July 23, 2007 Mr. Michael A. Balduzzi Sr. Vice President & COO Regional Operations, NE Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING AMENDMENT APPLICATION TO MODIFY TECHNICAL SPECIFICATIONS FOR THE DIESEL GENERATOR ENDURANCE TEST (TAC NO. MD4923)
Dear Mr. Balduzzi:
On March 22, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application for a proposed amendment for Indian Point Nuclear Generating Unit No. 2 which would revise the test acceptance criteria for the endurance test for the emergency diesel generators, Technical Specification Surveillance Requirement 3.8.1.10.
The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). In an email dated July 10, 2007, the Entergy staff indicated that a response to the RAI would be provided within 45 days of the date of this letter.
Please contact me at (301) 415-2901 if you have any questions on this issue.
Sincerely,
/RA/
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-247
Enclosure:
RAI cc w/encl: See next page
- See memo dated 6/19/07 OFFICE LPL1-1/PM LPL1-1/LA EEEB/BC LPL1-1/BC NAME JBoska SLittle GWilson*
MKowal DATE 7/23/07 7/23/07 6/19/07 7/23/07
Indian Point Nuclear Generating Unit No. 2 cc:
Mr. Michael R. Kansler President & CEO / CNO Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. Vice President Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Sr. Vice President Engineering & Technical Services Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Fred R. Dacimo Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Anthony Vitale - Acting General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway P.O. Box 249 Buchanan, NY 10511-0249 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Joseph P. DeRoy Vice President, Operations Support Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. John A. Ventosa GM, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Ernest J. Harkness Director, Oversight Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Patric W. Conroy Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. T.R. Jones - Acting Manager, Licensing Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P. O. Box 249 Buchanan, NY 10511-0249 Mr. William C. Dennis Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
Indian Point Nuclear Generating Unit No. 2 cc:
Mr. Michael Balboni Deputy Secretary for Public Safety State Capitol, Room 229 Albany, NY 12224 Mr. John P. Spath New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspectors Office Indian Point 2 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Raymond L. Albanese Four County Coordinator 200 Bradhurst Avenue Unit 4 Westchester County Hawthorne, NY 10532 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. William DiProfio PWR SRC Consultant 48 Bear Hill Road Newton, NH 03858 Mr. Garry Randolph PWR SRC Consultant 1750 Ben Franklin Drive, 7E Sarasota, FL 34236 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Phillip Musegaas Riverkeeper, Inc.
828 South Broadway Tarrytown, NY 10591 Mr. Mark Jacobs IPSEC 46 Highland Drive Garrison, NY 10524
Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING AMENDMENT APPLICATION TO MODIFY TECHNICAL SPECIFICATIONS FOR THE DIESEL GENERATOR ENDURANCE TEST ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 DOCKET NO. 50-247 By letter to the Nuclear Regulatory Commission (NRC) dated March 22, 2007, (Agencywide Documents Access Management System Accession No. ML070890307), Entergy Nuclear Operations, Inc. (the licensee) requested an amendment to the Indian Point Nuclear Generating Unit No. 2 (IP2) Technical Specifications (TS) Surveillance Requirement (SR) related to test acceptance criteria for emergency diesel generator (EDG) testing. The NRC staff is reviewing the submittal and has the following questions:
1.
Define the IP2 EDG ratings (continuous, 2000-hour, 2-hour, and 1/2-hour) and time constraints for operating at those ratings, similar to how the Indian Point Nuclear Generating Unit No. 3 (IP3) TS Bases define the ratings and time constraints for the Unit 3 EDGs (Revision 3, page B 3.8.1-4). Explain any discrepancies between the IP2 and IP3 definitions of the time constraints for operating at the load values of the ratings.
2.
Provide the basis for why there is a sequential limitation whereby it is unacceptable to operate the IP2 EDGs for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 2100 kW followed by operating at 2300 kW for 1/2-hour, and why any other combination of the IP2 EDG ratings is acceptable. Also provide the technical basis and acceptance (and its basis) from the EDG vendor for operating the EDGs for two consecutive overloading periods (30 minutes at the 30-minute rating and then 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at the 2-hour rating) without adversely affecting EDG design function capability and without requiring additional maintenance and/or inspection after the first overload period prior to operating at the second overload period.
Provide the details of the EDG maintenance that is required as a result of operating the EDGs at the short-term ratings and as described in the license amendment request.
This response needs to include the generator/excitation system capability as well as the engines capability.
3.
Provide the EDG loading calculation which establishes the KVAR, kilowatt, and power factor values, and the load profile (load values and duration of those values) until steady state loading conditions (no expected increases in loading) are reached after initiation of the worst-case design-basis event for each of the IP2 EDGs.
4.
Provide the bases that confirm the IP2 EDGs are capable of handling the worst-case load profile after considering derating of the EDGs, if any, due to EDG loading, engine coolant outlet temperature, air intake (combustion air) temperature, or other potential factors that may result in derating of the EDGs.
5.
Describe IP2's commitments to (and exceptions taken to) applicable guidance and standards regarding EDG design and testing, such as NRC Regulatory Guides and IEEE standards. Include the revision numbers of the applicable guidance documents and standards.
- 6.
Provide the applicable marked-up version of the IP2 TSs Bases pages.