NRC Physical Security Baseline Inspection Report 05000416-07-402; Preliminary Greater than Green Finding
ML071310448
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/09/2007
From: Chamberlain D
Division of Reactor Safety IV
To: Brian W
Entergy Operations
References
EA-07-084, IR-07-402
Download: ML071310448 (4)


See also: IR 05000416/2007402

Text

SAFEGUARDS INFORMATION

WARNING: Violation of Section 147 of the Atomic

Energy Act, protection requirements for "SAFEGUARDS

INFORMATION," is subject to civil and criminal penalties.

Safeguards Information determination made by:

Name/Title Kenneth Brooks/Security Inspector

Organization NRC/RIV/DRS/PSB

Basis 10 CFR 73.21

Signature /RA/ Date 5/9/2007

Document transmitted herewith contains SAFEGUARDS INFORMATION. When

separated from enclosure(s) or attachment(s), this document is decontrolled.

SAFEGUARDS INFORMATION

May 9, 2007

EA -07-084

William R. Brian, Vice President

of Operations

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, MS 39150

SUBJECT:

GRAND GULF NUCLEAR STATION - NRC PHYSICAL SECURITY BASELINE

INSPECTION REPORT 05000416/2007402; PRELIMINARY GREATER THAN

GREEN FINDING.

Dear Mr. Brian:

On March 8, 2007, the US Nuclear Regulatory Commission (NRC) completed the on-site

portion of a security baseline inspection at your Grand Gulf Nuclear Station. The inspection

covered one or more of the key attributes of the security cornerstone of the NRCs Reactor

Oversight Process. The enclosed inspection report documents the inspection results, which

were discussed on April 11, 2007, with you, and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed

personnel. In addition, the Chief, Plant Support Branch observed these activities.

This letter discusses a finding that appears to have greater than green security significance, as

described in Section 40A5 of this report. The finding was assessed based on the best available

information, including influential assumptions, using the Physical Protection Significance

Determination Process. The final resolution of this finding will convey the increment in the

importance to security by assigning the corresponding color, which may require additional

Entergy Operations, Inc.

-2-

SAFEGUARDS INFORMATION

Document transmitted herewith contains SAFEGUARDS INFORMATION. When

separated from enclosure(s) or attachment(s), this document is decontrolled.

SAFEGUARDS INFORMATION

inspection. Compensatory measures are in place while long-term corrective measures are

being implemented.

Before we make a final decision on this matter, we are providing you an opportunity to:

(1) present to the NRC your perspectives on the facts and assumptions, used by the NRC to

arrive at the finding and its significance, and explain why your corrective actions for a similar

violation concerning safeguards information documented in NRC Inspection

Report 05000416/2006006, were not sufficient to prevent a recurrence of failure to identify and

protect safeguards information, at a Regulatory Conference; or (2) submit your position on the

finding and explanation concerning the corrective actions mentioned above to the NRC in

writing. If you request a Regulatory Conference, it should be held within 30 days of the receipt

of this letter and we encourage you to submit supporting documentation at least one week prior

to the conference in an effort to make the conference more efficient and effective. If a

Regulatory Conference is held, it will be closed to public observation due to the discussion of

security related information. If you decide to submit only a written response, such submittal

should be sent to the NRC within 30 days of the receipt of this letter.

Please contact Michael P. Shannon, Chief, Plant Support Branch, Division of Reactor Safety, at

817-860-8215 within 10 business days of the date of receipt of this letter to notify the NRC of

your intentions. If we have not heard from you within 10 days, we will continue with our

significance determination and enforcement decision and you will be advised by separate

correspondence of the results of our deliberations on this matter.

Since the NRC has not made a final determination in this matter, no Notice of Violation is being

issued for the inspection finding at this time. In addition, please be advised that the number

and characterization of the apparent violation described in the enclosed inspection report may

change as a result of further NRC review.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public document Room or from the

Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS

is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room). However, because of the security-related concerns contained in the

enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be

available for public inspection.

Entergy Operations, Inc.

-3-

SAFEGUARDS INFORMATION

Document transmitted herewith contains SAFEGUARDS INFORMATION. When

separated from enclosure(s) or attachment(s), this document is decontrolled.

SAFEGUARDS INFORMATION

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for

your response, if any. This practice will ensure that your response will not be made available

electronically for public inspection in the NRC Public Document Room or from the NRCs

document system ADAMS. If Safeguards Information is necessary to provide an acceptable

response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark

your entire response Security Related Information - Withhold under 10 CFR 2.390" and follow

the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Dwight D. Chamberlain, Director

Division of Reactor Safety

Docket No.: 50-416

License No.: NPF-29

Nonpublic Enclosure:

Inspection Report 05000416/2007402

w/attachment: Supplemental Information

cc w/o enclosure:

Executive Vice President

and Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

General Manager, Plant Operations

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, MS 39150

Entergy Operations, Inc.

-4-

SAFEGUARDS INFORMATION

Document transmitted herewith contains SAFEGUARDS INFORMATION. When

separated from enclosure(s) or attachment(s), this document is decontrolled.

SAFEGUARDS INFORMATION

Director

Nuclear Safety & Licensing

Entergy Operations, Inc.

1340 Echelon Parkway

Jackson, MS 39213-8298

Director, Nuclear Safety Assurance

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, MS 39150