ML063340044
| ML063340044 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/30/2006 |
| From: | Olshan L NRC/NRR/ADRO/DORL/LPLII-1 |
| To: | Marinos E NRC/NRR/ADRO/DORL/LPLII-1 |
| Olshan L N, NRR/DLPM, 415-1419 | |
| References | |
| Download: ML063340044 (6) | |
Text
November 30, 2006 MEMORANDUM TO: Evangelos C. Marinos, Branch Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing FROM:
Leonard N. Olshan, Project Manager
/RA/
Plant Licensing Branch II-1 Division of Operating Reactor Licensing
SUBJECT:
FORTHCOMING MEETING WITH DUKE POWER COMPANY LLC DATE & TIME:
Wednesday and Thursday, December 13 and 14, 2006 Wednesday:
8:00 a.m. - 4:00 p.m.
Thursday:
8:00 a.m. - 3:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission Wednesday:
One White Flint North 11555 Rockville Pike, Room O-9B6 Thursday:
Two White Flint North 11545 Rockville Pike, Room T-CAF-S Rockville, Maryland PURPOSE:
To discuss the future license amendment request for a digital upgrade to Reactor Protective System and Engineered Safeguards Protective System (RPS/ESPS)
CATEGORY 1:
- This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Proprietary information will be discussed at certain times during this meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.
MEETING CONTACTS:
Leonard N. Olshan, NRR John F. Stang, NRR 301-415-1419 301-415-1345 lno@nrc.gov jfs2@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002 PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of Research (RES)
NRC DUKE P. Hiland (NRR)
R. Gill T. McGinty (NRR)
B. Shingleton A. Howe (NRR)
S. Richter E. Marinos (NRR)
W. Kemper (RES)
M. Waterman (NRR)
P. Rebstock (NRR)
N. Carte (NRR)
L. Olshan (NRR)
Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
Agenda cc w/encl: See next page November 30, 2006 PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of Research (RES)
NRC DUKE P. Hiland (NRR)
R. Gill T. McGinty (NRR)
B. Shingleton A. Howe (NRR)
S. Richter E. Marinos (NRR)
W. Kemper (RES)
M. Waterman (NRR)
P. Rebstock (NRR)
N. Carte (NRR)
L. Olshan (NRR)
Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
Agenda cc w/encl: See next page Distribution: See next page Accession Number: ML063340044 OFFICE LPL2-1/PM LPL2-1/LA LPL2-1/BC NAME LOlshan/nc MOBrien EMarinos DATE 11/30/2006 11/30/2006 11/30/2006 OFFICIAL RECORD COPY
SUBJECT:
FORTHCOMING MEETING WITH DUKE POWER COMPANY LLC Date: November 30, 2006 DISTRIBUTION:
PUBLIC LPL2-1 R/F RidsNrrAdro RidsNrrDorl RidsNrrDorlLpl2-1 RidsNrrPMLOlshan (hard copy)
RidsNrrLAMOBrien (hard copy)
RidsOpaMail R. Jasinski, NRR RidsNrrRgn2MailCenter S. Lee, EDO Region II K. Clark, OPA, Rgn II PMNS RidsNrrOgcMailCenter RidsNrrAcrsAcnwMailCenter Receptionist (OWFN and TWFN) (hard copies)
MEETING TO DISCUSS FUTURE LICENSE AMENDMENT REQUEST FOR A DIGITAL UPGRADE TO RPS/ESPS DECEMBER 13 AND 14, 2006 AGENDA December 13, 2006 8:00 a.m. - 8:15 a.m.
Introductions and opening remarks 8:15 a.m. - 9:15 a.m.
Project overview and status 9:15 a.m. - 12 noon Discussion of IEEE 603 compliance (Proprietary) 12 noon - 1:00 p.m.
Lunch 1:00 p.m. - 4:00 p.m.
Continue discussion of IEEE 603 compliance (Proprietary) 4:00 p.m.
Adjourn first day December 14, 2006 8:00 a.m. - 9:00 a.m.
Discussion of diverse high-pressure injection actuation system 9:00 a.m. - 12 noon Discussion of licensing plan 12 noon - 1:00 p.m.
Lunch 1:00 p.m. - 2:00 p.m.
Continue discussion of licensing plan 2:00 p.m. - 2:45 p.m.
Summary of discussion (all topics) 2:45 p.m. - 3:00 p.m.
Closing remarks 3:00 p.m.
Adjourn
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Ms. Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.
Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.
Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Mr. Leonard G. Green Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.
Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.
Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.
Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Charles Brinkman Director, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672 Ms. Kathryn B. Nolan Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202