Inspection / Activity Plan 03/01/2007 - 09/30/2008
ML070600135
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/01/2007
From:
NRC/RGN-II/DRP/RPB3
To:
Shared Package
ML070600127 List:
References
IR-07-001
Download: ML070600135 (2)


Text

Saint Lucie Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2007 07:51:05 Report 22 3

EB1-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 02/26/2007 03/02/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 02/26/2007 03/02/2007 1, 2 7111117B IP Permanent Plant Modifications 2

60853

- ISFSI CONSTRUCTION Other Routine 03/19/2007 03/23/2007 1

60854 IP Preoperational Testing Of An ISFSI 1

EB3-ISI

- U1 INSERVICE INSPECTION Baseline Inspections 04/09/2007 04/13/2007 1

7111108P IP Inservice Inspection Activities - PWR 1

PSB1-RP

- RP OCCUPATIONAL BASELINE INSPECTION Baseline Inspections 04/09/2007 04/13/2007 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/09/2007 04/13/2007 1

7112102 IP ALARA Planning and Controls 2

EB3SGISI

- U1 STEAM GENERATOR ISI Baseline Inspections 04/16/2007 04/20/2007 1

7111108P IP Inservice Inspection Activities - PWR 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)

Safety Issues 04/23/2007 04/27/2007 1, 2 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

7 EB1-CDBI

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 08/13/2007 08/17/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 08/27/2007 08/31/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 09/24/2007 09/28/2007 1, 2 7111121 IP Component Design Bases Inspection 3

OL RQ

- LICENSED OPERATOR REQUAL INSPECTION Baseline Inspections 08/27/2007 08/31/2007 1, 2 7111111B IP Licensed Operator Requalification Program 1

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 09/03/2007 09/05/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1

EB3-ISI

- U2 INSERVICE INSPECTION Baseline Inspections 10/22/2007 10/26/2007 2

7111108P IP Inservice Inspection Activities - PWR 2

PSB1-RP

- RP OCCUPATIONAL BASLINE INSP WK 1 Baseline Inspections 10/22/2007 10/26/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/22/2007 10/26/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 10/22/2007 10/26/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/22/2007 10/26/2007 1, 2 71151 IP Performance Indicator Verification 7

EB3SGRP

- STEAM GENERATOR REPLACEMENT Other Routine 10/29/2007 11/02/2007 2

50001 IP Steam Generator Replacement Inspection Other Routine 11/26/2007 11/30/2007 2

50001 IP Steam Generator Replacement Inspection Other Routine 12/17/2007 12/21/2007 2

50001 IP Steam Generator Replacement Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Saint Lucie Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2007 07:51:05 Report 22 1

EB3HEAD

- REACTOR HEAD REPLACEMENT Other Routine 11/05/2007 11/09/2007 2

71007 IP Reactor Vessel Head Replacement Inspection 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WK 2 Baseline Inspections 11/12/2007 11/16/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/12/2007 11/16/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 11/12/2007 11/16/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 11/12/2007 11/16/2007 1, 2 71151 IP Performance Indicator Verification 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Safety Issues 12/17/2007 12/21/2007 2

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

2 PSB1-EP

- EP EXERCISE Baseline Inspections 02/18/2008 02/22/2008 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 02/18/2008 02/22/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/18/2008 02/22/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 02/18/2008 02/22/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 02/18/2008 02/22/2008 1, 2 71151-EP03 IP Alert & Notification System 2

OL PREP

- INITIAL EXAM PREP Not Applicable 06/30/2008 07/03/2008 1

V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM Not Applicable 07/21/2008 08/01/2008 1

V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 1

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 08/11/2008 08/15/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 4

PSB1-RP

- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 09/08/2008 09/12/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/08/2008 09/12/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 09/08/2008 09/12/2008 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 09/08/2008 09/12/2008 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 09/08/2008 09/12/2008 1, 2 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 09/08/2008 09/12/2008 1, 2 71151-PR01 IP RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.