Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 December 20, 2006 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter
)Docket No. 50-328 Tennessee Valley Authority SE~QUOYAH NUCLEAR PLANT (SQN) -UNIT 2 STEAM GENERATOR (SG)
TUBE PLUGGING REPORT -
SG TUBE INSPECTIONS DURING UNIT 2 CYCLE 14 REFUELING OUTAGE A summary report of SG tube plugging during the Unit 2 Cycle 14 refueling outage, as required by SQN Technical Specification (TS) 4.4.5.5.a, is being provided in the enclosure.
The inservice inspection of the Unit 2 SG tubes was completed on December 17, 2006.
Please direct any questions concerning this issue to me at (423) 843-7170.
Sincerely, Glenn W. Morris Manager, Site Licensing and Industry Affairs Enclosure Printed on recycled paper
ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 2 CYCLE 14 (U2C14) REFUELING OUTAGE STEAM GENERATOR TUBE PLUGGING REPORT NUMBER OF TUBES PLUGGED FROM THE U2C13 INSPECTIONS BY STEAM GENERATOR Steam Generator No. 1:
8 Steam Generator No. 2:
11 Steam Generator No. 3:
15 Steam Generator No. 4:
12 Total Number of Tubes Plugged from U2C14 Steam Generator Inspections:
46 E1-1