Email: (PA) Piligrim Amp/Amr Audit Report
ML062510296
Person / Time
Site: Pilgrim
Issue date: 07/25/2006
From: Wen P
Office of Nuclear Reactor Regulation
To: Jackson M, Michael Orr
- No Known Affiliation, ATL International
References
%dam200612, TAC MD2296
Download: ML062510296 (4)


Text

I SJames Davis-Re: Pilgrim AMP/AMR Audit Report Page 1l From:

Peter Wen To:

Internet:erach @comcast.net; INTERNET:jackson @msn.com; intemet:wapavinich@comcast.net; Mark Orr Date:

07/25/2006 11:38:44 AM

Subject:

Re: Pilgrim AMP/AMR Audit Report Mark,INTERNET:jacksonwr@ msn.com We received Pilgrim's LRA Supplement and revised commitments, yesterday (Entergy Letter, dated 7/19/2006). I am forwarding the pdf file of that letter to the team members. All team members are supposed to review and incorporate the information provided in that letter before sending the revised AMR and AMP inputs to Joe and you. However, for TLAA inputs, Jim Medoff informed me that his write-up won't be ready until the second week of August, because some of his items were not included in the 07/09/06 letter, and also he need to discuss his write-up with Erach.

Since Erach has completed the first round of AMR review and also Jim Davis and he have completed the first round of AMP review, all team members (with the exception of Erach) are expected to send in their revised AMP and AMR inputs to you before August 1. Erach may send in his input to you after he returns from his vacation. To streamline the process, you and Joe may assemble the revised AMP/AMR inputs first. After you receive Jim Medoff's TLAA inputs, you may then assemble and send the completed draft audit report to the NRC for peer review. The current peer review schedule is August 14-18, 2006. The date to issue the final audit and review report is September 1, 2006.

If you have questions please call me or Jim Davis.

Peter

>> "Orr, Mark" <MPOrr@atlintl.com> 07/24/2006 11:47 AM >>>

Subject:

Audit report input for Pilgrim License Renewal AMP/AMR audit under Delivery No. DR-03-06-030 of GSA Contract S-10F-0092J - Titled

According to the schedule in Appendix B of the audit review plan, ATL is to deliver the initial draft of the AMP/AMR audit report to the NRC for your review on or before August 4, 2006. This date was based on ATL receiving all AMR sections from the audit team by today -July 24, 2006.

This would allow ATL approximately 2 weeks to assemble and do a complete technical edit of the draft report.

Currently ATL has only Section 3.2 "Aging Management of Engineered Safety Features" which was prepared by Wayne Pavinich, reviewed by Erach Patel, then revised by Wayne. This section is being incorporated into the audit report.

Please check on the status of Sections 3.1, 3.3, 3.4, 3.5, and 3.6 and let me know when they will be ready for incorporation into the draft report. ATL needs to receive these sections in a timely manner to maintain the schedule.

Additionally, please check on the status of Pilgrim's revision to its

James Davis - Re:. Pilgrim AMP/AMR, Audit Report Page 2 LRA which is needed to closeout some of the open items in the report.

Thank you, Mark Orr ATL International, Inc 20010 Century Blvd., Suite 500 Germantown, MD 20874 Phone: 301-515-6794 Fax: 301-972-6904 "Confidentiality Notice: The information contained in this message is intended only for the use of the addressee, and may be ATL proprietary, confidential and/or privileged. If the reader of this message is not the intended recipient, or the employee or agent responsible to deliver it to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately."

CC:

Dan Hoang; Duc Nguyen; James Davis; James Medoff; Joe Zabel; Kenneth Chang

[--cýt-e-m-'p--\\GW)0000-1-.f M -P-- - I-M..P a g e 1 Mail Envelope Properties (44C63AFE.81E: 20 : 35164)

Subject:

Creation Date From:

Created By:

Re: Pilgrim AMP/AMR Audit Report 07/25/2006 11:38:38 AM Peter Wen PXW@nrc.gov Recipients comcast.net erach (Intemet:erach @comcast.net) wapavinich (intemet:wapavinich @comcast.net) msn.com jackson (INTERNET:jackson @msn.com) atlintl.com JZabel CC (Joe Zabel)

MPOrr (Mark Orr) nrc.gov OWGWPO03.HQGWDO01 JAD CC (James Davis)

KXC2 CC (Kenneth Chang) nrc.gov OWGWPOO4.HQGWDOO1 DVH CC (Dan Hoang) nrc.gov TWGWPOO1.HQGWDO01 DTN1 CC (Duc Nguyen)

JXM CC (James Medoff)

Post Office comcast.net msn.com Route Intemet INTERNET atlintl.com nrc.gov nrc.gov nrc.gov OWGWPOO3.HQGWDOO1 OWGWPO04.HQGWDO01 TWGWPO01.HQGWDO01 Files MESSAGE Size 5153 Date & Time 07125/2006 11:38:38 AM

I c,\\temp\\GW)00001.TMP Page-2-1 c:\\temp\\GW}OO0O1.TMP Page2~

LRA Supplement July 19 2006 LTR.pdf 2988827 07/25/2006 9:38:12 AM Options Expiration Date:

None Priority:

Standard ReplyRequested:

No Return Notification:

None Concealed

Subject:

No Security:

Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled