrawn, and by letter dated July 2, 2007, the Nuclear Energy Institute (NEI) submitted the revised Generic FSAR Template Guidance for Maintenance Rule Program Description, Revision 1 (ADAMS Accession Number ML072140499).
The NRC staff performed an acceptance review of NEI 07-02, Revision 1, and found the material presented sufficient to begin our comprehensive review. The staff has also determined that additional information is necessary to complete this review.
On August 2, 2007, an electronic draft copy of the enclosed request for additional information (RAI) was transmitted to NEIs staff and discussed via telephone call. The NRC staff expects to issue its safety evaluation report by October 19, 2007, based on a 30 day response time for NEI on these questions. The staff estimates that this review will require approximately 160 staff hours including project management time. These review schedule milestones and estimated costs were discussed in a telephone call with NEIs staff on July 20, 2007, wherein, it was agreed that NEI would respond to the staffs RAIs in less than 30 days, barring complications.
If you have any questions or comments regarding this matter, I may be reached at (301) 415-0737, or by e-mail, mac6@nrc.gov.
Sincerely,
/RA/
Michael A. Canova, Project Manager EPR Projects Branch Division of New Reactor Licensing Office of New Reactors Project No. 689
Enclosure:
RAI Questions cc w/encl: See Next page Distribution:
PUBLIC MCanova RidsNroDnrlNwe1 PCoates RidsNroDnrlSpla GGulla RidsOgcMailCenter ADAMS ACCESSION NO.: ML072150417 NRR-088 OFFICE DNRL/NARP: PM DNRL/NARP: LA DSRA/SPLA:BC OGC DNRL/NWE1:BC NAME MCanova PCoates LMrowca SCoffin DATE 08/ 13 /07 08/ 13 /07 08/ 15 /07 08/ 23 /07 08/ 23 /07 OFFICIAL RECORD COPY
NEI New Reactors Mailing List List #35 cc:
Ms. Michele Boyd Mr. Ed Wallace Legislative Director General Manager Energy Program Projects Public Citizens Critical Mass Energy PBMR Pty LTD and Environmental Program P.O. Box 9396 215 Pennsylvania Avenue, SE Centurion 0046 Washington, DC 20003 Republic of South Africa Mr. Marvin Fertel Edward G. Wallace Senior Vice President Sr. General Manager and Chief Nuclear Officer U.S. Programs Nuclear Energy Institute PBMR Pty. Ltd.
1776 I Street, NW PO Box 16789 Suite 400 Chattanooga, TN 37416 Washington, DC 20006-3708 Mr. Gary Wright Ms. Leslie Compton Kass Director Senior Project Manager Division of Nuclear Facility Safety Nuclear Energy Institute Illinois Emergency Management Agency 1776 I Street, N.W.
1035 Outer Park Drive Suite 400 Springfield, IL 62704 Washington, DC 20006-3708 Dr. Gail H. Marcus U.S. Department of Energy Room 5A-143 1000 Independence Avenue, SW Washington, DC 20585 Mr. Brian Smith Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006
NEI New Reactors Mailing List Email APH@NEI.org (Adrian Heymer) awc@nei.org (Anne W. Cottingham) bennettS2@bv.com (Steve A. Bennett)
BrinkmCB@westinghouse.com (Charles Brinkman) chris.maslak@ge.com (Chris Maslak) cwaltman@roe.com (C. Waltman) david.lewis@pillsburylaw.com (David Lewis) dlochbaum@UCSUSA.org (David Lochbaum) frankq@hursttech.com (Frank Quinn) greshaja@westinghouse.com (James Gresham) jgutierrez@morganlewis.com (Jay M. Gutierrez) jim.riccio@wdc.greenpeace.org (James Riccio)
JJNesrsta@cpsenergy.com (James J. Nesrsta) john.o'neil@pillsburylaw.com (John O'Neil)
Joseph.savage@ge.com (Joseph Savage)
Joseph_Hegner@dom.com (Joseph Hegner)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) lynchs@gao.gov (Sarah Lynch - Meeting Notices Only) maria.webb@pillsburylaw.com (Maria Webb) mark.beaumont@wsms.com (Mark Beaumont) matias.travieso-diaz@pillsburylaw.com (Matias Travieso-Diaz) media@nei.org (Scott Peterson) mike_moran@fpl.com (Mike Moran) nirsnet@nirs.org (Michael Mariotte) patriciaL.campbell@ge.com (Patricia L. Campbell) paul.gaukler@pillsburylaw.com (Paul Gaukler)
Paul@beyondnuclear.org (Paul Gunter) phinnen@entergy.com (Paul Hinnenkamp) pshastings@duke-energy.com (Peter Hastings)
RJB@NEI.org (Russell Bell)
RKTemple@cpsenergy.com (R.K. Temple) roberta.swain@ge.com (Roberta Swain) ronald.hagen@eia.doe.gov (Ronald Hagen) sandra.sloan@areva.com (Sandra Sloan) sfrantz@morganlewis.com (Stephen P. Frantz) waraksre@westinghouse.com (Rosemarie E. Waraks)
C:\\FileNet\\ML072150417.wpd (Revised 7/31/07)
Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING NEI 07-02, GENERIC FSAR TEMPLATE GUIDANCE FOR MAINTENANCE RULE PROGRAM DESCRIPTION FOR PLANTS LICENSED UNDER 10 CFR PART 52, REVISION 1 (PROJECT NO. 689) 1.
A significant time gap exists from the point of time when this document may be used with a Combined Operating License (COL) until the time that an expert panel is formed.
During this period, the program will identify additional System, Structure or Component (SSC) functions that may be added or removed from the Maintenance Rule scope prior to the fuel load. One such example of SSCs that will need to be added are SSCs associated with the facility Emergency Operating Procedures (EOPs). Therefore, there should be a statement that ensures that late-identified SSCs will be addressed (as described in Section 17.X.1, Maintenance Rule Program Description.)
2.
Section 17.X.1.3 Preventive maintenance per 10 CFR 50.65(a)(2), describes how to determine which of the SSCs within the scope of the rule will be tracked in accordance with 50.65(a)(2). However, it does not cover the process for SSCs which are categorized in a Run-to-Failure status. Please explain your reasoning as to why Run to Failure considerations do not require treatment in this Topical Report.
3.
In Section 17.X.1.4, Periodic evaluation of monitoring and preventive maintenance per 10 CFR 50.65(a)(3), the bulleted section contents appear to be taken out of NUREG 0800, the Standard Review Plan (SRP) 17.6 Maintenance Rule, with the exception of Review of 50.65(a)(1) goals and 50.65(a)(2) performance criteria, condition monitoring criteria, SSC performance and condition history and effectiveness of corrective action.
Without additional information, the staff believes this should be included in this section.
4.
The first paragraph sentence of Section 17.X.3, Maintenance Rule Program Relationship With Reliability Assurance Activities, fails to include corrective maintenance as a related Maintenance Rule-related program. Either corrective maintenance should be included in the list of programs identified in this section or the broader category of simply maintenance programs should be used. Please explain your intentions if the corrective maintenance program was omitted on purpose.